CN104060622B - Steel drum Yield rainfall relation method is cheated in a kind of hole - Google Patents
Steel drum Yield rainfall relation method is cheated in a kind of hole Download PDFInfo
- Publication number
- CN104060622B CN104060622B CN201410332828.7A CN201410332828A CN104060622B CN 104060622 B CN104060622 B CN 104060622B CN 201410332828 A CN201410332828 A CN 201410332828A CN 104060622 B CN104060622 B CN 104060622B
- Authority
- CN
- China
- Prior art keywords
- steel drum
- hole
- stone
- water
- raft plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
Steel drum Yield rainfall relation method is cheated in a kind of hole, adopt the steel drum of column type, steel drum (1) bottom opening of column type also installs gate valve (2) in aperture, steel drum (1) outer wall surface welding seal ring (4), steel drum is put into the hole of filling in a centimeter stone (8), then fill up surrounding bottom steel drum with centimetre stone; In french drain, insert dog head stone (6), then enter steel drum in the water of other leakage points introducing hole by aperture by french drain; Inside steel drum, put into water pump (3) draw water, the present invention can keep whole raft plate construction stage steel drum at precipitation, whole foundation ditch is made to be in anhydrous Construction State, to waterproof construction and other operations advantageous particularly, raft plate can not be caused because of underground water to leak the phenomenons such as cracking, while ensure that raft plate concrete placings quality, also allow Yield rainfall relation work become easily and effectively.
Description
Technical field
The present invention relates to the water seal for deep foundation pit of building trade, cheat steel drum Yield rainfall relation method in a kind of hole specifically.
Background technology
Carry out the engineering, particularly deep-foundation pit engineering of constructing than more rich place at underground water, underground water yield is comparatively large, must take corresponding measures of preventing water to ensure carrying out smoothly of construction in construction.
The method of water seal for deep foundation pit has usually: water-stop curtain, well-points dewatering and gutter; But there is duration longer, complicated operation and the deficiency such as cost is higher, water-stop curtain can become very poor to the stagnant water effect at construction layer being gravel layer or almost not have effect.
Summary of the invention
The object of the invention is to for above-mentioned deficiency of the prior art, provide in a kind of hole and cheat steel drum Yield rainfall relation method.The present invention can keep whole raft plate construction stage steel drum at precipitation, whole foundation ditch is made to be in anhydrous Construction State, to waterproof construction and other operations advantageous particularly, raft plate can not be caused because of underground water to leak the phenomenons such as cracking, while ensure that raft plate concrete placings quality, also allow Yield rainfall relation work become easily and effectively.
The present invention adopts following technical scheme to be achieved:
Cheat steel drum Yield rainfall relation method in a kind of hole, its step is as follows:
A. column type steel drum (1) bottom opening and aperture install gate valve (2), steel drum (1) outer wall surface welding seal ring (4);
B., in the construction of raft plate, dig the hole of dark 800mm at the place of leaking, and fill out the thick centimetre stone (8) of 100mm in the bottom in hole;
C. steel drum (1) is put into the hole of filling in a centimeter stone (8), then use a centimeter stone (8) to fill up steel drum (1) bottom surrounding;
D. in french drain, insert dog head stone (6), and cover with plastic sheeting (7), then enter steel drum (1) in the water of other leakage points introducing hole by aperture by french drain;
E. put into water pump (3) in steel drum (1) the inside to draw water.
Described column type steel drum (1) diameter is 800mm ~ 1200mm, wall thickness is 5mm, and height is determined by built plank thickness.
Described steel drum (1) welds one seal ring (4) along the every 3000mm of short transverse.
Feature of the present invention is:
1, steel drum put into by water pump, and hole bed mud sand can not block water pump.
2, time raft plate is built, water pump does not stop pumping, and in whole work progress, underground water can not impact building of raft plate.
3, after raft plate has been built, underground water continues to extract out by the water pump in steel drum, and raft plate can not be caused because of underground water to leak.
4, after raft plate curing time terminates, the object of sealing can be reached simply by the gate valve of closing in steel drum.
Accompanying drawing explanation
Fig. 1 cheats ratio juris signal face, steel drum Yield rainfall relation side in the hole that proposes of the present invention;
Fig. 2 is the layout schematic diagram of cheating steel drum Yield rainfall relation method in hole;
Fig. 3 is the french drain sectional drawing of cheating steel drum Yield rainfall relation method in hole;
Fig. 4 is the installation sectional drawing of cheating steel drum Yield rainfall relation method in hole;
In figure: 1-steel drum, 2-gate valve, 3-water pump, 4-seal ring, 5-soil layer, 6-dog head stone, 7-plastic sheeting, 8-centimetre stone, 9-raft plate face.
Detailed description of the invention
Below in conjunction with accompanying drawing 1-4 and embodiment, the present invention is further elaborated.
Cheat steel drum Yield rainfall relation method in a kind of hole, implementation step is: the cylindrical steel drum (1) making a thick column type of diameter 800mm ~ 1200mm, 5mm, and height is determined by built plank thickness.Steel drum (1) bottom opening also installs gate valve (2), the long steel drum of every 3000mm (1) is along surrounding welding seal ring (4), in the construction of raft plate, the hole of dark 800mm is dug at the place of leaking, and it is thick to fill out 100mm with centimetre stone (8) in bottom, the water of other leakage point is incorporated in hole by french drain, again steel drum (1) is put into the hole of filling in a centimeter stone (8), then a centimeter stone (8) is used to fill up steel drum (1) bottom surrounding, insert dog head stone (6) in french drain, and cover with plastic sheeting (7).By french drain, the water of other leakage points is introduced dell to be entered by steel drum (1) bottom port, finally put into water pump (3) in steel drum (1) the inside, draw water.In whole work progress, underground water can not impact building of raft plate.
From accompanying drawing 1, cheat steel drum Yield rainfall relation method in hole, gate valve (2) is arranged on steel drum (1) bottom, and seal ring (4) is welded on steel drum (1) surrounding, and water pump (3) is put into steel drum (1) and drawn water.
From accompanying drawing 2, seal ring (4) is welded on steel drum (1) around, and gate valve (2) is arranged on steel drum (1) bottom, can adjust open amount.
From accompanying drawing 3, dog head stone (6) fills up whole french drain along soil layer (5), then uses plastic sheeting (7) to cover french drain.
From accompanying drawing 4, centimetre stone (8) is filled out at the upper 100mm of soil layer (5) thick, and steel drum (1) is placed on a centimeter stone (8), and centimetre stone (8) fills up along steel drum (1) bottom surrounding, and steel drum (1) top spills raft plate face (9) 50mm.
Claims (1)
1. cheat a steel drum Yield rainfall relation method in hole, it is characterized in that, step is as follows:
A. adopt the steel drum (1) of column type, steel drum (1) bottom opening also installs gate valve (2) in aperture, steel drum (1) outer wall surface welding seal ring (4);
B., in the construction of raft plate, dig the hole of dark 800mm at the place of leaking, and fill out the thick centimetre stone (8) of 100mm in the bottom in hole;
C. steel drum (1) is put into the hole of filling in a centimeter stone (8), then use a centimeter stone (8) to fill up steel drum (1) bottom surrounding;
D. in french drain, insert dog head stone (6), and cover with plastic sheeting (7), then enter steel drum (1) in the water of other leakage points introducing hole by aperture by french drain;
E. put into water pump (3) in steel drum (1) the inside to draw water;
Described column type steel drum (1) diameter is 800mm ~ 1200mm, wall thickness is 5mm, and height is determined by built plank thickness;
Described steel drum (1) welds one seal ring (4) along the every 3000mm of short transverse;
Described steel drum (1) is placed on a centimeter stone (8) its top upper and exposes raft plate face (9) 50mm, and centimetre stone (8) fills up along steel drum (1) bottom surrounding.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410332828.7A CN104060622B (en) | 2014-07-14 | 2014-07-14 | Steel drum Yield rainfall relation method is cheated in a kind of hole |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410332828.7A CN104060622B (en) | 2014-07-14 | 2014-07-14 | Steel drum Yield rainfall relation method is cheated in a kind of hole |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104060622A CN104060622A (en) | 2014-09-24 |
CN104060622B true CN104060622B (en) | 2016-02-10 |
Family
ID=51548536
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410332828.7A Active CN104060622B (en) | 2014-07-14 | 2014-07-14 | Steel drum Yield rainfall relation method is cheated in a kind of hole |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104060622B (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104895098A (en) * | 2015-06-24 | 2015-09-09 | 江苏省建筑科学研究院有限公司 | Piping blocking structure outside deep foundation pit underground diaphragm wall and grouting treatment method thereof |
CN105155562B (en) * | 2015-08-06 | 2017-05-31 | 河北二十冶建设有限公司 | For the construction method of deep basal pit spring sealing |
CN109723071B (en) * | 2019-02-23 | 2021-02-09 | 杭州昂创科技有限公司 | Construction method of double-layer steel drum drainage system built in basement floor post-cast strip |
CN110847199A (en) * | 2019-11-12 | 2020-02-28 | 中国二十冶集团有限公司 | Construction method for drainage of underground water of deep foundation pit |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4592846A (en) * | 1985-09-03 | 1986-06-03 | Ppg Industries, Inc. | Method and reservoir for in-ground containment of liquid waste |
CN201679008U (en) * | 2010-04-09 | 2010-12-22 | 中国三冶集团有限公司建筑安装工程公司 | Rigid water drainage device for foundation pit |
CN102296622A (en) * | 2011-05-19 | 2011-12-28 | 周昕 | Micro-pipe bundle seepage pipe for tailings |
CN103088838A (en) * | 2013-02-05 | 2013-05-08 | 中国十七冶集团有限公司 | Open caisson sealing bottom water drainage device and construction method |
CN103174154A (en) * | 2013-03-21 | 2013-06-26 | 东莞市彩丽建筑维护技术有限公司 | Underground building bottom plate water burst well pit solid seal method and auxiliary water lowering device |
CN203639943U (en) * | 2014-01-07 | 2014-06-11 | 温州东瓯建设集团有限公司 | Basement side-closed drainage pipe |
-
2014
- 2014-07-14 CN CN201410332828.7A patent/CN104060622B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4592846A (en) * | 1985-09-03 | 1986-06-03 | Ppg Industries, Inc. | Method and reservoir for in-ground containment of liquid waste |
CN201679008U (en) * | 2010-04-09 | 2010-12-22 | 中国三冶集团有限公司建筑安装工程公司 | Rigid water drainage device for foundation pit |
CN102296622A (en) * | 2011-05-19 | 2011-12-28 | 周昕 | Micro-pipe bundle seepage pipe for tailings |
CN103088838A (en) * | 2013-02-05 | 2013-05-08 | 中国十七冶集团有限公司 | Open caisson sealing bottom water drainage device and construction method |
CN103174154A (en) * | 2013-03-21 | 2013-06-26 | 东莞市彩丽建筑维护技术有限公司 | Underground building bottom plate water burst well pit solid seal method and auxiliary water lowering device |
CN203639943U (en) * | 2014-01-07 | 2014-06-11 | 温州东瓯建设集团有限公司 | Basement side-closed drainage pipe |
Also Published As
Publication number | Publication date |
---|---|
CN104060622A (en) | 2014-09-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102797266B (en) | Well sealing waterproof construction method for dewatering well | |
CN103343543B (en) | Foundation pit dewatering well pressure-reduction-type plugging method | |
CN101250879B (en) | Method for processing bottom solum trickleing water of deep building pit | |
CN204343312U (en) | A kind of plugging device of precipitation well in foundation pit | |
LU501539B1 (en) | Pumping and drainage method for foundation pit bottom plate construction of deep foundation pit and pumping and drainage structure | |
CN104060622B (en) | Steel drum Yield rainfall relation method is cheated in a kind of hole | |
CN103161172B (en) | Elevator shaft bottom precipitation construction method | |
CN202730786U (en) | Well-sealing waterproof construction structure of dewatering well | |
CN109519150B (en) | Dewatering well plugging device and method for large water yield | |
CN209339169U (en) | A kind of precipitation well in foundation pit plugging device | |
CN106522252A (en) | Seepage-proofing blocking mechanism and method for deep foundation pit raft dewatering well | |
CN113186903A (en) | Combined pile structure and construction method for treating insufficient bearing capacity of deep foundation pit construction pile by adopting combined pile structure | |
CN105484277A (en) | Component for tubular well precipitation construction in elevator foundation pit or sump and construction method | |
CN103572764A (en) | Watertight structure for retaining wall of ultra-deep manually excavated pile and construction method thereof | |
CN109723055B (en) | Underground diaphragm wall bottom reinforcing structure and construction method thereof | |
CN105178342B (en) | Precipitation well casing and method for blocking reserved hole of foundation pit through precipitation well casing | |
CN203768925U (en) | Seal device for dewatering well in foundation pit | |
CN104652495A (en) | Waterproof construction process for joint of inner support upright post of foundation pit and bottom plate | |
CN206495224U (en) | A kind of foundation pit of elevator shaft dewatering process structure | |
CN206385557U (en) | The water-impervious plugging mechanism of dewatering well on deep basal pit raft plate | |
CN205205844U (en) | Member is used in construction of tubular well precipitation in elevator foundation ditch or sump pit | |
CN202108045U (en) | Sleeve pipe with anchor rod penetrating through underground continuous wall | |
CN203939038U (en) | In a kind of hole, cheat steel drum and fall dewatering installation | |
CN104846837B (en) | The construction method of ultra-deep well in a kind of bright draining foundation ditch | |
CN111139854A (en) | Construction method for treating piping of exploration hole of foundation pit by drainage grouting method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: 650501 Yunnan Province, Kunming city Wuhua District West Road No. 22 Patentee after: Yunnan Jian Jian Fourth Construction Co., Ltd. Address before: 650032 Yunnan Province, Kunming city Wuhua District West Road No. 22 Patentee before: Fourth Construction Co., Ltd. of Yunnan Architectural Engineering Group |