CN107090840A - A kind of drainage well closing mode of pre-buried annulus - Google Patents
A kind of drainage well closing mode of pre-buried annulus Download PDFInfo
- Publication number
- CN107090840A CN107090840A CN201710283388.4A CN201710283388A CN107090840A CN 107090840 A CN107090840 A CN 107090840A CN 201710283388 A CN201710283388 A CN 201710283388A CN 107090840 A CN107090840 A CN 107090840A
- Authority
- CN
- China
- Prior art keywords
- blind plate
- drainage well
- buried
- annulus
- buried annulus
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000002689 soil Substances 0.000 claims abstract description 8
- 239000000758 substrate Substances 0.000 claims abstract description 7
- 238000010276 construction Methods 0.000 abstract description 11
- 238000001556 precipitation Methods 0.000 abstract description 7
- 238000005260 corrosion Methods 0.000 description 4
- 230000007797 corrosion Effects 0.000 description 4
- 230000000694 effects Effects 0.000 description 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 4
- 238000005266 casting Methods 0.000 description 3
- 230000001550 time effect Effects 0.000 description 3
- 229910000831 Steel Inorganic materials 0.000 description 2
- 238000009412 basement excavation Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 238000003466 welding Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000005065 mining Methods 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D19/00—Keeping dry foundation sites or other areas in the ground
- E02D19/06—Restraining of underground water
- E02D19/10—Restraining of underground water by lowering level of ground water
Abstract
A kind of drainage well closing mode of pre-buried annulus of the present invention, including blind plate, pre-buried annulus, the drainage well inwall are provided with pre-buried annulus, and the blind plate is arranged on pre-buried annulus, and the pre-buried ring is fixed on sand-free concrete tube.Drainage well outer wall is followed successively by sole plate, waterproof roll, bottom cushion, substrate original soil under upper.Blind plate and the pre-buried annulus groove full weld.Pre-buried annulus is weldingly fixed on sand-free concrete tube.Blind plate top has poured concrete.During being provided with the middle of blind plate for closing and closing after drainage well Yield rainfall relation controlled valve.Controlled valve on blind plate is closed mode.Blind plate is located at sole plate layer.A kind of drainage well closing mode of pre-buried annulus of the present invention, it is simple in construction, easy construction, with pre-buried annulus, drainage well precipitation work is carried out using blind plate special tectonic while carrying out full weld with blind plate periphery, blind plate is subjected to annulus in dry environments with reaching.
Description
Technical field
The present invention relates to drainage well closing mode field, the drainage well closing mode of more particularly to a kind of pre-buried annulus.
Background technology
With developing rapidly for China's economy, metro industry is maked rapid progress, in China 12 plans, subway progressively from
Medium-sized city is moved towards in large size city, and subway construction environment also becomes increasingly complex, and has been formed on and subway station is carried out in various stratum
Build.Before Deep Foundation Pit of Metro Stations excavation, generally, to improve soil strength in hole, subtracted come consolidated earth mass using base pit dewatering
The deflection of few bottom heave and building enclosure.
Drainage well is also a kind of dewatering well, and underground water drainage is the activities such as many underground excavation projects, strip mining transformation engineering
In the set point water level inevitably taken dredge under drop requirement condition constraint, the condition of engineering construction requirement is met, in foundation ditch
The dewatering well of interior setting.
Drainage well is prevalent in deep foundation pit precipitation construction.There is prefabricated steel sleeve and method in conventional closing drainage well way
Blue disk, can occur corrosion under the long-term corrosion function of underground water, and underground water may leak into lacking for basement along prefabricated steel sleeve
Point.
For these reasons, a kind of drainage well closing mode for preventing corrosion is invented particularly important.
The content of the invention
In order to solve the above-mentioned technical problem, the invention provides it is a kind of it is simple and reasonable, effectively prevent the pre-buried of corrosion
The drainage well closing mode of annulus.
The technical problems to be solved by the invention are achieved through the following technical solutions:
A kind of drainage well closing mode of pre-buried annulus of the present invention, including blind plate, pre-buried annulus, the drainage well inwall
Pre-buried annulus is provided with, the blind plate is arranged on pre-buried annulus, the pre-buried ring is fixed on sand-free concrete tube.
Further, the drainage well outer wall is followed successively by sole plate, waterproof roll, bottom cushion, substrate under upper
Original soil.
Further, the blind plate and the pre-buried annulus groove full weld.
Further, the pre-buried annulus is weldingly fixed on sand-free concrete tube.
Further, the blind plate top has poured concrete.
Further, during being provided with the middle of the blind plate for closing and closing after drainage well Yield rainfall relation switch valve
Door.
Further, the controlled valve on the blind plate is closed mode.
Further, the blind plate is located at sole plate layer.
By such scheme, the present invention at least has advantages below:
A kind of drainage well closing mode of pre-buried annulus of the present invention, simple in construction, easy construction, with pre-buried annulus,
Drainage well precipitation work is carried out using blind plate special tectonic while carrying out full weld with blind plate periphery, to reach in dry environments
Blind plate is subjected to annulus, had the characteristics that simultaneously:
1st, prefabricated blind plate has globality, and completely enclosed effect is reached using groove full weld;
2nd, using valve precipitation it is subjected to, constructs in dry environments while;
3rd, carry out waterproof on blind plate and casting concrete reaches closed for second time effect.
Described above is only the general introduction of technical solution of the present invention, in order to better understand the technological means of the present invention,
And can be practiced according to the content of specification, below with presently preferred embodiments of the present invention and coordinate accompanying drawing describe in detail as after.
Brief description of the drawings
Fig. 1 is that a kind of drainage well of pre-buried annulus of the present invention closes the structural representation of mode;
Fig. 2 is the attachment structure of the blind plate and pre-buried annulus of a kind of drainage well closing mode of pre-buried annulus shown in Fig. 1
Schematic diagram;
Fig. 3 is a kind of structural representation of the blind plate of the drainage well closing mode of pre-buried annulus shown in Fig. 1.
1st, blind plate;2nd, pre-buried annulus;3rd, sand-free concrete tube;4th, sole plate;5th, waterproof roll;6th, bottom cushion;7、
Substrate original soil;8th, concrete;9th, controlled valve.
Embodiment
With reference to the accompanying drawings and examples, the embodiment to the present invention is described in further detail.Implement below
Example is used to illustrate the present invention, but is not limited to the scope of the present invention.
Referring to shown in Fig. 1-3, a kind of drainage well of pre-buried annulus closes mode, including blind plate 1, pre-buried annulus 2, drainage well
Inwall is provided with pre-buried annulus 2, and blind plate 1 is arranged on pre-buried annulus 2, and pre-buried ring 2 is fixed on sand-free concrete tube 3.
Drainage well outer wall is followed successively by sole plate 4, waterproof roll 5, bottom cushion 6, substrate original soil 7 under upper.
Blind plate 1 and the pre-buried groove full weld of annulus 2.
Pre-buried annulus 2 is weldingly fixed on sand-free concrete tube 3.
The top of blind plate 1 has poured concrete eight.
It is provided with controlled valve 9 in the middle of blind plate 1, drainage well Yield rainfall relation during controlled valve 9 is used to close and after closing.
Controlled valve 9 on blind plate 1 is closed mode.
Blind plate 1 is located at sole plate layer 4.
A kind of drainage well closing mode of pre-buried annulus of the present invention, including blind plate 1, pre-buried annulus 2, drainage well inwall are set
Pre-buried annulus 2 is equipped with, blind plate 1 is arranged on pre-buried annulus 2, and pre-buried ring 2 is fixed on sand-free concrete tube 3, the diameter of blind plate 1 is omited
Less than drainage well diameter, blind plate 1 is covered on pre-buried annulus 2.
A kind of drainage well closing mode of pre-buried annulus of the present invention, blind plate 1 is covered on pre-buried annulus 2, entered in junction
Row groove full weld reaches sealing effect.
A kind of drainage well closing mode of pre-buried annulus of the present invention, including blind plate 1, pre-buried annulus 2, drainage well inwall are set
Pre-buried annulus 2 is equipped with, blind plate 1 is arranged on pre-buried annulus 2, and pre-buried ring 2 is fixed on sand-free concrete tube 3.Drainage well outer wall
Sole plate 4, waterproof roll 5, bottom cushion 6, substrate original soil 7 are followed successively by under upper.Blind plate 1 is expired with the pre-buried groove of annulus 2
Weldering.Pre-buried annulus 2 is weldingly fixed on sand-free concrete tube 3.Drainage is set in bottom of foundation ditch using prefabricated sand-free concrete tube
Well, completes to carry out drainage well closure construction after foundation ditch is not required to precipitation in construction of bottom plates.
A kind of drainage well closing mode of pre-buried annulus of the present invention, including blind plate 1, pre-buried annulus 2, drainage well inwall are set
Pre-buried annulus 2 is equipped with, blind plate 1 is arranged on pre-buried annulus 2, and pre-buried ring 2 is fixed on sand-free concrete tube 3.Drainage well outer wall
Sole plate 4, waterproof roll 5, bottom cushion 6, substrate original soil 7 are followed successively by under upper.Blind plate 1 is expired with the pre-buried groove of annulus 2
Weldering.Pre-buried annulus 2 is weldingly fixed on sand-free concrete tube 3.The top of blind plate 1 has poured concrete eight.It is provided with the middle of blind plate 1
Controlled valve 9, controlled valve 9 be used for close during and closing after drainage well Yield rainfall relation.Controlled valve 9 on blind plate 1 is closing
State.Blind plate 1 is located at sole plate layer 4.After back-plane design waterproof construction and casting concrete being carried out after blind plate closing on top
Reach closed for second time effect.
A kind of drainage well closing mode of pre-buried annulus of the present invention, by the cooperation of prefabricated annulus 2 and blind plate 1, has
Good globality, centre sets controlled valve 9, for closing during and closing after drainage well Yield rainfall relation.
A kind of drainage well closing mode of pre-buried annulus of the present invention, using pre-buried annulus, is expired with blind plate periphery
Drainage well precipitation work is carried out using blind plate special tectonic while weldering, blind plate and annulus are carried out in dry environments with reaching
Welding operation.
Valve is closed after the completion of welding, waterproof construction and concreting are carried out to blind plate top.
With advantages below:
1st, prefabricated blind plate has globality, and completely enclosed effect is reached using groove full weld;
2nd, using valve precipitation it is subjected to, constructs in dry environments while;
3rd, carry out waterproof on blind plate and casting concrete reaches closed for second time effect;
A kind of drainage well closing mode of pre-buried annulus of the present invention
Described above is only the general introduction of technical solution of the present invention, in order to better understand the technological means of the present invention,
And can be practiced according to the content of specification, below with presently preferred embodiments of the present invention and coordinate accompanying drawing describe in detail as after.
Described above is only the preferred embodiment of the present invention, is not intended to limit the invention, it is noted that for this skill
For the those of ordinary skill in art field, without departing from the technical principles of the invention, can also make it is some improvement and
Modification, these improvement and modification also should be regarded as protection scope of the present invention.
Claims (8)
1. the drainage well closing mode of a kind of pre-buried annulus, it is characterised in that described to dredge including blind plate (1), pre-buried annulus (2)
Dry-well inwall is provided with pre-buried annulus (2), and the blind plate (1) is arranged on pre-buried annulus (2), and the pre-buried ring (2) is fixed on
On sand-free concrete tube (3).
2. a kind of drainage well closing mode of pre-buried annulus according to claim 1, it is characterised in that the drainage
Well outer wall is followed successively by sole plate (4), waterproof roll (5), bottom cushion (6), substrate original soil (7) under upper.
3. a kind of drainage well closing mode of pre-buried annulus according to claim 1, it is characterised in that the blind plate
(1) with pre-buried annulus (2) the groove full weld.
4. the drainage well closing mode of a kind of pre-buried annulus according to claim 1, it is characterised in that described pre-buried
Annulus (2) is weldingly fixed on sand-free concrete tube (3).
5. a kind of drainage well closing mode of pre-buried annulus according to claim 1, it is characterised in that the blind plate
(1) top has poured concrete (8).
6. a kind of drainage well closing mode of pre-buried annulus according to claim 1, it is characterised in that the blind plate
(1) in the middle of be provided with for closing during and closing after drainage well Yield rainfall relation controlled valve (9).
7. a kind of drainage well closing mode of pre-buried annulus according to claim 6, it is characterised in that the blind plate
(1) controlled valve (9) on is closed mode.
8. a kind of drainage well closing mode of pre-buried annulus according to claim 2, it is characterised in that the blind plate
(1) it is located at sole plate layer (4).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710283388.4A CN107090840A (en) | 2017-04-26 | 2017-04-26 | A kind of drainage well closing mode of pre-buried annulus |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710283388.4A CN107090840A (en) | 2017-04-26 | 2017-04-26 | A kind of drainage well closing mode of pre-buried annulus |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107090840A true CN107090840A (en) | 2017-08-25 |
Family
ID=59638409
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710283388.4A Pending CN107090840A (en) | 2017-04-26 | 2017-04-26 | A kind of drainage well closing mode of pre-buried annulus |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107090840A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108755725A (en) * | 2018-06-22 | 2018-11-06 | 中国建筑第八工程局有限公司 | Examination well-sealing device and examination shut-in well construction method for drainage well |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
ES2022155B3 (en) * | 1986-01-20 | 1991-12-01 | Hydrogeo | DEVICE FOR DRAINING SOILS IN DEPTH. |
JP2010138641A (en) * | 2008-12-12 | 2010-06-24 | Ohbayashi Corp | Daily use well and method for constructing the same |
CN104631477A (en) * | 2014-12-23 | 2015-05-20 | 中建四局第六建筑工程有限公司 | Device installing and plugging method for lowering water in foundation pit |
CN204491645U (en) * | 2015-03-24 | 2015-07-22 | 平煤神马建工集团有限公司土建处 | A kind of deep foundation pit precipitation well-sealing device |
CN206052748U (en) * | 2016-08-29 | 2017-03-29 | 中国建筑第八工程局有限公司 | The quick well-sealing device of dewatering well hydraulic pressure |
CN207452924U (en) * | 2017-04-26 | 2018-06-05 | 中建三局集团有限公司 | A kind of drainage well enclosed construction of pre-buried annulus |
-
2017
- 2017-04-26 CN CN201710283388.4A patent/CN107090840A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
ES2022155B3 (en) * | 1986-01-20 | 1991-12-01 | Hydrogeo | DEVICE FOR DRAINING SOILS IN DEPTH. |
JP2010138641A (en) * | 2008-12-12 | 2010-06-24 | Ohbayashi Corp | Daily use well and method for constructing the same |
CN104631477A (en) * | 2014-12-23 | 2015-05-20 | 中建四局第六建筑工程有限公司 | Device installing and plugging method for lowering water in foundation pit |
CN204491645U (en) * | 2015-03-24 | 2015-07-22 | 平煤神马建工集团有限公司土建处 | A kind of deep foundation pit precipitation well-sealing device |
CN206052748U (en) * | 2016-08-29 | 2017-03-29 | 中国建筑第八工程局有限公司 | The quick well-sealing device of dewatering well hydraulic pressure |
CN207452924U (en) * | 2017-04-26 | 2018-06-05 | 中建三局集团有限公司 | A kind of drainage well enclosed construction of pre-buried annulus |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108755725A (en) * | 2018-06-22 | 2018-11-06 | 中国建筑第八工程局有限公司 | Examination well-sealing device and examination shut-in well construction method for drainage well |
CN108755725B (en) * | 2018-06-22 | 2023-06-09 | 中国建筑第八工程局有限公司 | Well test sealing device for dry well and well test sealing construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102071947B (en) | Construction method for soft surrounding rock section of large-span tunnel portal | |
CN204343312U (en) | A kind of plugging device of precipitation well in foundation pit | |
CN206722878U (en) | A kind of mining light-duty filling counterfort | |
CN105544607B (en) | There is the subway station side wall outsourcing waterproof construction method of boatswain chair beam | |
CN102061923B (en) | Tunnel construction method capable of protecting existing building | |
CN107218046A (en) | Mechanical assistance sealing Station structure and construction method in a kind of pilot tunnel | |
CN206090653U (en) | Anchor rod static pressure pile slip casting structure | |
CN104674846A (en) | Construction method for evacuating subway station by prefabricated structure cover | |
CN111734420B (en) | Water-rich stratum shield underwater receiving method provided with tunnel portal mortar retaining wall | |
CN203939021U (en) | A kind of water-enriched layer rockbolt static pressure steel pipe pile pile crown constructing structure | |
CN207892653U (en) | Decompression hydrophobic structure suitable for Weathering-residual soil layer fissure zone | |
CN209339169U (en) | A kind of precipitation well in foundation pit plugging device | |
CN108797641A (en) | A kind of structure and its construction method of Underground Subway Station construction period full station sealing | |
CN107700496A (en) | The inverse suitable combining construction method of deep basal pit | |
CN207452924U (en) | A kind of drainage well enclosed construction of pre-buried annulus | |
CN207277344U (en) | Guiding tool for the backfill of narrow Deep Foundation Pit Excavation | |
CN107090840A (en) | A kind of drainage well closing mode of pre-buried annulus | |
CN104060622B (en) | Steel drum Yield rainfall relation method is cheated in a kind of hole | |
CN113374263A (en) | Construction method for closing settled post-cast strip in advance | |
CN206816278U (en) | The new recyclable supporting steel arch-shelf of horizontal ground settlement and tunnel | |
CN206385557U (en) | The water-impervious plugging mechanism of dewatering well on deep basal pit raft plate | |
CN107905795A (en) | Subway station is inverse under a kind of operation condition widens method | |
CN204959781U (en) | Dewatering well plugging device | |
CN209040133U (en) | Well-covering device for dewatering well suitable for rich groundwater region | |
CN217438983U (en) | Deep basal pit high water pressure drop well block structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170825 |
|
RJ01 | Rejection of invention patent application after publication |