CN101781991A - Double-well type reinforcement method of shield arrival or starting end and double-well type shield arrival method - Google Patents

Double-well type reinforcement method of shield arrival or starting end and double-well type shield arrival method Download PDF

Info

Publication number
CN101781991A
CN101781991A CN 201010123683 CN201010123683A CN101781991A CN 101781991 A CN101781991 A CN 101781991A CN 201010123683 CN201010123683 CN 201010123683 CN 201010123683 A CN201010123683 A CN 201010123683A CN 101781991 A CN101781991 A CN 101781991A
Authority
CN
China
Prior art keywords
well
shield
shield structure
starting end
leading
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010123683
Other languages
Chinese (zh)
Other versions
CN101781991B (en
Inventor
辛振省
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 3 Engineering Group Co Ltd
Original Assignee
China Railway No 3 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 3 Engineering Group Co Ltd filed Critical China Railway No 3 Engineering Group Co Ltd
Priority to CN2010101236831A priority Critical patent/CN101781991B/en
Publication of CN101781991A publication Critical patent/CN101781991A/en
Application granted granted Critical
Publication of CN101781991B publication Critical patent/CN101781991B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention belongs to the technical field of shield arrival methods in shield tunnel construction engineering, in particular to a double-well type reinforcement method of a shield arrival or starting end and a double-well type shield arrival method, solving the problems of larger risks and high cost of the traditional shield arrival methods. The double-well type reinforcement method of the shield arrival or starting end is characterized in that an advance well is arranged outside a final arrival well or a station of the shield arrival or starting end. The invention has the advantages that water is blocked outside the advance well in advance by utilizing the advance well so as to ensure that a shield machine carries out arrival construction under the geological condition of no water, thereby radically changing an original geological condition, breaking up the huge risk of the shield arrival into parts, radically avoiding the huge risk of water and sand jetting during shield arrival in an area of a water and sand rich layer and reducing the hazard rate by more than 50 percent at least; and moreover, expenses generated by large-area full section reinforcement are saved to a certain extent. The invention has simple process method, convenient construction, low manufacturing cost and convenient popularization.

Description

The twin-well formula reinforcement means and the twin-well formula shield structure method of reseptance of reception of shield structure or starting end head
Technical field
The invention belongs to the technical field of shield structure method of reseptance in the shield tunnel construction project, the twin-well formula reinforcement means that is specifically related to reception of shield structure or starting end head reaches based on its twin-well formula shield structure method of reseptance of finishing.
Background technology
Shield method is as advanced method municipal and other major works extensive uses by city underground and other of tunnel excavation, the working security of shield method and speed of application will be higher than existing New Austrian Tunneling Method and other method for tunnel construction far away in the process of tunnel excavation, but, shield structure receiver section is the bottleneck of whole shield tunnel construction, and shield structure reception technique is still the construction section of excessive risk, high cost so far.
Existing shield structure reception technique mainly contains:
1. the full section reinforcing technique of rotary churning pile+agitation pile method.Promptly, a period of time reinforces carrying out agitation pile in the shield structure receiving terminal head tunnel section certain limit in advance, to agitation pile reinforce less than or the relatively poor place of consolidation effect carry out high-pressure rotary jet grouting pile and reinforce, reinforce the back composite soil and have certain intensity and water resistance, guaranteed that to a certain extent the safety of shield structure receives.Though but this method job practices is simple, but cost is not low, the most important thing is that consolidation effect is often undesirable, the latter half of tunnel cross-section because buried depth is bigger, generally is difficult to pile, do not reach the consolidation effect of anticipation at all, especially in high hydraulic pressure layer of sand area, big the increasing that have a big risk that this kind method receives caused a lot of calamitous engineering accidents.
2. horizontal grouting reinforcing method.That is, at the portal place of end well, applying high voltage is pressed into biliquid slurry or single liquid slurry to end soil body to carry out the termination and reinforces.Though this kind method has effectively remedied the defective of first method can be from vertically effectively reinforcing the peripheral soil body of tunnel cross-section, but its weak point is: on the one hand, reaching predetermined reinforcing scope and effect grouting pressure is difficult to grasp, be easy to cause the large tracts of land protuberance on ground, especially in the busiest section in city, it is very harmful; On the other hand, because this kind grouting method belongs to the fracture grouting method, the interlayer phenomenon that adds solid is more, and the folder mud layer often becomes the great risk source; Moreover this kind reinforcement means cost is high, only is applicable in the special engineering, is difficult to popularize.
Summary of the invention
The present invention is in order to solve the problems referred to above that existing shield structure method of reseptance exists, broken the mindset of traditional single received well, before the also not final reception of shield structure, in the underground leading well of establishing in advance, received, risk is broken the whole up into parts, finally reach not only safety but also economic purpose.
The present invention adopts following technical scheme to realize:
A kind of shield structure receives or the twin-well formula reinforcement means of starting end head, it is characterized in that the shield structure receives or the final received well of starting end head or station outside leading well is set.
The twin-well formula reinforcement means of reception of shield structure or starting end head, final received well or station safeguard the outer pre-XianCheng of wall " [" shape groove, cast plain concrete formation diaphragm wall is the plain wall of outsourcing in the groove, the plain wall of outsourcing with safeguard the wall leading well of formation that links to each other, the scope that leading well is surrounded, fore-and-aft distance is greater than the length of shield machine, and lateral separation is greater than the distance between the two shield tunnel outer rims, the bottom of leading well embeds impervious layer under the tunnel, and the top is higher than superlatively descends water level.
The lateral separation of described leading well is than the big 2~5m of distance between the two shield tunnel outer rims.The bottom of leading well embeds the degree of depth of impervious layer under the tunnel more than or equal to 1m.In rich water area, the top of leading well can flush with ground.
Twin-well formula shield structure method of reseptance is finished based on the above-mentioned shield structure reception or the twin-well formula reinforcement means of starting end head, and step is as follows:
1), shield machine arrives the plain wall of outsourcing of leading well, the parameter of adjusting shield machine makes the shield structure slowly polish the plain wall of concrete until the outsourcing element wall of cutter head of shield machine by leading well,
2), slowly advance and enter leading well fully, then the shutoff processing is carried out in the slit between tunnel, the section of jurisdiction outer rim of the aperture of the plain wall of leading well outsourcing and assembly unit until the shield structure;
3), after shutoff finishes, cut the portal at final received well or station place, the shield structure receives smoothly and enters the station.
The present invention has following beneficial effect: the present invention utilizes leading well, water is kept off in advance outside leading well, make shield machine not have to receive construction under the geological conditions of water, fundamentally changed original geological conditions, the great risk that the shield structure is received breaks the whole up into parts, gushing water emits the great risk of sand when fundamentally having solved water-rich sand layer area shield structure and receiving, reduce relative risk at least more than 50%, and saved the full section of large tracts of land to a certain extent and reinforced the expense that produces, process is simple, clear thinking understands that easy construction and cost are low, are convenient to popularize.
Description of drawings
Fig. 1 is the scope schematic diagram of leading well
Fig. 2 is the height and the degree of depth schematic diagram of leading well
Fig. 3-1 is leading well outside schematic diagram for shield machine arrives
Fig. 3-2 for cutter head of shield machine by the plain wall schematic diagram of leading well outsourcing
Fig. 3-3 is that shield machine is fully by the plain wall schematic diagram of leading well outsourcing
Fig. 3-4 is intermarginal hole schematic diagram outside slip casting or plain wall of additive method shutoff outsourcing and the tunnel
Fig. 3-5 receives schematic diagram for shield machine smoothly by the station exterior wall
Among the figure: the leading well of 1-, 2-shield tunnel, 3-shield machine, 4-safeguards wall, 5-portal, final received well of 6-or station, impervious layer under the 7-tunnel, the plain wall of 8-outsourcing, the 9-face of land, 10-is the tunnel, section of jurisdiction of assembly unit, intermarginal hole outside 11-diaphragm wall and the tunnel, section of jurisdiction, 12-shutoff hole, the tunnel of the pre-excavation of 13-, 14-station base plate.
The specific embodiment
In conjunction with the accompanying drawings the specific embodiment of the present invention is described further.
Shield structure of the present invention receive or the final received well of starting end head or station outside to be provided with leading well be or not too big shield structure reception operating mode at the impervious layer buried depth shield tunnel under.
Its concrete implementation method is: the pre-XianCheng of certain limit " [" shape groove outside the wall 4 of safeguarding at received well or station, pouring into a mould plain concrete formation diaphragm wall then is the plain wall 8 of outsourcing, the plain wall 8 of outsourcing with safeguard the wall 4 leading well 1 of formation that links to each other, the scope that leading well 1 is surrounded, vertically should be greater than shield machine length, laterally should be greater than the outer rim certain distance in two tunnels, as shown in Figure 1, the degree of depth should embed impervious layer 7 certain depths under the tunnel, the top will be higher than superlatively descends water level, in rich water area, for the purpose of easy construction, the plain wall of outsourcing top can flush with ground, as shown in Figure 2.
When the shield structure received, shield machine at first arrived the plain wall of outsourcing of leading well, shown in Fig. 3-1.The parameter (as: cutterhead rotating speed, fltting speed etc.) of adjusting shield machine makes the shield structure slowly polish the plain wall of outsourcing until the outsourcing element wall of cutter head of shield machine by leading well, shown in Fig. 3-2.Then, slowly advance and enter leading well fully, shown in Fig. 3-3 until the shield structure.Then the shutoff processing is carried out in the slit between tunnel, the section of jurisdiction outer rim of the aperture of the plain wall of leading well outsourcing and assembly unit, as Fig. 3-4.After shutoff is finished, cut the portal at final received well or station place, the shield structure receives smoothly and enters the station, shown in Fig. 3-5.
The situation of shield launching is the inverse process that the shield structure receives construction, and principle and method and shield structure receive identical.

Claims (7)

1. a shield structure receives or the twin-well formula reinforcement means of starting end head, it is characterized in that the shield structure receives or the final received well of starting end head or station outside leading well is set.
2. the twin-well formula reinforcement means of shield structure reception according to claim 1 or starting end head, pre-XianCheng " [" shape groove outside the wall (4) of safeguarding that it is characterized in that final received well or station, cast plain concrete formation diaphragm wall is the plain wall (8) of outsourcing in the groove, the plain wall of outsourcing (8) with safeguard wall (4) the formation leading well (1) that links to each other, the scope that leading well (1) is surrounded, fore-and-aft distance is greater than the length of shield machine (3), lateral separation is greater than the distance between two shield tunnels (2) outer rim, the bottom of leading well (1) embeds impervious layer (7) under the tunnel, and the top is higher than superlatively descends water level.
3. the twin-well formula reinforcement means of shield structure reception according to claim 2 or starting end head, the lateral separation that it is characterized in that described leading well (1) is than the big 2~5m of distance between two shield tunnels (2) outer rim.
4. according to the twin-well formula reinforcement means of claim 2 or 3 described shield structures receptions or starting end head, it is characterized in that the bottom of described leading well (1) embeds the degree of depth of impervious layer (7) under the tunnel more than or equal to 1m.
5. the twin-well formula reinforcement means of shield structure reception according to claim 4 or starting end head is characterized in that in rich water area the top of leading well can flush with ground.
6. twin-well formula shield structure method of reseptance, described method is based on claim 2 or 3 described shield structures receive or the twin-well formula reinforcement means of starting end head is finished, and it is characterized in that step is as follows:
1), shield machine arrives the outside of leading well, the parameter of adjusting shield machine makes the shield structure slowly polish the plain wall of concrete until the outsourcing element wall of cutter head of shield machine by leading well,
2), slowly advance and enter leading well fully, then the shutoff processing is carried out in the slit between tunnel, the section of jurisdiction outer rim of the aperture of the plain wall of leading well outsourcing and assembly unit until the shield structure;
3), after shutoff finishes, cut the portal at final received well or station place, the shield structure receives smoothly and enters the station.
7. twin-well formula shield structure method of reseptance, described method receives based on the described shield structure of claim 5 or the twin-well formula reinforcement means of starting end head is finished, and it is characterized in that step is as follows:
1), shield machine arrives the outside of leading well, the parameter of adjusting shield machine makes the shield structure slowly polish the plain wall of concrete until the outsourcing element wall of cutter head of shield machine by leading well,
2), slowly advance and enter leading well fully, then the shutoff processing is carried out in the slit between tunnel, the section of jurisdiction outer rim of the aperture of the plain wall of leading well outsourcing and assembly unit until the shield structure;
3), after shutoff finishes, cut the portal at final received well or station place, the shield structure receives smoothly and enters the station.
CN2010101236831A 2010-02-10 2010-02-10 Double-well type reinforcement method of shield arrival or starting end and double-well type shield arrival method Active CN101781991B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010101236831A CN101781991B (en) 2010-02-10 2010-02-10 Double-well type reinforcement method of shield arrival or starting end and double-well type shield arrival method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010101236831A CN101781991B (en) 2010-02-10 2010-02-10 Double-well type reinforcement method of shield arrival or starting end and double-well type shield arrival method

Publications (2)

Publication Number Publication Date
CN101781991A true CN101781991A (en) 2010-07-21
CN101781991B CN101781991B (en) 2012-05-30

Family

ID=42522135

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010101236831A Active CN101781991B (en) 2010-02-10 2010-02-10 Double-well type reinforcement method of shield arrival or starting end and double-well type shield arrival method

Country Status (1)

Country Link
CN (1) CN101781991B (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102011596A (en) * 2010-11-29 2011-04-13 中铁三局集团有限公司 Shield originating or receiving end tunnel portal maintenance process
CN102322269A (en) * 2011-08-30 2012-01-18 北京城乡建设集团有限责任公司 Super early receiving supporting structure of shield machine and super early receiving method
CN102434718A (en) * 2011-09-08 2012-05-02 广东省基础工程公司 Method for reinforcing originating end of push bench
CN103291317A (en) * 2013-06-19 2013-09-11 上海隧道工程股份有限公司 Construction method for old tunnel segment detaching and tunnel expanding and tunnel expanding machine
CN104018842A (en) * 2014-05-04 2014-09-03 广东水电二局股份有限公司 Receiving structure and receiving method used when shield tunneling machine reaches tunneling end point
CN107023303A (en) * 2017-04-10 2017-08-08 中铁十四局集团有限公司 A kind of large-diameter shield machine earthing balancing safety method of reseptance
CN108868814A (en) * 2018-08-24 2018-11-23 中铁西安勘察设计研究院有限责任公司 Collapsible loess combination land pebble stratum tunneling air duct connects the ventilating shaft of shield tunnel
CN108999218A (en) * 2018-08-14 2018-12-14 中铁十二局集团有限公司 Antiseepage panel wall construction method is passed through in the construction of shield section
CN109209396A (en) * 2018-11-16 2019-01-15 海南大学 A kind of shield tunnel end joint reinforcement structure and construction method
CN109751056A (en) * 2019-01-31 2019-05-14 中铁工程装备集团有限公司 A kind of water rich strata shield-tunneling construction active well end processing method
CN112253162A (en) * 2020-11-10 2021-01-22 中铁四局集团有限公司 Water-rich sand layer large-diameter jacking pipe group entrance and exit reinforcing structure and construction method

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108316307B (en) * 2018-02-08 2020-01-14 青岛理工大学 Construction method for starting shield machine station

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001115772A (en) * 1999-10-21 2001-04-24 Kajima Corp Connection method for existing tunnel and new tunnel
JP2001182477A (en) * 1999-12-28 2001-07-06 Zenitaka Corp Device of partition iron plate
CN1789666A (en) * 2005-12-27 2006-06-21 上海市隧道工程轨道交通设计研究院 Waterproof device for entrance of shield tunnel
CN101182772A (en) * 2007-11-20 2008-05-21 中铁二局股份有限公司 Two lines intersection small radius, shallow earth covering and large longitudinal slope complicated linetype shield construction method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001115772A (en) * 1999-10-21 2001-04-24 Kajima Corp Connection method for existing tunnel and new tunnel
JP2001182477A (en) * 1999-12-28 2001-07-06 Zenitaka Corp Device of partition iron plate
CN1789666A (en) * 2005-12-27 2006-06-21 上海市隧道工程轨道交通设计研究院 Waterproof device for entrance of shield tunnel
CN101182772A (en) * 2007-11-20 2008-05-21 中铁二局股份有限公司 Two lines intersection small radius, shallow earth covering and large longitudinal slope complicated linetype shield construction method

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102011596A (en) * 2010-11-29 2011-04-13 中铁三局集团有限公司 Shield originating or receiving end tunnel portal maintenance process
CN102322269A (en) * 2011-08-30 2012-01-18 北京城乡建设集团有限责任公司 Super early receiving supporting structure of shield machine and super early receiving method
CN102322269B (en) * 2011-08-30 2013-04-24 北京城乡建设集团有限责任公司 Super early receiving supporting structure of shield machine and super early receiving method
CN102434718A (en) * 2011-09-08 2012-05-02 广东省基础工程公司 Method for reinforcing originating end of push bench
CN103291317A (en) * 2013-06-19 2013-09-11 上海隧道工程股份有限公司 Construction method for old tunnel segment detaching and tunnel expanding and tunnel expanding machine
CN103291317B (en) * 2013-06-19 2016-03-09 上海隧道工程有限公司 Old tunnel duct piece removes the construction method expanding with tunnel and tunnel expanding machine
CN104018842A (en) * 2014-05-04 2014-09-03 广东水电二局股份有限公司 Receiving structure and receiving method used when shield tunneling machine reaches tunneling end point
CN104018842B (en) * 2014-05-04 2016-11-02 广东水电二局股份有限公司 A kind of shield machine arrives reception structure and the method for reseptance thereof of driving terminal
CN107023303A (en) * 2017-04-10 2017-08-08 中铁十四局集团有限公司 A kind of large-diameter shield machine earthing balancing safety method of reseptance
WO2018188529A1 (en) * 2017-04-10 2018-10-18 中铁十四局集团有限公司 Covering earth balancing and safe receiving method for large-diameter tunnel boring machine
CN108999218A (en) * 2018-08-14 2018-12-14 中铁十二局集团有限公司 Antiseepage panel wall construction method is passed through in the construction of shield section
CN108868814A (en) * 2018-08-24 2018-11-23 中铁西安勘察设计研究院有限责任公司 Collapsible loess combination land pebble stratum tunneling air duct connects the ventilating shaft of shield tunnel
CN108868814B (en) * 2018-08-24 2023-12-29 中铁西安勘察设计研究院有限责任公司 Air shaft of underground excavation air duct shield tunnel of collapsible loess combined pebble soil stratum
CN109209396A (en) * 2018-11-16 2019-01-15 海南大学 A kind of shield tunnel end joint reinforcement structure and construction method
CN109751056A (en) * 2019-01-31 2019-05-14 中铁工程装备集团有限公司 A kind of water rich strata shield-tunneling construction active well end processing method
CN112253162A (en) * 2020-11-10 2021-01-22 中铁四局集团有限公司 Water-rich sand layer large-diameter jacking pipe group entrance and exit reinforcing structure and construction method

Also Published As

Publication number Publication date
CN101781991B (en) 2012-05-30

Similar Documents

Publication Publication Date Title
CN101781991B (en) Double-well type reinforcement method of shield arrival or starting end and double-well type shield arrival method
CN104265307B (en) Non-uniform-hardness stratum earth pressure balance shield tunnel underpassing railway existing line construction method
CN103277106B (en) Highway tunnel three-step five-procedure excavation construction method
CN104500082B (en) In Tunneling by mining method, shield receives construction method
CN101749026B (en) Grid reinforcing method of shield receiving or starting end head and shield receiving method
CN102787846B (en) Upper-blocking and lower-draining construction method for undersea tunnel fault fracture zone
CN101886390B (en) All casing static pressure pile pulling technology in narrow space
CN103924987B (en) A kind of SMW engineering method stake tunnel shielding portal seepage-proof structure and construction method thereof
CN103114857A (en) Shield tunnel construction method
CN103790592A (en) End soil mass reinforcement system and method
CN102817621B (en) Comprehensive construction method applicable to controlling arch basement sedimentation for tunnel in unfavorable geological conditions
CN107503770A (en) A kind of duct pieces of shield tunnel secondary grouting method
CN102996135A (en) Construction method for crossing for complex formation of shield under ultra-deep earth
CN105064335A (en) Ultrahigh pressure rotary jet grouting method suitable for sandy cobble stratum shield end well reinforcement
AU2016431138B2 (en) Rotary jet-grouting modular rare-earth mining process
CN107338790B (en) Construction method of rotary spraying stirring composite pile
CN102011405A (en) Deepwater cofferdam slot sinking construction method
CN203878532U (en) Processing structure for deep, steep and inclined fault crack
CN102235008B (en) Engineering pile deviation preventing structure of soft soil foundation and pretreatment method
CN202991051U (en) Reinforcing structure capable of realizing shield reception without using water-stopping cord fabric
CN104929129A (en) Concrete cover-weight consolidation grouting method for non-cover-weight combination of different holes through guide pipes
CN108396760B (en) Combined deviation-rectifying construction technology for inclined open caisson
CN203050779U (en) Tunnel drainage structure suitable for bias pressure rich water strata
CN204941551U (en) A kind of subway station of Curve Pipe Jacking supporting and protection structure enlarging shield-tunneling construction
CN208472716U (en) Crack geology mortar leakage prevention drill-pouring pilework

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant