CN208472716U - Crack geology mortar leakage prevention drill-pouring pilework - Google Patents

Crack geology mortar leakage prevention drill-pouring pilework Download PDF

Info

Publication number
CN208472716U
CN208472716U CN201820673573.4U CN201820673573U CN208472716U CN 208472716 U CN208472716 U CN 208472716U CN 201820673573 U CN201820673573 U CN 201820673573U CN 208472716 U CN208472716 U CN 208472716U
Authority
CN
China
Prior art keywords
pouch
leakage prevention
mortar leakage
crack
grouting pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820673573.4U
Other languages
Chinese (zh)
Inventor
王新泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Group Co. Ltd.
Original Assignee
Hangzhou Jiangrun Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Jiangrun Technology Co Ltd filed Critical Hangzhou Jiangrun Technology Co Ltd
Priority to CN201820673573.4U priority Critical patent/CN208472716U/en
Application granted granted Critical
Publication of CN208472716U publication Critical patent/CN208472716U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a kind of crack geology mortar leakage prevention drill-pouring pileworks, including filling pile cage of reinforcement, mortar leakage prevention pouch, pouch injecting cement paste and crack reinforcing body;Mortar leakage prevention pouch is set on the outside of the filling pile cage of reinforcement of gap region, and is orderly arranged outside each steel fibre grid and auxiliary Grouting Pipe in mortar leakage prevention pouch, pouch Grouting Pipe is inserted into inside mortar leakage prevention pouch;Mortar leakage prevention pouch is connect with filling pile cage of reinforcement by laterally fastening reinforcing bar;Mortar leakage prevention pouch squeezes wealthy and forms pouch injecting cement paste by pouch Grouting Pipe slip casting;Mortar leakage prevention pouch forms crack reinforcing body by slip casting on the outside of auxiliary Grouting Pipe.The beneficial effects of the utility model are: mortar leakage prevention pouch is arranged in flaw sites in the utility model, concrete can be effectively prevent to leak to gap region, improve the utilization rate of material;Crack reinforcing body is arranged in the utility model on the outside of pouch, can improve the load-carrying properties of foundation pile.

Description

Crack geology mortar leakage prevention drill-pouring pilework
Technical field
The utility model relates to filling pile structure, in particular to one kind can promote cast-in-place pile concrete pouring quality, change The crack geotechnical boring filling pile structure of kind foundation pile load-carrying properties, belongs to geotechnical engineering field, is suitable for gap region bored concrete pile Engineering.
Background technique
Bored concrete pile has obtained relatively broad answer as a kind of foundation pile form in science of bridge building and architectural engineering With.When being irrigated pile driving construction under the geological conditions of crack, often need to set downwards sleeve from ground, but when the crack depth of burying compared with When big, site operation cost and difficulty will increase dramatically.Simultaneously as there is a large amount of rubble more in crack geology, it is generally existing The problems such as mechanical excavation difficulty is big, concrete spillage, seriously affects site operation efficiency.It is existing from the point of view of the stress performance of pile body There is the stress performance of the bored concrete pile of gap region to be influenced by gap region more significant.
In consideration of it, being made to promote the construction quality of crack geotechnical boring bored concrete pile, raising site operation efficiency, reducing engineering Valence, urgently utility model one kind can synchronize and realize that gap region hole slag quickly removes, cast-in-place pile concrete pouring quality mentions at present The crack geotechnical boring cast-in-place pile construction method for the targets such as liter, foundation pile load-carrying properties improve, project cost reduces.
Utility model content
The purpose of the utility model is to overcome deficiency in the prior art, providing a kind of can not only promote bored concrete pile coagulation Native pouring quality, the crack geology mortar leakage prevention drill-pouring pilework that foundation pile load-carrying properties can also be improved, reduce project cost.
This crack geology mortar leakage prevention drill-pouring pilework, including filling pile cage of reinforcement, mortar leakage prevention pouch, pouch slip casting Body and crack reinforcing body;Mortar leakage prevention pouch is set on the outside of the filling pile cage of reinforcement of gap region, and in the outer of mortar leakage prevention pouch Side sets gradually steel fibre grid and auxiliary Grouting Pipe, and pouch Grouting Pipe is inserted into inside mortar leakage prevention pouch;Mortar leakage prevention pouch with Filling pile cage of reinforcement is by laterally fastening reinforcing bar connection;Mortar leakage prevention pouch squeezes wealthy and forms pouch note by pouch Grouting Pipe slip casting Slurry;Mortar leakage prevention pouch forms crack reinforcing body by slip casting on the outside of auxiliary Grouting Pipe.
As preferred: the mortar leakage prevention pouch uses geotextile material, and grouting amount is according to mortar leakage prevention capsule in mortar leakage prevention pouch The volume of bag cavity predefines.
As preferred: using auxiliary Grouting Pipe to when slip casting, grouting pressure is outer lateral earth pressure on the outside of mortar leakage prevention pouch 1.1~1.5 times.
As preferred: the gap region is located between crack lower part rock stratum and crack top rock stratum.
The beneficial effects of the utility model are:
(1) mortar leakage prevention pouch is arranged in flaw sites in the utility model, and concrete can be effectively prevent to leak to gap region, Improve the utilization rate of material.
(2) crack reinforcing body is arranged in the utility model on the outside of pouch, can improve the load-carrying properties of foundation pile.
Detailed description of the invention
Fig. 1 is sectional schematic diagram after the completion of the utility model filling pile construction.
Description of symbols: 1- gap region;The crack 2- lower part rock stratum;The crack 3- top rock stratum;4- filling pile cage of reinforcement; 5- mortar leakage prevention pouch;6- steel fibre grid;7- assists Grouting Pipe;8- pouch Grouting Pipe;9- laterally fastens reinforcing bar;10- pouch note Slurry;The crack 11- reinforcing body.
Specific embodiment
The utility model is described further below with reference to embodiment.The explanation of following embodiments is only intended to help to manage Solve the utility model.It should be pointed out that for those skilled in the art, not departing from the utility model principle Under the premise of, several improvements and modifications can be made to this utility model, these improvement and modification also fall into the utility model In scope of protection of the claims.
Mix Design and pouring construction technical requirements, mortar leakage prevention pouch design and construction technical requirements, reinforcing bar Cage construction technical requirement etc., repeats no more in present embodiment, and emphasis illustrates that the utility model relates to the embodiments of method.
Shown in referring to Fig.1, the crack geology mortar leakage prevention drill-pouring pilework, in the bored concrete pile steel of gap region 1 Mortar leakage prevention pouch 5 is set on the outside of muscle cage 4, and is orderly arranged outside each steel fibre grid 6 and auxiliary Grouting Pipe in mortar leakage prevention pouch 5 7, pouch Grouting Pipe 6 is inserted into inside mortar leakage prevention pouch 5;By mortar leakage prevention pouch 5 and filling pile cage of reinforcement 4 by laterally fastening steel Muscle 9 connects;By pouch Grouting Pipe 8, into mortar leakage prevention pouch 5, wealthy mortar leakage prevention pouch 5 is squeezed in slip casting, and forms pouch injecting cement paste 10; The position of filling pile cage of reinforcement 4 is checked, then is irrigated pile concreting;Pass through auxiliary slip casting before cast-in-place pile concrete final set Pipe 7 forms crack reinforcing body 11 to the 5 outside slip casting of mortar leakage prevention pouch.
1 height of gap region is 3m, and gapfiller is clay, and rock is sand gravel.
Crack lower part rock stratum 2 is weak weathering glutenite.
Crack top rock stratum 3 is the glutenite of severely-weathered~completely decomposed.
Steel reinforcement cage 4 is diameter 1000mm, indulges muscle and uses HRB335, stirrup uses HPB300.
In the outside of steel reinforcement cage 4 setting mortar leakage prevention pouch 5, steel fibre grid 6, auxiliary Grouting Pipe 7;In mortar leakage prevention pouch 5 Inside insertion pouch Grouting Pipe 8;Mortar leakage prevention pouch 5 is connect with filling pile cage of reinforcement 4 by laterally fastening reinforcing bar 9.
Mortar leakage prevention pouch 5 uses geomembrane, and height 4m is set on the outside of steel reinforcement cage.
Steel fibre grid 6 is set on the outside of steel reinforcement cage, using steel plastic geogrid.
Auxiliary Grouting Pipe 7 and pouch Grouting Pipe 8 are all made of the steel pipe that diameter is 30mm, steel strength Q235B.Utilize capsule The bag cement injection slurries into mortar leakage prevention pouch 5 of Grouting Pipe 8, form pouch injecting cement paste 10.
Laterally fastening reinforcing bar 9 uses the HPB300 grade reinforcing bar of diameter 10mm.
Crack reinforcing body 11 uses the concrete of C35.

Claims (4)

1. a kind of crack geology mortar leakage prevention drill-pouring pilework, it is characterised in that including filling pile cage of reinforcement (4), mortar leakage prevention capsule Bag (5), pouch injecting cement paste (10) and crack reinforcing body (11);Setting is anti-on the outside of the filling pile cage of reinforcement (4) of gap region (1) Spillage pouch (5), and it is orderly arranged outside each steel fibre grid (6) and auxiliary Grouting Pipe (7) in mortar leakage prevention pouch (5), anti- Pouch Grouting Pipe (8) are inserted into inside spillage pouch (5);Mortar leakage prevention pouch (5) and filling pile cage of reinforcement (4) are by laterally fastening steel Muscle (9) connection;Mortar leakage prevention pouch (5) squeezes wealthy and forms pouch injecting cement paste (10) by pouch Grouting Pipe (8) slip casting;Mortar leakage prevention capsule Bag (5) forms crack reinforcing body (11) by slip casting on the outside of auxiliary Grouting Pipe (7).
2. crack geology mortar leakage prevention drill-pouring pilework according to claim 1, it is characterised in that the mortar leakage prevention capsule Bag (5) uses geotextile material, and mortar leakage prevention pouch (5) interior grouting amount is predefined according to the volume of mortar leakage prevention pouch (5) cavity.
3. crack geology mortar leakage prevention drill-pouring pilework according to claim 1, it is characterised in that using auxiliary slip casting (7) are managed to when slip casting, grouting pressure is 1.1~1.5 times of outer lateral earth pressure on the outside of mortar leakage prevention pouch (5).
4. crack geology mortar leakage prevention drill-pouring pilework according to claim 1, it is characterised in that the gap region (1) between crack lower part rock stratum (2) and crack top rock stratum (3).
CN201820673573.4U 2018-05-07 2018-05-07 Crack geology mortar leakage prevention drill-pouring pilework Active CN208472716U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820673573.4U CN208472716U (en) 2018-05-07 2018-05-07 Crack geology mortar leakage prevention drill-pouring pilework

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820673573.4U CN208472716U (en) 2018-05-07 2018-05-07 Crack geology mortar leakage prevention drill-pouring pilework

Publications (1)

Publication Number Publication Date
CN208472716U true CN208472716U (en) 2019-02-05

Family

ID=65220496

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820673573.4U Active CN208472716U (en) 2018-05-07 2018-05-07 Crack geology mortar leakage prevention drill-pouring pilework

Country Status (1)

Country Link
CN (1) CN208472716U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110820732A (en) * 2019-10-31 2020-02-21 广西大学 Cast-in-situ bored pile suitable for karst area with connectivity channel and pile forming method
CN115467358A (en) * 2022-08-25 2022-12-13 中煤科工西安研究院(集团)有限公司 Micro pile composite structure for reinforcing broken stratum, micro pile and construction process

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110820732A (en) * 2019-10-31 2020-02-21 广西大学 Cast-in-situ bored pile suitable for karst area with connectivity channel and pile forming method
CN115467358A (en) * 2022-08-25 2022-12-13 中煤科工西安研究院(集团)有限公司 Micro pile composite structure for reinforcing broken stratum, micro pile and construction process
CN115467358B (en) * 2022-08-25 2023-12-26 中煤科工西安研究院(集团)有限公司 Micro pile composite structure for reinforcing broken stratum, micro pile and construction process

Similar Documents

Publication Publication Date Title
CN110230309B (en) Karst area bridge karst cave pile foundation construction method
CN103184734B (en) A kind of construction method implanting slip casting compound pile
CN104612134A (en) Cast-in place pile post-grouting construction method for pouring construction
CN104234055B (en) A kind of prefabricated pile post-grouting device and technique thereof
CN105672348A (en) Construction method for cropping bridge pile foundation at sandy gravel stratum of abyssal region
CN101525881B (en) Structure of karst strata pile holes protecting wall and method for constructing pile holes
CN108612086B (en) Construction method of fractured geological cast-in-situ bored pile
CN103031839A (en) Construction method of hand-dug piles
CN104499479A (en) Dig-hole pile construction method based on penetration of sand gravel backfilling layer
CN105442532A (en) Construction method for pile-head-expanded bored pile
CN105780763A (en) Construction method of medium-hole vibrating casing wall protection type long spiral cast-in-situ bored pile
CN106907157B (en) A kind of shield machine normal pressure opens the cabin operation construction method
CN106948340A (en) A kind of construction method of the Manual excavated pile structure of high polymer grouting protection
CN203213101U (en) Embedding grouting combined pile
CN208472716U (en) Crack geology mortar leakage prevention drill-pouring pilework
CN103953030A (en) Threaded screwing inserting bar compaction filling pile
CN102235007B (en) Method for supporting deep foundation with upper nail-lower pile combination
CN216342131U (en) Shield tunnel invades limit stake and handles reinforced structure
CN203613568U (en) Anti-floating cement soil pile and anti-floating anchor rod combined anti-floating system
CN108643166A (en) The construction method for pulling out steel sheet pile soil vibration is beaten in a kind of weakening
CN203701112U (en) Composite foundation grouting steel tube type reinforced slope
CN207004431U (en) Soft soil foundation exciting drilling device
CN203808055U (en) Screw post-reinforced compacted pile
CN105040705A (en) Ground foundation treatment construction technology under multi-karst-cave geological conditions
CN105113513A (en) Anti-seepage foundation pit supporting structure and construction method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190517

Address after: 317500 Hebin Road, Daxi Town, Wenling City, Taizhou City, Zhejiang Province

Patentee after: China Construction Group Co. Ltd.

Address before: 310015 room 1901, unit 3, 3 Wanda Commercial Center, Gongshu District, Hangzhou, Zhejiang.

Patentee before: Hangzhou Jiang Run Science and Technology Ltd.