CN208472716U - Crack geology mortar leakage prevention drill-pouring pilework - Google Patents
Crack geology mortar leakage prevention drill-pouring pilework Download PDFInfo
- Publication number
- CN208472716U CN208472716U CN201820673573.4U CN201820673573U CN208472716U CN 208472716 U CN208472716 U CN 208472716U CN 201820673573 U CN201820673573 U CN 201820673573U CN 208472716 U CN208472716 U CN 208472716U
- Authority
- CN
- China
- Prior art keywords
- pouch
- leakage prevention
- mortar leakage
- crack
- grouting pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model relates to a kind of crack geology mortar leakage prevention drill-pouring pileworks, including filling pile cage of reinforcement, mortar leakage prevention pouch, pouch injecting cement paste and crack reinforcing body;Mortar leakage prevention pouch is set on the outside of the filling pile cage of reinforcement of gap region, and is orderly arranged outside each steel fibre grid and auxiliary Grouting Pipe in mortar leakage prevention pouch, pouch Grouting Pipe is inserted into inside mortar leakage prevention pouch;Mortar leakage prevention pouch is connect with filling pile cage of reinforcement by laterally fastening reinforcing bar;Mortar leakage prevention pouch squeezes wealthy and forms pouch injecting cement paste by pouch Grouting Pipe slip casting;Mortar leakage prevention pouch forms crack reinforcing body by slip casting on the outside of auxiliary Grouting Pipe.The beneficial effects of the utility model are: mortar leakage prevention pouch is arranged in flaw sites in the utility model, concrete can be effectively prevent to leak to gap region, improve the utilization rate of material;Crack reinforcing body is arranged in the utility model on the outside of pouch, can improve the load-carrying properties of foundation pile.
Description
Technical field
The utility model relates to filling pile structure, in particular to one kind can promote cast-in-place pile concrete pouring quality, change
The crack geotechnical boring filling pile structure of kind foundation pile load-carrying properties, belongs to geotechnical engineering field, is suitable for gap region bored concrete pile
Engineering.
Background technique
Bored concrete pile has obtained relatively broad answer as a kind of foundation pile form in science of bridge building and architectural engineering
With.When being irrigated pile driving construction under the geological conditions of crack, often need to set downwards sleeve from ground, but when the crack depth of burying compared with
When big, site operation cost and difficulty will increase dramatically.Simultaneously as there is a large amount of rubble more in crack geology, it is generally existing
The problems such as mechanical excavation difficulty is big, concrete spillage, seriously affects site operation efficiency.It is existing from the point of view of the stress performance of pile body
There is the stress performance of the bored concrete pile of gap region to be influenced by gap region more significant.
In consideration of it, being made to promote the construction quality of crack geotechnical boring bored concrete pile, raising site operation efficiency, reducing engineering
Valence, urgently utility model one kind can synchronize and realize that gap region hole slag quickly removes, cast-in-place pile concrete pouring quality mentions at present
The crack geotechnical boring cast-in-place pile construction method for the targets such as liter, foundation pile load-carrying properties improve, project cost reduces.
Utility model content
The purpose of the utility model is to overcome deficiency in the prior art, providing a kind of can not only promote bored concrete pile coagulation
Native pouring quality, the crack geology mortar leakage prevention drill-pouring pilework that foundation pile load-carrying properties can also be improved, reduce project cost.
This crack geology mortar leakage prevention drill-pouring pilework, including filling pile cage of reinforcement, mortar leakage prevention pouch, pouch slip casting
Body and crack reinforcing body;Mortar leakage prevention pouch is set on the outside of the filling pile cage of reinforcement of gap region, and in the outer of mortar leakage prevention pouch
Side sets gradually steel fibre grid and auxiliary Grouting Pipe, and pouch Grouting Pipe is inserted into inside mortar leakage prevention pouch;Mortar leakage prevention pouch with
Filling pile cage of reinforcement is by laterally fastening reinforcing bar connection;Mortar leakage prevention pouch squeezes wealthy and forms pouch note by pouch Grouting Pipe slip casting
Slurry;Mortar leakage prevention pouch forms crack reinforcing body by slip casting on the outside of auxiliary Grouting Pipe.
As preferred: the mortar leakage prevention pouch uses geotextile material, and grouting amount is according to mortar leakage prevention capsule in mortar leakage prevention pouch
The volume of bag cavity predefines.
As preferred: using auxiliary Grouting Pipe to when slip casting, grouting pressure is outer lateral earth pressure on the outside of mortar leakage prevention pouch
1.1~1.5 times.
As preferred: the gap region is located between crack lower part rock stratum and crack top rock stratum.
The beneficial effects of the utility model are:
(1) mortar leakage prevention pouch is arranged in flaw sites in the utility model, and concrete can be effectively prevent to leak to gap region,
Improve the utilization rate of material.
(2) crack reinforcing body is arranged in the utility model on the outside of pouch, can improve the load-carrying properties of foundation pile.
Detailed description of the invention
Fig. 1 is sectional schematic diagram after the completion of the utility model filling pile construction.
Description of symbols: 1- gap region;The crack 2- lower part rock stratum;The crack 3- top rock stratum;4- filling pile cage of reinforcement;
5- mortar leakage prevention pouch;6- steel fibre grid;7- assists Grouting Pipe;8- pouch Grouting Pipe;9- laterally fastens reinforcing bar;10- pouch note
Slurry;The crack 11- reinforcing body.
Specific embodiment
The utility model is described further below with reference to embodiment.The explanation of following embodiments is only intended to help to manage
Solve the utility model.It should be pointed out that for those skilled in the art, not departing from the utility model principle
Under the premise of, several improvements and modifications can be made to this utility model, these improvement and modification also fall into the utility model
In scope of protection of the claims.
Mix Design and pouring construction technical requirements, mortar leakage prevention pouch design and construction technical requirements, reinforcing bar
Cage construction technical requirement etc., repeats no more in present embodiment, and emphasis illustrates that the utility model relates to the embodiments of method.
Shown in referring to Fig.1, the crack geology mortar leakage prevention drill-pouring pilework, in the bored concrete pile steel of gap region 1
Mortar leakage prevention pouch 5 is set on the outside of muscle cage 4, and is orderly arranged outside each steel fibre grid 6 and auxiliary Grouting Pipe in mortar leakage prevention pouch 5
7, pouch Grouting Pipe 6 is inserted into inside mortar leakage prevention pouch 5;By mortar leakage prevention pouch 5 and filling pile cage of reinforcement 4 by laterally fastening steel
Muscle 9 connects;By pouch Grouting Pipe 8, into mortar leakage prevention pouch 5, wealthy mortar leakage prevention pouch 5 is squeezed in slip casting, and forms pouch injecting cement paste 10;
The position of filling pile cage of reinforcement 4 is checked, then is irrigated pile concreting;Pass through auxiliary slip casting before cast-in-place pile concrete final set
Pipe 7 forms crack reinforcing body 11 to the 5 outside slip casting of mortar leakage prevention pouch.
1 height of gap region is 3m, and gapfiller is clay, and rock is sand gravel.
Crack lower part rock stratum 2 is weak weathering glutenite.
Crack top rock stratum 3 is the glutenite of severely-weathered~completely decomposed.
Steel reinforcement cage 4 is diameter 1000mm, indulges muscle and uses HRB335, stirrup uses HPB300.
In the outside of steel reinforcement cage 4 setting mortar leakage prevention pouch 5, steel fibre grid 6, auxiliary Grouting Pipe 7;In mortar leakage prevention pouch 5
Inside insertion pouch Grouting Pipe 8;Mortar leakage prevention pouch 5 is connect with filling pile cage of reinforcement 4 by laterally fastening reinforcing bar 9.
Mortar leakage prevention pouch 5 uses geomembrane, and height 4m is set on the outside of steel reinforcement cage.
Steel fibre grid 6 is set on the outside of steel reinforcement cage, using steel plastic geogrid.
Auxiliary Grouting Pipe 7 and pouch Grouting Pipe 8 are all made of the steel pipe that diameter is 30mm, steel strength Q235B.Utilize capsule
The bag cement injection slurries into mortar leakage prevention pouch 5 of Grouting Pipe 8, form pouch injecting cement paste 10.
Laterally fastening reinforcing bar 9 uses the HPB300 grade reinforcing bar of diameter 10mm.
Crack reinforcing body 11 uses the concrete of C35.
Claims (4)
1. a kind of crack geology mortar leakage prevention drill-pouring pilework, it is characterised in that including filling pile cage of reinforcement (4), mortar leakage prevention capsule
Bag (5), pouch injecting cement paste (10) and crack reinforcing body (11);Setting is anti-on the outside of the filling pile cage of reinforcement (4) of gap region (1)
Spillage pouch (5), and it is orderly arranged outside each steel fibre grid (6) and auxiliary Grouting Pipe (7) in mortar leakage prevention pouch (5), anti-
Pouch Grouting Pipe (8) are inserted into inside spillage pouch (5);Mortar leakage prevention pouch (5) and filling pile cage of reinforcement (4) are by laterally fastening steel
Muscle (9) connection;Mortar leakage prevention pouch (5) squeezes wealthy and forms pouch injecting cement paste (10) by pouch Grouting Pipe (8) slip casting;Mortar leakage prevention capsule
Bag (5) forms crack reinforcing body (11) by slip casting on the outside of auxiliary Grouting Pipe (7).
2. crack geology mortar leakage prevention drill-pouring pilework according to claim 1, it is characterised in that the mortar leakage prevention capsule
Bag (5) uses geotextile material, and mortar leakage prevention pouch (5) interior grouting amount is predefined according to the volume of mortar leakage prevention pouch (5) cavity.
3. crack geology mortar leakage prevention drill-pouring pilework according to claim 1, it is characterised in that using auxiliary slip casting
(7) are managed to when slip casting, grouting pressure is 1.1~1.5 times of outer lateral earth pressure on the outside of mortar leakage prevention pouch (5).
4. crack geology mortar leakage prevention drill-pouring pilework according to claim 1, it is characterised in that the gap region
(1) between crack lower part rock stratum (2) and crack top rock stratum (3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820673573.4U CN208472716U (en) | 2018-05-07 | 2018-05-07 | Crack geology mortar leakage prevention drill-pouring pilework |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820673573.4U CN208472716U (en) | 2018-05-07 | 2018-05-07 | Crack geology mortar leakage prevention drill-pouring pilework |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208472716U true CN208472716U (en) | 2019-02-05 |
Family
ID=65220496
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820673573.4U Active CN208472716U (en) | 2018-05-07 | 2018-05-07 | Crack geology mortar leakage prevention drill-pouring pilework |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208472716U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110820732A (en) * | 2019-10-31 | 2020-02-21 | 广西大学 | Cast-in-situ bored pile suitable for karst area with connectivity channel and pile forming method |
CN115467358A (en) * | 2022-08-25 | 2022-12-13 | 中煤科工西安研究院(集团)有限公司 | Micro pile composite structure for reinforcing broken stratum, micro pile and construction process |
-
2018
- 2018-05-07 CN CN201820673573.4U patent/CN208472716U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110820732A (en) * | 2019-10-31 | 2020-02-21 | 广西大学 | Cast-in-situ bored pile suitable for karst area with connectivity channel and pile forming method |
CN115467358A (en) * | 2022-08-25 | 2022-12-13 | 中煤科工西安研究院(集团)有限公司 | Micro pile composite structure for reinforcing broken stratum, micro pile and construction process |
CN115467358B (en) * | 2022-08-25 | 2023-12-26 | 中煤科工西安研究院(集团)有限公司 | Micro pile composite structure for reinforcing broken stratum, micro pile and construction process |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110230309B (en) | Karst area bridge karst cave pile foundation construction method | |
CN103184734B (en) | A kind of construction method implanting slip casting compound pile | |
CN104612134A (en) | Cast-in place pile post-grouting construction method for pouring construction | |
CN104234055B (en) | A kind of prefabricated pile post-grouting device and technique thereof | |
CN105672348A (en) | Construction method for cropping bridge pile foundation at sandy gravel stratum of abyssal region | |
CN101525881B (en) | Structure of karst strata pile holes protecting wall and method for constructing pile holes | |
CN108612086B (en) | Construction method of fractured geological cast-in-situ bored pile | |
CN103031839A (en) | Construction method of hand-dug piles | |
CN104499479A (en) | Dig-hole pile construction method based on penetration of sand gravel backfilling layer | |
CN105442532A (en) | Construction method for pile-head-expanded bored pile | |
CN105780763A (en) | Construction method of medium-hole vibrating casing wall protection type long spiral cast-in-situ bored pile | |
CN106907157B (en) | A kind of shield machine normal pressure opens the cabin operation construction method | |
CN106948340A (en) | A kind of construction method of the Manual excavated pile structure of high polymer grouting protection | |
CN203213101U (en) | Embedding grouting combined pile | |
CN208472716U (en) | Crack geology mortar leakage prevention drill-pouring pilework | |
CN103953030A (en) | Threaded screwing inserting bar compaction filling pile | |
CN102235007B (en) | Method for supporting deep foundation with upper nail-lower pile combination | |
CN216342131U (en) | Shield tunnel invades limit stake and handles reinforced structure | |
CN203613568U (en) | Anti-floating cement soil pile and anti-floating anchor rod combined anti-floating system | |
CN108643166A (en) | The construction method for pulling out steel sheet pile soil vibration is beaten in a kind of weakening | |
CN203701112U (en) | Composite foundation grouting steel tube type reinforced slope | |
CN207004431U (en) | Soft soil foundation exciting drilling device | |
CN203808055U (en) | Screw post-reinforced compacted pile | |
CN105040705A (en) | Ground foundation treatment construction technology under multi-karst-cave geological conditions | |
CN105113513A (en) | Anti-seepage foundation pit supporting structure and construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20190517 Address after: 317500 Hebin Road, Daxi Town, Wenling City, Taizhou City, Zhejiang Province Patentee after: China Construction Group Co. Ltd. Address before: 310015 room 1901, unit 3, 3 Wanda Commercial Center, Gongshu District, Hangzhou, Zhejiang. Patentee before: Hangzhou Jiang Run Science and Technology Ltd. |