CN201459770U - Joint structure between two different fender bodies in deep foundation pit - Google Patents

Joint structure between two different fender bodies in deep foundation pit Download PDF

Info

Publication number
CN201459770U
CN201459770U CN2009200686699U CN200920068669U CN201459770U CN 201459770 U CN201459770 U CN 201459770U CN 2009200686699 U CN2009200686699 U CN 2009200686699U CN 200920068669 U CN200920068669 U CN 200920068669U CN 201459770 U CN201459770 U CN 201459770U
Authority
CN
China
Prior art keywords
pile soil
soil
baffling structure
steel sheet
deep foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009200686699U
Other languages
Chinese (zh)
Inventor
刘有才
张荣灿
冯成锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG ZHONGCHENG BUILDING ENGINEERING Co Ltd
Original Assignee
ZHEJIANG ZHONGCHENG BUILDING ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG ZHONGCHENG BUILDING ENGINEERING Co Ltd filed Critical ZHEJIANG ZHONGCHENG BUILDING ENGINEERING Co Ltd
Priority to CN2009200686699U priority Critical patent/CN201459770U/en
Application granted granted Critical
Publication of CN201459770U publication Critical patent/CN201459770U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The utility model relates to a joint structure between two different fender bodies in a deep foundation pit, which comprises a bored pile soil-blocking structure, a Larson steel plate pile soil-blocking structure and a soil-cement mixing pile water-stopping structure. The joint structure is characterized in that: the Larson steel plate pile soil-blocking structure is extended outwards to form an extended water-stopping segment at the vertical intersecting position between the bored pile soil-blocking structure and the Larson steel plate pile soil-blocking structure, and the soil-cement mixing pile water-stopping structure envelopes the bored pile soil-blocking structure, the Larson steel plate pile soil-blocking structure and the extended water-stopping segment from the periphery so as to form the labyrinth type joint structure. The joint structure has the advantages of effective soil blocking, long lasting time of water stopping, stable combination, strong seepage resisting performance, simple as well as convenient construction and the like.

Description

Joint design in the deep foundation ditch between two kinds of different fender bodies
Technical field
The utility model relates in the deep foundation ditch of a kind of industry and civilian construction the joint design between two kinds of different fender bodies.
Background technology
In the construction of deep big foundation pit, run into a underground structrue engineering by two owners or divide the situation (as Fig. 1) that two phases successively developed through regular meeting.For guaranteeing the reliability of (or first owner) foundation pit construction in early stage, should foundation ditch around ring close, it is continuous with early stage (or first owner) to take into account later stage (or second owner) foundation pit enclosure structure again.(or the first owner) foundation pit enclosure structure in early stage that for this reason requires to be located at the later stage in (or second owner) zone must be able to be removed smoothly, and must keep off soil effectively in early stage in the bracing of foundation pit.Therefore in the global design of foundation ditch, formed the combination of two kinds of different fender body structures, effective for the application that makes these two kinds of different fender body textural associations, must guarantee that its joint between the two is effective.Cause heavy economic losses for fear of having an accident, the joint design between different dimensional protection structure body has been proposed requirements at the higher level.
The utility model content
Joint design between two kinds of different fender bodies is provided to provide in a kind of deep foundation ditch the purpose of this utility model, stability and the anti-leakage that it has effective retaining soil and the sealing efficiency time is long, strengthen the junction, the advantage such as simple of constructing.
For achieving the above object, the present invention adopts following technical proposals:
Joint design in a kind of deep foundation ditch between two kinds of different fender bodies, comprise drill-pouring pile soil-baffling structure, Larsen steel sheet pile soil-baffling structure and cement mixing method water-stopping structure, it is characterized in that in described drill-pouring pile soil-baffling structure and the vertical intersection of Larsen steel sheet pile soil-baffling structure, the Larsen steel sheet pile soil-baffling structure one section extension sealing section that stretches out, described cement mixing method water-stopping structure described drill-pouring pile soil-baffling structure and Larsen steel sheet pile soil-baffling structure and extension sealing section thereof from peripheral envelope, constitutes the labyrinth joint structure.
Above-mentioned drill-pouring pile soil-baffling structure is perpendicular retaining fortifield village watch box of listing in the foundation ditch perisporium, and described Larsen steel sheet pile soil-baffling structure is listed in the interim retaining fortifield village watch box that deep foundation ditch is cut apart the place for perpendicular.
Between the Larsen steel sheet pile soil-baffling structure of above-mentioned extension sealing section and the cement mixing method water-stopping structure compaction grouting is arranged, this compaction grouting is the cement compaction grouting.
The perimetric length L of above-mentioned extension sealing section is 2.5~3 meters.。
The utility model compared with prior art, have following conspicuous substantive distinguishing features and advantage: the utility model forms the labyrinth joint structure by the lap length of control space enclosing structure, the underground water horizontal permeation path of effectively having extended delays and reduces and even the seepage stopped herein takes place.By to the compaction grouting between water-stopping structure and soil-baffling structure, remedied as the cement mixing method of water-stopping structure and the interlock defect of insufficient has easily taken place on the technology between stake and then making antiseepage tighter, soil body permeability resistance is strengthened, have more characteristics such as the sealing efficiency time is long, construction is simple.
Description of drawings
Fig. 1 is the underground construction subregion schematic diagram of the deep foundation ditch of one of the utility model with two kinds of different fender bodies.
Fig. 2 is the joint design at A place among Fig. 1.
Fig. 3 is a B-B place sectional drawing among Fig. 2.
The specific embodiment
A preferential embodiment accompanying drawings of the present utility model is as follows: referring to Fig. 1, Fig. 2 and Fig. 3.Joint design in this deep foundation ditch between two kinds of different fender bodies, comprise drill-pouring pile soil-baffling structure 3, Larsen steel sheet pile soil-baffling structure 6 and cement mixing method water-stopping structure 2, described drill-pouring pile soil-baffling structure 3 and Larsen steel sheet pile soil-baffling structure 6 vertical intersections, the Larsen steel sheet pile soil-baffling structure 6 one section extension sealing section 4 that stretches out, described cement mixing method water-stopping structure 2 described drill-pouring pile soil-baffling structure 3 and Larsen steel sheet pile soil-baffling structure 6 and extension sealing section 4 thereof from peripheral envelope, constitutes the labyrinth joint structure.
Above-mentioned drill-pouring pile soil-baffling structure 3 is perpendicular retaining fortifield village watch box of listing in foundation ditch perisporium 1.
Above-mentioned Larsen steel sheet pile soil-baffling structure 6 is listed in the interim retaining fortifield village watch box that deep foundation ditch is cut apart place 7 for perpendicular.
Between the Larsen steel sheet pile soil-baffling structure 6 of above-mentioned extension sealing section 4 and the cement mixing method water-stopping structure 2 compaction grouting 5 is arranged, this compaction grouting 5 is the cement compaction grouting.
The perimetric length L of above-mentioned extension sealing section 4 is 2.5~3 meters.

Claims (4)

1. the joint design between two kinds of different fender bodies in the deep foundation ditch, comprise drill-pouring pile soil-baffling structure (3), Larsen steel sheet pile soil-baffling structure (6) and cement mixing method water-stopping structure (2), it is characterized in that in described drill-pouring pile soil-baffling structure (3) and the vertical intersection of Larsen steel sheet pile soil-baffling structure (6), Larsen steel sheet pile soil-baffling structure (6) the one section extension sealing section (4) that stretches out, described cement mixing method water-stopping structure (2) described drill-pouring pile soil-baffling structure (3) and Larsen steel sheet pile soil-baffling structure (6) and extension sealing section (4) thereof from peripheral envelope, constitutes the labyrinth joint structure.
2. the joint design in the deep foundation ditch according to claim 1 between two kinds of different fender bodies, it is characterized in that described drill-pouring pile soil-baffling structure (3) is perpendicular retaining fortifield village watch box of listing in foundation ditch perisporium (1), described Larsen steel sheet pile soil-baffling structure (6) is listed in the interim retaining fortifield village watch box that deep foundation ditch is cut apart place (7) for perpendicular.
3. the joint design in the deep foundation ditch according to claim 1 between two kinds of different fender bodies, it is characterized in that between the Larsen steel sheet pile soil-baffling structure (6) of described extension sealing section (4) and the cement mixing method water-stopping structure (2) compaction grouting (5) being arranged, this compaction grouting (5) is the cement compaction grouting.
4. the joint design in the deep foundation ditch according to claim 1 between two kinds of different fender bodies, the perimetric length L that it is characterized in that described extension sealing section (4) is 2.5~3 meters.
CN2009200686699U 2009-03-11 2009-03-11 Joint structure between two different fender bodies in deep foundation pit Expired - Fee Related CN201459770U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009200686699U CN201459770U (en) 2009-03-11 2009-03-11 Joint structure between two different fender bodies in deep foundation pit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009200686699U CN201459770U (en) 2009-03-11 2009-03-11 Joint structure between two different fender bodies in deep foundation pit

Publications (1)

Publication Number Publication Date
CN201459770U true CN201459770U (en) 2010-05-12

Family

ID=42387123

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009200686699U Expired - Fee Related CN201459770U (en) 2009-03-11 2009-03-11 Joint structure between two different fender bodies in deep foundation pit

Country Status (1)

Country Link
CN (1) CN201459770U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102383432A (en) * 2011-02-23 2012-03-21 上海城地建设发展有限公司 Enclosure method for inserting H-shaped reinforced concrete slab piles in three-axis (two-axis) cement mixing pile
CN102635120A (en) * 2012-05-04 2012-08-15 张全胜 Supportless construction structure and supportless construction method for round deep base pit
CN105649090A (en) * 2016-03-01 2016-06-08 江苏东合南岩土科技股份有限公司 Construction method for support combining steel sheet piles and stirring piles

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102383432A (en) * 2011-02-23 2012-03-21 上海城地建设发展有限公司 Enclosure method for inserting H-shaped reinforced concrete slab piles in three-axis (two-axis) cement mixing pile
CN102635120A (en) * 2012-05-04 2012-08-15 张全胜 Supportless construction structure and supportless construction method for round deep base pit
CN102635120B (en) * 2012-05-04 2016-01-13 张全胜 Circular deep foundation ditch is without Construction of Supporting structure and construction method
CN105649090A (en) * 2016-03-01 2016-06-08 江苏东合南岩土科技股份有限公司 Construction method for support combining steel sheet piles and stirring piles

Similar Documents

Publication Publication Date Title
CN105040595B (en) Main Pier of Bridges cushion cap foundation pit supporting construction on riverbed, gentle slope basement rock and construction method thereof
CN202559361U (en) Precast high strength concrete thin-wall steel pipe pile foundation pit supporting structure
CN203256729U (en) Larson steel sheet pile containment device for open caisson construction
CN103290848B (en) Large diameter arc-shaped steel sheet pile combined foundation pit retaining structure and construction method thereof
CN103526724A (en) Anchoring impervious structure in which reservoir bottom geomembrane is connected with reservoir periphery drainage gallery peripheral joints
CN201459770U (en) Joint structure between two different fender bodies in deep foundation pit
CN104790435A (en) Post-subsidence pouring belt advancing waterstop impermeable concrete structure and construction technology thereof
CN101824825B (en) Deep foundation pit open cutting construction method
CN107326896A (en) One kind combination steel construction support pile and construction method
CN104805828B (en) W-shaped steel sheet pile structure
CN203080536U (en) Foundation pit guard structure
CN204825926U (en) Utilize excavation supporting system of atmosphere pressure as holding power
CN101775800B (en) Cement earth pile with double functions and forming method thereof
CN204266164U (en) Concrete veneer and grill-shaped cement soil wall combined type bank protection structure
CN208266896U (en) A kind of seabed water-retaining structure across municipal tunnel greatly
CN203530959U (en) High-strength underground diaphragm wall
CN103850246A (en) End part protective shoe sleeve of steel plate pile
CN204626420U (en) A kind of flag-shaped foundation pit enclosure structure
CN105089060A (en) Foundation pit support system using atmospheric pressure as support force
CN203080480U (en) Upstream blanket structure of concrete face rockfill dam
CN201883449U (en) Sea wall structure of compound pile
CN101205723A (en) Construction method of underground building access in precondition of non-relocation of pipelines
CN206289633U (en) A kind of foundation ditch flexible supporting structure
CN104895095A (en) A method of reinforcing deep water foundation pit steel sheet pile cofferdams
CN101793026B (en) Water-stopping capping beam of stirring pile

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100512

Termination date: 20140311