CN202785176U - Novel construction hoist - Google Patents

Novel construction hoist Download PDF

Info

Publication number
CN202785176U
CN202785176U CN 201220460377 CN201220460377U CN202785176U CN 202785176 U CN202785176 U CN 202785176U CN 201220460377 CN201220460377 CN 201220460377 CN 201220460377 U CN201220460377 U CN 201220460377U CN 202785176 U CN202785176 U CN 202785176U
Authority
CN
China
Prior art keywords
guide rail
rail bracket
construction hoist
climbing shuttering
new type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220460377
Other languages
Chinese (zh)
Inventor
刘跃进
王化龙
李向辉
赵洪亮
贺伟萍
程惠祺
黄玉祯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Jinglong Engineering Machinery Co Ltd
Original Assignee
Guangzhou Jinglong Engineering Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Jinglong Engineering Machinery Co Ltd filed Critical Guangzhou Jinglong Engineering Machinery Co Ltd
Priority to CN 201220460377 priority Critical patent/CN202785176U/en
Application granted granted Critical
Publication of CN202785176U publication Critical patent/CN202785176U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a novel construction hoist. The novel construction hoist comprises cages for carrying people or goods, a guiderail bracket, a climbing formwork, and a climbing formwork follow-up guiderail bracket, wherein the guiderail bracket consists of standard knots, the cages are arranged on the guiderail bracket, the climbing formwork follow-up guiderail bracket is fixedly arranged on the climbing formwork, a temporary wall-attached device is arranged between the climbing formwork follow-up guiderail bracket and the climbing formwork, the temporary wall-attached device consists of a roller mechanism, a main frame and support arms, the main frame is connected with the roller mechanism by a bolt, the support arms are connected with the main frame and the guiderail bracket by bolts, the roller mechanism comprises a roller mounting seat and rollers, the rollers are arranged in the roller mounting seat, and the roller mounting seat and the climbing formwork follow-up guiderail bracket are connected. According to the novel construction hoist, when the cantilever height of the construction hoist is greater than 7.5m, the cage of the construction hoist can be directly hoisted to a top operating platform of the climbing formwork.

Description

A kind of New Type Construction Hoist
Technical field
The utility model relates to the building hoist technical field, is specifically related to a kind ofly when building hoist cantilever height during greater than 7.5m, can make construction elevator cage directly be promoted to the New Type Construction Hoist of climbing shuttering top workplatform.
Background technology
High speed development along with national economy, building hoist begins bringing into play huge effect at increasing building field, also to use some special functions in some special places, yet, because the continuous progress of production level, in order to boost productivity, economize labor time, people require also more and more higher to properity, the efficient of elevator.At present, because architectural design pattern, style is noveltyization constantly, trend, the construction of each project of giving also brings a series of problem, the guide rail bracket cantilever height of common building hoist is no more than 7.5m, and for the guide rail bracket cantilever height during greater than 7.5m, building hoist can not be promoted on the platform at climbing shuttering top, therefore cause significant impact to construction, particularly in the high building floor, therefore design a kind ofly when building hoist cantilever height during greater than 7.5m, the building hoist that can make construction elevator cage directly be promoted to climbing shuttering top workplatform seems particularly important.
The utility model content
The utility model embodiment technical matters to be solved is, a kind of New Type Construction Hoist is provided, and can solve when building hoist guide rail bracket cantilever height during greater than 7.5m, and construction elevator cage also can directly be promoted to climbing shuttering top workplatform.
In order to solve the problems of the technologies described above, the utility model embodiment provides a kind of New Type Construction Hoist, comprising:
The cage that is used for manned or goods, the guide rail bracket that is formed by standard knot, the servo-actuated guide rail bracket of climbing shuttering and climbing shuttering, described cage is installed on the guide rail bracket, the servo-actuated guide rail bracket of described climbing shuttering is fixed on the climbing shuttering, is provided with interim wall-attaching equipment between the servo-actuated guide rail bracket of described climbing shuttering and guide rail bracket.
Further, described interim wall-attaching equipment comprises idler wheel mechanism, body frame and hold-down arm, and described body frame links to each other with idler wheel mechanism by bolt, and described hold-down arm links to each other with body frame and guide rail bracket respectively by bolt.
Further, described idler wheel mechanism comprises roller mount pad and roller, and described roller places in the roller mount pad, and described roller mount pad is connected with the servo-actuated guide rail bracket of climbing shuttering.
Further, the servo-actuated guide rail bracket of described climbing shuttering is made of the monolithic standard knot, can be built into different height according to the construction needs.
Further, be provided with workplatform on the described climbing shuttering.
Further, described interim wall-attaching equipment in twos the interval mounting distance be 4.5 meters.
Further, the described interim wall-attaching equipment that is arranged on bottommost apart from the cantilever height of described guide rail bracket above 21 meters.
Further, described cage is two cages, places respectively the both sides of guide rail bracket.
A kind of New Type Construction Hoist that the utility model provides, between guide rail bracket and the servo-actuated guide rail bracket of climbing shuttering, interim wall-attaching equipment is set, when climbing shuttering climbs, the servo-actuated guide rail bracket of climbing shuttering will climb synchronously along with climbing shuttering, cage can be worked during greater than 7.5m in the guide rail bracket cantilever height, in the climbing shuttering upper end workplatform is installed, convenient construction personnel work, utilize simultaneously the idler wheel mechanism with roller mount pad and roller, it is fixing that interim wall-attaching equipment can be regulated according to construction requirement on the servo-actuated guide rail bracket of climbing shuttering.
Description of drawings
In order to be illustrated more clearly in the technical scheme among the utility model embodiment, the below will do to introduce simply to the accompanying drawing of required use among the embodiment, apparently, accompanying drawing in the following describes only is embodiment more of the present utility model, for those of ordinary skills, under the prerequisite of not paying creative work, can also obtain according to these accompanying drawings other accompanying drawing.
Fig. 1 is a kind of New Type Construction Hoist structural representation that the utility model provides;
Fig. 2 is interim wall-attaching equipment constructional drawing.
The specific embodiment
A kind of New Type Construction Hoist that the utility model embodiment provides, between guide rail bracket and the servo-actuated guide rail bracket of climbing shuttering, interim wall-attaching equipment is set, when climbing shuttering climbs, the servo-actuated guide rail bracket of climbing shuttering will climb synchronously along with climbing shuttering, cage can be worked during greater than 7.5m in the guide rail bracket cantilever height, on climbing shuttering, be provided with workplatform is installed, convenient construction personnel work, utilize simultaneously the idler wheel mechanism with roller mount pad and roller, it is fixing that interim wall-attaching equipment can be regulated according to construction requirement on the servo-actuated guide rail bracket of climbing shuttering.
Below in conjunction with the accompanying drawing among the utility model embodiment, the technical scheme among the utility model embodiment is clearly and completely described, obviously, described embodiment only is the utility model part embodiment, rather than whole embodiment.Based on the embodiment in the utility model, those of ordinary skills are not making the every other embodiment that obtains under the creative work prerequisite, all belong to the scope of the utility model protection.
Referring to Fig. 1, Fig. 2, a kind of New Type Construction Hoist structural representation that provides for the utility model and interim wall-attaching equipment constructional drawing, comprise the cage 1 for manned or goods, the quantity of described cage is 2, by the guide rail bracket 2 that standard knot consists of, the height of guide rail bracket 2 can be built different height according to the construction needs.Described cage 1 is installed in the both sides of guide rail bracket 2, the servo-actuated guide rail bracket 3 of climbing shuttering is connected on the climbing shuttering 4, the servo-actuated guide rail bracket 3 of described climbing shuttering is made of the monolithic standard knot, can be built into different height according to the construction needs, between the servo-actuated guide rail bracket 3 of climbing shuttering and guide rail bracket 2, be provided with interim wall-attaching equipment 5, described interim wall-attaching equipment 5 comprises idler wheel mechanism 6, body frame 7, hold-down arm 8, described body frame 7 is bolted on the idler wheel mechanism 6, described hold-down arm 8 is separately fixed on body frame 7 and the guide rail bracket 2 by bolt, described idler wheel mechanism 6 comprises roller mount pad 11 and roller 9, described roller mount pad 11 is connected with the servo-actuated guide rail bracket 3 of climbing shuttering by roller 9, the cantilever height of the described guide rail bracket 2 of the interim wall-attaching equipment distance of bottommost is above 21 meters, be provided with workplatform 10 in climbing shuttering 4 upper ends, convenient construction personnel's work.
When guide rail bracket 2 cantilever height during greater than 7.5m, for guaranteeing the building hoist normal operation, form the servo-actuated guide rail bracket 3 of climbing shuttering with the docking of monolithic standard knot, the servo-actuated guide rail bracket 3 of climbing shuttering is fixed on the climbing shuttering 4, interim wall-attaching equipment 5 one ends are connected with the servo-actuated guide rail bracket 3 of climbing shuttering, interim wall-attaching equipment 5 other ends are connected on the building hoist guide rail bracket 2, make the cantilever height of building hoist guide rail bracket 2 guarantee to be not more than 7.5m, be fixedly connected on the servo-actuated guide rail bracket 3 of climbing shuttering on the climbing shuttering 4, when climbing shuttering 4 up climbs, the servo-actuated guide rail bracket 3 of climbing shuttering will climb synchronously along with climbing shuttering 4, climb behind the 4.5m, the most beneath one roller 9 breaks away from the servo-actuated guide rail bracket 3 of climbing shuttering, this moment, building hoist guide rail bracket 2 tops will be greater than 7.5m, the most beneath together interim wall-attaching equipment 5 is pulled down from building hoist guide rail bracket 2, on move to apart from interim 4.5m place, wall-attaching equipment 5 top installation topmost together, count from the interim wall-attaching equipment of top 5 tops, this moment, building hoist guide rail bracket 2 cantilevers will be less than or equal to 7.5m, when climbing shuttering 4 climbs again, repeat above-mentioned steps, guarantee that building hoist guide rail bracket 2 cantilever height are less than or equal to 7.5m.
Above content is in conjunction with concrete preferred implementation further detailed description of the utility model, can not assert that implementation of the present utility model is confined to these explanations.For the utility model person of an ordinary skill in the technical field, without departing from the concept of the premise utility, can also make some simple deduction or replace, all should be considered as belonging to protection domain of the present utility model.

Claims (8)

1. New Type Construction Hoist, comprise the cage for manned or goods, the guide rail bracket that is formed by standard knot, the servo-actuated guide rail bracket of climbing shuttering and climbing shuttering, described cage is installed on the guide rail bracket, the servo-actuated guide rail bracket of described climbing shuttering is fixed on the climbing shuttering, it is characterized in that, is provided with interim wall-attaching equipment between the servo-actuated guide rail bracket of described climbing shuttering and guide rail bracket.
2. a kind of New Type Construction Hoist according to claim 1, it is characterized in that, described interim wall-attaching equipment comprises idler wheel mechanism, body frame and hold-down arm, and described body frame links to each other with idler wheel mechanism by bolt, and described hold-down arm links to each other with body frame and guide rail bracket respectively by bolt.
3. a kind of New Type Construction Hoist according to claim 2 is characterized in that, described idler wheel mechanism comprises roller mount pad and roller, and described roller places in the roller mount pad, and described roller mount pad is connected with the servo-actuated guide rail bracket of climbing shuttering.
4. a kind of New Type Construction Hoist according to claim 1 is characterized in that, the servo-actuated guide rail bracket of described climbing shuttering is made of the monolithic standard knot.
5. a kind of New Type Construction Hoist according to claim 3 is characterized in that, described climbing shuttering upper end is provided with workplatform.
6. a kind of New Type Construction Hoist according to claim 5 is characterized in that, described interim wall-attaching equipment in twos interval mounting distance is 4.5 meters.
7. a kind of New Type Construction Hoist according to claim 6 is characterized in that, the described interim wall-attaching equipment that is arranged on bottommost apart from the cantilever height of described guide rail bracket above 21 meters.
8. each described a kind of New Type Construction Hoist is characterized in that according to claim 1-7, and described cage is two cages, and described cage places respectively the both sides of guide rail bracket.
CN 201220460377 2012-09-11 2012-09-11 Novel construction hoist Expired - Fee Related CN202785176U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220460377 CN202785176U (en) 2012-09-11 2012-09-11 Novel construction hoist

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220460377 CN202785176U (en) 2012-09-11 2012-09-11 Novel construction hoist

Publications (1)

Publication Number Publication Date
CN202785176U true CN202785176U (en) 2013-03-13

Family

ID=47812484

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220460377 Expired - Fee Related CN202785176U (en) 2012-09-11 2012-09-11 Novel construction hoist

Country Status (1)

Country Link
CN (1) CN202785176U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103303772A (en) * 2013-06-19 2013-09-18 泰兴市第一建筑安装工程有限公司 Ultra-long wall attaching device of construction lift
CN103342269A (en) * 2013-07-11 2013-10-09 中建三局建设工程股份有限公司 Attaching mechanism and ejecting method for super high-rise construction elevator
CN103723600A (en) * 2014-01-17 2014-04-16 上海建工集团股份有限公司 Wall attaching device of construction elevator steel charging platform as well as operation method of wall attaching device
CN104401889A (en) * 2014-11-21 2015-03-11 中联重科股份有限公司 Wall attaching frame and construction lifting machine with wall attaching frame
CN105366482A (en) * 2014-08-08 2016-03-02 北京天和建筑机械设备租赁有限责任公司 A sliding anchoring device for a construction hoist
CN107043060A (en) * 2017-03-08 2017-08-15 广州市特威工程机械有限公司 A kind of installation method of inverse formula installation lift

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103303772A (en) * 2013-06-19 2013-09-18 泰兴市第一建筑安装工程有限公司 Ultra-long wall attaching device of construction lift
CN103342269A (en) * 2013-07-11 2013-10-09 中建三局建设工程股份有限公司 Attaching mechanism and ejecting method for super high-rise construction elevator
CN103342269B (en) * 2013-07-11 2016-03-30 中建三局建设工程股份有限公司 A kind of attachment mechanism of Super High construction elevator and jacking method
CN103723600A (en) * 2014-01-17 2014-04-16 上海建工集团股份有限公司 Wall attaching device of construction elevator steel charging platform as well as operation method of wall attaching device
CN105366482A (en) * 2014-08-08 2016-03-02 北京天和建筑机械设备租赁有限责任公司 A sliding anchoring device for a construction hoist
CN104401889A (en) * 2014-11-21 2015-03-11 中联重科股份有限公司 Wall attaching frame and construction lifting machine with wall attaching frame
CN104401889B (en) * 2014-11-21 2016-08-24 中联重科股份有限公司 Wall-attached frame and there is its building hoist
CN107043060A (en) * 2017-03-08 2017-08-15 广州市特威工程机械有限公司 A kind of installation method of inverse formula installation lift

Similar Documents

Publication Publication Date Title
CN202785176U (en) Novel construction hoist
CN104528500B (en) Double tabletop is without scaffold elevator installing method
CN202881852U (en) Suspension bridge cable installation system
CN102556891A (en) Slide lifter
CN205662201U (en) Novel elevator suspends in midair device
CN103896127A (en) Connecting structure of construction hoist and building climbing formwork frame
CN204024013U (en) A kind of self-climbing lifting material platform
CN103991802B (en) A kind of large-scale derrick crane taking driver personnel
CN213416063U (en) Overhead hanging basket for steel reinforcement framework
CN206359150U (en) A kind of hanging basket system
CN205575409U (en) Unpowered self -propelled of large -span cable crane machine holds all alone ware
CN205777428U (en) Elevator is from climbing platforms
CN209873572U (en) Interim navigation lifting station of adjustable vertical lift height
CN201793300U (en) Elevator
CN2871634Y (en) Bridge maintaining equipment
CN202023149U (en) Hanging basket used in construction
CN104514390B (en) The many double-deck simple lifting lugs that post is installed altogether
CN212771963U (en) Movable suspension operation platform
CN205276967U (en) Garage lifting platform
CN113955611A (en) Novel elevator with three-side door
CN204549738U (en) A kind of arrangement structure of machine-roomless lift
CN202465179U (en) Slide lifter
CN105692411A (en) Elevator layout structure without machine room
CN201459602U (en) Equipment for bridge construction
CN202729516U (en) Running positioning roller device for cable trolley of construction lift

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130313

Termination date: 20160911