CN202785176U - Novel construction hoist - Google Patents
Novel construction hoist Download PDFInfo
- Publication number
- CN202785176U CN202785176U CN 201220460377 CN201220460377U CN202785176U CN 202785176 U CN202785176 U CN 202785176U CN 201220460377 CN201220460377 CN 201220460377 CN 201220460377 U CN201220460377 U CN 201220460377U CN 202785176 U CN202785176 U CN 202785176U
- Authority
- CN
- China
- Prior art keywords
- guide rail
- rail bracket
- construction hoist
- climbing shuttering
- new type
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model discloses a novel construction hoist. The novel construction hoist comprises cages for carrying people or goods, a guiderail bracket, a climbing formwork, and a climbing formwork follow-up guiderail bracket, wherein the guiderail bracket consists of standard knots, the cages are arranged on the guiderail bracket, the climbing formwork follow-up guiderail bracket is fixedly arranged on the climbing formwork, a temporary wall-attached device is arranged between the climbing formwork follow-up guiderail bracket and the climbing formwork, the temporary wall-attached device consists of a roller mechanism, a main frame and support arms, the main frame is connected with the roller mechanism by a bolt, the support arms are connected with the main frame and the guiderail bracket by bolts, the roller mechanism comprises a roller mounting seat and rollers, the rollers are arranged in the roller mounting seat, and the roller mounting seat and the climbing formwork follow-up guiderail bracket are connected. According to the novel construction hoist, when the cantilever height of the construction hoist is greater than 7.5m, the cage of the construction hoist can be directly hoisted to a top operating platform of the climbing formwork.
Description
Technical field
The utility model relates to the building hoist technical field, is specifically related to a kind ofly when building hoist cantilever height during greater than 7.5m, can make construction elevator cage directly be promoted to the New Type Construction Hoist of climbing shuttering top workplatform.
Background technology
High speed development along with national economy, building hoist begins bringing into play huge effect at increasing building field, also to use some special functions in some special places, yet, because the continuous progress of production level, in order to boost productivity, economize labor time, people require also more and more higher to properity, the efficient of elevator.At present, because architectural design pattern, style is noveltyization constantly, trend, the construction of each project of giving also brings a series of problem, the guide rail bracket cantilever height of common building hoist is no more than 7.5m, and for the guide rail bracket cantilever height during greater than 7.5m, building hoist can not be promoted on the platform at climbing shuttering top, therefore cause significant impact to construction, particularly in the high building floor, therefore design a kind ofly when building hoist cantilever height during greater than 7.5m, the building hoist that can make construction elevator cage directly be promoted to climbing shuttering top workplatform seems particularly important.
The utility model content
The utility model embodiment technical matters to be solved is, a kind of New Type Construction Hoist is provided, and can solve when building hoist guide rail bracket cantilever height during greater than 7.5m, and construction elevator cage also can directly be promoted to climbing shuttering top workplatform.
In order to solve the problems of the technologies described above, the utility model embodiment provides a kind of New Type Construction Hoist, comprising:
The cage that is used for manned or goods, the guide rail bracket that is formed by standard knot, the servo-actuated guide rail bracket of climbing shuttering and climbing shuttering, described cage is installed on the guide rail bracket, the servo-actuated guide rail bracket of described climbing shuttering is fixed on the climbing shuttering, is provided with interim wall-attaching equipment between the servo-actuated guide rail bracket of described climbing shuttering and guide rail bracket.
Further, described interim wall-attaching equipment comprises idler wheel mechanism, body frame and hold-down arm, and described body frame links to each other with idler wheel mechanism by bolt, and described hold-down arm links to each other with body frame and guide rail bracket respectively by bolt.
Further, described idler wheel mechanism comprises roller mount pad and roller, and described roller places in the roller mount pad, and described roller mount pad is connected with the servo-actuated guide rail bracket of climbing shuttering.
Further, the servo-actuated guide rail bracket of described climbing shuttering is made of the monolithic standard knot, can be built into different height according to the construction needs.
Further, be provided with workplatform on the described climbing shuttering.
Further, described interim wall-attaching equipment in twos the interval mounting distance be 4.5 meters.
Further, the described interim wall-attaching equipment that is arranged on bottommost apart from the cantilever height of described guide rail bracket above 21 meters.
Further, described cage is two cages, places respectively the both sides of guide rail bracket.
A kind of New Type Construction Hoist that the utility model provides, between guide rail bracket and the servo-actuated guide rail bracket of climbing shuttering, interim wall-attaching equipment is set, when climbing shuttering climbs, the servo-actuated guide rail bracket of climbing shuttering will climb synchronously along with climbing shuttering, cage can be worked during greater than 7.5m in the guide rail bracket cantilever height, in the climbing shuttering upper end workplatform is installed, convenient construction personnel work, utilize simultaneously the idler wheel mechanism with roller mount pad and roller, it is fixing that interim wall-attaching equipment can be regulated according to construction requirement on the servo-actuated guide rail bracket of climbing shuttering.
Description of drawings
In order to be illustrated more clearly in the technical scheme among the utility model embodiment, the below will do to introduce simply to the accompanying drawing of required use among the embodiment, apparently, accompanying drawing in the following describes only is embodiment more of the present utility model, for those of ordinary skills, under the prerequisite of not paying creative work, can also obtain according to these accompanying drawings other accompanying drawing.
Fig. 1 is a kind of New Type Construction Hoist structural representation that the utility model provides;
Fig. 2 is interim wall-attaching equipment constructional drawing.
The specific embodiment
A kind of New Type Construction Hoist that the utility model embodiment provides, between guide rail bracket and the servo-actuated guide rail bracket of climbing shuttering, interim wall-attaching equipment is set, when climbing shuttering climbs, the servo-actuated guide rail bracket of climbing shuttering will climb synchronously along with climbing shuttering, cage can be worked during greater than 7.5m in the guide rail bracket cantilever height, on climbing shuttering, be provided with workplatform is installed, convenient construction personnel work, utilize simultaneously the idler wheel mechanism with roller mount pad and roller, it is fixing that interim wall-attaching equipment can be regulated according to construction requirement on the servo-actuated guide rail bracket of climbing shuttering.
Below in conjunction with the accompanying drawing among the utility model embodiment, the technical scheme among the utility model embodiment is clearly and completely described, obviously, described embodiment only is the utility model part embodiment, rather than whole embodiment.Based on the embodiment in the utility model, those of ordinary skills are not making the every other embodiment that obtains under the creative work prerequisite, all belong to the scope of the utility model protection.
Referring to Fig. 1, Fig. 2, a kind of New Type Construction Hoist structural representation that provides for the utility model and interim wall-attaching equipment constructional drawing, comprise the cage 1 for manned or goods, the quantity of described cage is 2, by the guide rail bracket 2 that standard knot consists of, the height of guide rail bracket 2 can be built different height according to the construction needs.Described cage 1 is installed in the both sides of guide rail bracket 2, the servo-actuated guide rail bracket 3 of climbing shuttering is connected on the climbing shuttering 4, the servo-actuated guide rail bracket 3 of described climbing shuttering is made of the monolithic standard knot, can be built into different height according to the construction needs, between the servo-actuated guide rail bracket 3 of climbing shuttering and guide rail bracket 2, be provided with interim wall-attaching equipment 5, described interim wall-attaching equipment 5 comprises idler wheel mechanism 6, body frame 7, hold-down arm 8, described body frame 7 is bolted on the idler wheel mechanism 6, described hold-down arm 8 is separately fixed on body frame 7 and the guide rail bracket 2 by bolt, described idler wheel mechanism 6 comprises roller mount pad 11 and roller 9, described roller mount pad 11 is connected with the servo-actuated guide rail bracket 3 of climbing shuttering by roller 9, the cantilever height of the described guide rail bracket 2 of the interim wall-attaching equipment distance of bottommost is above 21 meters, be provided with workplatform 10 in climbing shuttering 4 upper ends, convenient construction personnel's work.
When guide rail bracket 2 cantilever height during greater than 7.5m, for guaranteeing the building hoist normal operation, form the servo-actuated guide rail bracket 3 of climbing shuttering with the docking of monolithic standard knot, the servo-actuated guide rail bracket 3 of climbing shuttering is fixed on the climbing shuttering 4, interim wall-attaching equipment 5 one ends are connected with the servo-actuated guide rail bracket 3 of climbing shuttering, interim wall-attaching equipment 5 other ends are connected on the building hoist guide rail bracket 2, make the cantilever height of building hoist guide rail bracket 2 guarantee to be not more than 7.5m, be fixedly connected on the servo-actuated guide rail bracket 3 of climbing shuttering on the climbing shuttering 4, when climbing shuttering 4 up climbs, the servo-actuated guide rail bracket 3 of climbing shuttering will climb synchronously along with climbing shuttering 4, climb behind the 4.5m, the most beneath one roller 9 breaks away from the servo-actuated guide rail bracket 3 of climbing shuttering, this moment, building hoist guide rail bracket 2 tops will be greater than 7.5m, the most beneath together interim wall-attaching equipment 5 is pulled down from building hoist guide rail bracket 2, on move to apart from interim 4.5m place, wall-attaching equipment 5 top installation topmost together, count from the interim wall-attaching equipment of top 5 tops, this moment, building hoist guide rail bracket 2 cantilevers will be less than or equal to 7.5m, when climbing shuttering 4 climbs again, repeat above-mentioned steps, guarantee that building hoist guide rail bracket 2 cantilever height are less than or equal to 7.5m.
Above content is in conjunction with concrete preferred implementation further detailed description of the utility model, can not assert that implementation of the present utility model is confined to these explanations.For the utility model person of an ordinary skill in the technical field, without departing from the concept of the premise utility, can also make some simple deduction or replace, all should be considered as belonging to protection domain of the present utility model.
Claims (8)
1. New Type Construction Hoist, comprise the cage for manned or goods, the guide rail bracket that is formed by standard knot, the servo-actuated guide rail bracket of climbing shuttering and climbing shuttering, described cage is installed on the guide rail bracket, the servo-actuated guide rail bracket of described climbing shuttering is fixed on the climbing shuttering, it is characterized in that, is provided with interim wall-attaching equipment between the servo-actuated guide rail bracket of described climbing shuttering and guide rail bracket.
2. a kind of New Type Construction Hoist according to claim 1, it is characterized in that, described interim wall-attaching equipment comprises idler wheel mechanism, body frame and hold-down arm, and described body frame links to each other with idler wheel mechanism by bolt, and described hold-down arm links to each other with body frame and guide rail bracket respectively by bolt.
3. a kind of New Type Construction Hoist according to claim 2 is characterized in that, described idler wheel mechanism comprises roller mount pad and roller, and described roller places in the roller mount pad, and described roller mount pad is connected with the servo-actuated guide rail bracket of climbing shuttering.
4. a kind of New Type Construction Hoist according to claim 1 is characterized in that, the servo-actuated guide rail bracket of described climbing shuttering is made of the monolithic standard knot.
5. a kind of New Type Construction Hoist according to claim 3 is characterized in that, described climbing shuttering upper end is provided with workplatform.
6. a kind of New Type Construction Hoist according to claim 5 is characterized in that, described interim wall-attaching equipment in twos interval mounting distance is 4.5 meters.
7. a kind of New Type Construction Hoist according to claim 6 is characterized in that, the described interim wall-attaching equipment that is arranged on bottommost apart from the cantilever height of described guide rail bracket above 21 meters.
8. each described a kind of New Type Construction Hoist is characterized in that according to claim 1-7, and described cage is two cages, and described cage places respectively the both sides of guide rail bracket.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220460377 CN202785176U (en) | 2012-09-11 | 2012-09-11 | Novel construction hoist |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220460377 CN202785176U (en) | 2012-09-11 | 2012-09-11 | Novel construction hoist |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202785176U true CN202785176U (en) | 2013-03-13 |
Family
ID=47812484
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220460377 Expired - Fee Related CN202785176U (en) | 2012-09-11 | 2012-09-11 | Novel construction hoist |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202785176U (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103303772A (en) * | 2013-06-19 | 2013-09-18 | 泰兴市第一建筑安装工程有限公司 | Ultra-long wall attaching device of construction lift |
CN103342269A (en) * | 2013-07-11 | 2013-10-09 | 中建三局建设工程股份有限公司 | Attaching mechanism and ejecting method for super high-rise construction elevator |
CN103723600A (en) * | 2014-01-17 | 2014-04-16 | 上海建工集团股份有限公司 | Wall attaching device of construction elevator steel charging platform as well as operation method of wall attaching device |
CN104401889A (en) * | 2014-11-21 | 2015-03-11 | 中联重科股份有限公司 | Wall-attached frame and construction elevator with same |
CN105366482A (en) * | 2014-08-08 | 2016-03-02 | 北京天和建筑机械设备租赁有限责任公司 | A sliding anchoring device for a construction hoist |
CN107043060A (en) * | 2017-03-08 | 2017-08-15 | 广州市特威工程机械有限公司 | A kind of installation method of inverse formula installation lift |
-
2012
- 2012-09-11 CN CN 201220460377 patent/CN202785176U/en not_active Expired - Fee Related
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103303772A (en) * | 2013-06-19 | 2013-09-18 | 泰兴市第一建筑安装工程有限公司 | Ultra-long wall attaching device of construction lift |
CN103342269A (en) * | 2013-07-11 | 2013-10-09 | 中建三局建设工程股份有限公司 | Attaching mechanism and ejecting method for super high-rise construction elevator |
CN103342269B (en) * | 2013-07-11 | 2016-03-30 | 中建三局建设工程股份有限公司 | A kind of attachment mechanism of Super High construction elevator and jacking method |
CN103723600A (en) * | 2014-01-17 | 2014-04-16 | 上海建工集团股份有限公司 | Wall attaching device of construction elevator steel charging platform as well as operation method of wall attaching device |
CN105366482A (en) * | 2014-08-08 | 2016-03-02 | 北京天和建筑机械设备租赁有限责任公司 | A sliding anchoring device for a construction hoist |
CN104401889A (en) * | 2014-11-21 | 2015-03-11 | 中联重科股份有限公司 | Wall-attached frame and construction elevator with same |
CN104401889B (en) * | 2014-11-21 | 2016-08-24 | 中联重科股份有限公司 | Wall-attached frame and construction elevator with same |
CN107043060A (en) * | 2017-03-08 | 2017-08-15 | 广州市特威工程机械有限公司 | A kind of installation method of inverse formula installation lift |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202785176U (en) | Novel construction hoist | |
CN104528500B (en) | Double tabletop is without scaffold elevator installing method | |
CN202881852U (en) | Suspension bridge cable installation system | |
CN102556891A (en) | Slide lifter | |
CN205662201U (en) | Novel elevator suspends in midair device | |
CN103896127A (en) | Connecting structure of construction hoist and building climbing formwork frame | |
CN206359150U (en) | A kind of hanging basket system | |
CN209873572U (en) | Interim navigation lifting station of adjustable vertical lift height | |
CN202766043U (en) | Building hoist with electric platform trap door | |
CN204024013U (en) | A kind of self-climbing lifting material platform | |
CN103991802B (en) | A kind of large-scale derrick crane taking driver personnel | |
CN213416063U (en) | Overhead hanging basket for steel reinforcement framework | |
CN205575409U (en) | Unpowered self-propelled cable bearing device of large-span cable crane | |
CN205777428U (en) | Elevator is from climbing platforms | |
CN201793300U (en) | Elevator | |
CN215479056U (en) | Hydraulic elevator with slowly fall device | |
CN2871634Y (en) | Bridge maintaining equipment | |
CN202023149U (en) | Hanging basket used in construction | |
CN104514390B (en) | The many double-deck simple lifting lugs that post is installed altogether | |
CN212771963U (en) | Movable suspension operation platform | |
CN205276967U (en) | Garage lifting platform | |
CN204549738U (en) | A kind of arrangement structure of machine-roomless lift | |
CN202465179U (en) | Slide lifter | |
CN201592956U (en) | Crane for mounting bridge curtain board | |
CN202729516U (en) | Running positioning roller device for cable trolley of construction lift |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130313 Termination date: 20160911 |