CN201592956U - Crane for mounting bridge shielding plate - Google Patents

Crane for mounting bridge shielding plate Download PDF

Info

Publication number
CN201592956U
CN201592956U CN2009202926945U CN200920292694U CN201592956U CN 201592956 U CN201592956 U CN 201592956U CN 2009202926945 U CN2009202926945 U CN 2009202926945U CN 200920292694 U CN200920292694 U CN 200920292694U CN 201592956 U CN201592956 U CN 201592956U
Authority
CN
China
Prior art keywords
cucurbit
crane
hangs
hoist
utility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009202926945U
Other languages
Chinese (zh)
Inventor
姜会浩
张鹏
何瑞
肖绪文
贾学军
侯利成
江涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China State Construction Engineering Corp Ltd CSCEC
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China State Construction Engineering Corp Ltd CSCEC
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China State Construction Engineering Corp Ltd CSCEC, China Construction Second Engineering Bureau Co Ltd filed Critical China State Construction Engineering Corp Ltd CSCEC
Priority to CN2009202926945U priority Critical patent/CN201592956U/en
Application granted granted Critical
Publication of CN201592956U publication Critical patent/CN201592956U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a crane for mounting a bridge shielding plate, which comprises a main structure frame, a hoist guiding beam, a front hoist and a rear hoist, wherein the main structure frame is provided with a front support upright post and a rear support upright post; the hoist guiding beam is arranged in the middle of the upper end surface of the main structure frame, and the front end extends out of the main structure frame; the front hoist and the rear hoist are respectively arranged on the hoist guiding beam; the rear support upright post is provided with a counterweight; the front support upright post is provided with a guide wheel; and the rear support upright post is provided with a fixing wheel. The utility model has the advantages of simple structure, low cost and convenient maintenance. The utility model is closely matched with the mounting and construction process of the bridge shielding plate of the passenger dedicated line; after being tested by on-site experiment, the utility model can satisfy the mounting precision requirement of the shielding plate, is convenient to operate, and does not affect the conduction of the other construction operations.

Description

The crane that is used for mounting bridge shield plate
Technical field
The utility model belongs to the erecting device of Passenger dedicated railway Bridge shield, relates in particular to a kind of crane that is used for mounting bridge shield plate.
Background technology
Railway line for passenger traffic bridge floor shield quality is about 500kg, only depends on manpower can't implement its erection work.But,, need construction continuously because shield is to be provided with continuously on bridge floor, if adopt general-utility car to hang installation, the installation in position precision is difficult to control on the one hand, and to hang floor area big for general-utility car on the other hand, must influence carrying out of other construction operations, thereby influence construction speed.The patent No. is 200720191945, denomination of invention discloses a kind of crane technical scheme for the utility model patent of " simple and easy rail mounted cantilever telpher ": it comprises cantalever rod bearing, cantalever rod, pulley, wirerope lifting rope and lifting rope capstan winch, and the bottom of cantalever rod bearing is provided with guide tracked base, and two bottom side of cantilevered boom support are equipped with the roller that matches with the guide rail of guide tracked base.Though this kind crane can be realized the carrying of object, but still need manpower to participate in, also fail fundamentally to solve weight is placed to this difficult problem of desired location.
The utility model content
Main purpose of the present utility model is to reduce manual work intensity, realizes the continuous construction operation of bridge floor shield, does not influence carrying out of other construction operations simultaneously.
For achieving the above object, the technical scheme that the utility model adopted is: a kind of crane that is used for mounting bridge shield plate comprises that main structural frame, cucurbit hang nose girder, preceding cucurbit hangs and the back cucurbit hangs.Described main structural frame has support post behind two preceding support posts and two, and main structural frame forms crane main stress structure, guarantees the shield mounting stability.Described cucurbit hangs that nose girder is installed on the midway location of main structural frame upper surface and front end that cucurbit hangs nose girder extends main structural frame.Cucurbit hangs and the back cucurbit hangs and is installed on cucurbit successively and hangs on the nose girder before described, and the two coordinative operation is used to lift the cement concrete shield, and preceding cucurbit hangs and the back cucurbit hangs and can be chosen as electronic as required or manually all can.
Described main structural frame hangs on the back support post of nose girder rear end near cucurbit counterweight is installed, to keep the balance of crane car body when the lifting shield.
On the support post track adjusting wheel is installed before described.On the support post of described back tight pulley is installed, the direct of travel of tight pulley hangs nose girder perpendicular to cucurbit.Can easily crane be carried out integral body by track adjusting wheel and tight pulley moves.
The preceding support post of main structural frame and back support post spacing are about 2.6m, can make crane to move across the crashproof wall of bridge deck concrete, thereby not influence carrying out of other construction operations.
The beneficial effects of the utility model are: the utility model is simple in structure, and cost is low, and is easy to maintenance.The installation process of the Passenger dedicated railway Bridge of combining closely shield by in-place test test, uses this crane can satisfy the requirement of shield setting accuracy, and is not easy and simple to handle, not and influence carrying out of other construction operations.
Description of drawings
Fig. 1 is the lateral plan that is used for the crane of mounting bridge shield plate described in the utility model;
Fig. 2 is the front view that is used for the crane of mounting bridge shield plate described in the utility model.
The specific embodiment
Below in conjunction with the drawings and specific embodiments the utility model is described in further detail.
In conjunction with illustrated in figures 1 and 2, a kind of crane that is used for mounting bridge shield plate, comprise main structural frame, cucurbit hang nose girder 2, preceding cucurbit hang 4 and the back cucurbit hang 3.Described main structural frame has support post 1 behind two preceding support posts 5 and two, and main structural frame forms crane main stress structure, guarantees the shield mounting stability.Described cucurbit hangs that nose girder 2 is installed on the midway location of main structural frame upper surface and front end that cucurbit hangs nose girder 2 extends main structural frame, makes the action radius of handling shield further stretch out.Before described cucurbit hang 4 and the back cucurbit hang 3 and be installed on cucurbit successively and hang on the nose girder 2, the two coordinative operation is used to lift the cement concrete shield, preceding cucurbit hang 4 and the back cucurbit hang 3 and can be chosen as electronic as required or manually all can.
Described main structural frame hangs on the back support post 1 of nose girder 2 rear ends near cucurbit counterweight 8 is installed, to keep the balance of crane car body when the lifting shield.On the support post 5 track adjusting wheel 6 is installed before described.On the support post 1 of described back tight pulley 7 is installed, the direct of travel of tight pulley 7 hangs nose girder 2 perpendicular to cucurbit.Can carry out integral body to crane easily by track adjusting wheel 6 and tight pulley 7 moves.
During use, earlier crane is moved to the desired location, tight pulley 7 and track adjusting wheel 6 are carried out stationkeeping; Before re-using cucurbit hang 4 and the back cucurbit hang 3 and cooperate the lifting shields, and hang nose girder 2 along cucurbit and proceed to the installation site; At last shield being positioned over the desired location gets final product.
The utility model is not limited to the foregoing description; to those skilled in the art, any conspicuous improvement that the foregoing description of the present utility model is made or change can not exceed the embodiment of the present utility model that only illustrates by way of example and the protection domain of claims.

Claims (3)

1. crane that is used for mounting bridge shield plate is characterized in that: described crane comprises that main structural frame, cucurbit hang nose girder (2), preceding cucurbit hangs (4) and the back cucurbit hangs (3); Described main structural frame has support post (1) behind two preceding support posts (5) and two, and described cucurbit hangs that nose girder (2) is installed on the midway location of main structural frame upper surface and front end that cucurbit hangs nose girder (2) extends main structural frame; Before described cucurbit hang (4) and afterwards cucurbit hang (3) and be installed on cucurbit successively and hang on the nose girder (2).
2. crane as claimed in claim 1 is characterized in that: described main structural frame hangs on the back support post (1) of nose girder (2) rear end near cucurbit counterweight (8) is installed.
3. crane as claimed in claim 1 or 2 is characterized in that: on the support post (5) track adjusting wheel (6) is installed before described; On the described back support post (1) tight pulley (7) is installed, the direct of travel of tight pulley (7) hangs nose girder (2) perpendicular to cucurbit.
CN2009202926945U 2009-12-30 2009-12-30 Crane for mounting bridge shielding plate Expired - Fee Related CN201592956U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009202926945U CN201592956U (en) 2009-12-30 2009-12-30 Crane for mounting bridge shielding plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009202926945U CN201592956U (en) 2009-12-30 2009-12-30 Crane for mounting bridge shielding plate

Publications (1)

Publication Number Publication Date
CN201592956U true CN201592956U (en) 2010-09-29

Family

ID=42775022

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009202926945U Expired - Fee Related CN201592956U (en) 2009-12-30 2009-12-30 Crane for mounting bridge shielding plate

Country Status (1)

Country Link
CN (1) CN201592956U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103287986A (en) * 2013-05-08 2013-09-11 中铁隧道集团一处有限公司 Curtain board transport lifting device and method for mounting curtain board by using device
CN103663236A (en) * 2013-12-11 2014-03-26 国网浙江杭州市萧山区供电公司 Heavy-type cover plate lifting device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103287986A (en) * 2013-05-08 2013-09-11 中铁隧道集团一处有限公司 Curtain board transport lifting device and method for mounting curtain board by using device
CN103663236A (en) * 2013-12-11 2014-03-26 国网浙江杭州市萧山区供电公司 Heavy-type cover plate lifting device

Similar Documents

Publication Publication Date Title
CN201580915U (en) Tyre-type gantry crane
RU2381326C1 (en) Device for lifting and erecting units of superstructure
CN202248941U (en) Integral lifting, positioning and mounting device for large-scale steel members
CN206418415U (en) A kind of bridge and facade wall maintenance device
CN111717797A (en) Double-machine cooperative hoisting system and method for overpass railway deep cutting highway bridge under construction
CN109098089A (en) A kind of suspension bridge column overhead main cable saddle hanging apparatus and construction method
CN101717048A (en) Hoist for mounting bridge shield plate
CN201592956U (en) Crane for mounting bridge shielding plate
CN205954489U (en) Stride cast -in -place space of business line steel structure construction protection on bridge and move movable support
CN208995936U (en) S type steel box girder of cable stayed bridge on across ground rail traffic slides mounting bracket
CN201080597Y (en) Multifunctional cast-in-situ cantilever plate construction bracket
CN206625137U (en) The cast-in-place closure segment Hanging Basket of one kind swivel cantilever beam slides running gear
CN103288002A (en) Simple combination portal upper-air heavy-article hoisting device
CN108625270A (en) Nose girder gantry crane installs bridge prefabrication box girder construction method
CN203284126U (en) Simple composite gantry high-altitude weight hoisting device
CN211498465U (en) Bridge detects uses mobile device
CN111980392A (en) Crown block sliding contact line installation device and construction method thereof
CN209039993U (en) A kind of device carrying out the tensioning of great cantilever bent cap using movable supporting frame
CN202247682U (en) Bridge crane for installing curtain board
CN110820555A (en) Bridge maintenance vehicle and method for avoiding bridge pier by maintenance platform
CN215755931U (en) Large transformer hoisting equipment in factory building
CN205116006U (en) High -speed railway bridge longmen walking maintenance detection device
CN202594676U (en) Bridge deck system shielding plate installation gantry crane for passenger dedicated railway line
CN212769477U (en) Double-machine cooperative hoisting system for overpass railway deep cutting highway bridge under construction
CN212249118U (en) Installation device for sliding contact line of crown block

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100929

Termination date: 20101230