CN206625137U - The cast-in-place closure segment Hanging Basket of one kind swivel cantilever beam slides running gear - Google Patents
The cast-in-place closure segment Hanging Basket of one kind swivel cantilever beam slides running gear Download PDFInfo
- Publication number
- CN206625137U CN206625137U CN201720257991.0U CN201720257991U CN206625137U CN 206625137 U CN206625137 U CN 206625137U CN 201720257991 U CN201720257991 U CN 201720257991U CN 206625137 U CN206625137 U CN 206625137U
- Authority
- CN
- China
- Prior art keywords
- cast
- hanging basket
- shoulder pole
- walking rails
- closure segment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000011065 in-situ storage Methods 0.000 claims abstract description 27
- 229910000831 Steel Inorganic materials 0.000 claims description 20
- 239000010959 steel Substances 0.000 claims description 20
- 238000010276 construction Methods 0.000 description 12
- 238000000034 method Methods 0.000 description 5
- 230000007812 deficiency Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 241001669679 Eleotris Species 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000012407 engineering method Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
Abstract
The cast-in-place closure segment Hanging Basket of one kind swivel cantilever beam slides running gear, it is arranged on two cast-in-situ box girders, including Hanging Basket and two walking rails, two walking rails are parallel and are fixed at respectively on two cast-in-situ box girders, Hanging Basket is slidably connected by linear advancement mechanism and two walking rails, and Hanging Basket is sheathed on two cast-in-situ box girders simultaneously.
Description
Technical field
The utility model belongs to bridge construction device field, more particularly to the cast-in-place closure segment Hanging Basket of swivel cantilever beam slides
Luggage is put.
Background technology
The bridge of swivel engineering method construction is mostly overbridge, and after the completion of swivel bridges rotator construction, continuous beam closure segment is typically adopted
Constructed with hanging basket cantilever method, due to the particularity of swivel bridges application background, the construction of bridge rotating T structures in order to reduce pair to greatest extent
Existing railway etc. generally fulfils bridge both sides anti-collision wall, the anti-protective constructions such as net of throwing ahead of schedule construction across the interference of lower works,
Because safeguard structure influences, it is enterprising that the technical method of traditional Hanging Basket using is manually fixed on track using chain block or jack
Row traction, traditional technology method have that working strength is big, operating personnel are more, simultaneously operating is poor, translational speed is slow, security
Difference, reduce to existing railway etc. across lower works interference period is long the deficiencies of, increase Construction quality and safety hidden danger.
Utility model content
The purpose of this utility model is to provide a kind of swivel cantilever beam simple in construction, easy to operate, safety coefficient is high
Cast-in-place closure segment Hanging Basket slides running gear.
To achieve the above object, the technical solution adopted in the utility model is:The cast-in-place closure segment of one kind swivel cantilever beam is hung
Basket slides running gear, is arranged on two cast-in-situ box girders, including Hanging Basket and two walking rails, two walking rails it is parallel and
It is fixed at respectively on two cast-in-situ box girders, Hanging Basket is slidably connected by linear advancement mechanism and two walking rails, and Hanging Basket
It is sheathed on simultaneously on two cast-in-situ box girders.
Linear advancement mechanism is respectively equipped with described two walking rails, linear advancement mechanism includes hoist engine, wirerope, card
Button steel piston shoes and fixed pulley, buckle steel piston shoes are slideably positioned on walking rails along the length direction of walking rails, Hanging Basket and card
Button steel piston shoes are fixedly connected, and hoist engine and fixed pulley are respectively arranged on walking rails both ends, and wirerope one end is connected with hoist engine, another
End is directly connected with Hanging Basket or is connected afterwards with Hanging Basket around fixed pulley.
The Hanging Basket includes two groups of shoulder pole girder groups be arrangeding in parallel, and shoulder pole girder group includes being parallel to each other and same vertical flat
Upper shoulder pole girder and lower shoulder pole girder in face, upper shoulder pole girder are located above cast-in-situ box girder, and lower shoulder pole girder is located at below cast-in-situ box girder, on
Shoulder pole girder is connected with lower shoulder pole girder by vertical distance adjusting means, and closure segment is provided between the lower shoulder pole girder of two shoulder pole girder groups
End template and skeleton.
The vertical distance adjusting means are the first fining twisted steel and auxiliary jack.
The walking rails are fixedly connected by the second fining twisted steel in cast-in-situ box girder of nuzzling in advance with cast-in-situ box girder.
The fixed pulley is arranged on the counter-force skeleton for being fixed on walking rails end.
The utility model is this have the advantage that due to the structure:It can be put in railway in stipulated time section, most quickly
Degree completes the reach of Hanging Basket or retracts work, avoids to greatest extent because cross-line is constructed to existing railway etc. across lower works
Caused by influence, be effectively guaranteed existing railway operation etc. across lower works safety, two rack winches connections during operation
Same operating platform, can assume unified command of, simultaneously operating, Hanging Basket both sides move forward with fall back process in can synchronous shift, gram
It is more as operating personnel in the trailer system of suspended basket artificial jack, jack are taken, it is difficult to which simultaneously operating, Hanging Basket both sides are difficult
The deficiencies of with synchronizing moving, the suspended basket leapfrog problem caused by hand fit is uncoordinated is avoided, improve work effect
Rate, reduce to existing bridge etc. across lower works interference, reduce construction cost, shorten the construction period, improve extension
The security and stability of basket traveling.
Brief description of the drawings
Fig. 1 is the utility model structure diagram;
Fig. 2 is Fig. 1 top views;
Fig. 3 is Fig. 1 left views.
Embodiment
As shown in Figure 1 to Figure 3, a kind of cast-in-place closure segment Hanging Basket of swivel cantilever beam slides running gear, is arranged at two now
Pour in box beam 12, including Hanging Basket and two walking rails 4, two walking rails 4 are parallel and are fixed at two cast-in-place casees respectively
On beam 12, Hanging Basket is slidably connected by linear advancement mechanism and two walking rails 4, and Hanging Basket is sheathed on two cast-in-place casees simultaneously
On beam 12.
Be respectively equipped with linear advancement mechanism on two walking rails 4, and the linear advancement mechanism on two walking rails 4 by
Same controller control, linear advancement mechanism include hoist engine 1, wirerope 15, buckle steel piston shoes 3 and fixed pulley 14, buckle steel
Length direction of the piston shoes 3 along walking rails 4 is slideably positioned on walking rails 4, and Hanging Basket is fixedly connected with buckle steel piston shoes 3, volume
To raise machine 1 and fixed pulley 14 is respectively arranged on the both ends of walking rails 4, the one end of wirerope 15 is connected with hoist engine 1, when hanging basket advancing, steel
The other end of cable 15 is connected with the tie point 16 of Hanging Basket afterwards around fixed pulley 14;It is when Hanging Basket retracts, the other end of wirerope 15 is straight
Connect and be connected with the tie point of Hanging Basket 17.
Hanging Basket includes two groups of shoulder pole girder groups be arrangeding in parallel, and shoulder pole girder group includes being parallel to each other and in same vertical plane
Upper shoulder pole girder 2 and lower shoulder pole girder 9, upper shoulder pole girder 2 be located at the top of cast-in-situ box girder 12, lower shoulder pole girder 9 is located under cast-in-situ box girder 12
Side, upper shoulder pole girder 2 are connected by vertical distance adjusting means with lower shoulder pole girder 9, set between the lower shoulder pole girder 9 of two shoulder pole girder groups
There are closure segment end template and skeleton 11.
Vertical distance adjusting means are the first fining twisted steel 10 and auxiliary jack 7, pass through the He of the first fining twisted steel 10
Aid in jack 7 adjustable upper the distance between shoulder pole girder 2 and lower shoulder pole girder 9, so as to adjust closure segment end template and skeleton 11 with
The distance between bottom of cast-in-situ box girder 12, ensure stationarity of the Hanging Basket in motion process.
Walking rails 4 are fixedly connected by the second fining twisted steel 6 in cast-in-situ box girder 12 of nuzzling in advance with cast-in-situ box girder 12,
Second fining twisted steel 6 is to be embedded in the top surface of cast-in-situ box girder 12, and walking rails 4 and cast-in-situ box girder 12 by accurately measuring setting-out
Between be provided with steel sleeper 5;Fixed pulley 14, which is arranged at, to be fixed on the counter-force skeleton 13 of the end of walking rails 4.
After the swivel T structure prestressed stretch-draws of cast-in-situ box girder 12 finish cast-in-place support removal completely, Hanging Basket is arranged on swivel T structures
Mid-span cantilever end, carry out turning after Hanging Basket installation T structures weigh, counterweight, then formal swivel, after the completion of swivel, wirerope 15
One end is connected with the tie point 16 of Hanging Basket afterwards around fixed pulley 14;Due to the linear advancement mechanism on two walking rails 4 by
Same controller control, can realize that two hoist engines 1 are run simultaneously by controller, realize the steady advance of Hanging Basket, pass through
First fining twisted steel 10 and auxiliary jack 7 adjust between closure segment end template and skeleton 11 and the bottom of cast-in-situ box girder 12 away from
From the closure segment construction of completion mid-span.After the completion for the treatment of 12 whole prestressed stretch-draws of cast-in-situ box girder, by the one end of wirerope 15 directly and Hanging Basket
Tie point 17 connect, Hanging Basket is retracted using two hoist engines 1, complete construction.
Claims (6)
1. the cast-in-place closure segment Hanging Basket of one kind swivel cantilever beam slides running gear, it is arranged on two cast-in-situ box girders, its feature exists
In:Including Hanging Basket and two walking rails, two walking rails are parallel and are fixed at respectively on two cast-in-situ box girders, and Hanging Basket leads to
Cross linear advancement mechanism to be slidably connected with two walking rails, and Hanging Basket is sheathed on two cast-in-situ box girders simultaneously.
2. a kind of cast-in-place closure segment Hanging Basket of swivel cantilever beam according to claim 1 slides running gear, it is characterised in that:
Linear advancement mechanism is respectively equipped with described two walking rails, linear advancement mechanism includes hoist engine, wirerope, buckle steel piston shoes
And fixed pulley, buckle steel piston shoes are slideably positioned on walking rails along the length direction of walking rails, Hanging Basket and buckle steel piston shoes
Be fixedly connected, hoist engine and fixed pulley are respectively arranged on walking rails both ends, and wirerope one end is connected with hoist engine, the other end directly with
Hanging Basket is connected or is connected afterwards with Hanging Basket around fixed pulley.
3. a kind of cast-in-place closure segment Hanging Basket of swivel cantilever beam according to claim 1 or 2 slides running gear, its feature exists
In:The Hanging Basket includes two groups of shoulder pole girder groups be arrangeding in parallel, and shoulder pole girder group includes being parallel to each other and in same vertical plane
Upper shoulder pole girder and lower shoulder pole girder, upper shoulder pole girder be located above cast-in-situ box girder, lower shoulder pole girder be located at cast-in-situ box girder lower section, upper shoulder pole
Beam is connected with lower shoulder pole girder by vertical distance adjusting means, and closure segment bed die is provided between the lower shoulder pole girder of two shoulder pole girder groups
Plate and skeleton.
4. a kind of cast-in-place closure segment Hanging Basket of swivel cantilever beam according to claim 3 slides running gear, it is characterised in that:
The vertical distance adjusting means are the first fining twisted steel and auxiliary jack.
5. a kind of cast-in-place closure segment Hanging Basket of swivel cantilever beam according to claim 1 slides running gear, it is characterised in that:
The walking rails are fixedly connected by the second fining twisted steel in cast-in-situ box girder of nuzzling in advance with cast-in-situ box girder.
6. a kind of cast-in-place closure segment Hanging Basket of swivel cantilever beam according to claim 2 slides running gear, it is characterised in that:
The fixed pulley is arranged on the counter-force skeleton for being fixed on walking rails end.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720257991.0U CN206625137U (en) | 2017-03-16 | 2017-03-16 | The cast-in-place closure segment Hanging Basket of one kind swivel cantilever beam slides running gear |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720257991.0U CN206625137U (en) | 2017-03-16 | 2017-03-16 | The cast-in-place closure segment Hanging Basket of one kind swivel cantilever beam slides running gear |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206625137U true CN206625137U (en) | 2017-11-10 |
Family
ID=60209674
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720257991.0U Expired - Fee Related CN206625137U (en) | 2017-03-16 | 2017-03-16 | The cast-in-place closure segment Hanging Basket of one kind swivel cantilever beam slides running gear |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206625137U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108411795A (en) * | 2018-03-16 | 2018-08-17 | 中铁二十五局集团第三工程有限公司 | An a kind of Curved Continuous Beams Hanging Basket fast fallback method over long distances |
CN108411767A (en) * | 2018-02-06 | 2018-08-17 | 中铁二院昆明勘察设计研究院有限责任公司 | A kind of self-closing type closes up box hat system and construction method |
CN110685227A (en) * | 2019-11-02 | 2020-01-14 | 中铁七局集团有限公司 | Construction method of formwork support system of obstacle-crossing wide-width swivel bridge closure segment hanging bracket method |
-
2017
- 2017-03-16 CN CN201720257991.0U patent/CN206625137U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108411767A (en) * | 2018-02-06 | 2018-08-17 | 中铁二院昆明勘察设计研究院有限责任公司 | A kind of self-closing type closes up box hat system and construction method |
CN108411795A (en) * | 2018-03-16 | 2018-08-17 | 中铁二十五局集团第三工程有限公司 | An a kind of Curved Continuous Beams Hanging Basket fast fallback method over long distances |
CN110685227A (en) * | 2019-11-02 | 2020-01-14 | 中铁七局集团有限公司 | Construction method of formwork support system of obstacle-crossing wide-width swivel bridge closure segment hanging bracket method |
CN110685227B (en) * | 2019-11-02 | 2021-11-02 | 中铁七局集团有限公司 | Construction method of formwork support system of obstacle-crossing wide-width swivel bridge closure segment hanging bracket method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206625137U (en) | The cast-in-place closure segment Hanging Basket of one kind swivel cantilever beam slides running gear | |
CN103452052B (en) | Movable mold hanging equipment for closing swivel bridges and closure section construction method | |
CN102174795B (en) | Reversible suspended basket wheel type travelling system and method | |
CN201003145Y (en) | Upward and self-walking type mobile die carrier | |
CN202090286U (en) | Traction system suitable for self-anchored type double cable plane suspension bridge | |
CN105780660B (en) | A kind of section assembling box girder construction technique | |
CN203866715U (en) | Multi-roof-truss rhombic truss hanging basket for long-cantilever box beam construction | |
CN202881852U (en) | Suspension bridge cable installation system | |
CN103882812B (en) | Across the construction method of girder in stayed-cable bridge | |
CN103669215B (en) | Vertical-horizontal overall-sliding type side mold of fulcrum-few support | |
CN102094392A (en) | Lower supported hanging basket in bridge construction and application thereof | |
CN102198695B (en) | Longitudinal moving method for outside die of box girder outer film | |
CN110055908A (en) | A kind of Demolition Construction method of bridge construction upstroke movable framework | |
CN104110002B (en) | A kind of method for changing steel truss girder bridge floorings | |
CN205259074U (en) | Basket traveling system is hung to triangle | |
CN102587293A (en) | System and method for cradle cantilever construction of variable-width section concrete girder | |
CN204112239U (en) | Across the rotary body device of the little bridge beam of high ferro on a kind of low-angle | |
CN202031032U (en) | Direction-changeable wheeled running system for cradle | |
CN102587292B (en) | System and method for cradle cantilever construction | |
CN208501523U (en) | It is a kind of novel for setting up the Bridge Erector for spelling wide beam | |
CN108275572B (en) | A kind of hanging method of tube drawbench in self-elevating drilling platform land formation | |
CN202055175U (en) | Hoisting device of box girder-lifting machine beam-hanging traveling crane | |
CN205116006U (en) | High -speed railway bridge longmen walking maintenance detection device | |
CN2871634Y (en) | Bridge maintaining equipment | |
CN201592956U (en) | Crane for mounting bridge shielding plate |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |