CN108411795A - An a kind of Curved Continuous Beams Hanging Basket fast fallback method over long distances - Google Patents
An a kind of Curved Continuous Beams Hanging Basket fast fallback method over long distances Download PDFInfo
- Publication number
- CN108411795A CN108411795A CN201810220215.2A CN201810220215A CN108411795A CN 108411795 A CN108411795 A CN 108411795A CN 201810220215 A CN201810220215 A CN 201810220215A CN 108411795 A CN108411795 A CN 108411795A
- Authority
- CN
- China
- Prior art keywords
- hanging basket
- basket
- over long
- long distances
- rollback
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
- E01D21/10—Cantilevered erection
Abstract
The invention discloses a kind of Curved Continuous Beams Hanging Basket fast fallback methods over long distances, include the following steps:S1 Hanging Basket rollback pre-structures are reinforced;S2 Hanging Baskets bottom basket and template fall and fix;Hanging Basket rollback line adjustment fixed pulley is arranged in S3, arranges class curved path walking track and installation pulling equipment;S4 removes Hanging Basket after so that Hanging Basket is retracted to outside existing safety line using pulling equipment.The Curved Continuous Beams Hanging Basket of a structure fast fallback method over long distances, it is ensured that the fast and stable of Hanging Basket back off procedure, securely and reliably, meanwhile, reduce Hanging Basket curve beam body cross-sectional direction traveling offset distance, in addition, also having effects of energy saving and emission reduction.
Description
Technical field
The present invention relates to Construction of continuous beam technical fields, and in particular to a kind of Curved Continuous Beams Hanging Basket is primary quick over long distances
Backing method.
Background technology
Hanging Basket rollback is the construction technology for being frequently necessary to encounter in Construction of continuous beam, is needed in recent years disposable quick over long distances
The case where moving back Hanging Basket is a lot of in engineering, and how the speed of Hanging Basket is moved back in quickening at double, reduces security risk, and it is few etc. to retreat the used time
It is everybody problem in the urgent need to address.Such as:It is 75+125 by Xiang Tan grand bridge 214#-217# continuous beams that my company undertakes the construction of
+ 75m rotator construction continuous beams, it is 1200m to be located at sweep, in the curve location of vector distance 26cm, and on across Shanghai elder brother's railway, Hunan
The station tracks such as steel industrial siding 5, are most one of the swivel continuous beams in across the railway station track in China.Swivel continuous beam is poured using Hanging Basket cantilever
Note, across closing up in finally turning.After closing up for general building site beam, you can dismounting in situ, which is unloaded, hangs, however, at this both wired upper
Have Hanging Basket returning back to other than safe-guard line and could carry out dismounting work.Discovery is checked at scene, Hanging Basket need from 216# piers across
Middle position retreats to the segments 2#, to that after outside existing railway coverage, could be removed, meanwhile, be limited by it is busy both
There is the influence of Shanghai elder brother's transportation route, not only traffic safety risk is high, but also the construction time that can be given is extremely limited, it is necessary to short-term
Interior disposable rollback is in place.Through network retrieval and market survey, have no at home on camber beam across busy transport multiply Taoist priest
Construction precedent apart from fast fallback Hanging Basket.
Invention content
In view of this, the object of the present invention is to provide a kind of Curved Continuous Beams Hanging Basket fast fallback method over long distances,
To ensure Hanging Basket back off procedure fast and stable, securely and reliably, meanwhile, reduce traveling of the Hanging Basket in curve beam body cross-sectional direction
Offset distance, in addition, also having effects of energy saving and emission reduction.
The present invention is solved the above problems by following technological means:A kind of Curved Continuous Beams Hanging Basket is primary over long distances quickly to return
Annealing method includes the following steps:
S1 Hanging Basket rollback pre-structures are reinforced:Increase vertical supporting steel member and longitudinal nose girder under main couple, by Hanging Basket by
Power system is converted into freely supported structure and is examined to calculate Hanging Basket reinforcement system by cantilever design, ensures the stabilization moved after entire Hanging Basket system
Row;
S2 Hanging Baskets bottom basket and template fall and fix:As needed, by Hanging Basket bottom basket and template system whereabouts suitable distance,
After the completion of waiting for that Hanging Basket bottom basket and template system fall, using chain block, sunpender or steel wire rope by side form and bed die system with hanging
Basket lower and upper cross-member, which is connected and fixed, forms an entirety;
Hanging Basket rollback line adjustment fixed pulley is arranged in S3, arranges class curved path walking track and installation pulling equipment;
S4 removes Hanging Basket after so that Hanging Basket is retracted to outside existing safety line using pulling equipment.
Further, in step S3, fixed pulley spacing is determined using method adjustment in vector distance point.
Further, use in vector distance point method adjustment determine the detailed process of fixed pulley spacing for:It was being retracted according to Hanging Basket
The offset distance of Cheng Zhongliang cross-sectional directions is less than the minimum safe distance between Hanging Basket and beam body flange plate, and is considering security risk
And in the case of taking satisfactory after correcting to delay and move back the Hanging Basket time, between the practical rollback circuit of setting Hanging Basket and theoretical rollback circuit
Safe difference, i.e., safe vector distance is laid with the fixed pulley linear for adjusting dilatory steel strand wires, between determining between fixed pulley
Away from the vector distance between the practical rollback circuit of calculating Hanging Basket and theoretical rollback circuit makes the vector distance be less than safe vector distance.
Further, in step S3, pulling equipment includes drawing jack, steel strand wires and automatic continuous jacking pumping plant, described
Pushing tow jack is fixedly mounted by counter-force seat.
Further, in step S4, the detailed process for making Hanging Basket retract using pulling equipment is:Hanging Basket is moved by two fulcrums
If dilatory jack is dilatory.
Further, fulcrum more dilatory jack of arranged in series are each drawn.
Further, in step S1, after anchor point unclamps after Hanging Basket, using cradle structure fulcrum is increased, increase stable structure.
Beneficial effects of the present invention:
1) technology applies bridge prestress tensioning equipment theory of mechanics, is laid on the whole circuit that Hanging Basket retracts logical
Long walking rails, using jack, steel hinge line and pushing tow pumping plant, one-time continuous stretches rollback Hanging Basket, improves Hanging Basket rollback
Rate.
2) by increasing by two Pin main couples longitudinal direction of Hanging Basket cantilever end, vertical connecting rod and support construction, make Hanging Basket center of gravity
After move, release anchoring after become rock-steady structure, ensure that Hanging Basket retreat stability.
3) technology determines adjustment pulley room away from it is song to adjust traction steel strand wires by fixed pulley using method in vector distance point
Line is hung in the traveling offset distance of curve beam body cross-sectional direction when to ensure that Hanging Basket retracts in curve beam section to reduce Hanging Basket
The safety of extension system, the rapidity of rollback.
4) technology changes conventional separate unit jack pushing tow pattern, using the 2 jack series connection of unilateral single steel strand
Automatic continuous jacking, the synchronous push of 2 steel strand wires, 4 jack, greatly accelerates Hanging Basket rollback speed, greatly reduces
To the existing influence across railway transportation efficiency, the risk to both wired traffic safeties is reduced.
5) this technique reduces the durations that uses of plant, and material therefor and equipment are that bridge construction scene is normal
See material and facility, can gather materials on the spot, has the effect of in energy-saving and emission-reduction certain.
Specific implementation mode
Below with reference to embodiment, the present invention is described in detail, and the present invention provides a kind of Curved Continuous Beams Hanging Basket is long
Fast fallback method of distance, includes the following steps:
S1 Hanging Basket rollback pre-structures are reinforced:Increase vertical supporting steel member and longitudinal nose girder under main couple, by Hanging Basket by
Power system is converted into freely supported structure and is examined to calculate Hanging Basket reinforcement system by cantilever design, ensures the stabilization moved after entire Hanging Basket system
It goes, after anchor point unclamps after Hanging Basket, using cradle structure fulcrum is increased, increases stable structure;By increasing by two Pin of Hanging Basket cantilever end
Main couple longitudinal direction, vertical connecting rod and support construction, are moved after making Hanging Basket center of gravity, are become rock-steady structure after releasing anchoring, are ensured
The stability that Hanging Basket retreats.
S2 Hanging Baskets bottom basket and template fall and fix:As needed, by Hanging Basket bottom basket and template system whereabouts suitable distance,
After the completion of waiting for that Hanging Basket bottom basket and template system fall, using chain block, sunpender or steel wire rope by side form and bed die system with hanging
Basket lower and upper cross-member, which is connected and fixed, forms an entirety;
Hanging Basket rollback line adjustment fixed pulley is arranged in S3, arranges class curved path walking track and installation pulling equipment;It adopts
Determine that fixed pulley spacing, detailed process are with method adjustment in vector distance point:According to Hanging Basket in back off procedure central sill cross-sectional direction
Offset distance be less than minimum safe distance between Hanging Basket and beam body flange plate, and considering security risk and taking satisfactory after correcting
Delay in the case of moving back the Hanging Basket time, the safe difference between the practical rollback circuit of setting Hanging Basket and theoretical rollback circuit is pacified
Full vector distance is laid with the fixed pulley linear for adjusting dilatory steel strand wires, determines the spacing between fixed pulley, calculates Hanging Basket practical time
The vector distance between circuit and theoretical rollback circuit is moved back, the vector distance is made to be less than safe vector distance;Pulling equipment includes dilatory jack, steel
Twisted wire and automatic continuous jacking pumping plant, the pushing tow jack are fixedly mounted by counter-force seat.It is determined and is adjusted using method in vector distance point
Whole pulley room is away from it is curve to adjust traction steel strand wires by fixed pulley, to reduce Hanging Basket in curve beam body cross-sectional direction
Traveling offset distance, when to ensure that Hanging Basket retracts in curve beam section, the safety of hangar system, the rapidity of rollback.
S4 removes Hanging Basket after so that Hanging Basket is retracted to outside existing safety line using pulling equipment.Specifically, Hanging Basket movement by
Two fulcrums set dilatory jack and draw, each dilatory fulcrum more dilatory jack of arranged in series.In the whole process that Hanging Basket retracts
Elongated walking rails are laid on circuit, using jack, steel hinge line and pushing tow pumping plant, one-time continuous stretches rollback Hanging Basket, improves
The rate that Hanging Basket retracts.In addition, conventional separate unit jack pushing tow pattern is changed, it is very heavy using unilateral single steel strand 2
Top series connection automatic continuous jacking, the synchronous push of 2 steel strand wires, 4 jack greatly accelerate Hanging Basket rollback speed, greatly
Reduce the risk reduced to the existing influence across railway transportation efficiency to both wired traffic safeties.
To keep above-mentioned technical proposal clearer, Hanging Basket on the grand bridge 214#-217# continuous beams of Xiang Tan is described in detail below
Back off procedure.
Xiang Tan grand bridge 214#-217# continuous beams are 75+125+75m rotator construction continuous beams, are positioned at sweep
1200m, in the curve location of vector distance 26cm, and on the station tracks such as across Shanghai elder brother's railway, Hunan steel industrial siding 5, be across the railway station track in China
One of most swivel continuous beam, using Hanging Basket free cantilever casting, across closing up in finally turning.After closing up for general building site beam,
It can remove to unload in situ and hang, only Hanging Basket, which is return back to other than safe-guard line, on both wired could carry out dismounting work.It is existing
Discovery is checked in field, and Hanging Basket needs are retreated from 216# pier span centres position to from the segments 2#, after outside existing railway coverage, ability
It is removed, meanwhile, being limited by busy existing Shanghai elder brother transportation route influences, and not only traffic safety risk is high, but also can give
The construction time given is extremely limited, it is necessary to disposable in a short time to retract in place.
Hanging Basket is Diamond-Shape Form Traveler, and the square-section rod piece that diamond shape purlin piece is made of the common hot-rolled steel channels of 40b is constituted, front beam
It is made of I 56b I-steel, basket forward and backward crossbeam in bottom is made of I 40b I-steel, and sunpender pricks screw-thread steel using the essence of Φ 32.It hangs
Before basket retracts, structural strengthening is carried out first, and specifically, in both sides diamond shape purlin, under piece increases vertical supporting steel member and longitudinal direction
Hanging Basket stress system is converted into freely supported structure by cantilever design and examines calculation reinforcing Hanging Basket system, ensures entire Hanging Basket system by nose girder
The stabilization row moved after system.After closure segment pours completion demoulding, scene using chain block, sunpender etc. by side form and bed die system with
Diamond-Shape Form Traveler lower and upper cross-member, which is connected and fixed, forms an entirety.After Hanging Basket releases anchor system before retreating, the lotuses such as lower part template
It carries and is all transmitted on overhanging upper beam by screw-thread steel, inspection is needed to count whether the force-bearing situations such as portion's main couple, crossbeam meet in,
It cannot such as bear to need to take strengthening measure, (be referred to through entrusting outer detection unit inspection to calculate《Newly-built Chang Zhu Tan inter-city passenger rail synthesis III
It marks 216# pier Hanging Baskets and retreats dismounting inspection calculation report》), hanging basket main truss, upper front beam amount of deflection, intensity are satisfied by requirement, but it is upper after
Crossbeam only amount of deflection meets, and brace maximum stress is more than allowable stress value, is unsatisfactory for code requirement, it is proposed that increases water at brace
Flat chord member.Scene is imagined increases horizon bar in upper rear cross beam position, and horizon bar is spliced to form using 12, is adopted between rod piece and rod piece
With fillet weld full weld, weld bead height is not less than 8mm.After inspection calculates and increases horizon bar, rear cross beam maximum stress meets intensity and wants
It asks.
After being unclamped for anchor point after Hanging Basket, the problem of cradle structure torque is without safety stock, using increasing cradle structure branch
Point increases structural stability.In both sides diamond shape purlin, under piece increases vertical supporting steel member and longitudinal nose girder, and duplex is used between bilateral
Word steel is welded to connect, and is increased to reinforce between rod piece angle point and walking rails in every side and be connected with Double-layer two-splice I-steel, by Hanging Basket
Stress system is converted into freely supported structure by cantilever design, so that cradle structure torque is had safety stock during traveling, and be not required to
Anchor position increases the frictional force that counterweight increases suspended basket after giving Hanging Basket original, increases rod piece and only increases structural stability, is not necessarily to
Inspection is calculated.
It waits after the completion of reinforcing, Hanging Basket bottom basket and template system are fallen 2.95m at twice, and first time whereabouts 2.35m is exited
Both the segments 4# position falls 0.6m again after wired, is fixed side form and crossbeam using steel wire rope and chain block.216# pier span centres
Bottom elevation is 82.35m, and the segments 4#, the segments 4# lower section is in both wired outer, the segments bottom elevation 80.44m, 2# bottom elevation
79.86m.Hanging Basket bottom basket and bed die top surface absolute altitude are first dropped into 80.00m in span centre position before retracting, Hanging Basket is retreated to 4# and saved
Duan Shi, bed die and beam bottom headroom 0.44m, Hanging Basket bottom basket bottom absolute altitude is 79.18m at this time.K4 lines and Hunan steel industrial siding K5 carrier cables
Absolute altitude 77.101m, Hanging Basket bottom and carrier cable height difference 2.1m.Hanging Basket retreats to both wired outer rear (segments 4#) and again drops to bottom basket
Then 79.4m retreats Hanging Basket to the segments 2#, complete to retreat.
Adjustment fixed pulley spacing is determined using method in vector distance point, specifically, considers to be not provided with adjustment pulley, arrangement first
The case where rectilinear orbit, the Hanging Basket forward and backward crossbeam both sides that retract respectively have an essence to prick spiral shell mosquito steel as hanging basket bed die and side form
Supporting member, it is 15cm, walking rails circuit (i.e. Hanging Basket rollback circuit) at a distance from beam body flange plate that every essence, which pricks spiral shell mosquito steel,
The distance between Hanging Basket theory plan rollback circuit is vector distance.Hanging Basket arranges that rectilinear orbit retracts, Hanging Basket rollback circuit and extension
26cm vector distances are generated between basket theory plan rollback circuit, Hanging Basket side essence, which pricks spiral shell mosquito steel, will collide beam flange plate, and Hanging Basket has side
The security risk inclined, it is also possible to can not complete to retreat in limited construction skylight point, make Hanging Basket rest on both wired, to transport
Busy Shanghai elder brother line traffic safety makes a big impact.Therefore the curve element arrangement that track only presses beam is retreated, is to sum up analyzed, only
Arrangement adjustment fixed pulley can be considered, the case where design curve track out of shape.
Rail overall length is by many single straight rails, the similar curve track of composition.Method is for adjusting in vector distance point
The method of difference (claiming vector distance) between the whole practical rollback circuit of Hanging Basket and theoretical rollback circuit, makes Hanging Basket in back off procedure central sill
The offset distance of cross-sectional direction is less than the minimum safe distance 15cm between Hanging Basket and beam body flange plate;It is calculated through drawing, using fixed
When one per 10m dilatory steel hinge line of adjustment of pulley is linear, vector distance 10cm, using the every 5m of the fixed pulley together dilatory steel hinge line of adjustment
When linear, vector distance 2.5cm, it is contemplated that Hanging Basket cannot be more than 3cm in the upper deviation of practical back off procedure middle orbit, otherwise
Hanging Basket has the risk for deflecting away from rail, may cause security risk or need satisfactory after correcting is taken to delay to move back the Hanging Basket time, institute
It is adjusted together per 5m with method selection in vector distance point and draws the linear scheme of steel hinge line, the vector distance after adjustment is 2.5cm, is less than track
Traveling difference 3cm and flange plate safe distance 15cm ensures that the traveling of Hanging Basket rollback is safe and smooth.
Arrange continuously dragging jack, Hanging Basket mobile frictional force:Bed die and side form system gross weight 30t, Hanging Basket dead weight 30t,
Gross weight N=60t.Startup power:Steel friction coefficient μ takes 0.2, starts frictional force F=μ N=600 × 0.2=120KN;Sliding
Power:Steel friction coefficient μ takes 0.15, starts frictional force F=μ N=600 × 0.15=90KN.It is moved according to the above Hanging Basket that calculates
It moves minimum startup power and is more than 120KN, could the dilatory movement of Hanging Basket, Hanging Basket movement be set stretch-draw jack by two fulcrums and dragged
It draws, so it is 60KN that jack lowest pull is drawn in everywhere, jack selects ZLD20 type stretch-draw jacks, maximum stretching force
For 200KN, it can know that 2 ZLD20 types stretch-draw jacks can draw movable hanging basket from calculating, as a result of continuously tensioning
Method avoids the compartment for moving back anchor, oil return, upper anchor, and everywhere draws jack and connected by 2 jack, to what is realized
One tensioning, another is moved back anchor, oil return, upper anchor, toward the continual progress tensioning operation of complex Alternating.From the safety stock for moving back Hanging Basket
Consider, Hanging Basket anchor point is drawn in everywhere, increases by one of steel strand wires and Hanging Basket is drawn in 2 jack series connection, Hanging Basket is made to retract
Process is safer, and in practice, Hanging Basket, which retracts, draws jack everywhere by 4 ZLD20 type stretch-draw jack combination of two
It forms, point is drawn at two and configures 8 ZLD20 type stretch-draw jacks altogether.
After jack arranges, it is fixedly mounted by counter-force seat, counter-force seat basis utilizes anchor embedded hole after 0# block original Hanging Baskets,
Steel locking steel plate is pricked using essence to be formed, and then welds counter-force seat on the steel plate.Finally install traction steel strand wires and jack etc.
Pulling equipment.It is drawn using jack and dismantles Hanging Basket after Hanging Basket retracts to home.
Finally illustrate, the above examples are only used to illustrate the technical scheme of the present invention and are not limiting, although with reference to compared with
Good embodiment describes the invention in detail, it will be understood by those of ordinary skill in the art that, it can be to the skill of the present invention
Art scheme is modified or replaced equivalently, and without departing from the objective and range of technical solution of the present invention, should all be covered at this
In the right of invention.
Claims (7)
1. a kind of Curved Continuous Beams Hanging Basket fast fallback method over long distances, which is characterized in that include the following steps:
S1 Hanging Basket rollback pre-structures are reinforced:Increase vertical supporting steel member and longitudinal nose girder under main couple, by Hanging Basket beaer
System is converted into freely supported structure and is examined to calculate Hanging Basket reinforcement system by cantilever design, ensures the stabilization row moved after entire Hanging Basket system;
S2 Hanging Baskets bottom basket and template fall and fix:As needed, it by Hanging Basket bottom basket and template system whereabouts suitable distance, waits hanging
After the completion of basket bottom basket and template system fall, using chain block, sunpender or steel wire rope by side form and bed die system on Hanging Basket
Bottom end rail, which is connected and fixed, forms an entirety;
Hanging Basket rollback line adjustment fixed pulley is arranged in S3, arranges class curved path walking track and installation pulling equipment;
S4 removes Hanging Basket after so that Hanging Basket is retracted to outside existing safety line using pulling equipment.
2. a Curved Continuous Beams Hanging Basket according to claim 1 fast fallback method over long distances, which is characterized in that step
In S3, fixed pulley spacing is determined using method adjustment in vector distance point.
3. a Curved Continuous Beams Hanging Basket according to claim 2 fast fallback method over long distances, which is characterized in that use
Method adjustment determines that the detailed process of fixed pulley spacing is in vector distance point:According to Hanging Basket in the inclined of back off procedure central sill cross-sectional direction
Away from less than the minimum safe distance between Hanging Basket and beam body flange plate, and is considering security risk and satisfactory after correcting is taken to delay
In the case of moving back the Hanging Basket time, the safe difference between the practical rollback circuit of setting Hanging Basket and theoretical rollback circuit, i.e. safety arrow
Away from the laying fixed pulley linear for adjusting dilatory steel strand wires determines the spacing between fixed pulley, calculate the practical rollback line of Hanging Basket
Vector distance between road and theoretical rollback circuit, makes the vector distance be less than safe vector distance.
4. a Curved Continuous Beams Hanging Basket according to claim 1 fast fallback method over long distances, which is characterized in that step
In S3, pulling equipment includes that dilatory jack, steel strand wires and automatic continuous jacking pumping plant, the pushing tow jack pass through counter-force seat
It is fixedly mounted.
5. a Curved Continuous Beams Hanging Basket according to claim 4 fast fallback method over long distances, which is characterized in that step
In S4, the detailed process for making Hanging Basket retract using pulling equipment is:Hanging Basket movement sets dilatory jack by two fulcrums and draws.
6. a Curved Continuous Beams Hanging Basket according to claim 5 fast fallback method over long distances, which is characterized in that each
Dilatory fulcrum more dilatory jack of arranged in series.
7. a Curved Continuous Beams Hanging Basket according to claim 1 fast fallback method over long distances, which is characterized in that step
In S1, after anchor point unclamps after Hanging Basket, using cradle structure fulcrum is increased, increase stable structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810220215.2A CN108411795B (en) | 2018-03-16 | 2018-03-16 | An a kind of Curved Continuous Beams Hanging Basket fast fallback method over long distances |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810220215.2A CN108411795B (en) | 2018-03-16 | 2018-03-16 | An a kind of Curved Continuous Beams Hanging Basket fast fallback method over long distances |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108411795A true CN108411795A (en) | 2018-08-17 |
CN108411795B CN108411795B (en) | 2019-08-23 |
Family
ID=63131963
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810220215.2A Active CN108411795B (en) | 2018-03-16 | 2018-03-16 | An a kind of Curved Continuous Beams Hanging Basket fast fallback method over long distances |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108411795B (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2008050907A (en) * | 2006-08-28 | 2008-03-06 | Yokogawa Bridge Holdings Corp | Bridge girder member erecting construction method and bridge girder member erecting device used therefor |
CN101586330A (en) * | 2008-05-22 | 2009-11-25 | 中铁十一局集团第一工程有限公司 | Receding construction method of cradle of continuous girder bridge made of prestressing concrete |
CN205399229U (en) * | 2016-03-11 | 2016-07-27 | 李涛 | Bridge triangle hanging basket |
CN206070393U (en) * | 2016-09-20 | 2017-04-05 | 中交武汉港湾工程设计研究院有限公司 | A kind of asynchronous construction hanging basket of Wavelike steel webplate composite beam bridge |
CN206625137U (en) * | 2017-03-16 | 2017-11-10 | 中铁十局集团第二工程有限公司 | The cast-in-place closure segment Hanging Basket of one kind swivel cantilever beam slides running gear |
-
2018
- 2018-03-16 CN CN201810220215.2A patent/CN108411795B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2008050907A (en) * | 2006-08-28 | 2008-03-06 | Yokogawa Bridge Holdings Corp | Bridge girder member erecting construction method and bridge girder member erecting device used therefor |
CN101586330A (en) * | 2008-05-22 | 2009-11-25 | 中铁十一局集团第一工程有限公司 | Receding construction method of cradle of continuous girder bridge made of prestressing concrete |
CN205399229U (en) * | 2016-03-11 | 2016-07-27 | 李涛 | Bridge triangle hanging basket |
CN206070393U (en) * | 2016-09-20 | 2017-04-05 | 中交武汉港湾工程设计研究院有限公司 | A kind of asynchronous construction hanging basket of Wavelike steel webplate composite beam bridge |
CN206625137U (en) * | 2017-03-16 | 2017-11-10 | 中铁十局集团第二工程有限公司 | The cast-in-place closure segment Hanging Basket of one kind swivel cantilever beam slides running gear |
Also Published As
Publication number | Publication date |
---|---|
CN108411795B (en) | 2019-08-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US3490605A (en) | Traveling beam for the production of bridge sections | |
CN101250856B (en) | Echelon cradle as well as construction method thereof | |
CN208815424U (en) | A kind of bridge descending hanging basket | |
CN101736703B (en) | 3000t special bridge girder erection machine for integrally erecting 120m-span double-layer four-line steel beam bridge for highway and railway | |
CN102797227A (en) | Construction method adopting inverted triangular obliquely-crawling hanging basket | |
CN108265628A (en) | One kind rides cable-styled erection crane lifting cable-stayed bridge girder steel and bridge floor board construction method | |
CN105239510A (en) | Dismounting beam support used for high pier small-radius curve cast-in-situ box beam and construction method | |
CN202369933U (en) | Trestle bridge cantilever beam lifting system and bridge surface precast beam erecting construction system | |
CN102433844A (en) | Cantilever beam hoisting system of trestle and construction system and method for erecting prefabricated beam of bridge deck | |
CN103993745A (en) | Integral transfer girder hoisting device and hoisting method thereof | |
CN108086168A (en) | Ride cable-styled erection crane | |
CN102587293A (en) | System and method for cradle cantilever construction of variable-width section concrete girder | |
CN112144401B (en) | Bridge girder erection machine over-span method based on curve track and large longitudinal slope environment | |
CN210713752U (en) | High-altitude operation construction hanging basket capable of moving in three-dimensional space | |
CN108411795B (en) | An a kind of Curved Continuous Beams Hanging Basket fast fallback method over long distances | |
CN105544401A (en) | Overweight combined highway and railway bridge rigid suspending cable stiffened continuous steel trussed beam pushing device with stiffening string | |
CN207987749U (en) | Ride cable-styled erection crane | |
CN108625270A (en) | Nose girder gantry crane installs bridge prefabrication box girder construction method | |
CN102926330B (en) | Installation method of hanging basket suitable for bridge construction | |
CN210529487U (en) | Bridge and box-shaped bridge inspection device with flange plates | |
EP1111135A3 (en) | Method of building viaducts | |
CN105507623A (en) | Coke oven greenhouse applicable to different regional meteorological conditions | |
CN111042004A (en) | Hanging basket track beam traveling method | |
CN106351123B (en) | A kind of more case Wavelike steel webplate main girder construction Hanging Baskets of list rope | |
CN205348005U (en) | Construction operation combination platform of basket is hung to cable -stay bridge guy rope |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |