CN105544401A - Overweight combined highway and railway bridge rigid suspending cable stiffened continuous steel trussed beam pushing device with stiffening string - Google Patents

Overweight combined highway and railway bridge rigid suspending cable stiffened continuous steel trussed beam pushing device with stiffening string Download PDF

Info

Publication number
CN105544401A
CN105544401A CN201610016485.2A CN201610016485A CN105544401A CN 105544401 A CN105544401 A CN 105544401A CN 201610016485 A CN201610016485 A CN 201610016485A CN 105544401 A CN105544401 A CN 105544401A
Authority
CN
China
Prior art keywords
purlin
girder
jack
overweight
center
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610016485.2A
Other languages
Chinese (zh)
Inventor
李荣浩
伍军
梁崇双
张时利
刘瑜
曹晗
丁仕洪
邢文彬
伍超然
阮蔚平
易中楼
夏云
李富
张士宝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
STEEL STRUCTURE Co Ltd OF CHINA TIESIJU CIVIL ENGINEERING GROUP
Original Assignee
STEEL STRUCTURE Co Ltd OF CHINA TIESIJU CIVIL ENGINEERING GROUP
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by STEEL STRUCTURE Co Ltd OF CHINA TIESIJU CIVIL ENGINEERING GROUP filed Critical STEEL STRUCTURE Co Ltd OF CHINA TIESIJU CIVIL ENGINEERING GROUP
Priority to CN201610016485.2A priority Critical patent/CN105544401A/en
Publication of CN105544401A publication Critical patent/CN105544401A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Abstract

The invention discloses an overweight combined highway and railway bridge rigid suspending cable stiffened continuous steel trussed beam pushing device with a stiffening string. The pushing device comprises a sliding device, a vertical jacking device, a horizontal pushing system device and a transverse deviation rectifying device. The sliding device comprises a left girder sliding block, a middle girder sliding block and a right girder sliding block and slideway beams. The sliding blocks are located above the slideway beams, MGE sliding plates with oil channels are arranged at the bottoms of the sliding blocks, and a long MGE stainless steel plate is laid on the tops of the slideway beams. The vertical jacking device comprises a left girder vertical lifting jack, a middle girder vertical lifting jack, a right girder vertical lifting jack, a horizontal counter force seat and distributive girders, and the horizontal contour force seat is fixed to the front ends of the slideway beams. The transverse deviation rectifying device comprises limiting check blocks, deviation rectifying jacks and lateral counter force seats, limiting check blocks are arranged on the left side of the left girder slidway beam and the right side of the right girder slidway beam, no check block is arranged on the middle girder slideway beam, the lateral counter force seats are located on the outer side of the front end of the left girder slideway beam, the outer side of the front end of the middle girder slideway beam and the outer side of the front end of the right girder slideway beam, pistons at the front ends of the deviation rectifying jacks press the outer side walls of the sliding blocks, and the rear ends of the deviation rectifying jacks are limited through the lateral counter force seats.

Description

Overweight combined bridge rigid suspended cable stiffening continuous truss sill bolt is put more energy into string thrustor
Technical field
The present invention relates to bridge steel structure technical field, specifically belong to a kind of overweight combined bridge rigid suspended cable stiffening continuous truss sill bolt and to put more energy into string thrustor, be mainly used in band and put more energy into string steel truss girder jack-in erection.
Background technology
Rigid suspended cable stiffening steel truss girder bridge is as the large span combined bridge form of structure of novelty, the at present domestic bridge only having this form of structure.This rigid suspended cable stiffening steel truss girder bridge crosses over the Yellow River major trough, and span is (123+3*180+128) m, and the heavy 37000t of full-bridge, adopts incremental launching method to install erection.Because steel truss girder span is large, rigid suspended cable stiffening string is elongated, tonnage of bridge is excessive, because fulcrum change can cause beam string structure system instability of putting more energy in incremental launching construction process, main truss fulcrum is stressed excessive, need realize pushing tow Multipoint synchronous and control, ensure full-bridge quality of finished bridge.
Existing thrustor is often applied to the less or trusses parallel chords jack-in erection of tonnage.Band rigidity string pushing tow of putting more energy into both had needed strictly to control bridge linear, realized incremental launching construction by multipoint jacking again, and existing thrustor cannot meet overweight combined bridge rigid suspended cable stiffening continuous truss sill bolt and to put more energy into the requirement of string pushing tow.
Summary of the invention
The invention provides a kind of overweight combined bridge rigid suspended cable stiffening continuous steel truss girder pushing device, namely realize the jack-in erection of overweight combined bridge steel truss girder and the accurate location and installation of string of putting more energy into by rigid suspended cable stiffening continuous steel truss girder pushing device.
The technical solution used in the present invention is as follows:
A kind of overweight combined bridge rigid suspended cable stiffening continuous truss sill bolt is put more energy into string thrustor, comprise slide device, vertical top removal device, horizontal-top pushing system device, lateral deviation-correcting device, it is characterized in that: described slide device comprises purlin, left, center, right three slide block 1, slipway beam 2, purlin, described left, center, right three slide block 1 lays respectively at above slipway beam 2, be respectively equipped with out the slide plate 10 of oil duct bottom purlin, left, center, right three slide block 1, elongated corrosion resistant plate 12 is laid at described slipway beam 2 top; Described vertical top removal device comprises the vertical jack 3 in purlin, left, center, right three, horizontal reacting force seat 4, distribution beam 8, described horizontal reacting force seat 4 is fixed on slipway beam 2 front end, described distribution beam 8 is positioned over slipway beam 2 rear end surface respectively, and vertical jack 3 is all established at described horizontal reacting force seat 4 top, distribution beam 8 top; Described horizontal-top pushing system device comprises purlin, left, center, right three horizontally tracting jack 6, drag cable 7, ground tackle 9, draws anchor device 15, purlin, described left, center, right three horizontally tracting jack 6 is installed on horizontal reacting force seat 4 front end respectively, the drag cable 7 of drawing in horizontally tracting jack 6 through ground tackle 9 with slide block 2 or draw anchor device 15 to be connected, described in draw anchor device 15 to be connected with upper chord 14 docking port by high-strength bolt; Described lateral deviation-correcting device comprises positive stop 13, correction jack 5, lateral reaction seat 12.
Described positive stop 13 be arranged on the left of the slipway beam of left purlin with right purlin slipway beam on the right side of space, positive stop is not established in middle purlin, and described lateral reaction seat 12 is positioned at purlin, purlin, left, center, right three slipway beam front end outer side.
Described correction jack 5 forward bolt piston top is pressed on the lateral wall of slide block 1, and rear end is spacing by lateral reaction seat 5.
Described slide plate 10 material is MGE, and corrosion resistant plate 12 material is MGE.
Advantage of the present invention:
1, the present invention is directed to overweight combined bridge rigid suspended cable stiffening continuous truss sill bolt string pushing tow feature of putting more energy into and vertical top removal device is set, its distribution beam can move on slipway beam, top lifting position can be adjusted in real time and play heights of roofs, guaranteeing bridge construction stability and security.
2, the present invention arranges purlin, left, center, right three horizontal-top pushing system device, slide device, vertical top removal device, can meet the pushing tow requirement of overweight steel truss girder, and well control steel truss girder becomes bridge linear, guarantees construction safety.
3, the vertical top removal device of the present invention, not only solves the difficult problem that rigid suspended cable stiffening string installs location, serves protection supporting role during steel truss girder pushing tow simultaneously.
Accompanying drawing explanation
Fig. 1 is layout schematic diagram of the present invention.
Fig. 2 is that facade of the present invention arranges schematic diagram.
Fig. 3 is horizontal-top pushing system device schematic diagram of the present invention.
Fig. 4 is that the present invention's right purlin slipway beam and slide block arrange schematic diagram.
Fig. 5 is that the present invention's left purlin slipway beam and deviation correcting device arrange schematic diagram.
Detailed description of the invention
See accompanying drawing, a kind of overweight combined bridge rigid suspended cable stiffening continuous truss sill bolt is put more energy into string thrustor, comprise slide device, vertical top removal device, horizontal-top pushing system device, lateral deviation-correcting device, it is characterized in that: described slide device comprises purlin, left, center, right three slide block 1, slipway beam 2, purlin, described left, center, right three slide block 1 lays respectively at above slipway beam 2, be respectively equipped with out the MGE material slide plate 10 of oil duct bottom purlin, left, center, right three slide block 1, elongated MGE material corrosion resistant plate 12 is laid at described slipway beam 2 top; Described vertical top removal device comprises the vertical jack 3 in purlin, left, center, right three, horizontal reacting force seat 4, distribution beam 8, described horizontal reacting force seat 4 is fixed on slipway beam 2 front end, described distribution beam 8 is positioned over slipway beam 2 rear end surface respectively, and vertical jack 3 is all established at described horizontal reacting force seat 4 top, distribution beam 8 top; Described horizontal-top pushing system device comprises purlin, left, center, right three horizontally tracting jack 6, drag cable 7, ground tackle 9, draws anchor device 15, purlin, described left, center, right three horizontally tracting jack 6 is installed on horizontal reacting force seat 4 front end respectively, the drag cable 7 of drawing in horizontally tracting jack 6 through ground tackle 9 with slide block 2 or draw anchor device 15 to be connected, described in draw anchor device 15 to be connected with upper chord 14 docking port by high-strength bolt; Described lateral deviation-correcting device comprises positive stop 13, correction jack 5, lateral reaction seat 12, described positive stop 13 be arranged on the left of the slipway beam of left purlin with right purlin slipway beam on the right side of space, positive stop is not established in middle purlin, described lateral reaction seat 12 is positioned at purlin, purlin, left, center, right three slipway beam front end outer side, described correction jack 5 forward bolt piston top is pressed on the lateral wall of slide block 1, and rear end is spacing by lateral reaction seat 5.
Four vertical jacks are all established at slipway beam two ends, purlin, left, center, right three, the middle purlin maximum top lifting power of the vertical jack of every platform is 800t, the left and right purlin maximum top lifting power of the vertical jack of every platform is 500t, the every platform maximum drawbar pull of horizontally tracting jack is 400t, the every platform of correction jack maximum top power is 400t, drag cable is made up of the steel strand of 18 diameters 15.2, and vertical jack range is 200mm.

Claims (4)

1. an overweight combined bridge rigid suspended cable stiffening continuous truss sill bolt is put more energy into string thrustor, it is characterized in that, comprise slide device, vertical top removal device, horizontal-top pushing system device, lateral deviation-correcting device, it is characterized in that: described slide device comprises purlin, left, center, right three slide block, slipway beam, purlin, described left, center, right three slide block lays respectively at above slipway beam, purlin, left, center, right three slider bottom is respectively equipped with out the slide plate of oil duct, and elongated corrosion resistant plate is laid at described slipway beam top; Described vertical top removal device comprises the vertical jack in purlin, left, center, right three, horizontal reacting force seat, distribution beam, described horizontal reacting force seat is fixed on slipway beam front end, described distribution beam is positioned over slipway beam rear end surface respectively, and vertical jack is all established at described horizontal reacting force seat top, distribution beam top; Described horizontal-top pushing system device comprises purlin, left, center, right three horizontally tracting jack, drag cable, ground tackle, draws anchor device, purlin, described left, center, right three horizontally tracting jack is installed on horizontal reacting force seat front end respectively, the drag cable of drawing in horizontally tracting jack through ground tackle with slide block or draw anchor device to be connected, described in draw anchor device to be connected with upper chord docking port by high-strength bolt; Described lateral deviation-correcting device comprises positive stop, correction jack, lateral reaction seat.
2. overweight combined bridge rigid suspended cable stiffening continuous truss sill bolt according to claim 1 is put more energy into string thrustor, it is characterized in that, described positive stop be arranged on the left of the slipway beam of left purlin with right purlin slipway beam on the right side of space, positive stop is not established in middle purlin, and described lateral reaction seat is positioned at purlin, purlin, left, center, right three slipway beam front end outer side.
3. overweight combined bridge rigid suspended cable stiffening continuous truss sill bolt according to claim 1 is put more energy into string thrustor, and it is characterized in that, described correction jack forward bolt piston top is pressed on the lateral wall of slide block, and rear end is spacing by lateral reaction seat.
4. overweight combined bridge rigid suspended cable stiffening continuous truss sill bolt according to claim 1 is put more energy into string thrustor, and it is characterized in that, described slide plate material is MGE, and corrosion resistant plate material is MGE.
CN201610016485.2A 2016-01-07 2016-01-07 Overweight combined highway and railway bridge rigid suspending cable stiffened continuous steel trussed beam pushing device with stiffening string Pending CN105544401A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610016485.2A CN105544401A (en) 2016-01-07 2016-01-07 Overweight combined highway and railway bridge rigid suspending cable stiffened continuous steel trussed beam pushing device with stiffening string

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610016485.2A CN105544401A (en) 2016-01-07 2016-01-07 Overweight combined highway and railway bridge rigid suspending cable stiffened continuous steel trussed beam pushing device with stiffening string

Publications (1)

Publication Number Publication Date
CN105544401A true CN105544401A (en) 2016-05-04

Family

ID=55823932

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610016485.2A Pending CN105544401A (en) 2016-01-07 2016-01-07 Overweight combined highway and railway bridge rigid suspending cable stiffened continuous steel trussed beam pushing device with stiffening string

Country Status (1)

Country Link
CN (1) CN105544401A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106223203A (en) * 2016-08-26 2016-12-14 中铁四局集团第二工程有限公司 Steel girder erection support and using method thereof
CN107090773A (en) * 2017-05-22 2017-08-25 中国铁建大桥工程局集团有限公司 A kind of concrete prefabricated beam section crack resistence sliding system of kiloton
CN112726427A (en) * 2020-12-25 2021-04-30 中铁大桥局集团有限公司 Steel truss pushing construction method and device
CN113322832A (en) * 2021-07-13 2021-08-31 广西北投公路建设投资集团有限公司 Bridge incremental launching construction technology

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101906755A (en) * 2010-09-06 2010-12-08 中铁大桥局集团有限公司 Three-truss continuous steel truss girder pushing device and arrangement method thereof
CN102373671A (en) * 2011-11-18 2012-03-14 中铁四局集团有限公司 Steel trussed beam and flexible arch bridge construction method with vault pushing
CN102619174A (en) * 2012-03-20 2012-08-01 中铁四局集团钢结构有限公司 Large-span continuous steel truss girder arch pushing device
CN103266573A (en) * 2013-06-17 2013-08-28 中铁山桥集团有限公司 Self-anchored suspension bridge steel box girder three-slideway synchronous jacking construction method
CN103510475A (en) * 2013-09-27 2014-01-15 中铁大桥局股份有限公司 Long-distance pushing construction method of thee-main-truss steel truss beam in single-connection and double-span modes without guide beam

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101906755A (en) * 2010-09-06 2010-12-08 中铁大桥局集团有限公司 Three-truss continuous steel truss girder pushing device and arrangement method thereof
CN102373671A (en) * 2011-11-18 2012-03-14 中铁四局集团有限公司 Steel trussed beam and flexible arch bridge construction method with vault pushing
CN102619174A (en) * 2012-03-20 2012-08-01 中铁四局集团钢结构有限公司 Large-span continuous steel truss girder arch pushing device
CN103266573A (en) * 2013-06-17 2013-08-28 中铁山桥集团有限公司 Self-anchored suspension bridge steel box girder three-slideway synchronous jacking construction method
CN103510475A (en) * 2013-09-27 2014-01-15 中铁大桥局股份有限公司 Long-distance pushing construction method of thee-main-truss steel truss beam in single-connection and double-span modes without guide beam

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106223203A (en) * 2016-08-26 2016-12-14 中铁四局集团第二工程有限公司 Steel girder erection support and using method thereof
CN107090773A (en) * 2017-05-22 2017-08-25 中国铁建大桥工程局集团有限公司 A kind of concrete prefabricated beam section crack resistence sliding system of kiloton
CN112726427A (en) * 2020-12-25 2021-04-30 中铁大桥局集团有限公司 Steel truss pushing construction method and device
CN113322832A (en) * 2021-07-13 2021-08-31 广西北投公路建设投资集团有限公司 Bridge incremental launching construction technology

Similar Documents

Publication Publication Date Title
CN103967050B (en) Construction system of subway station
CN101250856B (en) Echelon cradle as well as construction method thereof
CN208815424U (en) A kind of bridge descending hanging basket
CN106948268A (en) Variable Section Steel box beam pushing tow is combined the unit and application method
CN105544401A (en) Overweight combined highway and railway bridge rigid suspending cable stiffened continuous steel trussed beam pushing device with stiffening string
CN108265628A (en) One kind rides cable-styled erection crane lifting cable-stayed bridge girder steel and bridge floor board construction method
CN102041782B (en) Multi-point pushing system of large-span steel truss girders and pushing process thereof
CN207032041U (en) Variable Section Steel box beam pushing tow combines the unit
CN201297036Y (en) Discharging platform
CN101781878A (en) Integral lifting template of main pylon of single-pylon cable-stayed bridge without dorsal cables and lifting construction method thereof
CN110331670A (en) Contour double case combined beam structure assembling process
CN103437301A (en) Method for mounting construction hanging basket of suspended pouring section of single plane cable-stayed bridge
CN203947421U (en) Compound beam cable stayed bridge direction across bridge prestress application device
CN203199913U (en) Assembling and disassembling type hoisting truss
CN109629439B (en) Construction method of single-tower cable-stayed bridge
CN104120659A (en) Descending type suspended scaffold
CN108086168A (en) Ride cable-styled erection crane
CN102926330B (en) Installation method of hanging basket suitable for bridge construction
CN207987749U (en) Ride cable-styled erection crane
CN103866699A (en) Rail-free type walking hanging basket
CN206693041U (en) Cable way bridge gooseneck
CN212077660U (en) Large-span wide width bridge girder rhombus hanging basket construction structure
CN214573768U (en) Self-climbing sliding formwork pouring system for second-stage concrete pouring of gate slot
CN210766423U (en) Diagonal web member bracket trolley with adjustable inclination angle
CN210395127U (en) Assembled Bailey beam hanging basket upper walking system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160504

RJ01 Rejection of invention patent application after publication