CN207032041U - Variable Section Steel box beam pushing tow combines the unit - Google Patents

Variable Section Steel box beam pushing tow combines the unit Download PDF

Info

Publication number
CN207032041U
CN207032041U CN201720431256.7U CN201720431256U CN207032041U CN 207032041 U CN207032041 U CN 207032041U CN 201720431256 U CN201720431256 U CN 201720431256U CN 207032041 U CN207032041 U CN 207032041U
Authority
CN
China
Prior art keywords
steel box
pushing tow
joist
thrustor
girder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720431256.7U
Other languages
Chinese (zh)
Inventor
冉国亮
梅军
孔军豪
赵子龙
李娜
郭晓松
胡鹏飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Engineering Co Ltd of China Railway Seventh Group Co Ltd
Original Assignee
Wuhan Engineering Co Ltd of China Railway Seventh Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Engineering Co Ltd of China Railway Seventh Group Co Ltd filed Critical Wuhan Engineering Co Ltd of China Railway Seventh Group Co Ltd
Priority to CN201720431256.7U priority Critical patent/CN207032041U/en
Application granted granted Critical
Publication of CN207032041U publication Critical patent/CN207032041U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model belongs to field of bridge construction, is related to a kind of pushing tow combination unit, more particularly to a kind of Variable Section Steel box beam pushing tow combination unit.Include support, thrustor, steel box-girder and for the programme controlled digital control system of integral construction, thrustor described in the rack bearing, the thrustor carries the steel box-girder;The thrustor includes multigroup walking jack and joist, and one joist of corresponding carrying, multiple joists carry the steel box-girder jointly on walking jack described in every group;The gradient for the steel box-girder bottom position that the gradient at the top of each joist is in contact with it is consistent, and each joist bottom slope is 0.Its advantage is:Auxiliary equipment needed for simple in construction, system working stability, construction is less, can be effectively improved the too high and vertical nonsynchronous shortcoming of top lift of pad during pushing tow.

Description

Variable Section Steel box beam pushing tow combines the unit
Technical field
The utility model belongs to field of bridge construction, is related to a kind of pushing tow combination unit, more particularly to a kind of Variable Section Steel Box beam pushing tow combines the unit.
Background technology
With the development of Bridges in Our Country construction, the jack-in erection of Large-span Steel Box Beam turns into an important development direction. General overpass, main bridge overcrossing railway line, steel box beam erection use incremental launching method, and steel box-girder is indulged in the side of spanning along bridge Axis direction is assembled paragraph by paragraph, lays slideway and slide device under steel box-girder, pushing steel box girder, along straight skidding to predetermined spanning, Then auxiliary equipment is removed, positive girder steel is moved, it is in place to fall beam.
At present, across iron bridge incremental launching construction technology is mainly pad pushing tow both at home and abroad, pad be present during bridge incremental launching It is too high, the shortcomings of vertical top lift in jack pushing tow stroke is asynchronous, Variable Section Steel box beam can not be well adapted to.It is badly in need of A kind of Variable Section Steel box beam pushing tow combination unit, safe and effective can solve cross a river stream, across highway, particularly across existing The bridge incremental launching construction of Business Line.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of Variable Section Steel for above-mentioned the deficiencies in the prior art Box beam pushing tow combines the unit, and the pushing tow combining structure is simple, system working stability, auxiliary equipment is less needed for construction, and can To effectively improve the too high and vertical nonsynchronous shortcoming of top lift of pad during pushing tow.
Technical scheme is as follows used by the utility model:
The utility model belongs to field of bridge construction, is related to a kind of pushing tow combination unit, more particularly to bottom board slope is not The steel box-girder pushing tow combination unit of even variation.
A kind of Variable Section Steel box beam pushing tow combination unit, include support, thrustor, steel box-girder and for integral construction Programme controlled digital control system, thrustor described in the rack bearing, the thrustor carry the steel box-girder;The top Pushing device includes multigroup walking jack and joist, and corresponds to one support of carrying described in every group on walking jack Beam, multiple joists carry the steel box-girder jointly;The steel case that the gradient at the top of each joist is in contact with it The gradient of beam bottom position is consistent, and each joist bottom slope is 0.
On the basis of above-mentioned technical proposal, the utility model can also improve as follows:
Further, the support includes stock, base, transverse distribution beam, longitudinal distribution beam and bearing beam..Wherein, the set Frame is arranged on the base, and longitudinal distribution beam is welded in above the stock, and the transverse distribution beam is horizontal State and it is mutually perpendicular to longitudinal distribution beam and is connected up and down, the connection side of the transverse distribution beam and longitudinal distribution beam Formula is welds, the multigroup walking jack of transverse distribution load bearing beam.Wherein, multigroup walking jack can Require arrangement quantity and position according to bridge construction, multi-point support realized to steel box-girder by the joist being positioned above, with up to To the construction effect to steel box-girder multi-point pushing.
Further, the stock includes spiral steel pipe and bridging, connects between two spiral steel pipes being parallel to each other The bridging is connect, the spiral steel pipe and the bridging junction are provided with batten plate, the spiral steel pipe and the bridging It is mutually permanently connected by batten plate welding.The bridging of triangle, triangle are welded among the spiral steel pipe by batten plate For structure the most firm so that whole stock stabilized structure, bearing capacity is strong, meets pushing tow lifting construction demand.
Further, the base includes pre-embedded anchoring bolts and basis, and the pre-embedded anchoring bolts anchor connection is in described Basic top, the spiral steel pipe lower end and the pre-embedded anchoring bolts anchor connection.
Further, in addition to lifting device, the lifting device is between the support and the thrustor.It is described Lifting device includes:Electric block, steel wire rope, job platform and lifting spiral steel pipe.
Wherein, two job platforms are symmetrically distributed in the on both sides of the middle of the stock and connection fixed thereto, two The electric block is connected to the both ends of the transverse distribution beam, and described steel wire rope one end is fixedly connected with the operation horizontal Platform, the other end are placed through the electric block above the job platform and are connected with the joist being positioned above, The joist is provided with hanger with the steel wire rope junction, and the steel wire rope is fixedly connected by the hanger with the joist; The lifting is with spiral steel pipe between longitudinal distribution beam and the support.
Whole lifting device is used to lift thrustor and the overall of steel box-girder.
Further, walking jack described in every group includes longitudinal jack, horizontal jack, vertical jack.Cause This walking jack have around, upper and lower 3 directions must move pushing tow function, disclosure satisfy that steel box-girder pushing tow is applied The needs of work.
A kind of Variable Section Steel box beam pushing tow combination unit provided by the utility model, has following advantages:
1st, thrustor and lifting device of the present utility model use stock, its stock structure can in pushing tow process and It is play the guiding role in lifting process, makes whole device more stable, while stock can also provides load transfer support, can be achieved more Stroke jacks, and simple operation is practical.
2nd, the utility model is in steel box-girder bottom by being provided with multistage joist, the gradient at the top of each joist with The gradient of its steel box-girder bottom position contacted is consistent, and each joist bottom slope is 0.So joist and steel case The contact surface perfection of beam institute agrees with, and avoids eccentric force and uneven stress of the beam body to jack during jacking, can be effective Steel box-girder is solved the pad excessive height on jack during each step pushing tow the shortcomings that, is avoided in jack lift stroke The asynchronous shortcoming of vertical top lift.Because the peak of steel box-girder bottom differs too big with minimum point, therefore use multistage support Beam rather than a joist, can save material, mitigate the weight of thrustor.Multistage joist is distributed in the different positions of steel box-girder Put, adapt to the different gradient of steel box-girder bottom, during pushing tow, instruction of multigroup walking jack in digital control system respectively Under the operation simultaneously of more fulcrums, accuracy is high and can save cost of labor.
3rd, the utility model by electric block and steel wire rope by thrustor and the steel box-girder above thrustor Overall lifting overall upwards, effectively prevent the construction Difficulties of jack pad.Simultaneously because the support using multistage given shape Load bearing beam steel box-girder, eccentric force and uneven stress of the steel box-girder in lifting process are avoided, and each step was lifted The problem of pad in journey is too high.And two job platforms are arranged as required to, by electric block and steel wire rope from two End carries out lifting work, to increase the steadiness of lifting device lifting operation.
4th, lifting device of the present utility model according to the highly desirable of lifting, can lengthen the lifting spiral of corresponding length Steel pipe, overall structure is simple, and Assembling is easy, and auxiliary equipment needed for construction is less, and versatility is stronger, applicable different size Steel box-girder pushing tow and lifting construction;By Optimizing Construction Scheme, with reference to on-site actual situations, scientific and reasonable configuration personnel, Machinery, material, improve efficiency of construction, high-quality, efficient completion method of multiplexing coordinative construction.
5th, construction intellectuality, information-based configuration of the utility model by digital control system, reaches work progress and monitors entirely, with This reaches the harmony and continuity of more work post coordinative constructions.
Brief description of the drawings
The utility model is described in further detail below in conjunction with the drawings and specific embodiments.According to following explanation and power Sharp claim, advantages and features of the present utility model will become apparent from.It should be noted that accompanying drawing using very simplified form and Non- accurately ratio is used, only to purpose that is convenient, lucidly aiding in illustrating the utility model embodiment.
Fig. 1 is the structural representation of the bridge incremental launching combination unit described in the utility model embodiment 1;
Fig. 2 is the structural representation of the bridge incremental launching combination unit described in the utility model embodiment 2;
Wherein, 1- joists, 2- walking jack, 3- steel box-girders, 4- spiral steel pipes, 5- bridgings, 6- batten plates, 7- bases Plinth, 8- pre-embedded anchoring bolts, 9- longitudinal directions distribution beam, 10- transverse distribution beams, 11- bearing beams, 12- steel wire ropes, 13- electric blocks, 14- job platforms, 15- lifting spiral steel pipes, 16- hangers.
Embodiment
The utility model is described in further detail below in conjunction with the drawings and specific embodiments.According to following explanation and power Sharp claim, advantages and features of the present utility model will become apparent from.It should be noted that accompanying drawing using very simplified form and Non- accurately ratio is used, only to purpose that is convenient, lucidly aiding in illustrating the utility model embodiment.
Embodiment 1
In the present embodiment, as shown in figure 1, a kind of bridge incremental launching combines the unit, support, thrustor, steel case are included Beam and for the programme controlled digital control system of integral construction, thrustor described in the rack bearing, the thrustor carrying The steel box-girder;The thrustor includes multigroup walking jack and joist, and equal on walking jack described in every group One joist of corresponding carrying, multiple joists carry the steel box-girder jointly;The gradient at the top of each joist The gradient for the steel box-girder bottom position being in contact with it is consistent, and each joist bottom slope is 0.
Wherein, joist uses Q235 steel plate rollings, is welded.
The support includes stock, base, transverse distribution beam, longitudinal distribution beam and bearing beam.Wherein, the stock is arranged on On the base, longitudinal distribution beam is welded in above the stock, the transverse distribution beam be horizontal and with institute State longitudinal distribution beam to be mutually perpendicular to and be up and down connected, the connected mode of the transverse distribution beam and longitudinal distribution beam is weldering Connect, the multigroup walking jack of transverse distribution load bearing beam.Wherein, multigroup walking jack can be according to bridge Beam construction requirement arranges quantity and position, and multi-point support is realized to steel box-girder by the joist being positioned above.
The stock includes spiral steel pipe and bridging, is cut between two spiral steel pipes being parallel to each other described in connection Knife supports, and the spiral steel pipe and the bridging junction are provided with batten plate, and the spiral steel pipe and the bridging pass through batten plate Welding is mutually permanently connected.
The base includes pre-embedded anchoring bolts and basis, and the pre-embedded anchoring bolts anchor connection is on the basis of described Side, the spiral steel pipe lower end and the pre-embedded anchoring bolts anchor connection.
Walking jack described in every group includes longitudinal jack, horizontal jack, vertical jack.Therefore before having Afterwards, left and right, upper and lower 3 directions must move pushing tow function.
Pushing tow process of the present utility model:Steel box-girder is positioned on multiple joists, each joist and steel box-girder connect Contacting surface perfection agrees with, and ensure that the steadiness of carrying, pushing tow work is carried out by walking jack, according to incremental launching construction needs By the very heavy completion of walking around, upper and lower 3 directions adjust steel box-girder position.Pushed up in walking jack Push away in work, by joist agrees with steel box-girder institute contact surface perfection, avoid steel box-girder during pushing tow to jack The problem of pad during eccentric force and uneven stress, and each step pushing tow is too high, ensure that incremental launching construction has Effect property.
Embodiment 2
In the present embodiment, as shown in Fig. 2 a kind of difference of pushing tow combination unit described with embodiment 1 is Also include lifting device, in addition, a kind of pushing tow combination unit of embodiment 2 is same as Example 1.
In the present embodiment, in addition to lifting device, the lifting device be located at the support and the thrustor it Between.The lifting device includes:Electric block, steel wire rope, job platform and lifting spiral steel pipe.
Wherein, two job platforms are symmetrically distributed in the on both sides of the middle of the stock and connection fixed thereto, two The electric block is connected to the both ends of the transverse distribution beam, and described steel wire rope one end is fixedly connected with the operation horizontal Platform, the other end are placed through the electric block above the job platform and are connected with the joist being positioned above, The joist is provided with hanger with the steel wire rope junction, and the steel wire rope is fixedly connected by the hanger with the joist; The lifting is with spiral steel pipe between longitudinal distribution beam and the support.
Lifting process of the present utility model:After the pushing tow for being carried out example 1 works, electric block, steel wire are utilized Rope, and hanger integrally lift thrustor and steel box-girder, and lifting spiral steel pipe is installed after the completion of lifting, and the lifting is used Spiral steel pipe, the lifting are fixedly connected with longitudinal distribution beam with spiral steel pipe upper end, and lower end is fixedly connected with the support Spiral steel pipe, complete lifting operation.
Described above is only preferred embodiment of the present utility model, and the scope of protection of the utility model is not limited merely to Above-described embodiment, all technical schemes belonged under the utility model thinking belong to the scope of protection of the utility model.
For those skilled in the art, some under the premise of the utility model principle is not departed from change Enter and retouch, these improvements and modifications also should be regarded as the scope of protection of the utility model.

Claims (9)

  1. A kind of 1. Variable Section Steel box beam pushing tow combination unit, it is characterised in that:Include support, thrustor, steel box-girder and use In the programme controlled digital control system of integral construction, thrustor described in the rack bearing, the thrustor carries the steel Box beam;The thrustor includes multigroup walking jack and joist, and described in every group on walking jack to agreeing A joist is carried, multiple joists carry the steel box-girder jointly;The gradient at the top of each joist connects with it The gradient of the tactile steel box-girder bottom position is consistent, and each joist bottom slope is 0.
  2. 2. Variable Section Steel box beam pushing tow combination unit according to claim 1, it is characterised in that:The support includes set Frame, base, transverse distribution beam, longitudinal distribution beam and bearing beam.
  3. 3. Variable Section Steel box beam pushing tow combination unit according to claim 2, it is characterised in that:The stock is arranged on institute State on base, longitudinal distribution beam is welded in above the stock, the transverse distribution beam be horizontal and with it is described Longitudinal distribution beam is mutually perpendicular to and is connected up and down, and the connected mode of the transverse distribution beam and longitudinal distribution beam is welding, The multigroup walking jack of transverse distribution load bearing beam.
  4. 4. Variable Section Steel box beam pushing tow combination unit according to claim 3, it is characterised in that:The stock includes spiral Steel pipe and bridging, connect the bridging between two spiral steel pipes being parallel to each other, the spiral steel pipe and described Bridging junction is provided with batten plate, the spiral steel pipe and the bridging and is mutually permanently connected by batten plate welding.
  5. 5. Variable Section Steel box beam pushing tow combination unit according to claim 4, it is characterised in that:The base includes pre-buried Foundation bolt and basis, the pre-embedded anchoring bolts anchor connection in it is described basis top, the spiral steel pipe lower end with it is described Pre-embedded anchoring bolts anchor connection.
  6. 6. Variable Section Steel box beam pushing tow combination unit according to claim 5, it is characterised in that:Also include lifting device, The lifting device is between the support and the thrustor.
  7. 7. Variable Section Steel box beam pushing tow combination unit according to claim 6, it is characterised in that:The lifting device bag Include:Electric block, steel wire rope, job platform and lifting spiral steel pipe.
  8. 8. Variable Section Steel box beam pushing tow combination unit according to claim 7, it is characterised in that:Two job platforms The on both sides of the middle of the stock and connection fixed thereto are symmetrically distributed in, two electric blocks are connected to the transverse direction The both ends of distribution beam, described steel wire rope one end are fixedly connected with the job platform, and the other end is placed through above the job platform The electric block and be connected with the joist being positioned above, be provided with and hang in the joist and the steel wire rope junction Ear, the steel wire rope are fixedly connected by the hanger with the joist;Lifting spiral steel pipe is located at the longitudinal direction point With between beam and the support.
  9. 9. the Variable Section Steel box beam pushing tow combination unit according to claim 1 or 8, it is characterised in that:Stride described in every group Formula jack includes longitudinal jack, horizontal jack, vertical jack.
CN201720431256.7U 2017-04-24 2017-04-24 Variable Section Steel box beam pushing tow combines the unit Expired - Fee Related CN207032041U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720431256.7U CN207032041U (en) 2017-04-24 2017-04-24 Variable Section Steel box beam pushing tow combines the unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720431256.7U CN207032041U (en) 2017-04-24 2017-04-24 Variable Section Steel box beam pushing tow combines the unit

Publications (1)

Publication Number Publication Date
CN207032041U true CN207032041U (en) 2018-02-23

Family

ID=61479060

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720431256.7U Expired - Fee Related CN207032041U (en) 2017-04-24 2017-04-24 Variable Section Steel box beam pushing tow combines the unit

Country Status (1)

Country Link
CN (1) CN207032041U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106948268A (en) * 2017-04-24 2017-07-14 中铁七局集团武汉工程有限公司 Variable Section Steel box beam pushing tow is combined the unit and application method
CN110258353A (en) * 2019-07-31 2019-09-20 河南省交通规划设计研究院股份有限公司 And of Varying Depth steel-concrete composite beams bridge construction technique with support
CN111335187A (en) * 2020-03-25 2020-06-26 上海远通路桥工程有限公司 Construction process for triangular area of open-web rigid frame bridge
CN111424563A (en) * 2020-04-02 2020-07-17 中交一公局集团有限公司 Steel beam pushing method for transverse widening and longitudinal slope changing
CN114606871A (en) * 2022-03-29 2022-06-10 武汉思力特种工程机械施工有限公司 Incremental launching method for variable-cross-section steel beam of long-span bridge
CN115450120A (en) * 2022-09-01 2022-12-09 中铁二十四局集团江苏工程有限公司 Long-span walking type steel box girder pushing construction equipment

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106948268A (en) * 2017-04-24 2017-07-14 中铁七局集团武汉工程有限公司 Variable Section Steel box beam pushing tow is combined the unit and application method
CN106948268B (en) * 2017-04-24 2023-07-21 中铁七局集团武汉工程有限公司 Variable-section steel box girder pushing combined device and using method thereof
CN110258353A (en) * 2019-07-31 2019-09-20 河南省交通规划设计研究院股份有限公司 And of Varying Depth steel-concrete composite beams bridge construction technique with support
CN111335187A (en) * 2020-03-25 2020-06-26 上海远通路桥工程有限公司 Construction process for triangular area of open-web rigid frame bridge
CN111335187B (en) * 2020-03-25 2021-11-16 上海远通路桥工程有限公司 Construction process for triangular area of open-web rigid frame bridge
CN111424563A (en) * 2020-04-02 2020-07-17 中交一公局集团有限公司 Steel beam pushing method for transverse widening and longitudinal slope changing
CN114606871A (en) * 2022-03-29 2022-06-10 武汉思力特种工程机械施工有限公司 Incremental launching method for variable-cross-section steel beam of long-span bridge
CN114606871B (en) * 2022-03-29 2023-09-26 武汉思力特种工程机械施工有限公司 High-section variable steel girder pushing method for large-span bridge
CN115450120A (en) * 2022-09-01 2022-12-09 中铁二十四局集团江苏工程有限公司 Long-span walking type steel box girder pushing construction equipment
CN115450120B (en) * 2022-09-01 2023-09-01 中铁二十四局集团江苏工程有限公司 Large-span walking type steel box girder pushing construction equipment

Similar Documents

Publication Publication Date Title
CN207032041U (en) Variable Section Steel box beam pushing tow combines the unit
CN106948268A (en) Variable Section Steel box beam pushing tow is combined the unit and application method
CN103266573B (en) Steel Box Girder of Self-Anchored Suspension beam unidirectional single-point three slideway synchronous push construction method
CN103821087B (en) Prefabricated bridge Steel Space pipe concrete truss combination beams and construction method
CN202899044U (en) Vierendeel box-shaped double-girder bridge crane
CN102080357A (en) Integrated beam-falling device and method for steel pipe pier bailey beam cast-in-place bracket
CN104328734A (en) Multi-connection and multi-span continuous steel truss girder bridge and construction method thereof
CN203393639U (en) Diamond self-anchored hanging basket for road and bridge construction
CN104060542A (en) Transverse bridge direction prestress exerting device for combined beam cable-stayed bridge and transverse bridge direction prestress exerting method
CN103557011B (en) A kind of side wall trolley
CN211498526U (en) Self-lifting type corrugated steel web cast-in-situ box girder hanging basket
CN203947421U (en) Compound beam cable stayed bridge direction across bridge prestress application device
CN210856948U (en) Cable-passing type bridge floor crane for central double-cable-plane cable-stayed bridge
CN205257790U (en) Fixed high -low leg handle portal crane
CN207987749U (en) Ride cable-styled erection crane
CN211947993U (en) Support for large-span cast-in-situ bridge construction
CN102926330B (en) Installation method of hanging basket suitable for bridge construction
CN203583378U (en) Floor plate truss trolley for mounting bridge deck slab of composite structure bridge
CN108086168A (en) Ride cable-styled erection crane
CN215925647U (en) Arch rib buckle cable anchoring beam for tower buckle integration
CN113774813A (en) Traction deviation rectifying equipment convenient for installing large-section steel truss box girder
CN201598572U (en) Large-span segment assembly bridge fabrication machine
CN210395127U (en) Assembled Bailey beam hanging basket upper walking system
CN210262748U (en) Cantilever supporting structure for steel box girder pushing construction
CN209260563U (en) A kind of Bailey beam truss entirety transverse sliding device for cast-in-situ continuous beam

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180223

CF01 Termination of patent right due to non-payment of annual fee