CN206693041U - Cable way bridge gooseneck - Google Patents

Cable way bridge gooseneck Download PDF

Info

Publication number
CN206693041U
CN206693041U CN201720385643.1U CN201720385643U CN206693041U CN 206693041 U CN206693041 U CN 206693041U CN 201720385643 U CN201720385643 U CN 201720385643U CN 206693041 U CN206693041 U CN 206693041U
Authority
CN
China
Prior art keywords
gooseneck
main rope
steadying line
cable
bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720385643.1U
Other languages
Chinese (zh)
Inventor
杜洪亮
傅支黔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Chengdu Engineering Co Ltd
Original Assignee
PowerChina Chengdu Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Chengdu Engineering Co Ltd filed Critical PowerChina Chengdu Engineering Co Ltd
Priority to CN201720385643.1U priority Critical patent/CN206693041U/en
Application granted granted Critical
Publication of CN206693041U publication Critical patent/CN206693041U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

A kind of cable way bridge gooseneck is the utility model is related to, belongs to science of bridge building field.The utility model includes gooseneck, and steadying line cable saddle is provided at both ends with the top of gooseneck, the hole passed through for main rope is provided with the middle part of gooseneck.The utility model on gooseneck with providing holes at main rope position correspondence, main rope passes through the hole on gooseneck with gooseneck intersection, gooseneck both ends set steadying line cable saddle to be connected with steadying line, so make the connection of main rope and steadying line more close, main rope is more coordinated with steadying line deformation, each gooseneck vertical bridge to distribution evenly, so as to reduce the internal force of gooseneck, reduce the sectional dimension of gooseneck;For main rope by the constraint in the hole on gooseneck, the transverse distribution for making each cable wire of main rope evenly, more meets the hypothesis of the uniform stressed of cable way bridge calculating.

Description

Cable way bridge gooseneck
Technical field
A kind of cable way bridge gooseneck is the utility model is related to, belongs to science of bridge building field.
Background technology
Modern cable way bridge is a kind of temporary bridge girder construction form widely used in large-scale construction project, the car of cable way bridge Load passes to main bearing rope by floorings, and main rope transmits the force to the anchorage for being anchored in two sides.Cable way bridge generally has bridge Face rope and the steadying line composition for being distributed in bridge floor rope both sides, set crossbeam, bridge floor rope is arranged at crossbeam between bridge floor rope and steadying line Top, crossbeam both sides are connected with steadying line, and the load on bridge floor passes to crossbeam by bridge floor rope, then is acted on by the allotment of crossbeam Steadying line is set to participate in stress, when live load is acted between two crossbeams, load is transmitted to the horizontal stroke of load point both sides by bridge floor rope Beam makes steadying line participate in stress by the allotment effect of crossbeam, because the connection of bridge floor rope and crossbeam is weaker, apart from load farther out Crossbeam allotment effect it is smaller, so as to internal force it is smaller.The floorings generally use plank of cable way bridge, because bridge floor is wider and plank Rigidity it is limited, so the internal force of bridge floor rope is uneven.
Utility model content
Technical problem to be solved in the utility model is:A kind of cable way bridge gooseneck is provided, cable way bridge stress can be made Situation is more reasonable.
Technical scheme is used by solve above-mentioned technical problem the utility model:Cable way bridge gooseneck, including steel are horizontal Beam, gooseneck top are provided at both ends with steadying line cable saddle, the hole passed through for main rope are provided with the middle part of gooseneck.
It is further:Hole is circular port.
It is further:Gooseneck is made using I-steel, and I-steel includes web and wing plate, and steadying line cable saddle is located at the wing On plate, hole is on web.
It is further:Web both sides are provided with ribbed stiffener, and ribbed stiffener is arranged at intervals along gooseneck length direction.
The utility model be applied to cable way bridge concrete technology step be:Construction anchorage;Main rope is connected with unilateral anchorage;System Make gooseneck, after main rope passes through multiple goosenecks, be connected with other side anchorage;Adjust position of the crossbeam between spanning;Adjustment Main rope arrow degree;Lay floorings;Be open to traffic operation.
The beneficial effects of the utility model are:On gooseneck with providing holes, main rope and gooseneck at main rope position correspondence Intersection sets steadying line cable saddle to be connected with steadying line through the hole on gooseneck, gooseneck both ends, so makes main rope and stably The connection of rope is more close, and the deformation of main rope and steadying line is more coordinated, each gooseneck vertical bridge to distribution evenly, so as to Reduce the internal force of gooseneck, reduce the sectional dimension of gooseneck;Main rope makes each steel of main rope by the constraint in the hole on gooseneck The transverse distribution of rope evenly, more meets the hypothesis of the uniform stressed of cable way bridge calculating.
Brief description of the drawings
Fig. 1 is elevation of the present utility model;
Fig. 2 is plan of the present utility model;
Fig. 3 is Fig. 1 A-A views;
Marked in figure:1- goosenecks, 2- steadying lines cable saddle, 3- main ropes, 4- holes, 5- ribbed stiffeners.
Embodiment
The utility model is described in further detail below in conjunction with the accompanying drawings.
As shown in FIG. 1 to 3, the utility model includes gooseneck 1, and the top of gooseneck 1 is provided at both ends with steadying line cable saddle 2, the middle part of gooseneck 1 is provided with the hole 4 passed through for main rope 3.4 preferably circular hole of hole.
Gooseneck 1 is preferably made using I-steel, and I-steel includes web and wing plate, and steadying line cable saddle 2 is located on wing plate, Hole 4 is on web.To improve structural strength and stability, web both sides are additionally provided with ribbed stiffener 5, and ribbed stiffener 5 is along gooseneck 1 Length direction is arranged at intervals.

Claims (4)

1. cable way bridge gooseneck, including gooseneck (1), gooseneck (1) top is provided at both ends with steadying line cable saddle (2), its feature It is:The hole (4) passed through for main rope (3) is provided with the middle part of gooseneck (1).
2. cable way bridge gooseneck as claimed in claim 1, it is characterised in that:Hole (4) is circular port.
3. cable way bridge gooseneck as claimed in claim 1 or 2, it is characterised in that:Gooseneck (1) is made using I-steel, work Word ladle includes web and wing plate, and steadying line cable saddle (2) is on wing plate, and hole (4) are on web.
4. cable way bridge gooseneck as claimed in claim 3, it is characterised in that:Web both sides are provided with ribbed stiffener (5), ribbed stiffener (5) it is arranged at intervals along gooseneck (1) length direction.
CN201720385643.1U 2017-04-13 2017-04-13 Cable way bridge gooseneck Active CN206693041U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720385643.1U CN206693041U (en) 2017-04-13 2017-04-13 Cable way bridge gooseneck

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720385643.1U CN206693041U (en) 2017-04-13 2017-04-13 Cable way bridge gooseneck

Publications (1)

Publication Number Publication Date
CN206693041U true CN206693041U (en) 2017-12-01

Family

ID=60444303

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720385643.1U Active CN206693041U (en) 2017-04-13 2017-04-13 Cable way bridge gooseneck

Country Status (1)

Country Link
CN (1) CN206693041U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106835953A (en) * 2017-04-13 2017-06-13 中国电建集团成都勘测设计研究院有限公司 Cable way bridge gooseneck
CN112431112A (en) * 2020-10-23 2021-03-02 浙江大学 Assembled ground anchor through-type pedestrian cable bridge structure and construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106835953A (en) * 2017-04-13 2017-06-13 中国电建集团成都勘测设计研究院有限公司 Cable way bridge gooseneck
CN112431112A (en) * 2020-10-23 2021-03-02 浙江大学 Assembled ground anchor through-type pedestrian cable bridge structure and construction method

Similar Documents

Publication Publication Date Title
CN104631343B (en) From traveling rhombus keying cradle in truss type structure and suspended basket and construction method
CN108194116B (en) Whole prefabricated rail top wind channel assembly structure of subway station
CN107938520B (en) Using the method for vertical drag-line construction steel reinforced concrete combination beam
CN106835953A (en) Cable way bridge gooseneck
CN206693041U (en) Cable way bridge gooseneck
CN206219997U (en) A kind of box crossbeam of bridge is reinforced and mounting structure
CN105887680B (en) One kind mixing cable beam anchoring structure
CN203559354U (en) Stay cable anchoring structure applied to prestressed concrete partially cable-stayed bridge
CN103510466B (en) Wet joint construction method for T-shaped beam bridge deck system
CN108004931A (en) Using the method for mixing drag-line construction steel reinforced concrete combination beam
CN105544401A (en) Overweight combined highway and railway bridge rigid suspending cable stiffened continuous steel trussed beam pushing device with stiffening string
CN106320699B (en) The fast assembling-disassembling method of truss type formwork strutting system
CN203833417U (en) Attachment joint of high-rise-building external elevator guide rail
CN107720542A (en) A kind of ceiling mounted tracks composite beam
CN204151698U (en) T beam transverse prestress reinforcing construction
CN103510521A (en) Connecting component
CN206232306U (en) A kind of glomeration building concrete hollow block wall piece banding system colligation beam
CN203514323U (en) Connection component
CN202416173U (en) Wide girder bridge floor system structure with horizontal K support
CN205576737U (en) Trompil steel pipe steel and concrete composite beam bridge structure
CN204326490U (en) A kind of construction of lift well operating platform
CN103848320B (en) A kind of attachment node of skyscraper external elevator guide rail and attachment construction method thereof
CN212561221U (en) Diagonal tension load-adjusting system for reinforcing rigid truss bridge
CN107859174A (en) A kind of small span portal-rigid frames use the device of end plate connection
CN203238971U (en) Combination and adjustment device of truss end portions

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant