Crane for mounting bridge curtain board Download PDFInfo
- Publication number
- CN101717048A CN101717048A CN200910215836A CN200910215836A CN101717048A CN 101717048 A CN101717048 A CN 101717048A CN 200910215836 A CN200910215836 A CN 200910215836A CN 200910215836 A CN200910215836 A CN 200910215836A CN 101717048 A CN101717048 A CN 101717048A
- Authority
- CN
- China
- Prior art keywords
- crane
- cucurbit
- hangs
- nose girder
- hoist crane
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 abstract description 9
- 238000009434 installation Methods 0.000 abstract description 5
- 238000012423 maintenance Methods 0.000 abstract description 2
- 238000000034 method Methods 0.000 abstract 1
- 239000004568 cement Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000012467 final product Substances 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The invention relates to a crane for mounting a bridge curtain board, which comprises a main structure frame, a hoist crane guide beam, a front hoist crane and a rear hoist crane. The main structure frame is provided with a front supporting upright post and a rear supporting upright post, the hoist crane guide beam is installed at the middle position of the upper end face of the main structure frame, and the front end of the hoist crane guide beam extends out of the main structure frame. The front hoist crane and the rear hoist crane are sequentially installed on the hoist crane guide beam, the rear support upright post is provided with a balance weight, the front support upright post is provided with a guide wheel, and the rear support upright post is provided with a fixed wheel. The invention has simple structure, low cost and convenient maintenance. The crane is closely combined with the installation and construction process of the passenger dedicated line bridge curtain board, and through field test tests, the crane can meet the requirement of curtain board installation accuracy, is simple and convenient to operate, and does not influence the development of other construction operations.
Description
Technical field
The invention belongs to the erecting device of Passenger dedicated railway Bridge shield, relate in particular to a kind of crane that is used for mounting bridge shield plate.
Background technology
Railway line for passenger traffic bridge floor shield quality is about 500kg, only depends on manpower can't implement its erection work.But,, need construction continuously because shield is to be provided with continuously on bridge floor, if adopt general-utility car to hang installation, the installation in position precision is difficult to control on the one hand, and to hang floor area big for general-utility car on the other hand, must influence carrying out of other construction operations, thereby influence construction speed.The patent No. is 200720191945, denomination of invention discloses a kind of crane technical scheme for the patent of invention of " simple and easy rail mounted cantilever telpher ": it comprises cantalever rod bearing, cantalever rod, pulley, wirerope lifting rope and lifting rope capstan winch, and the bottom of cantalever rod bearing is provided with guide tracked base, and two bottom side of cantilevered boom support are equipped with the roller that matches with the guide rail of guide tracked base.Though this kind crane can be realized the carrying of object, but still need manpower to participate in, also fail fundamentally to solve weight is placed to this difficult problem of desired location.
Summary of the invention
Main purpose of the present invention is to reduce manual work intensity, realizes the continuous construction operation of bridge floor shield, does not influence carrying out of other construction operations simultaneously.
For achieving the above object, the technical solution adopted in the present invention is: a kind of crane that is used for mounting bridge shield plate comprises that main structural frame, cucurbit hang nose girder, preceding cucurbit hangs and the back cucurbit hangs.Described main structural frame has support post behind two preceding support posts and two, and main structural frame forms crane main stress structure, guarantees the shield mounting stability.Described cucurbit hangs that nose girder is installed on the midway location of main structural frame upper surface and front end that cucurbit hangs nose girder extends main structural frame.Cucurbit hangs and the back cucurbit hangs and is installed on cucurbit successively and hangs on the nose girder before described, and the two coordinative operation is used to lift the cement concrete shield, and preceding cucurbit hangs and the back cucurbit hangs and can be chosen as electronic as required or manually all can.
Described main structural frame hangs on the back support post of nose girder rear end near cucurbit counterweight is installed, to keep the balance of crane car body when the lifting shield.
On the support post track adjusting wheel is installed before described.On the support post of described back tight pulley is installed, the direct of travel of tight pulley hangs nose girder perpendicular to cucurbit.Can easily crane be carried out integral body by track adjusting wheel and tight pulley moves.
The preceding support post of main structural frame and back support post spacing are about 2.6m, can make crane to move across the crashproof wall of bridge deck concrete, thereby not influence carrying out of other construction operations.
Beneficial effect of the present invention is: the present invention is simple in structure, and cost is low, and is easy to maintenance.The installation process of the Passenger dedicated railway Bridge of combining closely shield by in-place test test, uses this crane can satisfy the requirement of shield setting accuracy, and is not easy and simple to handle, not and influence carrying out of other construction operations.
Description of drawings
Fig. 1 is the lateral plan that is used for the crane of mounting bridge shield plate of the present invention;
Fig. 2 is the front view that is used for the crane of mounting bridge shield plate of the present invention.
The specific embodiment
The present invention is further detailed explanation below in conjunction with the drawings and specific embodiments.
In conjunction with illustrated in figures 1 and 2, a kind of crane that is used for mounting bridge shield plate, comprise main structural frame, cucurbit hang nose girder 2, preceding cucurbit hang 4 and the back cucurbit hang 3.Described main structural frame has support post 1 behind two preceding support posts 5 and two, and main structural frame forms crane main stress structure, guarantees the shield mounting stability.Described cucurbit hangs that nose girder 2 is installed on the midway location of main structural frame upper surface and front end that cucurbit hangs nose girder 2 extends main structural frame, makes the action radius of handling shield further stretch out.Before described cucurbit hang 4 and the back cucurbit hang 3 and be installed on cucurbit successively and hang on the nose girder 2, the two coordinative operation is used to lift the cement concrete shield, preceding cucurbit hang 4 and the back cucurbit hang 3 and can be chosen as electronic as required or manually all can.
Described main structural frame hangs on the back support post 1 of nose girder 2 rear ends near cucurbit counterweight 8 is installed, to keep the balance of crane car body when the lifting shield.On the support post 5 track adjusting wheel 6 is installed before described.On the support post 1 of described back tight pulley 7 is installed, the direct of travel of tight pulley 7 hangs nose girder 2 perpendicular to cucurbit.Can carry out integral body to crane easily by track adjusting wheel 6 and tight pulley 7 moves.
During use, earlier crane is moved to the desired location, tight pulley 7 and track adjusting wheel 6 are carried out stationkeeping; Before re-using cucurbit hang 4 and the back cucurbit hang 3 and cooperate the lifting shields, and hang nose girder 2 along cucurbit and proceed to the installation site; At last shield being positioned over the desired location gets final product.
The invention is not restricted to the foregoing description; to those skilled in the art, any conspicuous improvement that the above embodiment of the present invention is made or change can not exceed the embodiments of the invention that only illustrate by way of example and the protection domain of claims.
Claims (3)
1. crane that is used for mounting bridge shield plate is characterized in that: described crane comprises that main structural frame, cucurbit hang nose girder (2), preceding cucurbit hangs (4) and the back cucurbit hangs (3); Described main structural frame has support post (1) behind two preceding support posts (5) and two, and described cucurbit hangs that nose girder (2) is installed on the midway location of main structural frame upper surface and front end that cucurbit hangs nose girder (2) extends main structural frame; Before described cucurbit hang (4) and afterwards cucurbit hang (3) and be installed on cucurbit successively and hang on the nose girder (2).
2. crane as claimed in claim 1 is characterized in that: described main structural frame hangs on the back support post (1) of nose girder (2) rear end near cucurbit counterweight (8) is installed.
3. crane as claimed in claim 1 or 2 is characterized in that: on the support post (5) track adjusting wheel (6) is installed before described; On the described back support post (1) tight pulley (7) is installed, the direct of travel of tight pulley (7) hangs nose girder (2) perpendicular to cucurbit.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200910215836A CN101717048A (en) | 2009-12-30 | 2009-12-30 | Crane for mounting bridge curtain board |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200910215836A CN101717048A (en) | 2009-12-30 | 2009-12-30 | Crane for mounting bridge curtain board |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101717048A true CN101717048A (en) | 2010-06-02 |
Family
ID=42431700
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN200910215836A Pending CN101717048A (en) | 2009-12-30 | 2009-12-30 | Crane for mounting bridge curtain board |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101717048A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102515031A (en) * | 2011-12-30 | 2012-06-27 | 中铁十三局集团第四工程有限公司 | Bridge curtain board mounting vehicle |
CN102530733A (en) * | 2012-01-13 | 2012-07-04 | 广东省源天工程公司 | Large radial gate lifting equipment and lifting method thereof |
CN106672814A (en) * | 2016-12-27 | 2017-05-17 | 合肥彩虹新能源有限公司 | Conveying trolley for mounting glass kiln water bag |
CN107161869A (en) * | 2017-06-01 | 2017-09-15 | 中铁四局集团机电设备安装有限公司 | Special cantilever simple crane for high-speed railway curtain board |
-
2009
- 2009-12-30 CN CN200910215836A patent/CN101717048A/en active Pending
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102515031A (en) * | 2011-12-30 | 2012-06-27 | 中铁十三局集团第四工程有限公司 | Bridge curtain board mounting vehicle |
CN102530733A (en) * | 2012-01-13 | 2012-07-04 | 广东省源天工程公司 | Large radial gate lifting equipment and lifting method thereof |
CN106672814A (en) * | 2016-12-27 | 2017-05-17 | 合肥彩虹新能源有限公司 | Conveying trolley for mounting glass kiln water bag |
CN107161869A (en) * | 2017-06-01 | 2017-09-15 | 中铁四局集团机电设备安装有限公司 | Special cantilever simple crane for high-speed railway curtain board |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201580915U (en) | Tyre-type gantry crane | |
RU2381326C1 (en) | Device for lifting and erecting units of superstructure | |
KR100619277B1 (en) | Apparatus diagnosing safety movable of suspension bridge | |
CN201635020U (en) | Bridge floor dismantling crane for large and medium concrete bridges | |
CN202248941U (en) | Integral lifting, positioning and mounting device for large-scale steel members | |
CN205954489U (en) | Stride cast -in -place space of business line steel structure construction protection on bridge and move movable support | |
CN206553923U (en) | A kind of mobile platform device for being used to install Collison fence for bridge | |
CN101717048A (en) | Crane for mounting bridge curtain board | |
CN111717797A (en) | Double-machine cooperative hoisting system and method for overpass railway deep cutting highway bridge under construction | |
CN109098089A (en) | A kind of suspension bridge column overhead main cable saddle hanging apparatus and construction method | |
CN107201719A (en) | Overpass anti-collision wall formwork hoisting conveyance and anti-collision wall construction method | |
CN111980392A (en) | Crown block sliding contact line installation device and construction method thereof | |
CN108625270A (en) | Nose girder gantry crane installs bridge prefabrication box girder construction method | |
CN103288002A (en) | Simple combination portal upper-air heavy-article hoisting device | |
CN201592956U (en) | Crane for mounting bridge curtain board | |
CN201080597Y (en) | Multifunctional cast-in-situ cantilever plate construction bracket | |
CN206625137U (en) | The cast-in-place closure segment Hanging Basket of one kind swivel cantilever beam slides running gear | |
CN206784172U (en) | Overpass anti-collision wall formwork hoisting conveyance | |
CN206635657U (en) | A kind of symmetrical formula Bridge Erector of setting a roof beam in place | |
CN211498465U (en) | Bridge detects uses mobile device | |
CN209039993U (en) | A kind of device carrying out the tensioning of great cantilever bent cap using movable supporting frame | |
CN109279522A (en) | Movable units body glass curtain wall cantilevered hanging device | |
CN202247682U (en) | Bridge crane for installing curtain board | |
CN205116006U (en) | High -speed railway bridge longmen walking maintenance detection device | |
CN212769477U (en) | Double-machine cooperative hoisting system for overpass railway deep cutting highway bridge under construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20100602 |