CN202703842U - Container ship - Google Patents

Container ship Download PDF

Info

Publication number
CN202703842U
CN202703842U CN 201220414999 CN201220414999U CN202703842U CN 202703842 U CN202703842 U CN 202703842U CN 201220414999 CN201220414999 CN 201220414999 CN 201220414999 U CN201220414999 U CN 201220414999U CN 202703842 U CN202703842 U CN 202703842U
Authority
CN
China
Prior art keywords
bulwark
deck
box ship
utility
model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220414999
Other languages
Chinese (zh)
Inventor
龚英弢
冯雪源
周炳焕
陶美珍
施雷
罗昆
余建伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China International Marine Containers Group Co Ltd
CIMC Ocean Engineering Design and Research Institute Co Ltd
Original Assignee
China International Marine Containers Group Co Ltd
CIMC Ocean Engineering Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China International Marine Containers Group Co Ltd, CIMC Ocean Engineering Design and Research Institute Co Ltd filed Critical China International Marine Containers Group Co Ltd
Priority to CN 201220414999 priority Critical patent/CN202703842U/en
Application granted granted Critical
Publication of CN202703842U publication Critical patent/CN202703842U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Packages (AREA)

Abstract

The utility model discloses a container ship. The container ship comprises a ship body, bulwarks and decks. The decks comprise a main deck used to stack a plurality of rows of containers and a forecastle deck. The bulwarks comprise a first bulwark arranged on the forecastle deck and a second bulwark arranged on the main deck, the second bulwark extends from the forecastle deck to the direction of a stern and at least exceeds the position on the main deck where the first row of containers are located. The container ship can reduce impact and corrosion on the containers by sea water and then effectively protect the containers.

Description

Box ship
Technical field
The utility model relates to a kind of ship design and manufacturing field, relates in particular to a kind of box ship.
Background technology
Box ship is as main ships that transport take the carrying freight container.As shown in Figure 1, Fig. 1 is the structural representation of traditional box ship.Tradition box ship 1 mainly comprises hull 11, bulwark 12 and deck 13, deck 13 comprises main deck 131 and fore castle deck 132, freight container 14 is deposited on the main deck 131, bulwark 12 only is arranged on the fore castle deck 132, and the length of bulwark 12 is too short, the freight container 141 that is positioned at first row on the main deck 131 is subject to impact and the erosion of the seawater that fore splashes, so that the freight container 141 of first row is vulnerable to damage.
The utility model content
The technical problems to be solved in the utility model is to overcome the deficiency that above-mentioned prior art exists, and proposes a kind of box ship that can effectively protect freight container.
For solving the problems of the technologies described above, the utility model proposes a kind of box ship, it comprises main deck and the fore castle deck of arranging in a row vanning for stacking more, described bulwark comprises and is arranged on the first bulwark on the fore castle deck and is arranged on the second bulwark on the main deck, described the second bulwark extends from fore castle deck to the stern direction, and surpasses at least the position of first row freight container main deck of living in.
Described box ship, wherein, the length of described the second bulwark is greater than 7113mm.
Described box ship, wherein, described bulwark height is greater than 5869mm.
Compared with prior art, box ship of the present utility model reduces seawater to impact and the erosion of freight container, and then effectively protects freight container by lengthening bulwark.
Description of drawings
Fig. 1 is the structural representation of traditional box ship.
Fig. 2 is the structural representation of the utility model box ship.
The specific embodiment
In order to further specify principle of the present utility model and structure, now by reference to the accompanying drawings preferred embodiment of the present utility model is elaborated.
As shown in Figure 2, Fig. 2 is the structural representation of the utility model box ship.Box ship 2 comprises hull 21, bulwark 22 and deck 23.Deck 23 comprises main deck 231 and fore castle deck 232, stacks on the main deck 231 and arranges in a row vanning 24 more.Bulwark 22 is arranged on the edge on deck 23; and it comprises and is arranged on the first bulwark 221 on the fore castle deck 232 and is arranged on the second bulwark 222 on the main deck 232; the second bulwark 222 extends from fore castle deck 231 to the stern direction; and surpass at least the position of first row freight container 241 main decks 231 of living in; make height and the length of the second bulwark 222 cover first row freight container 241; first row freight container 241 is gone along with sb. to guard him, and protection freight container 241 is not subjected to impact and the erosion of seawater.
Preferentially, the height H of bulwark 22 is greater than 5869mm.
Preferentially, the length L of the second bulwark 222 is greater than 7113mm.
Box ship of the present utility model reduces seawater to impact and the erosion of freight container, and then effectively protects freight container by lengthening bulwark.
Below only be better possible embodiments of the present utility model, and unrestricted protection domain of the present utility model, the equivalent structure that all utilization the utility model specification sheetss and accompanying drawing content have been done changes, and all is included in the protection domain of the present utility model.

Claims (3)

1. box ship, it is characterized in that, comprise hull, bulwark and deck, described deck comprises main deck and the fore castle deck of arranging in a row vanning for stacking more, described bulwark comprises and is arranged on the first bulwark on the fore castle deck and is arranged on the second bulwark on the main deck, described the second bulwark extends from fore castle deck to the stern direction, and surpasses at least the position of first row freight container main deck of living in.
2. box ship as claimed in claim 1 is characterized in that, the length of described the second bulwark is greater than 7113mm.
3. box ship as claimed in claim 1 is characterized in that, described bulwark height is greater than 5869mm.
CN 201220414999 2012-08-20 2012-08-20 Container ship Expired - Fee Related CN202703842U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220414999 CN202703842U (en) 2012-08-20 2012-08-20 Container ship

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220414999 CN202703842U (en) 2012-08-20 2012-08-20 Container ship

Publications (1)

Publication Number Publication Date
CN202703842U true CN202703842U (en) 2013-01-30

Family

ID=47584169

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220414999 Expired - Fee Related CN202703842U (en) 2012-08-20 2012-08-20 Container ship

Country Status (1)

Country Link
CN (1) CN202703842U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105644723A (en) * 2014-11-13 2016-06-08 中集船舶海洋工程设计研究院有限公司 Container ship

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105644723A (en) * 2014-11-13 2016-06-08 中集船舶海洋工程设计研究院有限公司 Container ship
CN105644723B (en) * 2014-11-13 2020-04-03 中集船舶海洋工程设计研究院有限公司 Container ship

Similar Documents

Publication Publication Date Title
CN106043610B (en) A kind of method using semi-submerged ship ships that transport
CN203975160U (en) A kind of Liquefied Natural Gas fuel filling ship
WO2011046313A3 (en) Floating structure with fuel tank for gas fuel
WO2011046314A3 (en) Floating structure with fuel tank for gas fuel
CN206171713U (en) Quick binary freighter
PH12017502095A1 (en) Hybrid ship using wind-powered propulsive force as auxiliary
KR102447030B1 (en) Container Ship with slow speed and large full form
CN202703842U (en) Container ship
CN201932335U (en) Seawater ballast-free chemical ship
CN201989928U (en) Full-rotation towboat with totally-enclosed type bulwark
CN105644723B (en) Container ship
CN201914402U (en) Oil tanker without seawater ballast
CN201512097U (en) Feeder dual-purpose inland-water pusher barge
CN201849636U (en) Rotary dual-layer broadside system used for river/sea combined ship
CN203581334U (en) Wood chip transport ship
WO2015140823A2 (en) A modified deck cell-guide system for deck stowage of containers
CN202966602U (en) Ocean engineering vessel
CN204310015U (en) Box ship
CN106906787A (en) A kind of yacht wharf structure
CN202765233U (en) Roller fairleader group used for ships
CN202107073U (en) Handy-size bulk carrier suitable for Changjiang navigation channel
CN207536088U (en) A kind of three body salvor of small face line
CN201614000U (en) Ship with towing device
CN202783704U (en) Inland river enclosed hatch cargo barge
CN204548441U (en) A kind of dock

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130130

Termination date: 20190820