Two cantilever hard rock coal road pick anchor equipments
Technical field:
The utility model relates to a kind of digging device, particularly a kind of pair of cantilever hard rock coal road pick anchor equipment.
Background technology:
Present coal mine roadway digging device and anchoring device major part are independent separately operations, even combination is to a certain degree arranged, since between driving and the anchoring in the requirement of locus the inevitable paradox of institute, can not bring into play to greatest extent optimum performance separately, its shortcoming is:
1, development machine is after the certain progress of driving, must withdraw, allow roofboltier enter and carry out the anchoring operation, after the anchoring operation is finished, development machine just can enter the driving that carries out next round, perhaps development machine must stop after tunneling a segment distance, waits for and could continue forward driving after the anchoring operation is finished, and this operating type has had a strong impact on drivage efficiency.
2, after development machine generally tunnels a fuselage length and withdraws from, could allow jumbolter enter and carry out the anchoring operation, cause the unsupported back span lengthening, especially in the situation that features as poor geologic condition, increase operating personnel's danger, be unfavorable for safety in production.
3, current coal mine roadway heading equipment is mostly for single-cantilever designs, and drivage efficiency is relatively not high.
4, the ventilation dust-laying effect is undesirable, and Dust Capacity is larger, is unfavorable for operating personnel's health.
5, the operating type underaction of jumbolter causes the lengthening of anchoring time and anchoring efficiency low.
6, the operating personnel does not have certain safeguard measure in operation process, and larger potential safety hazard is arranged.
7, the transportation of net sheet and lifting mostly rely on manpower, and operating personnel's labour intensity is larger.
The utility model content
The purpose of this utility model is: for overcoming the deficiencies in the prior art, provide a kind of two cantilever hard rock coal road pick anchor equipments easy to use.
The technical solution of the utility model
:
A kind of pair of cantilever hard rock coal road pick anchor equipment, include coal conveyer, hydraulic system, electrical control system, dust pelletizing system, dynamical system, headstock, be connected in the cantilever cutter sweep of headstock front end, the crawler unit of headstock below and the supporting platform that is articulated in the headstock rear end, described cantilever cutter sweep is made of two cantilever cutterheads, two cantilever cutterheads are distributed in the both sides of headstock front end along the headstock center line, be provided with temporary support device in the headstock upper end, be provided with roofbolt rig and side wall jumbolter at described supporting platform, also be provided with net sheet travelling bogie on the supporting platform.
Temporary support device includes the supporting leg that four hoist cylinders that are fixed on the headstock consist of, be connected in double-deck interim ceiling and the finger-type shield that is connected in the temporary support device rear end on the supporting leg, described finger-type shield is the strip structure that plurality of steel plates is welded.
Net sheet travelling bogie includes liftable articulated stand and net sheet delivery platform, and net sheet travelling bogie bottom and supporting platform base are rack and pinion drive mechanism.
Supporting platform and headstock are hinged, can the supporting platform be swung by oil cylinder, and described supporting platform rear end bottom is provided with the rear support boots, and side walls hinged have side wall support boots, is connected with telescopic hydraulic cylinder on the supporting boot.
Supporting platform both sides are hinged with Curved beam, and Curved beam can move forward and backward along the supporting platform, and Curved beam is submitted and is connected to the roofbolt rig and the sidewall jumbolter is articulated on the Curved beam, and jumbolter can be along the Curved beam circular swing motion.
Coal conveyer is articulated in the headstock lower end, and by earth-moving equipment, starry wheel and drag conveyor consist of.
The beneficial effects of the utility model are:
1, of the present utility model pair of cantilever hard rock coal road pick anchor equipment, driving system and anchor system organically combined carry out operation, during driving, can carry out synchronously the anchoring operation, excavation operation can be carried out continuously, greatly improved drivage efficiency.
2, the temporary lining adopted of of the present utility model pair of cantilever hard rock coal road pick anchor equipment has telescopic temporary supporting plate and finger-type shield, greatly shortened the unsupported back span in the tunneling process, improve operating personnel's safety work coefficient, guaranteed safety in production.
3, of the present utility model pair of cantilever hard rock coal road pick anchor equipment adopts the two cutterhead designs of two cantilevers, two cantilever cutterheads distribute along center line, two cutterhead parallel motions, cutting half of rock (coal) layer separately respectively, they both can be synchronized with the movement, again independently moving separately, setting by control program, two cutterhead interference can not occur, cutting has improved drivage efficiency simultaneously.
4, of the present utility model pair of cantilever hard rock coal road pick anchor equipment adopts development machine spray dust-reducing system and rotation brattice to take out the combination of dirt cleaning system, utilize the rotary airflow generator to produce swirling eddy, form the rotation brattice with spiral air flow the dust that fully mechanized workface produces is locked in the place ahead, driver position, by deduster work plane can all not collected by all dust of spraying sedimentation again, then it be purged.Development machine spray dust-reducing system and rotation brattice are taken out the two cooperation of dirt cleaning system, reach the effect of high-effective dust-removing.
5, the jumbolter of of the present utility model pair of cantilever hard rock coal road pick anchor equipment can swing in the certain angle scope along Curved beam, Curved beam can move forward and backward certain distance along the supporting platform, jumbolter quantity can suitably be mated according to driving speed, so just guaranteed that each jumbolter can move forward and backward neatly, swing, make the anchoring operation have very large flexibility, greatly improved anchoring efficiency.
6, the finger-type shield of the temporary lining of of the present utility model pair of cantilever hard rock coal road pick anchor equipment has not only been protected anchoring operating personnel's safety; can also the net sheet is pre-stored in interim ceiling; play the booster action that the net sheet is installed; both ensure operating personnel's safety, also improved linked network efficient.
7, of the present utility model pair of net sheet travelling bogie that cantilever hard rock coal road pick anchor equipment has, not only the net sheet can be transported fast, also has elevating function, the convenient operation personnel place the net sheet in the temporary lining cavity, alleviated operating personnel's labour intensity, the efficient that has improved the transportation of net sheet and installed.
Description of drawings
Fig. 1 is the main TV structure schematic diagram of the two cantilever hard rock coal road pick of the utility model anchor equipment;
Fig. 2 is the left TV structure schematic diagram of Fig. 1;
Fig. 3 is the plan structure schematic diagram of Fig. 1.
Number in the figure 1 is cutterhead, and label 2 is cantilever, and label 3 is double-deck interim ceiling, label 4 is the hoist cylinder supporting leg, and label 5 is the finger-type shield, and label 6 is the roofbolt rig, label 7 is net sheet travelling bogie, and label 8 is Curved beam, and label 9 is the side wall jumbolter, label 10 is the supporting platform, label 11 is scratch board conveyor, and label 12 is the rear support boots of supporting platform, and label 13 is the side wall support boots of supporting platform, label 14 is crawler unit, and label 15 is earth-moving equipment.
The specific embodiment
A kind of pair of cantilever hard rock coal road pick anchor equipment, referring to Fig. 1-Fig. 3, include coal conveyer, hydraulic system, electrical control system, dust pelletizing system, dynamical system, headstock, be connected in the cantilever cutter sweep of headstock front end, the crawler unit 14 of headstock below and the supporting platform 10 that is articulated in the headstock rear end, be provided with temporary support device in the headstock upper end, be provided with roofbolt rig 6 and side wall jumbolter 9 at described supporting platform, also be provided with net sheet travelling bogie 7 on the supporting platform.
Cutting means is made of 2 pairs of cutterheads 1 of two cantilevers, two cantilever cutterheads distribute along center line, 1 parallel motion of two cutterheads, cutting half of rock (coal) layer separately respectively, they both can be synchronized with the movement, again independently moving separately, setting by control program, two cutterheads, 1 interference can not occur, cutting has improved whole driving speed simultaneously.Temporary support device includes the supporting leg 4 that four hoist cylinders that are fixed on the headstock consist of, be connected in double-deck interim ceiling 3 and the finger-type shield 5 that is connected in the temporary support device rear end on the supporting leg 4, the strip structure that described finger-type shield 5 is welded for plurality of steel plates, temporary support device is in tunneling process, can adjust the length that double-deck interim ceiling 3 stretches out according to the stroke of cantilever 2, shorten as much as possible unsupported back span, the oil cylinder on the protection cantilever 2; Interim ceiling 3 be double-decker, and the net sheet for supporting can be stored in interlayer inside, simultaneously temporarily ceiling 3 also for the protection of operating personnel and the dynamical system of headstock inside; In the linked network operating process, finger-type shield 5 is used for holding the net sheet that exposes, simultaneously the constructor under the protective mooring rod rig; Four hoist cylinder supporting legs 4 can make the double-deck interim certain distance of ceiling 3 liftings, avoid because the reach difficulty that the out-of-shape of excavation face causes.
But relative sliding between supporting platform 10 and the headstock, simultaneously, supporting platform 10 can swing certain angle along headstock in vertical plane, is used for compensation ground, tunnel out-of-flatness and causes supporting platform 10 to tilt.The movement of supporting platform 10 is by the oil cylinder pushing on the sidewall support boots 13, side wall support boots 13 can slide along supporting platform 10, the roofbolt rig 6 of distribution varying number and side wall jumbolter 9 on the supporting platform 10, rig quantity can be according to the demand coupling of driving speed.Supporting platform 10 is cavity, the inner drag conveyor 11 of placing.Liftable net sheet travelling bogie 7 both can be used as vehicle, and the net sheet is carried forward from the equipment rear portion, can be used as again the lifting appliance that the net sheet is installed, and the net sheet is risen certain altitude, and the convenient operation personnel place the net sheet in the cavity of temporary support device.
Roofbolt rig 6 and side wall jumbolter 9 rigs can swing in the certain angle scope along Curved beam 8, Curved beam 8 can move forward and backward certain distance along supporting platform 10, jumbolter quantity can suitably be mated according to driving speed, so just guaranteed that each jumbolter can move forward and backward neatly, swing, make the anchoring operation have very large flexibility, for the anchor pole of the place ahead no marking, can carry out at any time complement.
The new-type dust removal with machine of rotation brattice purifies equipment, adopt development machine spray dust-reducing system and rotation brattice to take out the combination of dirt cleaning system, utilize the rotary airflow generator to produce swirling eddy, form the rotation brattice with spiral air flow the dust that fully mechanized workface produces is locked in the place ahead, driver position, by deduster work plane can all not collected by all dust of spraying sedimentation, then be that it is purged again.Smoke the dirt purification and realize by wet scrubber, the air of dust-laden is sucked into deduster, by the water curtain of special nozzle generation, dust and water are mixed, pass the demist bed course, do further mixing, then pass through drop separator dust (sewage) is separated with air.The two cooperates to make development machine spray dust-reducing system and rotation brattice take out the dirt cleaning system, reaches the effect of high-effective dust-removing.
Cutterhead 1 stretches out the distance of 500mm during work along cantilever 2, cantilever about 2 swings up and down, cut whole section rock (coal) layer, owing to being the two cutterhead structures of two cantilevers, two cantilevers 2 can be set in control program can be synchronously or carry out alone the cut operation, and mutually noninterfere between two cantilever 2 operational periods; The earth-moving equipment 15 of bottom is sent into drag conveyor 11 to fallen rock (coal) material by starry wheel, and rock (coal) material is transported to the rear portion; After cantilever 2 reaches range (500mm), the headstock 500mm that under crawler unit 14 drives, moves forward, cutterhead 1 continues cutting rock (coal) layer; When carrying out tunneling process, jumbolter on the supporting platform matches with temporary support device on the headstock and implements the anchoring operation, in tunneling process, temporary support device scalable temporary supporting plate stretch out forward along with the elongation of cantilever, oil cylinder on the protection cantilever 2, the net sheet of storage also stretches out along with the driving progress in the double-deck interim ceiling 3, rests on the finger-type shield 5, is anchored on the top board by roofbolt rig 6 again; During this time net sheet transportation installation carriage 7 comes the transport network sheet as required, or assists the net sheet in interim ceiling 3 interior storage and the installations of bilayer; Side wall jumbolter 9 on the supporting platform 10 carries out the anchoring operation of sidewall simultaneously, and all jumbolters can carry out the anchoring operation neatly in certain distance and angle.Crawler belt moves forward the distance of 1m, and after the anchoring operation comes to an end, side wall support boots 13 stretching sidewalls, rear support boots 12 are regained, and propelling cylinder is pushed ahead 1m with supporting platform 10, then puts down supporting platform rear support boots, unclamp side wall support boots 13, reclaim propelling cylinder.Reciprocating working realizes that excavation operation and anchoring operation are in overall temporal coupling successively.