CN202627011U - Composite type soft foundation treatment pile group - Google Patents
Composite type soft foundation treatment pile group Download PDFInfo
- Publication number
- CN202627011U CN202627011U CN 201220307010 CN201220307010U CN202627011U CN 202627011 U CN202627011 U CN 202627011U CN 201220307010 CN201220307010 CN 201220307010 CN 201220307010 U CN201220307010 U CN 201220307010U CN 202627011 U CN202627011 U CN 202627011U
- Authority
- CN
- China
- Prior art keywords
- piles
- pile
- cfg
- revolving
- soft foundation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
The utility model relates to a soft foundation treatment structure, in particular to a composite type soft foundation treatment pile group comprising CFG (Cement Flyash Gravel) piles, revolving bored piles and pipe piles, which are arranged on a foundation, wherein matrixes formed by the revolving bored piles and matrixes formed by the pipe piles are arranged at intervals, and the CFG piles are also arranged in a matrix shape and arranged in the matrixes formed by the revolving bored piles and the matrixes formed by the pipe piles; the upsides of the CFG piles, the revolving bored piles and the pipe piles are respectively connected with respective pile caps, and the pile caps of the CFG piles, the revolving bored piles and the pipe piles are connected through reinforcing steel bars; and geogrids are supported on the pile caps of the CFG piles, the revolving bored piles and the pipe piles, and mattress layers are supported on the geogrids. Compared with the prior art, the composite type soft foundation treatment pile group has the advantages that the CFG piles, the revolving bored piles and the pipe piles are staggered in the matrix shape, so that the stress characteristic of the foundation under different working conditions in different periods can be achieved, and meanwhile, the bearing capacity of the foundation is improved to the maximum extent; and the pile caps of the CFG piles, the revolving bored piles and the pipe piles are connected, and the load of the a roadbed is transferred through the mattress layers, so that the bearing capacity of the pile with a high-strength pile cap is effectively exerted, the stability of the foundation is improved, and the problem of non-uniform stress in soft foundation treatment is solved.
Description
Technical field:
The utility model relates to a kind of treatment of soft foundation structure, a particularly a kind of combined type treatment of soft foundation clump of piles.
Background technology:
Along with expanding economy, progress of science and technology, infrastructure constructions such as the traffic of China, water conservancy, Fang Jian development is very rapidly; And China's coastal area is economically developed, many, the technical sophistication of engineering construction investment project, and the weak soil of coastal area marine sediment distributes extensively; But because the load of works is increasing, to ground require increasingly high, so increasing requirement of engineering is carried out artificial treatment to ground; For example: the house foundation of soft base band, Industrial Plant, port and pier, subway engineering, civil air defense constructions and installations or the like; Nearly all work items all can arrive situation such as treatment of soft foundation, jacking existing building in advance, and treatment of soft foundation mode in the past is single, and combination property is low; Fund input is big, and the scope of application has limitation.
The utility model content:
It is wide that the utility model purpose of the utility model is to solve geological condition complicacy, skewness, scope, and the marine sediment mud that extensively distributes is soft more and moulds, flows and mould a shape and the dark combined type treatment of soft foundation clump of piles of the treatment of soft foundation degree of depth.
The technical scheme of the utility model is:
An a kind of combined type treatment of soft foundation clump of piles; Comprise the CFG stake that places on the ground, drilled pile and pile tube circle round; The matrix that matrix that the said drilled pile that circles round constitutes and said pile tube constitute is provided with at interval, and said CFG stake also is rectangular layout and places the matrix of the said drilled pile formation of circling round and the matrix that pile tube constitutes; Above-mentioned three's top connects pile cover separately respectively, and three's pile cover connects through reinforcing bar; Three's pile cover upper support GSZ, this GSZ upper support mattress layer.
The utility model compared with prior art; CFG stake, circle round drilled pile and pile tube place on the ground respectively; The three is matrix and interleaved is arranged, can solve the ground mechanical characteristic under different times, the different operating mode, has improved bearing capacity of foundation soil simultaneously to greatest extent; Three's pile cover connects, and transmits embankment load through mattress layer, can effectively bring into play the supporting capacity of pile cover high strength stake, improves the stability of ground, solves the difficult problem of treatment of soft foundation discontinuity.
The preferred version of the utility model is:
Said mattress layer is compiled geogrids layer, middle part medium coarse sand bed course, middle part hardcore bed, two-way footpath, upper strata volume GSZ, top medium coarse sand bed course and upper strata hardcore bed by bottom hardcore bed, bottom medium coarse sand bed course, the two-way footpath of lower floor from bottom to top and is constituted.
Said three's pile cover carries out horizontal stroke, the vertical connection through reinforcing bar.
Said CFG stake, circle round drilled pile and pile tube three's stake top connects pile cover separately through the mode of building respectively.
Description of drawings:
Fig. 1 is the CFG stake, drilled pile and pile tube three arrangement sketch map circle round.
Fig. 2 is a pile cover syndeton sketch map.
Fig. 3 is the A portion enlarged drawing among Fig. 2.
The specific embodiment:
Below in conjunction with embodiment the utility model is detailed:
An a kind of combined type treatment of soft foundation clump of piles; Referring to accompanying drawing 1 to accompanying drawing 3, among the figure: GSZ 8, middle level medium coarse sand bed course 9, middle level hardcore bed 10, two-way footpath, upper strata volume GSZ 11, upper strata medium coarse sand bed course 12, upper strata hardcore bed 13, reinforcing bar 14, pile cover 15 are compiled in CFG stake 1, the drilled pile 2 that circles round, pile tube 3, mattress layer 4, GSZ 5, bottom hardcore bed 6, bottom medium coarse sand bed course 7, the two-way footpath of lower floor.
In the present embodiment; CFG stake 1, circle round drilled pile 2 and pile tube 3 are placed on the ground; Wherein: circle round drilled pile 2 and pile tube 3 respectively and do not become matrix arrangements; The matrix that matrix that the drilled pile 2 that circles round constitutes and pile tube 3 constitute is provided with at interval, and CFG stake 1 also is rectangular layout, and places the matrix of drilled pile 2 formations of circling round and the matrix that pile tube 3 constitutes.
Above-mentioned CFG stake 1, circle round drilled pile 2 and pile tube 3 threes' top is connected pile cover 15 separately respectively, treat that pile foundation construction is accomplished after, three's pile cover 15 is through reinforcing bar 14 horizontal strokes, the vertical connection; Three's pile cover 15 upper support GSZs 5, GSZ 5 upper support mattress layers 4.
The middle level medium coarse sand bed course 9 that mattress layer 3 is compiled geogrids layer 8,5 cm thickness by the two-way footpath of thick bottom hardcore bed 6,5 cm of 15cm thick bottom medium coarse sand bed course 7, lower floor from bottom to top is that the upper strata medium coarse sand bed course 12 of compiling GSZ 11,5 cm thickness with the two-way footpath in middle level hardcore bed 10, the upper strata of 15 cm thickness is to constitute with the thick upper strata hardcore bed 13 of 15cm; Mattress layer 3 transmits the embankment load, can effectively bring into play the supporting capacity of pile cover ability high strength stake, improves the stability of ground.
Claims (4)
1. combined type treatment of soft foundation clump of piles; Comprise the CFG stake that places on the ground, drilled pile and pile tube circle round; It is characterized in that: the matrix that matrix that the said drilled pile that circles round constitutes and said pile tube constitute is provided with at interval, and said CFG stake also is rectangular layout and places the matrix of the said drilled pile formation of circling round and the matrix that pile tube constitutes; Above-mentioned three's top connects pile cover separately respectively, and three's pile cover connects through reinforcing bar; Three's pile cover upper support GSZ, this GSZ upper support mattress layer.
2. a compound treatment of soft foundation clump of piles according to claim 1 is characterized in that: said mattress layer is compiled geogrids layer, middle part medium coarse sand bed course, middle part hardcore bed, two-way footpath, upper strata volume GSZ, top medium coarse sand bed course and upper strata hardcore bed by bottom hardcore bed, bottom medium coarse sand bed course, the two-way footpath of lower floor from bottom to top and is constituted.
3. a combined type treatment of soft foundation clump of piles according to claim 1 is characterized in that: said three's pile cover carries out horizontal stroke, the vertical connection through reinforcing bar.
4. a combined type treatment of soft foundation clump of piles according to claim 1 is characterized in that: said CFG stake, circle round drilled pile and pile tube three's stake top connects pile cover separately through the mode of building respectively.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220307010 CN202627011U (en) | 2012-06-28 | 2012-06-28 | Composite type soft foundation treatment pile group |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220307010 CN202627011U (en) | 2012-06-28 | 2012-06-28 | Composite type soft foundation treatment pile group |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202627011U true CN202627011U (en) | 2012-12-26 |
Family
ID=47380222
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220307010 Expired - Lifetime CN202627011U (en) | 2012-06-28 | 2012-06-28 | Composite type soft foundation treatment pile group |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202627011U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102704462A (en) * | 2012-06-28 | 2012-10-03 | 中铁十六局集团第五工程有限公司 | Composite treatment grouped piles for soft foundation |
-
2012
- 2012-06-28 CN CN 201220307010 patent/CN202627011U/en not_active Expired - Lifetime
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102704462A (en) * | 2012-06-28 | 2012-10-03 | 中铁十六局集团第五工程有限公司 | Composite treatment grouped piles for soft foundation |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN1837512B (en) | Combined cofferdam of steel slab pile and steel pipe pile an method for manufacturing the same | |
CN102635120B (en) | Circular deep foundation ditch is without Construction of Supporting structure and construction method | |
CN103015367B (en) | High-efficiency economical construction method for revetment | |
CN104818711A (en) | Anti-liquefaction three-dimensional drainage rigid pile and construction method thereof | |
CN105200879A (en) | Water-permeable foam concrete pile compound foundation | |
CN103924602A (en) | Deep soft soil foundation pit construction method | |
CN103669385A (en) | Method for improving pile group bearing capacity by means of reticular pile foundations | |
CN102691302A (en) | Concrete structure for supporting deep foundation pit | |
CN102704462A (en) | Composite treatment grouped piles for soft foundation | |
CN106192882B (en) | Two-way cross transmission combination form system | |
CN207176700U (en) | A kind of solid matter perfusion inner support of pile foundation ditch permanent support structure under complex environment | |
CN202644591U (en) | A reinforced bridge pile foundation in tunnel construction under the geological condition of water-rich quicksand | |
CN102912762A (en) | Dam with pile groups and permeable frame and construction method of dam | |
CN202627011U (en) | Composite type soft foundation treatment pile group | |
CN109487793A (en) | Inner support of pile foundation pit permanent support structure is perfused in a kind of solid matter under complex environment | |
CN205382942U (en) | Multilayer underground space curtain posture subsurface excavated construction's supporting construction under existing facility | |
CN204898687U (en) | Modular excavation supporting pilework | |
CN202672161U (en) | Cement-soil mixing drum sheet-pile united slope structure with soil nails | |
CN203034418U (en) | Ecological riverway embankment by filing dimension stones in reinforced concrete frames | |
CN201738286U (en) | Tetrapod pier type structure | |
CN208907218U (en) | A kind of empty van sea wall structure crossed over and protect underground utilities | |
CN202440824U (en) | Three-line-pile super-deep foundation-pit support structure | |
CN203701128U (en) | Micro pile-reinforced bridge foundation and bridge | |
CN203256771U (en) | Semi-gravity type column and board combined retaining wall structure | |
CN202969406U (en) | Wind power generation tower foundation combining reverse frustum with free-standing column |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20121226 |
|
CX01 | Expiry of patent term |