CN105200879A CN201510673979.3A CN201510673979A CN105200879A CN 105200879 A CN105200879 A CN 105200879A CN 201510673979 A CN201510673979 A CN 201510673979A CN 105200879 A CN105200879 A CN 105200879A
Authority
CN
China
Prior art keywords
pile
foam concrete
permeable foam
foundation
pile body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510673979.3A
Other languages
Chinese (zh)
Other versions
CN105200879B (en
Inventor
吴顺川
刘洋
高永涛
刘恒宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
University of Science and Technology Beijing USTB
Original Assignee
University of Science and Technology Beijing USTB
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by University of Science and Technology Beijing USTB filed Critical University of Science and Technology Beijing USTB
Priority to CN201510673979.3A priority Critical patent/CN105200879B/en
Publication of CN105200879A publication Critical patent/CN105200879A/en
Application granted granted Critical
Publication of CN105200879B publication Critical patent/CN105200879B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The invention provides a water-permeable foam concrete pile compound foundation, and belongs to the technical field of civil engineering. The compound foundation comprises pile bodies, pile caps and a mattress layer, wherein the pile caps are positioned at the top of the pile bodies; the mattress layer is positioned on the pile caps. The pile bodies are made of water-permeable foam concrete. Compared with the conventional material pile, according to the water-permeable foam concrete pile compound foundation, the self weight of the pile bodies is reduced, the water-permeable capability of the pile bodies is improved, and a longitudinal drainage passage is formed, so that sedimentation caused by self weight is reduced, solidification of foundation soil body is accelerated, the bearing capacity of the compound foundation is effectively improved, post-construction sedimentation of the foundation is controlled, and the construction period is shortened. Meanwhile, due to the properties of light weight, water permeability and the like, the compound foundation can achieve the same treating effect with relatively small size, so that the construction amount and material consumption can be reduced, the engineering cost can be effectively controlled, and relatively excellent economic benefits are obtained.

Description

A kind of permeable foam concrete pile composite foundation
Technical field
The present invention relates to technical field of civil engineering, refer to a kind of permeable foam concrete pile composite foundation especially, be applicable to the situation that soft foundation is reinforced.
Background technology
At present, in road project, the normal composite foundation form that adopts carries out consolidation process to soft foundation, and wherein pile foundation can transmit load to deep soil layer, is used widely.The normal stake adopted in current composite foundation, its pile shaft material is from great, and bad hydraulic permeability, be unfavorable for that the bearing capacity of foundation soil gives full play to, easily there is larger sedimentation in pile body self, and ground consolidation is slow.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of permeable foam concrete pile composite foundation, to overcome in current all kinds of composite foundation, and the stake deadweight deficiency of bad hydraulic permeability comparatively greatly.
This permeable foam concrete pile composite foundation comprises pile body, pile cover and mattress layer, and pile cover is arranged on pile body top, is provided with mattress layer above pile cover, and pile shaft material is permeable foam concrete, thus alleviates pile body deadweight, increases pile body water permeability.
The cross section of pile body is circular or square, and pile cover is variable cross-section truncated cone-shaped, prismatic table shape or prismatic cylindrical, prismatic, to bear upper load better.Pile cover material is the permeable foam concrete identical with pile body or the ordinary concrete meeting requirement for bearing capacity, the selection of the cementitious material of permeable foam concrete, admixture and Admixture and match ratio, determine bearing capacity of pile and permeable effect demand according to basement process, mattress layer is the loose seepy material of sandstone class.
Pile body and pile cover adopt prefabricated or on-the-spot pore-forming method for filling pile.
Pile body inside can arrange that pile body indulges in muscle or pile body stirrup one or both, whether the configuration quantity basis requirement for bearing capacity of configuration reinforcement and reinforcing bar and stressing conditions and determine in pile body.
The beneficial effect of technique scheme of the present invention is as follows:
Such scheme, compared with the composite foundation of existing all kinds of conventional material stake, effectively can reduce pile body deadweight, reduce because pile body is conducted oneself with dignity the sedimentation caused, pile body internal foam pore is interconnected simultaneously, formation longitudinal drainage passage increases water permeability, accelerates foundation soil consolidation, reduces settlement after construction and the remarkable reduction of erection time; Simultaneously due to lightweight, the characteristic such as permeable, adopt composite foundation of the present invention that the stake of reduced size can be adopted to reach identical treatment effect, compare conventional kind composite foundation, reduce construction volume and material usage, effective Control Engineering cost, obtains better economic benefit.
Accompanying drawing explanation
Fig. 1 is permeable foam concrete pile composite foundation schematic diagram of the present invention;
Fig. 2 is the structural representation of permeable foam concrete stake of the present invention;
Fig. 3 is the top view of permeable foam concrete stake of the present invention;
Fig. 4 is detailed description of the invention schematic diagram.
Wherein: 1-pile body; 2-pile cover; 3-mattress layer; 4-pile body indulges muscle; 5-pile body stirrup; 6-roadbed and road surface, top; 7-geotextiles; 8-soft layer; 9-deep soil layer.
Detailed description of the invention
For making the technical problem to be solved in the present invention, technical scheme and advantage clearly, be described in detail below in conjunction with the accompanying drawings and the specific embodiments.
The present invention is directed in existing all kinds of composite foundation, the stake deadweight problems such as bad hydraulic permeability comparatively greatly, provide a kind of permeable foam concrete pile composite foundation.
As shown in Figure 1, Figure 2 and Figure 3, this permeable foam concrete pile composite foundation is made up of pile body 1, pile cover 2 and mattress layer 3, and pile cover 2 is arranged on pile body 1 top, arranges mattress layer 3 above pile cover 2.
As shown in Figure 4, somewhere highway construction carries out consolidation process to soft foundation, adopts permeable foam concrete pile composite foundation provided by the invention.For making roadbed reach bearing capacity and settlement requirement, adopt drill-pouring piling method, form compound foundation.Wherein, pile body 1 adopts permeable foamed concrete material, the selection of its cementitious material, admixture and Admixture and match ratio, determines bearing capacity of pile and permeable effect demand according to basement process.Pile body 1 inside arranges pile body and indulges muscle 4 and pile body stirrup 5.Mattress layer 3 is the loose seepy material of sandstone class.
The cross section of the pile body 1 of foam concrete stake is square, and pile body 1 is through soft layer 8, and stake end arrives deep soil layer 9 and going down load.
For making stake, soil reaches co-operation state, and pile body 1 top is furnished with truncated cone-shaped pile cover 2, and is covered with mattress layer 3.Mattress layer 3 geotextiles 7 covers and bound edge.After the permeable foam concrete pile composite foundation of bottom has been constructed and met the requirement of bearing capacity and rigidity, banket on top and formed roadbed and road surface, top 6.
The present embodiment is only the concrete form of implementation of one of the present invention, and in the section form of its pile 1, the form of pile cover 2, pile body 1, configuration reinforcement and number of steel bars are determined according to requirement for bearing capacity and stressing conditions, and the present invention does not do concrete restriction.
The above is the preferred embodiment of the present invention; it should be pointed out that for those skilled in the art, under the prerequisite not departing from principle of the present invention; can also make some improvements and modifications, these improvements and modifications also should be considered as protection scope of the present invention.

Claims (7)

1. a permeable foam concrete pile composite foundation, it is characterized in that: comprise pile body (1), pile cover (2) and mattress layer (3), pile cover (2) is arranged on pile body (1) top, and pile cover (2) top arranges mattress layer (3); Pile body (1) material is permeable foam concrete.
2. the permeable foam concrete pile composite foundation of one according to claim 1, is characterized in that: described pile body (1) cross section is for circular or square.
3. the permeable foam concrete pile composite foundation of one according to claim 1, is characterized in that: described pile cover (2) is variable cross-section truncated cone-shaped, prismatic table shape or prismatic cylindrical, prismatic.
4. the permeable foam concrete pile composite foundation of one according to claim 1, is characterized in that: described pile cover (2) material is the permeable foam concrete identical with pile body (1) or the ordinary concrete meeting requirement for bearing capacity.
5. the permeable foam concrete pile composite foundation of one according to claim 1, is characterized in that: described pile body (1) and pile cover (2) adopt prefabricated or on-the-spot pore-forming method for filling pile.
6. the permeable foam concrete pile composite foundation of one according to claim 1, is characterized in that: described pile body (1) be directly made up of permeable foam concrete or arrange in pile body (1) inside pile body indulges in muscle (4), pile body stirrup (5) one or both.
7. the permeable foam concrete pile composite foundation of one according to claim 1, is characterized in that: described mattress layer (3) is the loose seepy material of sandstone class.
CN201510673979.3A 2015-10-16 2015-10-16 A kind of permeable foam concrete pile composite foundation Active CN105200879B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510673979.3A CN105200879B (en) 2015-10-16 2015-10-16 A kind of permeable foam concrete pile composite foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510673979.3A CN105200879B (en) 2015-10-16 2015-10-16 A kind of permeable foam concrete pile composite foundation

Publications (2)

Publication Number Publication Date
CN105200879A true CN105200879A (en) 2015-12-30
CN105200879B CN105200879B (en) 2017-07-28

Family

ID=54948813

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510673979.3A Active CN105200879B (en) 2015-10-16 2015-10-16 A kind of permeable foam concrete pile composite foundation

Country Status (1)

Country Link
CN (1) CN105200879B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105648872A (en) * 2016-02-03 2016-06-08 济南轨道交通集团有限公司 Device and construction method for prefabricated seepage column
CN106676994A (en) * 2017-01-20 2017-05-17 浙江省交通规划设计研究院 Foamed concrete embankment with adjustable load and construction method thereof
CN107794932A (en) * 2017-11-06 2018-03-13 固远晨通科技发展有限公司 A kind of light-weight foamed concrete backfill bridge pier structure
CN108442358A (en) * 2018-05-18 2018-08-24 中南航空港建设公司 Pervious concrete grouting behind shaft or drift lining foundation consolidation process and transition stake and composite pile pile system
CN109736342A (en) * 2018-12-28 2019-05-10 江苏省水利工程科技咨询股份有限公司 A kind of soil cement mattress layer and its construction method in hydraulic engineering composite foundation
CN113026710A (en) * 2021-03-10 2021-06-25 武汉广益交通科技股份有限公司 Core inserting pile processing method combining foam concrete bottom expanding with upper soil body light solidification
WO2021190044A1 (en) * 2020-03-23 2021-09-30 中铁二院工程集团有限责任公司 Composite lightweight pile structure, manufacturing method, construction method and pile connecting method
CN115492082A (en) * 2022-09-28 2022-12-20 中交一公局第七工程有限公司 Composite foundation treatment method, equipment and application for deep soft foundation

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101144256A (en) * 2007-09-30 2008-03-19 中铁二院工程集团有限责任公司 Slag-free orbit reinforced concrete pile net structure roadbed and construction method thereof
CN101831904A (en) * 2010-05-06 2010-09-15 南京工业大学 Permeable concrete pile
CN101922146A (en) * 2009-09-15 2010-12-22 东南大学 Method for performing foundation treatment by using permeable concrete pipe piles
CN202787224U (en) * 2012-08-03 2013-03-13 华侨大学 Compound soft clay foundation
JP2014114600A (en) * 2012-12-10 2014-06-26 Kajima Corp Foundation pile construction method
CN103952957A (en) * 2014-04-15 2014-07-30 浙江大学宁波理工学院 Road base structure capable of solving problem of vehicle bumping
CN205062598U (en) * 2015-10-16 2016-03-02 北京科技大学 Foam concrete stake composite foundation permeates water

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101144256A (en) * 2007-09-30 2008-03-19 中铁二院工程集团有限责任公司 Slag-free orbit reinforced concrete pile net structure roadbed and construction method thereof
CN101922146A (en) * 2009-09-15 2010-12-22 东南大学 Method for performing foundation treatment by using permeable concrete pipe piles
CN101831904A (en) * 2010-05-06 2010-09-15 南京工业大学 Permeable concrete pile
CN202787224U (en) * 2012-08-03 2013-03-13 华侨大学 Compound soft clay foundation
JP2014114600A (en) * 2012-12-10 2014-06-26 Kajima Corp Foundation pile construction method
CN103952957A (en) * 2014-04-15 2014-07-30 浙江大学宁波理工学院 Road base structure capable of solving problem of vehicle bumping
CN205062598U (en) * 2015-10-16 2016-03-02 北京科技大学 Foam concrete stake composite foundation permeates water

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105648872A (en) * 2016-02-03 2016-06-08 济南轨道交通集团有限公司 Device and construction method for prefabricated seepage column
CN106676994A (en) * 2017-01-20 2017-05-17 浙江省交通规划设计研究院 Foamed concrete embankment with adjustable load and construction method thereof
CN107794932A (en) * 2017-11-06 2018-03-13 固远晨通科技发展有限公司 A kind of light-weight foamed concrete backfill bridge pier structure
CN107794932B (en) * 2017-11-06 2023-10-03 固远晨通科技发展有限公司 Pier structure is backfilled to foam lightweight concrete
CN108442358A (en) * 2018-05-18 2018-08-24 中南航空港建设公司 Pervious concrete grouting behind shaft or drift lining foundation consolidation process and transition stake and composite pile pile system
CN109736342A (en) * 2018-12-28 2019-05-10 江苏省水利工程科技咨询股份有限公司 A kind of soil cement mattress layer and its construction method in hydraulic engineering composite foundation
WO2021190044A1 (en) * 2020-03-23 2021-09-30 中铁二院工程集团有限责任公司 Composite lightweight pile structure, manufacturing method, construction method and pile connecting method
CN113026710A (en) * 2021-03-10 2021-06-25 武汉广益交通科技股份有限公司 Core inserting pile processing method combining foam concrete bottom expanding with upper soil body light solidification
CN115492082A (en) * 2022-09-28 2022-12-20 中交一公局第七工程有限公司 Composite foundation treatment method, equipment and application for deep soft foundation
CN115492082B (en) * 2022-09-28 2023-09-19 中交一公局第七工程有限公司 Composite foundation treatment method, equipment and application for deep soft foundation

Also Published As

Publication number Publication date
CN105200879B (en) 2017-07-28

Similar Documents

Publication Publication Date Title
CN105200879A (en) Water-permeable foam concrete pile compound foundation
CN104131555B (en) A kind of outsourcing water penetration concrete reinforced pipe crushed stone grouting pile and construction method thereof
CN101922146A (en) Method for performing foundation treatment by using permeable concrete pipe piles
CN102650128B (en) Cement mixing pile with stiffness core capable of draining and pre-pressing firstly and then grouting as well as construction method thereof
CN101634143A (en) Method for treating spiral oil-extruding filling pile composite foundation in stratum containing soft clay
CN205088671U (en) Precast concrete drainage stake
CN203393530U (en) Anti-floating lightweight high-fill embankment structure
CN101831904A (en) Permeable concrete pile
CN204000851U (en) The stake of a kind of outsourcing water permeability concrete reinforced pipe gravel slip-casting
CN103195060A (en) Soft foundation pre-stressed anchor rod reinforced structure and use thereof
CN205062598U (en) Foam concrete stake composite foundation permeates water
CN202187340U (en) Concrete filled steel tube core column rock-socketed pile
CN203866852U (en) Anti-floating pile structure composited by deep spiral-spraying cement soil plate and anchor rod
CN103938651B (en) The stake of Large stone porous concrete and treatment process of composite foundation thereof under water
CN206800571U (en) Lytag rainwater seepage well
CN202559340U (en) First-drainage post-preloading grouting stiff-core cement mixing pile
CN104746507B (en) Construction waste regeneration drainage CFG pile foundation and construction method thereof
CN204875834U (en) Liquefaction sand and soil structure
CN103981863B (en) The construction method of a kind of discrete material pile and the upper and lower consubstantiality compound pile of concrete pile
CN102433873A (en) Side wall porous hollow pile
CN202672161U (en) Cement-soil mixing drum sheet-pile united slope structure with soil nails
CN201538963U (en) Deep and thick soft soil foundation composite strengthening structure of high-speed railway
CN204919568U (en) Compound supporting construction of shallow foundation ditch
CN204898645U (en) Construction waste regeneration drainage CFG pile foundation
CN208907218U (en) A kind of empty van sea wall structure crossed over and protect underground utilities

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant