CN109736342A - A kind of soil cement mattress layer and its construction method in hydraulic engineering composite foundation - Google Patents

A kind of soil cement mattress layer and its construction method in hydraulic engineering composite foundation Download PDF

Info

Publication number
CN109736342A
CN109736342A CN201811627511.0A CN201811627511A CN109736342A CN 109736342 A CN109736342 A CN 109736342A CN 201811627511 A CN201811627511 A CN 201811627511A CN 109736342 A CN109736342 A CN 109736342A
Authority
CN
China
Prior art keywords
soil cement
mattress layer
foundation
soil
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811627511.0A
Other languages
Chinese (zh)
Inventor
周喜武
任玉彬
陈学东
周治刚
左保静
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Water Conservancy Engineering Science And Technology Consulting Ltd By Share Ltd
Original Assignee
Jiangsu Water Conservancy Engineering Science And Technology Consulting Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Water Conservancy Engineering Science And Technology Consulting Ltd By Share Ltd filed Critical Jiangsu Water Conservancy Engineering Science And Technology Consulting Ltd By Share Ltd
Priority to CN201811627511.0A priority Critical patent/CN109736342A/en
Publication of CN109736342A publication Critical patent/CN109736342A/en
Pending legal-status Critical Current

Links

Abstract

The present invention relates to a kind of soil cement mattress layers, are made of following substances in weight percentage: cement 8% ~ 18%, water 0 ~ 10%, surplus are clay.Its construction method in hydraulic engineering composite foundation, including excavation pit are laid with three steps such as soil cement mattress layer and ground construction.Present invention layout is simple and compact, and it is convenient to construct, low in cost, it can not only play the role of adjusting stress distribution between stake soil, due also to permeability coefficient of cement soil is smaller, there is good seepage capability, therefore solve the disadvantage that traditional broken stone cushion layer becomes seepage channel.

Description

A kind of soil cement mattress layer and its construction method in hydraulic engineering composite foundation
Technical field
The present invention relates to a kind of soil cement mattress layer and its construction method in hydraulic engineering composite foundation, dependent territory, which is built, to be applied Work technical field.
Background technique
Mattress layer is a kind of method that stress distribution between stake soil is adjusted in composite foundation.Mattress layer is applied not only to CFG, It is also used for broken stone pile, tubular pole etc., with form compound foundation, guarantees the collective effect of stake and inter-pile soil.
In industry with civil buildings, mattress layer generallys use 0.1 ~ 0.3 meter of thickness of blotter.In hydraulic engineering, Such as sluice, pumping plant building, for upstream and downstream there are certain water-head, seepage-proof stable is that control is had in design process One of factor.For the hydraulic structure using composite foundation, composite foundation is according to broken stone cushion layer, then mattress layer will become Seepage channel, antiseepage be difficult to ensure safely, therefore is directed to this problem, there is an urgent need to develop a kind of novel mattress layer structure, To meet the needs of actual use.
Summary of the invention
The object of the invention, which is that, overcomes above-mentioned deficiency, provide a kind of soil cement mattress layer and its hydraulic engineering compoundly Construction method in base.
To achieve the above object, the present invention is to be achieved through the following technical solutions:
A kind of soil cement mattress layer, is made of following substances in weight percentage: cement 8% ~ 18%, water 0 ~ 10%, surplus are clay.
Further, the clay is the solid, powdery knot that granule content of the partial size no more than 0.005 millimeter is more than 50% Structure.
A kind of construction method of soil cement mattress layer in hydraulic engineering composite foundation, comprising the following steps:
The first step, excavation pit are compacted, then first according to construction drawing in designated position excavation pit, and to bottom of foundation ditch The concrete precast pile that several axis and level perpendicular distribution are squeezed into bottom of foundation ditch constructs concrete prefabricated pile foundation, so Concrete precast pile is backfilled and is compacted afterwards;
Second step is laid with soil cement mattress layer, cement, water and clay is added to together in mixing plant by use ratio and carried out It is stirred, then the mixture after stirring is uniformly laid on to the concrete prefabricated pile foundation after the backfill of first step excavation pit Upper surface obtains soil cement mattress layer after compacting, and the soil cement mattress layer being laid with is with a thickness of 0.2 ~ 0.5 meter;
Third step, ground construction after completing second step construction, can directly carry out on the soil cement mattress layer that second step is laid with Reinforced concrete floor construction.
Further, in the first step, concrete precast pile be height be not less than 7 meters, side length be 25 ~ 40 centimetres just Tetragonous rod structure, and spacing is 60 ~ 120 centimetres between two neighboring concrete precast pile, each concrete precast pile is around foundation pit Any one structure distribution in middle line rectangular array or annular array.
Further, it in the third step, sets between soil cement mattress layer upper surface and reinforced concrete beds with a thickness of 0- 0.3 meter of geotextile layer.
Present invention layout is simple and compact, and it is convenient to construct, low in cost, can not only play and adjust stress distribution between stake soil Effect there is good seepage capability due also to permeability coefficient of cement soil is smaller, therefore solve traditional broken stone cushion layer at The shortcomings that for seepage channel.
Detailed description of the invention
Fig. 1 is the method for the present invention flow diagram.
Fig. 2 is schematic structural view of the invention.
Specific embodiment
Embodiment 1
As shown in Figure 1, a kind of soil cement mattress layer, is made of following substances in weight percentage: cement 8%, surplus are clay.
Wherein, the clay is the solid, powdery structure that granule content of the partial size no more than 0.005 millimeter is more than 50%.
A kind of construction method of soil cement mattress layer in hydraulic engineering composite foundation, comprising the following steps:
The first step, excavation pit are compacted, then first according to construction drawing in designated position excavation pit, and to bottom of foundation ditch The concrete precast pile that several axis and level perpendicular distribution are squeezed into bottom of foundation ditch constructs concrete prefabricated pile foundation, so Concrete precast pile is backfilled and is compacted afterwards;
Second step is laid with soil cement mattress layer, cement, water and clay is added to together in mixing plant by use ratio and carried out Be stirred, then by the mixture after stirring be laid on the first step excavation pit backfill after concrete prefabricated pile foundation Upper surface obtains soil cement mattress layer after compacting, and the soil cement mattress layer being laid with is with a thickness of 0.2 meter;
Third step, ground construction after completing second step construction, can directly carry out on the soil cement mattress layer that second step is laid with Reinforced concrete floor construction.
Meanwhile in the first step, concrete precast pile is that height is 7 meters, the square prism structure that side length is 25 centimetres, And spacing is 60 centimetres between two neighboring concrete precast pile, each concrete precast pile is around foundation pit middle line rectangular array point Cloth.
Embodiment 2
As shown in Figure 1, a kind of soil cement mattress layer, is made of following substances in weight percentage: cement 18%, water 10%, surplus are Clay.
Preferably, the clay is the solid, powdery structure that granule content of the partial size no more than 0.005 millimeter is more than 50%.
A kind of construction method of soil cement mattress layer in hydraulic engineering composite foundation, comprising the following steps:
The first step, excavation pit are compacted, then first according to construction drawing in designated position excavation pit, and to bottom of foundation ditch The concrete precast pile that several axis and level perpendicular distribution are squeezed into bottom of foundation ditch constructs concrete prefabricated pile foundation, so Concrete precast pile is backfilled and is compacted afterwards;
Second step is laid with soil cement mattress layer, cement, water and clay is added to together in mixing plant by use ratio and carried out Be stirred, then by the mixture after stirring be laid on the first step excavation pit backfill after concrete prefabricated pile foundation Upper surface obtains soil cement mattress layer after compacting, and the soil cement mattress layer being laid with is with a thickness of 0.5 meter;
Third step, ground construction after completing second step construction, can directly carry out on the soil cement mattress layer that second step is laid with Reinforced concrete floor construction.
Wherein, in the first step, concrete precast pile is that height is 8 meters, the square prism structure that side length is 40 centimetres, And spacing is 120 centimetres between two neighboring concrete precast pile, each concrete precast pile is around foundation pit middle line circular array Distribution.
Further, it in the third step, sets between soil cement mattress layer upper surface and reinforced concrete beds with a thickness of 0.3 The geotextile layer of rice.
Embodiment 3
As shown in Figure 1, a kind of soil cement mattress layer, is made of following substances in weight percentage: cement 12%, water 3%, surplus are viscous Soil.
In addition, the clay is the solid, powdery structure that granule content of the partial size no more than 0.005 millimeter is more than 50%.
A kind of construction method of soil cement mattress layer in hydraulic engineering composite foundation, comprising the following steps:
The first step, excavation pit are compacted, then first according to construction drawing in designated position excavation pit, and to bottom of foundation ditch The concrete precast pile that several axis and level perpendicular distribution are squeezed into bottom of foundation ditch constructs concrete prefabricated pile foundation, so Concrete precast pile is backfilled and is compacted afterwards;
Second step is laid with soil cement mattress layer, cement, water and clay is added to together in mixing plant by use ratio and carried out Be stirred, then by the mixture after stirring be laid on the first step excavation pit backfill after concrete prefabricated pile foundation Upper surface obtains soil cement mattress layer after compacting, and the soil cement mattress layer being laid with is with a thickness of 0.3 meter;
Third step, ground construction after completing second step construction, can directly carry out on the soil cement mattress layer that second step is laid with Reinforced concrete beds construction.
Wherein, in the first step, concrete precast pile is that height is 9 meters, the square prism structure that side length is 30 centimetres, And spacing is 100 centimetres between two neighboring concrete precast pile, each concrete precast pile is around foundation pit middle line rectangular array Distribution.
In addition, being set between soil cement mattress layer upper surface and reinforced concrete beds in the third step with a thickness of 0.15 meter Geotextile layer,
Present invention layout is simple and compact, and it is convenient to construct, low in cost, can not only play the work for adjusting stress distribution between stake soil With due also to permeability coefficient of cement soil is smaller, there is good seepage capability, therefore solve traditional broken stone cushion layer and become and seep The shortcomings that circulation road.
The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention.The technology of the industry Personnel are it should be appreciated that the present invention is not limited to the above embodiments, and the above embodiments and description only describe this The principle of invention, without departing from the spirit and scope of the present invention, various changes and improvements may be made to the invention, these changes Change and improvement all fall within the protetion scope of the claimed invention.The claimed scope of the invention by appended claims and its Equivalent thereof.

Claims (5)

1. a kind of soil cement mattress layer, it is characterised in that: the soil cement mattress layer is made of following substances in weight percentage: Cement 8% ~ 18%, water 0 ~ 10%, surplus are clay.
2. a kind of soil cement mattress layer according to claim 1, it is characterised in that: the clay is not more than for partial size 0.005 millimeter of granule content is more than 50% solid, powdery structure.
3. a kind of construction method of soil cement mattress layer in hydraulic engineering composite foundation, it is characterised in that: the soil cement Construction method of the mattress layer in hydraulic engineering composite foundation the following steps are included:
The first step, excavation pit are compacted, then first according to construction drawing in designated position excavation pit, and to bottom of foundation ditch The concrete precast pile that several axis and level perpendicular distribution are squeezed into bottom of foundation ditch constructs concrete prefabricated pile foundation, so Concrete precast pile is backfilled and is compacted afterwards;
Second step is laid with soil cement mattress layer, cement, water and clay is added to together in mixing plant by use ratio and carried out It is stirred, then the mixture after stirring is uniformly laid on to the concrete prefabricated pile foundation after the backfill of first step excavation pit Upper surface obtains soil cement mattress layer after compacting, and the soil cement mattress layer being laid with is with a thickness of 0.2 ~ 0.5 meter;
Third step, ground construction after completing second step construction, can directly carry out on the soil cement mattress layer that second step is laid with Reinforced concrete floor construction.
4. a kind of construction method of the soil cement mattress layer according to claim 3 in hydraulic engineering composite foundation, special Sign is: in the first step, concrete precast pile is that height is not less than 7 meters, the square prism knot that side length is 25 ~ 40 centimetres Structure, and spacing is 60 ~ 120 centimetres between two neighboring concrete precast pile, each concrete precast pile is in square around foundation pit middle line Any one structure distribution in shape array or annular array.
5. a kind of preparation process of soil cement mattress layer according to claim 3, it is characterised in that: in the second step, The geotextile layer with a thickness of 0-0.3 meter is set between soil cement mattress layer upper surface and reinforced concrete beds.
CN201811627511.0A 2018-12-28 2018-12-28 A kind of soil cement mattress layer and its construction method in hydraulic engineering composite foundation Pending CN109736342A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811627511.0A CN109736342A (en) 2018-12-28 2018-12-28 A kind of soil cement mattress layer and its construction method in hydraulic engineering composite foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811627511.0A CN109736342A (en) 2018-12-28 2018-12-28 A kind of soil cement mattress layer and its construction method in hydraulic engineering composite foundation

Publications (1)

Publication Number Publication Date
CN109736342A true CN109736342A (en) 2019-05-10

Family

ID=66362008

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811627511.0A Pending CN109736342A (en) 2018-12-28 2018-12-28 A kind of soil cement mattress layer and its construction method in hydraulic engineering composite foundation

Country Status (1)

Country Link
CN (1) CN109736342A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110273431A (en) * 2019-07-22 2019-09-24 重庆众誉材工科技有限公司 A kind of construction method of the column of the belt conveyer in high landfill area
CN110512590A (en) * 2019-07-11 2019-11-29 桂林理工大学 It is a kind of for preventing the construction method of bridge foundation differential settlement
CN110805054A (en) * 2019-11-20 2020-02-18 湖南易兴建筑有限公司 Construction method of reinforced concrete composite foundation
CN111395314A (en) * 2020-03-27 2020-07-10 宣城市政建设集团有限公司 CFG pile composite foundation construction method
CN111794030A (en) * 2020-07-01 2020-10-20 长江勘测规划设计研究有限责任公司 Method for widening dyke foundation at through-dyke building

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110072757A (en) * 2009-12-23 2011-06-29 대림산업 주식회사 Constructing method of dual footing structure
CN105200879A (en) * 2015-10-16 2015-12-30 北京科技大学 Water-permeable foam concrete pile compound foundation

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110072757A (en) * 2009-12-23 2011-06-29 대림산업 주식회사 Constructing method of dual footing structure
CN105200879A (en) * 2015-10-16 2015-12-30 北京科技大学 Water-permeable foam concrete pile compound foundation

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
沈志新等: "沭北闸拆建工程沉井基础处理技术探讨", 《中国水利学会2016学术年会论文集(下册)》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110512590A (en) * 2019-07-11 2019-11-29 桂林理工大学 It is a kind of for preventing the construction method of bridge foundation differential settlement
CN110273431A (en) * 2019-07-22 2019-09-24 重庆众誉材工科技有限公司 A kind of construction method of the column of the belt conveyer in high landfill area
CN110805054A (en) * 2019-11-20 2020-02-18 湖南易兴建筑有限公司 Construction method of reinforced concrete composite foundation
CN111395314A (en) * 2020-03-27 2020-07-10 宣城市政建设集团有限公司 CFG pile composite foundation construction method
CN111794030A (en) * 2020-07-01 2020-10-20 长江勘测规划设计研究有限责任公司 Method for widening dyke foundation at through-dyke building

Similar Documents

Publication Publication Date Title
CN109736342A (en) A kind of soil cement mattress layer and its construction method in hydraulic engineering composite foundation
CN101298782B (en) Method and system for basement engineering water proof and water drain
CN205874850U (en) Railway soft soil foundation light soil roadbed structure
CN113186766A (en) Shallow soft soil foundation foam light soil embankment structure and construction method
CN202347641U (en) Permeable concrete rainwater drainage structure
CN108457249A (en) A kind of structure design and construction method of novel composite panel sand-gravel dam
CN104099936B (en) Artificial heap builds cascading waterfalls water scenery structure and construction method thereof on massif
CN109853311A (en) A kind of marine plain area Construction of Soft Soil Subgrade technique and road structure
CN203160263U (en) Rigid piles and soft piles adopted composite foundation for resisting side displacement and soil squeeze of saturated soft soils
CN205576857U (en) Be suitable for hydraulic and hydroelectric engineering's super high enrockment dam structure
CN106087880B (en) A kind of dam that 300 meter level is high and its construction technology
CN109208545B (en) Construction method of artificial landscape overflow dam with energy dissipation effect
CN113818402A (en) Reinforcing and reinforcing structure of clay core rockfill dam and construction method thereof
CN206844132U (en) Superelevation light supporting structure
CN105780764A (en) Light cemented soil composite mixing pile
CN102373675A (en) Fabricated culvert member and construction method thereof
CN110172988A (en) A kind of piling formula composite concrete placement ground and its construction method
CN105780737A (en) Super-high rockfill dam structure suitable for water conservancy and hydropower engineering and construction method of dam structure
CN105064351A (en) Pile planting method
CN110820772A (en) Bulk accumulation body side slope slide-resistant pile and structured cementing combined reinforcing method and construction process
CN103938609B (en) A kind of rubble/sand loaded filter-porous concrete pile composite foundation and processing method
CN202945579U (en) Full-section three-graded concrete dam structure
CN202323906U (en) Assembly type culvert component
CN109653241A (en) Composite foundation reinforcement counterfort wall structure and construction method
CN210104461U (en) Roadbed structure of light soil roadbed combined with steel pipe pile

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190510

RJ01 Rejection of invention patent application after publication