CN110172988A - A kind of piling formula composite concrete placement ground and its construction method - Google Patents

A kind of piling formula composite concrete placement ground and its construction method Download PDF

Info

Publication number
CN110172988A
CN110172988A CN201910598150.XA CN201910598150A CN110172988A CN 110172988 A CN110172988 A CN 110172988A CN 201910598150 A CN201910598150 A CN 201910598150A CN 110172988 A CN110172988 A CN 110172988A
Authority
CN
China
Prior art keywords
vertical
cushion cap
piling
layer
long stake
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910598150.XA
Other languages
Chinese (zh)
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Li Jin Shui
Original Assignee
Li Jin Shui
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Li Jin Shui filed Critical Li Jin Shui
Priority to CN201910598150.XA priority Critical patent/CN110172988A/en
Publication of CN110172988A publication Critical patent/CN110172988A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • E02D27/14Pile framings, i.e. piles assembled to form the substructure

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Foundations (AREA)

Abstract

The present invention relates to technical field of building construction, the present invention discloses a kind of piling formula composite concrete placement ground, including ground basic body, long stake, vertical stub, cushion cap and frame column vertically, the vertical main reinforcement of long stake and the main reinforcement of vertical stub protrude into cushion cap from bottom, vertical long stake is centered on cushion cap bottom centre in degree corner square profile, the square distribution centered on cushion cap bottom centre of vertical stub.Invention additionally discloses a kind of construction methods of piling formula composite concrete placement ground, including following construction procedure: step 1: preparing place;Step 2: mattress layer and backfill soil supporting layer are laid in bottom of foundation ditch;Step 3: production driven pile;Step 4: piling trial test is carried out;Step 6: formal piling;Step 7: cushion cap is poured.Have the beneficial effect that vertical long stake is interspersed with vertical stub, each stake independence is good, can use single pile finite element and quickly calculates, difficulty of construction is low, and project cost is low, and construction method is simple.

Description

A kind of piling formula composite concrete placement ground and its construction method
Technical field
The present invention relates to technical field of building construction, specially a kind of piling formula composite concrete placement ground and its construction method.
Background technique
Ground refers to that the soil body or rock mass of supporting base below building, ground have subsoil and composite foundation (artificial Ground) two classes.Subsoil is the natural soil layer for being not required to very important person's reinforcing, and composite foundation needs people's consolidation process, common to have aggregate chips Bed course, sand bedding course, combination ash earthen backfill are tamped again.
Composite foundation is by the way that vertical or horizontal reinforcement is arranged in ground, and reinforcement and original place base are formed compoundly Base, to improve bearing capacity of foundation slab, reduce settlement of foundation.For heavy construction structure, in terms of settling with bearing capacity control, stake Basis is undoubtedly preferred composite foundation in current engineer application, with opening up for pile foundation progress of research and its application range Width, long-short pile combination form are concerned with its peculiar advantage in the realm of building construction, occur long-short pile combination foundation and Long-short pile combined foundation.But in the prior art, long-short pile is generally using being simply interspersed, and long-short pile quantity is more, engineering Cost is high, and the advantage of long-short pile is underutilized, and difficulty of construction is also big.
Summary of the invention
The purpose of the present invention is to provide a kind of piling formula composite concrete placement ground and its construction methods, to solve above-mentioned background The problem of being proposed in technology.
To achieve the above object, the invention provides the following technical scheme: a kind of piling formula composite concrete placement ground, including ground Ontology, vertically long stake, vertical stub, cushion cap and frame column, described ground basic body is from top to bottom successively by plain concrete layer, ground Supporting course, mattress layer, Soft Soil Layer and deep layer supporting course composition, the main reinforcement of the vertical long stake and the main reinforcement of vertical stub are the bottom of from Portion protrudes into cushion cap, and the vertical long stake is in spend corner square profile, and long stake vertically centered on cushion cap bottom centre Pile top protrude into deep layer supporting course, the vertical stub square distribution centered on cushion cap bottom centre, and vertical The pile top of stub protrudes into Soft Soil Layer, is fixedly connected with frame column at the top of the cushion cap.
Preferably, the soil supporting layer is formed by plain soil and aggregate chips by compaction in layers, and the cushion cap is cup-shaped or rank Trapezoidal, cushion cap is embedded in soil supporting layer preferably, and the mattress layer is by the graded sand rock layers that are located above and is located below Plastic film layers tile, the graded gravel particle size that graded sand rock layers use is between 5-40 millimeters, wherein 25-40 The graded gravel content of millimeter is no less than 50%, and plastic film layers are using the double-deck polyurethane film, and the thickness of plastic film layers is not Less than 8 millimeters.
Preferably, the cushion cap bottom sets that there are four vertical long stakes and eight vertical stubs, eight vertical stubs to be surrounded The apex angle of square be in the side centers of 45 degree of corner squares that four vertical long stakes are surrounded.
Preferably, in addition to four vertical long stakes, cushion cap bottom centre is additionally provided with a vertical long stake, and adjacent upright is long The center of stake and vertical stub is away from 2.5-3.0 times for vertical stub outer diameter.
A kind of construction method of piling formula composite concrete placement ground, including following construction procedure:
Step 1: preparing place, removing obstacles object, and gutter is arranged in smooth location;
Step 2: excavating downwards the foundation pit of 30-35 meters of depth in place with excavator, is laid with mattress layer in bottom of foundation ditch Afterwards, 20-25 meters of soil supporting layer is backfilled;
Step 3: outdoor production driven pile near at the construction field (site), and carry out stacking by vertical long stake and vertical stub and fold It puts;
Step 4: determining piling order, and scale is arranged, and sets up pile frame, carries out piling trial test with sinking apparatus;
Step 6: it is formally driven piles by centre to two sides with sinking apparatus;
Step 7: pouring cushion cap, is backfilling and compacted 5-15 meters of soil supporting layers, and pouring frame column pours plain concrete layer;
Preferably, the vertical long stake and vertical stub are all made of deformed bar mixed mud tubing string and are spliced, every section The length of deformed bar mixed mud tubing string is 10 meters, is connected between deformed bar mixed mud tubing string using ring flange.
Preferably, the length of the vertical long stake is 50 meters, and the length of the vertical stub is 20 meters.
Compared with prior art, the beneficial effects of the present invention are:
1. the present invention can play vertical long stake control deformation by the cooperation between long stake and vertical stub vertically simultaneously The bearing capacity of ability and soil supporting layer reduces settlement of foundation, reduces difficulty of construction, and project cost is low, construction method letter It is single;
2. the present invention improves the bearing capacity of pile foundation by vertical stub, the carrying of soil supporting layer can be made full use of Power, and by the vertical stub of reasonable Arrangement, reduce vertical long stake, reduces construction cost and difficulty;
3. be located at the periphery of eight vertical stubs by four vertical long stakes in the case where limited amount, be conducive to for Entire pile foundation provides bearing capacity, and the vertical stub for being located inside can give full play to its rigidity, centrally located vertical Long stake and four vertical long stakes of periphery are interspersed with vertical stub, and each stake independence is good, can use single pile finite element Quickly calculate.
Detailed description of the invention
Fig. 1 is schematic structural view of the invention;
Fig. 2 is the distribution schematic diagram of long stake and vertical stub in cushion cap bottom vertically in the present invention.
In figure: 1 plain concrete layer, 2 soil supporting layers, 3 mattress layers, 4 Soft Soil Layers, 5 deep layer supporting courses, 6 vertical long stakes, 7 Vertical stub, 8 cushion caps, 9 frame columns.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Fig. 1 to Fig. 2 is please referred to, the present invention provides a kind of technical solution: a kind of piling formula composite concrete placement ground, including ground Ontology, vertical long stake 6, vertical stub 7, cushion cap 8 and frame column 9.Ground basic body from top to bottom successively by plain concrete layer 1, Base supporting course 2, mattress layer 3, Soft Soil Layer 4 and deep layer supporting course 5 form.Wherein, soil supporting layer 2 is by the bottom of foundation with next The weak soil part of depthkeeping degree is excavated, then backfill element soil and aggregate chips, and is formed by compaction in layers.Mattress layer 3 is upper by being located at The graded sand rock layers and underlying plastic film layers of side tile, the graded gravel particle size that graded sand rock layers use Between 5-40 millimeters, wherein 25-40 millimeters of graded gravel content is 50%, and plastic film layers are using the double-deck thin polyurethane Film, plastic film layers with a thickness of 8 millimeters.Ground basic body can prevent from the steam of underground from penetrating into ground holding by mattress layer 3 Power layer 2 accelerates soil supporting layer 2 to form.
The vertical main reinforcement of long stake 6 and the main reinforcement of vertical stub 7 protrude into cushion cap 8 from bottom, and vertical long stake 6 is with cushion cap 8 It is in 45 degree of corner square profiles centered on bottom centre, and the pile top of long stake 6 protrudes into deep layer supporting course 5 vertically, vertically The square distribution centered on 8 bottom centre of cushion cap of stub 7, and the pile top of vertical stub 7 protrudes into Soft Soil Layer 4, cushion cap 8 Cup-shaped, cushion cap 8 is embedded in soil supporting layer 2, and frame column 9 is fixedly connected at the top of cushion cap 8.
As shown in Fig. 2, 8 bottom of cushion cap is set, there are four vertical long stakes 6 and eight vertical stubs 7, eight vertical stubs 7 to be enclosed At the apex angle of square be in the side centers of 45 degree of corner squares that four vertical long stakes 6 are surrounded.Except four vertical long Outside stake 6,8 bottom centre of cushion cap is additionally provided with a vertical long stake 6, and the center of the long stake 6 of adjacent upright and vertical stub 7 is away from being vertically 3.0 times of 7 outer diameter of stub.
Five vertical long stakes 6 and eight vertical stubs 7 are evenly distributed, wherein four vertical long stakes 6 are vertical short positioned at eight The periphery of stake 7, is conducive to provide bearing capacity for entire pile foundation, and the vertical stub 7 for being located inside can give full play to it Rigidity, centrally located vertical long stake 6 and four vertical long stakes of periphery are interspersed with vertical stub 7, are distributed relatively equal Even, each stake independence is good, can use single pile finite element and quickly calculates, simple and convenient, and it is relatively easy to calculate check.By vertical Cooperation between long stake 6 and vertical stub 7 can play vertical long stake 6 simultaneously and control holding for deformability and soil supporting layer 2 Loading capability is improved the bearing capacity of pile foundation by vertical stub 7, can make full use of the bearing capacity of soil supporting layer 2, and led to The vertical stub 7 of reasonable Arrangement is crossed, reduces vertical long stake 6, reduces construction cost and difficulty.
Embodiment 1
A kind of construction method of piling formula composite concrete placement ground, including following construction procedure:
Step 1: preparing place, removing obstacles object, and gutter is arranged in smooth location;
Step 2: excavating downwards the foundation pit of 30 meters of depth in place with excavator, after bottom of foundation ditch is laid with mattress layer 3, The soil supporting layer 2 of 20 meters of backfill;
Step 3: outdoor production driven pile near at the construction field (site), and stacking is carried out by vertical long stake 6 and vertical stub 7 It stacks;
Step 4: determining piling order, and scale is arranged, and sets up pile frame, carries out piling trial test with sinking apparatus;
Step 6: it is formally driven piles by centre to two sides with sinking apparatus;
Step 7: pouring cushion cap, is backfilling and compacted 10 meters of soil supporting layers 2, and pouring frame column 9 pours plain concrete layer 1;
Wherein, vertical long stake 6 and vertical stub 7 are all made of deformed bar mixed mud tubing string and are spliced, and every section is answered in advance The length of power reinforced concrete tubing string is 10 meters, is connected between deformed bar mixed mud tubing string using ring flange.Vertical long stake 6 Length be 50 meters, the length of vertical stub 7 is 20 meters.
Embodiment 2
A kind of construction method of piling formula composite concrete placement ground, including following construction procedure:
Step 1: preparing place, removing obstacles object, and gutter is arranged in smooth location;
Step 2: excavating downwards the foundation pit of 35 meters of depth in place with excavator, after bottom of foundation ditch is laid with mattress layer 3, The soil supporting layer 2 of 25 meters of backfill;
Step 3: outdoor production driven pile near at the construction field (site), and stacking is carried out by vertical long stake 6 and vertical stub 7 It stacks;
Step 4: determining piling order, and scale is arranged, and sets up pile frame, carries out piling trial test with sinking apparatus;
Step 6: it is formally driven piles by centre to two sides with sinking apparatus;
Step 7: pouring cushion cap, is backfilling and compacted 10 meters of soil supporting layers 2, and pouring frame column 9 pours plain concrete layer 1;
Wherein, vertical long stake 6 and vertical stub 7 are all made of deformed bar mixed mud tubing string and are spliced, and every section is answered in advance The length of power reinforced concrete tubing string is 10 meters, is connected between deformed bar mixed mud tubing string using ring flange.Vertical long stake 6 Length be 50 meters, the length of vertical stub 7 is 20 meters.
Embodiment 3
A kind of construction method of piling formula composite concrete placement ground, including following construction procedure:
Step 1: preparing place, removing obstacles object, and gutter is arranged in smooth location;
Step 2: excavating downwards the foundation pit of 30 meters of depth in place with excavator, after bottom of foundation ditch is laid with mattress layer 3, The soil supporting layer 2 of 25 meters of backfill;
Step 3: outdoor production driven pile near at the construction field (site), and stacking is carried out by vertical long stake 6 and vertical stub 7 It stacks;
Step 4: determining piling order, and scale is arranged, and sets up pile frame, carries out piling trial test with sinking apparatus;
Step 6: it is formally driven piles by centre to two sides with sinking apparatus;
Step 7: pouring cushion cap, is backfilling and compacted 5 meters of soil supporting layers 2, and pouring frame column 9 pours plain concrete layer 1;
Wherein, vertical long stake 6 and vertical stub 7 are all made of deformed bar mixed mud tubing string and are spliced, and every section is answered in advance The length of power reinforced concrete tubing string is 10 meters, is connected between deformed bar mixed mud tubing string using ring flange.Vertical long stake 6 Length be 50 meters, the length of vertical stub 7 is 20 meters.
Embodiment 4
A kind of construction method of piling formula composite concrete placement ground, including following construction procedure:
Step 1: preparing place, removing obstacles object, and gutter is arranged in smooth location;
Step 2: excavating downwards the foundation pit of 35 meters of depth in place with excavator, after bottom of foundation ditch is laid with mattress layer 3, The soil supporting layer 2 of 20 meters of backfill;
Step 3: outdoor production driven pile near at the construction field (site), and stacking is carried out by vertical long stake 6 and vertical stub 7 It stacks;
Step 4: determining piling order, and scale is arranged, and sets up pile frame, carries out piling trial test with sinking apparatus;
Step 6: it is formally driven piles by centre to two sides with sinking apparatus;
Step 7: pouring cushion cap, is backfilling and compacted 15 meters of soil supporting layers 2, and pouring frame column 9 pours plain concrete layer 1;
Wherein, vertical long stake 6 and vertical stub 7 are all made of deformed bar mixed mud tubing string and are spliced, and every section is answered in advance The length of power reinforced concrete tubing string is 10 meters, is connected between deformed bar mixed mud tubing string using ring flange.Vertical long stake 6 Length be 50 meters, the length of vertical stub 7 is 20 meters.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (8)

1. a kind of piling formula composite concrete placement ground, including ground basic body, vertically long stake (6), vertical stub (7), cushion cap (8) and frame Trestle (9), it is characterised in that: described ground basic body is from top to bottom successively by plain concrete layer (1), soil supporting layer (2), mattress Layer (3), Soft Soil Layer (4) and deep layer supporting course (5) composition, the main reinforcement of the vertical long stake (6) and the main reinforcement of vertical stub (7) are equal It is protruded into cushion cap (8) from bottom, the vertical long stake (6) is centered on cushion cap (8) bottom centre in 45 degree of corner squares point Cloth, and the pile top of long stake (6) protrudes into deep layer supporting course (5) vertically, and the vertical stub (7) is with cushion cap (8) bottom centre Centered on square distribution, and the pile top of vertical stub (7) protrudes into Soft Soil Layer (4), fixed at the top of the cushion cap (8) to connect Connect frame column (9).
2. a kind of piling formula composite concrete placement ground according to claim 1, it is characterised in that: the soil supporting layer (2) It is formed by plain soil and aggregate chips by compaction in layers, the cushion cap (8) is cup-shaped or stairstepping, cushion cap (8) are embedded in ground holding force In layer (2).
3. a kind of piling formula composite concrete placement ground according to claim 1, it is characterised in that: the mattress layer (3) is by position It tiles in the graded sand rock layers of top and underlying plastic film layers, the graded gravel particle that graded sand rock layers use Size is between 5-40 millimeters, and wherein 25-40 millimeters of graded gravel content is no less than 50%, and plastic film layers are using double-deck poly- The thickness of urethane film, plastic film layers is not less than 8 millimeters.
4. a kind of piling formula composite concrete placement ground according to claim 1, it is characterised in that: cushion cap (8) bottom is set There are four vertical long stake (6) and eight vertical stubs (7), the apex angle for the square that eight vertical stubs (7) are surrounded is in four The side center for 45 degree of corner squares that a vertical long stake (6) is surrounded.
5. a kind of piling formula composite concrete placement ground according to claim 1, it is characterised in that: remove four vertical long stakes (6) outside, cushion cap (8) bottom centre is additionally provided with a vertical long stake (6), the center of the long stake of adjacent upright (6) and vertical stub (7) Away from 2.5-3.0 times for vertical stub (7) outer diameter.
6. a kind of construction method of the piling formula composite concrete placement ground as described in claim 1-5 any one, it is characterised in that: Including following construction procedure:
Step 1: preparing place, removing obstacles object, and gutter is arranged in smooth location;
Step 2: excavating downwards the foundation pit of 30-35 meters of depth in place with excavator, after bottom of foundation ditch is laid with mattress layer (3), The soil supporting layer (2) of 20-25 meters of backfill;
Step 3: outdoor production driven pile near at the construction field (site), and stacking is carried out by vertical long stake (6) and vertical stub (7) It stacks;
Step 4: determining piling order, and scale is arranged, and sets up pile frame, carries out piling trial test with sinking apparatus;
Step 6: it is formally driven piles by centre to two sides with sinking apparatus;
Step 7: pouring cushion cap, is backfilling and compacted 5-15 meters of soil supporting layers (2), and pouring frame column (9) pours plain concrete layer (1)。
7. a kind of construction method of piling formula composite concrete placement ground according to claim 6, it is characterised in that: described vertical Long stake (6) and vertical stub (7) are all made of deformed bar mixed mud tubing string and are spliced, every section deformed bar mixed mud pipe The length of column is 10 meters, is connected between deformed bar mixed mud tubing string using ring flange.
8. a kind of construction method of piling formula composite concrete placement ground according to claim 7, it is characterised in that: described vertical The length of long stake (6) is 50 meters, and the length of the vertical stub (7) is 20 meters.
CN201910598150.XA 2019-07-04 2019-07-04 A kind of piling formula composite concrete placement ground and its construction method Pending CN110172988A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910598150.XA CN110172988A (en) 2019-07-04 2019-07-04 A kind of piling formula composite concrete placement ground and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910598150.XA CN110172988A (en) 2019-07-04 2019-07-04 A kind of piling formula composite concrete placement ground and its construction method

Publications (1)

Publication Number Publication Date
CN110172988A true CN110172988A (en) 2019-08-27

Family

ID=67699728

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910598150.XA Pending CN110172988A (en) 2019-07-04 2019-07-04 A kind of piling formula composite concrete placement ground and its construction method

Country Status (1)

Country Link
CN (1) CN110172988A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110847215A (en) * 2019-12-18 2020-02-28 长江勘测规划设计研究有限责任公司 Full-paved long and short pile composite foundation-tube offshore wind power foundation and construction method
JP2021055347A (en) * 2019-09-30 2021-04-08 大和ハウス工業株式会社 Foundation structure and construction method therefor

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2021055347A (en) * 2019-09-30 2021-04-08 大和ハウス工業株式会社 Foundation structure and construction method therefor
CN110847215A (en) * 2019-12-18 2020-02-28 长江勘测规划设计研究有限责任公司 Full-paved long and short pile composite foundation-tube offshore wind power foundation and construction method

Similar Documents

Publication Publication Date Title
CN205874850U (en) Railway soft soil foundation light soil roadbed structure
CN107447613B (en) A deep ultra-soft soil embankment and its construction method
CN108560542B (en) A kind of bidirectional reinforcement of waste tire covering building slag and construction method thereof
CN107419630A (en) A kind of the soft soil foundation high-filled embankment and construction method of effectively control settlement after construction
CN203174619U (en) Reverse raft concrete terrace
CN103334450B (en) Construction method of pile precast slab retaining wall with drainage ditch
CN206902488U (en) A kind of soft soil foundation high-filled embankment of effectively control settlement after construction
CN114457840A (en) A kind of construction method of prefabricated ecological retaining wall
CN214993554U (en) Hydraulic engineering's side slope reinforced structure
CN106676993A (en) Roadbed reinforcing system of reinforced gravel framework structure and reinforcing method of roadbed reinforcing system
CN102286955B (en) Reinforced concrete pile type dyke and construction method thereof
CN215977211U (en) A composite foundation treatment structure of pipe pile combined with cement-soil mixing pile
CN206902734U (en) A kind of earth construction of soft foundation zone
CN206625096U (en) A kind of reinforced rubble frame structure subgrade strengthening system
CN110172988A (en) A kind of piling formula composite concrete placement ground and its construction method
CN215976664U (en) A rigid pile composite foundation treatment structure for a lower sleeping pipe gallery structure
CN107514008A (en) Composite foundation reinforced cantilever retaining wall structure and construction method
CN209723024U (en) Composite foundation reinforcement counterfort wall structure
CN111851572A (en) Self-embedded ecological building block, retaining wall and construction method of retaining wall
CN207452938U (en) Composite foundation reinforced cantilever retaining wall structure
CN109653241A (en) Composite foundation reinforcement counterfort wall structure and construction method
CN217352404U (en) Deep soft soil foundation treatment structure
CN216712980U (en) A kind of reinforcement treatment structure of deep soft soil foundation combined with concrete lattice wall and bulk material piles
CN215165533U (en) A kind of solid waste landfill slope anchoring structure
CN109989477B (en) Soft soil foundation for preventing building foundation from non-uniform settlement and construction method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190827

WD01 Invention patent application deemed withdrawn after publication