CN202440824U - Three-line-pile super-deep foundation-pit support structure - Google Patents

Three-line-pile super-deep foundation-pit support structure Download PDF

Info

Publication number
CN202440824U
CN202440824U CN2011204717848U CN201120471784U CN202440824U CN 202440824 U CN202440824 U CN 202440824U CN 2011204717848 U CN2011204717848 U CN 2011204717848U CN 201120471784 U CN201120471784 U CN 201120471784U CN 202440824 U CN202440824 U CN 202440824U
Authority
CN
China
Prior art keywords
campshed
deep foundation
line
support structure
foundation pit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011204717848U
Other languages
Chinese (zh)
Inventor
徐荣彬
马兆荣
王晓村
汤东升
陆晓琴
廖泽球
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Energy Engineering Group Guangdong Electric Power Design Institute Co Ltd
Original Assignee
Guangdong Electric Power Design Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Electric Power Design Institute filed Critical Guangdong Electric Power Design Institute
Priority to CN2011204717848U priority Critical patent/CN202440824U/en
Application granted granted Critical
Publication of CN202440824U publication Critical patent/CN202440824U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model discloses a three-line-pile super-deep foundation-pit support structure, comprising front-line piles, middle-line piles and rear-line piles, wherein the front-line piles, the middle-line piles and all the rear-line piles are arranged in parallel. The advantages of the utility model are that: construction is convenient, floor space is small, structural strength is high, integrity is good and the foundation-pit-top horizontal displacement is smaller than that of the same kind of support structure.

Description

Three campshed ultra-deep foundation pit supporting and protection structure
Technical field
The utility model relates to a kind of supporting and protection structure of foundation ditch, especially relates to the ultra-deep foundation pit supporting.
Background technology
In recent years, along with the development of urban construction, floor is built higher and higher, and subway digs darker and darker, and the corresponding underground deep foundation ditch degree of depth is also more and more darker, and foundation ditch often is close to City Building, and safety of construction has also been proposed increasingly high requirement.Ultra-large type ultra-deep foundation pit supporting and protection structure has multiple pattern, and the supporting and protection structure that adopts usually comprises interior support or draws continuous underground wall structure, the interior support of anchor system or draw piling structure, the soil nailing combining anchor retaining structure of anchor system.Said structure mainly contains following shortcoming:
1, adopts interior continuous underground wall structure or the piling structure of supporting; Brace summer, support column need be set in foundation ditch; Beam column is put closeer at the foundation ditch lining, support and being connected of post, support and being connected of wall etc., complex structure; Construction brings inconvenience to internal construction, and the post node has sinking or off normal to supporting the stressed considerable influence that has.Construction period wants layering that support, stage excavation are set, and construction period is longer.
2, anchor continuous underground wall structure or piling structure are drawn in employing, need arrange anchor poles along being provided with in the forebay, the tens of rice of rock-bolt length more; It is bigger to take the underground space; Often exceed the expropriation of land scope, and utilize anchor pole as continuing stressed permanent structure, its durability also is worth research; Same this scheme construction period wants the layering setting to draw anchor, stage excavation, and construction period is longer.
3, soil nailing combining anchor retaining structure is same exists that to take the underground space bigger, and require for geological conditions high, defective such as compliance is weak.
Summary of the invention
The purpose of the utility model provides three campshed ultra-deep foundation pit supporting and protection structure of a kind of, easy construction little to ambient influnence, structural strength height and good endurance.
The technical solution of the utility model is: a kind of three campshed ultra-deep foundation pit supporting and protection structure, and it is a kind of system of deep foundation pit support, is made up of parallel preceding campshed, middle campshed and back campshed, preceding campshed, middle campshed, back campshed pile spacing successively decrease successively.
Supporting and protection structure is provided with three campsheds altogether, and campshed is arranged in parallel, and preceding campshed to the pile spacing of back campshed successively decreases; The campshed system can effectively form the bigger whole supporting of the rigidity of structure; The easy construction of campshed, little to ambient influnence, the displacement of foundation ditch top is less than similar supporting and protection structure; Need not establish support system inside and outside the foundation ditch, the excavation of foundation ditch is also more convenient.
The spacing of campshed and said back campshed can improve the campshed integral rigidity less than the spacing of campshed in said and said preceding campshed in said, improves the non-deformability of structural system, improves integrally-built stability, reduces stake top displacement.
The quantity of campshed is the twice of said back campshed quantity in said, and the quantity of said preceding campshed is the twice of said middle campshed quantity.Reduce the quantity of back campshed and middle campshed, under the prerequisite that guarantees structural strength, reduce engineering quantity, reduce construction costs.
The top of campshed, middle campshed and back campshed is anchored at respectively on the horizontal plate-girder before said.Can guarantee integral rigidity, improve structural strength.
The utility model has the advantages that: easy construction, floor space is little, and structural strength is high, good integrity, the horizontal movement of foundation ditch top is less than similar supporting and protection structure.
Description of drawings
Accompanying drawing 1 is the structural representation of the utility model embodiment;
Accompanying drawing 2 is the layout sketch map of the utility model embodiment;
1, ground, 2, foundation ditch, 3, inwall, 4, horizontal plate-girder, 5, preceding campshed, 6, middle campshed, 7, the back campshed, 8, first soil layer, 9, second soil layer, the 10, the 3rd soil layer, the 11, the 4th soil layer.
The specific embodiment
Embodiment:
Consult Fig. 1; Be a kind of three campshed ultra-deep foundation pit supporting and protection structure sketch mapes; It is made up of the preceding campshed of under the ground 1, the inwall that is arranged on foundation ditch 2 in order 3 back several 5, middle campshed 6 and back campshed 7; Parallel to each other between the row of wherein whole preceding campsheds 5, whole middle campsheds 6 and whole back campshed 7, and the top of preceding campshed 5, middle campshed 6 and back campshed 7 is connected on the horizontal plate-girder 4.Spacing is less than spacing between middle campshed 6 and the preceding campshed 5 between middle campshed 6 and the back campshed 7.
Ground is respectively first soil layer 8, second soil layer 9, the 3rd soil layer 10 and the 4th soil layer 11 below 1.Preceding campshed 5, middle campshed 6 and back campshed 7 pass above-mentioned soil layer respectively.
Consult Fig. 2, in the present embodiment, the degree of depth of foundation ditch 2 is 16.5m; Horizontal plate-girder 4 is positioned at 3.5m place, 1 below, ground, inwall 3 thickness 150mm, and preceding campshed 5, middle campshed 6 and back campshed 7 diameters are 1m; Before the quantity of campshed 5 be the twice of middle campshed 6 quantity, the quantity of middle campshed 6 is the twice of back campshed 7 quantity, wherein spacing 1m between two preceding campsheds 5; Interval 2m between two middle campsheds 6; Spacing 4m between the campshed 7 after two, the whole supporting degree of depth can reach more than the 20m, and the foundation ditch top displacement is no more than 10mm.
Above-listed detailed description is specifying to one of the utility model possible embodiments; This embodiment is not the claim in order to restriction the utility model; Allly do not break away from the equivalence that the utility model does and implement or change, all should be contained in the claim of this case.

Claims (4)

1. campshed ultra-deep foundation pit supporting and protection structure, it is characterized in that: it is a kind of system of deep foundation pit support, is made up of parallel preceding campshed, middle campshed and back campshed, preceding campshed, middle campshed, afterwards the campshed pile spacing successively decreases successively.
2. three campshed ultra-deep foundation pit supporting and protection structure according to claim 1 is characterized in that: row's spacing of campshed and said back campshed is less than row's spacing of campshed in said and preceding campshed in said.
3. three campshed ultra-deep foundation pit supporting and protection structure according to claim 1 and 2 is characterized in that: the quantity of campshed is the twice of said back campshed quantity in said, and the quantity of said preceding campshed is the twice of said middle campshed quantity.
4. three campshed ultra-deep foundation pit supporting and protection structure according to claim 3 is characterized in that: the top of campshed, middle campshed and back campshed is anchored at respectively on the horizontal beam slab before said.
CN2011204717848U 2011-11-24 2011-11-24 Three-line-pile super-deep foundation-pit support structure Expired - Fee Related CN202440824U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011204717848U CN202440824U (en) 2011-11-24 2011-11-24 Three-line-pile super-deep foundation-pit support structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011204717848U CN202440824U (en) 2011-11-24 2011-11-24 Three-line-pile super-deep foundation-pit support structure

Publications (1)

Publication Number Publication Date
CN202440824U true CN202440824U (en) 2012-09-19

Family

ID=46822278

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011204717848U Expired - Fee Related CN202440824U (en) 2011-11-24 2011-11-24 Three-line-pile super-deep foundation-pit support structure

Country Status (1)

Country Link
CN (1) CN202440824U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103074898A (en) * 2013-01-18 2013-05-01 江苏鸿基科技有限公司 Multi-row pile foundation pit support structure and construction method thereof
CN103882870A (en) * 2014-03-24 2014-06-25 上海强劲地基工程股份有限公司 Cement mixing pile and concrete pile meshing supporting structure and construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103074898A (en) * 2013-01-18 2013-05-01 江苏鸿基科技有限公司 Multi-row pile foundation pit support structure and construction method thereof
CN103074898B (en) * 2013-01-18 2015-09-23 江苏鸿基科技有限公司 Multi-row pile foundation pit support structure and construction method thereof
CN103882870A (en) * 2014-03-24 2014-06-25 上海强劲地基工程股份有限公司 Cement mixing pile and concrete pile meshing supporting structure and construction method

Similar Documents

Publication Publication Date Title
CN202989937U (en) Grille-type double-row pile supporting structure
CN205134327U (en) Concrete diclinic props row -pile support system
CN202689031U (en) Deep foundation pit retaining and protecting retaining wall
CN205314116U (en) Continuous type of combined type drilling cling compound structure
CN105155548B (en) A kind of drag-line double-row pile (wall) supporting construction
CN103104102B (en) Construction method for underground storey-addition reconstruction
CN202830942U (en) Combined supporting structure with anchor cables and cast-in-situ bored piles
CN103821160A (en) Soft soil foundation combined pile net structure
CN204780938U (en) Novel recoverable anchor formula double row pile supporting construction that draws
CN102888848A (en) Supporting structure for controlling stability of foundation ditch
CN202440824U (en) Three-line-pile super-deep foundation-pit support structure
CN207176700U (en) A kind of solid matter perfusion inner support of pile foundation ditch permanent support structure under complex environment
CN204282395U (en) A kind of stake holder counterfort retaining wall
CN202416252U (en) L-shaped flood prevention retaining wall with high piles
CN202090352U (en) Deep foundation pit bracing system with steel pipe piles-self-drilling type pre-stress anchor rods
CN204715364U (en) A kind of foundation pit support device
CN205188976U (en) Drag -line double row pile supporting construction
CN202298629U (en) Dual-row pile structure provided with vertical anchoring rods
CN204753656U (en) A clump of piles - soil - structure interact experimental model directly replaces to one side
CN204370417U (en) A kind of for base pit engineering external corner or the road place of going along with sb. to guard him to drawing cable bolting structure
CN202577316U (en) Structure of miniature piles in combination with composite soil nailing wall
CN208309592U (en) Foundation pit supporting structure
CN203420283U (en) Deep foundation pit in open cut section of tunnel
CN202830938U (en) Supporting structure for controlling foundation trench stability
CN202543946U (en) Supporting structure for drainage type fender posts in soft soil area

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CHINA ENERGY ENGINEERING GROUP GUANGDONG ELECTRIC

Free format text: FORMER NAME: CHINA ENERGY ENGINEERING GROUP GUANGDONG ELECTRIC POWER DESIGN INSTITUTE

Owner name: CHINA ENERGY ENGINEERING GROUP GUANGDONG ELECTRIC

Free format text: FORMER NAME: GUANGDONG ELECTRIC POWER DESIGN INSTITUTE

CP01 Change in the name or title of a patent holder

Address after: 510663 Luogang District, Guangdong, Guangzhou Science City Fung Road, No. 1, No.

Patentee after: CHINA ENERGY ENGINEERING GROUP GUANGDONG ELECTRIC POWER DESIGN INSTITUTE Co.,Ltd.

Address before: 510663 Luogang District, Guangdong, Guangzhou Science City Fung Road, No. 1, No.

Patentee before: GUANGDONG ELECTRIC POWER DESIGN INSTITUTE OF CHINA ENERGY ENGINEERING GROUP Co.,Ltd.

Address after: 510663 Luogang District, Guangdong, Guangzhou Science City Fung Road, No. 1, No.

Patentee after: GUANGDONG ELECTRIC POWER DESIGN INSTITUTE OF CHINA ENERGY ENGINEERING GROUP Co.,Ltd.

Address before: 510663 Luogang District, Guangdong, Guangzhou Science City Fung Road, No. 1, No.

Patentee before: Guangdong Electric Power Design Institute

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120919

Termination date: 20181124