CN202610775U - 消力池护坦布置结构 - Google Patents
消力池护坦布置结构 Download PDFInfo
- Publication number
- CN202610775U CN202610775U CN2012202071489U CN201220207148U CN202610775U CN 202610775 U CN202610775 U CN 202610775U CN 2012202071489 U CN2012202071489 U CN 2012202071489U CN 201220207148 U CN201220207148 U CN 201220207148U CN 202610775 U CN202610775 U CN 202610775U
- Authority
- CN
- China
- Prior art keywords
- apron
- protection
- absorption basin
- arrangement structure
- basement rock
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Landscapes
- Sewage (AREA)
Abstract
本实用新型涉及一种消力池护坦布置结构。本实用新型的目的是提供一种结构简单、施工方便的消力池护坦布置结构,充分利用预应力锚筋在各种工况下都能持续发挥作用的特点,保证护坦与基础面始终处于受压状态,紧密接触,减小结合面的浮托力和动水冲击压力,提高消力池钢筋混凝土护坦的稳定性。本实用新型的技术方案是:消力池护坦布置结构,包括基岩,以及浇筑于该基岩上方的钢筋混凝土护坦,其特征在于:所述基岩与护坦之间采用预应力锚杆锚固。本实用新型适用于水利水电工程中消力池的布置。
Description
技术领域
本实用新型涉及一种消力池护坦布置结构,主要适用于水利水电工程中消力池的布置。
背景技术
水利水电工程应用底流消能时,一般均设置消力池,采用钢筋混凝土底板作为护坦;护坦分层浇筑,其厚度一般受抗浮控制,需要进行抗浮稳定复核。护坦在脉动水压力、浮托力,以及止水失效后动水冲击压力等的作用下,有可能上浮失稳,需要锚筋提供的拉力维持稳定。目前国内工程中基本上都采用非预应力锚固方式,其缺点在于:非预应力锚筋底板在护坦与基础面(一般为基岩面)有较大位移时锚筋才能充分发挥作用;而在泄洪水流脉动水压力和浮托力等作用下,由于护坦与基础面的脱离,浮托力将增加,同时护坦的刚度大大降低,容易振动失稳;在消力池检修时,在浮托力作用下,由于护坦与基础面的脱离,浮托力作用在整块底板上,而且护坦与基础的凝聚力完全丧失,对护坦稳定也很不利。
发明内容
本实用新型要解决的技术问题是:针对上述存在的问题提供一种结构简单、施工方便的消力池护坦布置结构,充分利用预应力锚筋在各种工况下都能持续发挥作用的特点,保证护坦与基础面始终处于受压状态,紧密接触,减小结合面的浮托力和动水冲击压力,提高消力池钢筋混凝土护坦的稳定性。
本实用新型所采用的技术方案是:消力池护坦布置结构,包括基岩,以及浇筑于该基岩上方的钢筋混凝土护坦,其特征在于:所述基岩与护坦之间采用预应力锚杆锚固。
所述护坦由若干层叠加浇筑而成。
所述预应力锚杆一端锚固于基岩内,另一端穿过护坦的次顶层后安装用于实现施加预应力的垫板和螺母,同时该端的端部连接固定筋,该螺纹钢筋同时与护坦顶层的钢筋焊接。
所述预应力锚杆为分段式预应力中空锚杆或套管式预应力中空锚杆。
本实用新型的有益效果是:本实用新型采用预应力锚杆代替现有技术常用的非预应力锚杆,实现基岩与护坦的预应力锚固,使得护坦与基础面(基岩面)始终处于受压状态,从而减小了结合面的浮托力和动水冲击压力,提高了消力池钢筋混凝土护坦的稳定性,节省了工程投资。
附图说明
图1是本实用新型的结构图。
图2是本实用新型中分段式预应力中空锚杆的结构图。
图3是本实用新型中套管式预应力中空锚杆的结构图。
图4是本实用新型中涨壳式预应力中空锚杆的结构图。
具体实施方式
如图1所示,本实施例消力池护坦布置结构包括基岩1,以及浇筑于该基岩上方的钢筋混凝土护坦2,本例中所述护坦2采用分层浇筑的方法,形成若干层;所述基岩1与护坦2之间采用预应力锚杆3锚固,如图2所示,本例中预应力锚杆采用分段式预应力中空锚杆(RDH型),包括螺母3-1、垫板3-3、注浆管3-4,以及依次连接的中空锚杆体3-5、连接套3-6和螺纹钢筋3-8,其中连接套3-6上同轴安装阻浆器3-7;实际使用中,螺纹钢筋3-8自由端通过锚固剂锚固于基岩1内,锚杆体3-5远离螺纹钢筋3-8一端穿过护坦2的次顶层(护坦面层下方的一层)后安装垫板3-3和螺母3-1,并采用扭力扳手法拧紧螺母3-1至所需扭矩,使垫板3-3紧压护坦2的次顶层表面,施加预应力;同时锚杆体3-5远离螺纹钢筋3-8一端的端部通过连接套3-6连接固定筋4,该固定筋同时与护坦2顶层的钢筋2-1焊接。
其施工工艺如下:
a、首先在基岩1面上钻设锚筋孔,插入螺纹钢筋3-8并注浆固定;为保证钻孔顺直,保证锚固安装质量,应使用十字钻头或纽扣钻头;早强锚固体可用早强树脂或早强水泥药卷。
b、采用连接套3-6将螺纹钢筋3-8与中孔锚杆体3-5连接,并分层浇筑护坦2混凝土;中孔锚杆体3-5可以根据需要用连接套加长,同时接头部位应错开一定距离。
c、护坦2浇筑至次顶层,同时在已浇混凝土达到一定强度后,安装垫板3-3和螺母3-1,并采用扭力扳手法拧紧螺母3-1至所需扭矩,施加预应力。
d、用连接套3-6连接固定筋4,同时该固定筋应与护坦2面层钢筋2-1焊接,然后完成护坦2面层混凝土的浇注即可。
所述预应力锚杆3还可以选用如图3、图4所示的套管式预应力中空锚杆(GY型)或涨壳式预应力中空锚杆(EX型)。
Claims (4)
1.一种消力池护坦布置结构,包括基岩(1),以及浇筑于该基岩上方的钢筋混凝土护坦(2),其特征在于:所述基岩(1)与护坦(2)之间采用预应力锚杆(3)锚固。
2.根据权利要求1所述的消力池护坦布置结构,其特征在于:所述护坦(2)由若干层叠加浇筑而成。
3.根据权利要求2所述的消力池护坦布置结构,其特征在于:所述预应力锚杆(3)一端锚固于基岩(1)内,另一端穿过护坦(2)的次顶层后安装用于实现施加预应力的垫板(3-3)和螺母(3-1),同时该端的端部连接固定筋(4),该螺纹钢筋同时与护坦(2)顶层的钢筋(2-1)焊接。
4.根据权利要求1或2或3所述的消力池护坦布置结构,其特征在于:所述预应力锚杆(3)为分段式预应力中空锚杆或套管式预应力中空锚杆。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012202071489U CN202610775U (zh) | 2012-05-10 | 2012-05-10 | 消力池护坦布置结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012202071489U CN202610775U (zh) | 2012-05-10 | 2012-05-10 | 消力池护坦布置结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202610775U true CN202610775U (zh) | 2012-12-19 |
Family
ID=47344487
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012202071489U Expired - Lifetime CN202610775U (zh) | 2012-05-10 | 2012-05-10 | 消力池护坦布置结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202610775U (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103669302A (zh) * | 2014-01-10 | 2014-03-26 | 中国水电顾问集团昆明勘测设计研究院有限公司 | 一种电站消力池管网暗埋式排水系统 |
-
2012
- 2012-05-10 CN CN2012202071489U patent/CN202610775U/zh not_active Expired - Lifetime
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103669302A (zh) * | 2014-01-10 | 2014-03-26 | 中国水电顾问集团昆明勘测设计研究院有限公司 | 一种电站消力池管网暗埋式排水系统 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN214116984U (zh) | 装配式混凝土抗震梁柱连接节点 | |
CN201459716U (zh) | 缓粘结或无粘结后张预应力灌注桩 | |
CN104790424B (zh) | 风力发电塔基础环基础的加固系统及其加固方法 | |
CN2878511Y (zh) | 拉压组合自锚型岩石锚杆 | |
CN101629418A (zh) | 后张预应力灌注桩及施工方法 | |
CN107299699A (zh) | 装配式空腔剪力墙水平接缝齿槽式干式连接结构 | |
CN101230579A (zh) | 环形承压底板井格梁式风力发电塔基础 | |
CN203569582U (zh) | 一种混凝土管桩与承台的连接结构 | |
CN208793021U (zh) | 一种盾构隧道抗浮控制结构 | |
CN102966360A (zh) | 小净距隧道中岩墙加固方法 | |
CN109183986A (zh) | 一种装配式框架结构梁柱连接节点及施工方法 | |
CN105201514A (zh) | 一种含水岩层井壁结构及施工方法 | |
CN201605522U (zh) | 波形钢腹板钢筋混凝土组合结构 | |
CN103088842A (zh) | 毛石挡土墙加固单面模板支撑系统及施工方法 | |
CN201610546U (zh) | 预应力锚固框架板 | |
CN2756708Y (zh) | 全长粘结式预应力锚杆 | |
CN202610775U (zh) | 消力池护坦布置结构 | |
CN203440993U (zh) | 预制钢筋混凝土梁的连接节点 | |
CN111379581B (zh) | 一种深部巷道预应力全锚支护施工设备及其施工方法 | |
CN201474703U (zh) | 一种水工隧洞固结圈承力结构 | |
CN209066596U (zh) | 一种装配式框架结构梁柱连接节点 | |
CN208907228U (zh) | 一种预应力模块式挡土墙 | |
CN206157919U (zh) | 一种预制件的连接节点 | |
CN204898944U (zh) | 一种开缝钢板混凝土组合耗能剪力墙 | |
CN200985798Y (zh) | 矿用金属锚杆组合紧固卡头 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20121219 |