CN202380731U - 反梁挂模支撑架 - Google Patents

反梁挂模支撑架 Download PDF

Info

Publication number
CN202380731U
CN202380731U CN 201120563722 CN201120563722U CN202380731U CN 202380731 U CN202380731 U CN 202380731U CN 201120563722 CN201120563722 CN 201120563722 CN 201120563722 U CN201120563722 U CN 201120563722U CN 202380731 U CN202380731 U CN 202380731U
Authority
CN
China
Prior art keywords
steel bars
reversed beam
vertical
transverse
reinforcement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201120563722
Other languages
English (en)
Inventor
张书锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CSCEC Strait Construction and Development Co Ltd
Original Assignee
Third Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd filed Critical Third Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd
Priority to CN 201120563722 priority Critical patent/CN202380731U/zh
Application granted granted Critical
Publication of CN202380731U publication Critical patent/CN202380731U/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

本实用新型涉及一种反梁挂模支撑架,其特征在于:它包括竖向钢筋、垂直固定连接于竖向钢筋下部的横向钢筋以及固定连接于竖向钢筋的上部与横向钢筋的外端部或外端部附近部位之间的斜向钢筋;所述横向钢筋的内端部与竖向钢筋之间的距离=反梁侧模的厚度,所述竖向钢筋和斜向钢筋的下端部均露置于横向钢筋的下方。本实用新型具有结构简单、拆装方便的显著优点,不仅可节约大量的反梁侧模安装劳动力,还保证了反梁侧模的施工质量。

Description

反梁挂模支撑架
技术领域
本实用新型涉及一种反梁挂模支撑架。
背景技术
现场混凝土结构中,凸出板面高度的梁称为反梁5,如图1所示。传统的用于固定浇筑反梁5的反梁侧模4不仅安装加固较为繁琐,如图2所示,需采用斜撑7及支撑木板8将反梁侧模4固定在垫层或底模板9板面上,而且浇筑完混凝土楼板6后还需及时拔除插入混凝土楼板6中的支撑木板8并及时补洞,以免对混凝土结构造成影响。
发明内容
为了解决现有技术所存在的上述问题,本实用新型提供了一种反梁挂模支撑架,它具有结构简单、拆装方便的显著优点,不仅可节约大量的反梁侧模安装劳动力,还保证了反梁侧模的施工质量。
本实用新型技术方案是这样构成的,一种反梁挂模支撑架,其特征在于:它包括竖向钢筋、垂直固定连接于竖向钢筋下部的横向钢筋以及固定连接于竖向钢筋的上部与横向钢筋的外端部或外端部附近部位之间的斜向钢筋;所述横向钢筋的内端部与竖向钢筋之间的距离=反梁侧模的厚度,所述竖向钢筋和斜向钢筋的下端部均露置于横向钢筋的下方。
所述竖向钢筋的下端部与横向钢筋之间的距离=位于反梁底部的混凝土楼板的厚度。
本实用新型上述技术方案的工作原理说明如下:反梁侧模安装前,先将多个反梁挂模支撑架的竖向钢筋和斜向钢筋的下端部按一定间距分别与埋设于混凝土楼板层中的结构板筋点焊或绑扎固定,然后将反梁侧模安放在反梁挂模支撑架的水平悬挑端(横向钢筋内端)上即可,混凝土浇筑施工时,可将部分钢筋埋入浇筑好的混凝土结构中,无需取出。本实用新型所述的反梁挂模支撑架可采用现场钢筋加工过程中的废料加工而成,反梁挂模支撑架的尺寸根据反梁高度及楼板厚度而定。
较之现有技术而言,本实用新型具有以下优点:
(1)拆装方便,施工工序简单易操作。
(2)不仅可节约大量的反梁侧模安装劳动力,还保证了反梁侧模的施工质量。
(3)结构简单,成本低,可利用现场的钢筋加工废料,变废为宝。
(4)拆除反梁侧模时,割除伸出混凝土楼板的楼面部分的钢筋即可,割除的钢筋还可继续作为加工反梁挂模支撑架的原料,重复利用。
附图说明
图1是反梁混凝土结构示意图。
图2是一种传统的用来浇筑反梁混凝土结构的反梁侧模及用来固定反梁侧模的安装架结构示意图。
图3是本实用新型提供的一种反梁挂模支撑架的实施例结构示意图。
图4是利用本实用新型实施例固定反梁侧模的浇筑前工作状态示意图。
图5是利用本实用新型实施例固定反梁侧模的浇筑后工作状态示意图。
图中标号说明:1、竖向钢筋,2、横向钢筋,3、斜向钢筋,4、反梁侧模,5、反梁,6、混凝土楼板,7、斜撑,8、支撑木板,9、垫层或底模板,10、结构板筋。
具体实施方式
下面结合说明书附图和具体实施方式对本实用新型内容进行详细说明:
如图3所示为本实用新型提供的一种反梁挂模支撑架的实施例结构示意图,其特征在于:它包括竖向钢筋1、垂直固定连接于竖向钢筋1下部的横向钢筋2以及固定连接于竖向钢筋1的上部与横向钢筋2的外端部或外端部附近部位之间的斜向钢筋3;所述横向钢筋2的内端部与竖向钢筋1之间的距离=反梁侧模4的厚度,所述竖向钢筋1和斜向钢筋3的下端部均露置于横向钢筋2的下方。
所述竖向钢筋1的下端部与横向钢筋2之间的距离=位于反梁5底部的混凝土楼板6的厚度。

Claims (2)

1.一种反梁挂模支撑架,其特征在于:它包括竖向钢筋(1)、垂直固定连接于竖向钢筋(1)下部的横向钢筋(2)以及固定连接于竖向钢筋(1)的上部与横向钢筋(2)的外端部或外端部附近部位之间的斜向钢筋(3);所述横向钢筋(2)的内端部与竖向钢筋(1)之间的距离=反梁侧模(4)的厚度,所述竖向钢筋(1)和斜向钢筋(3)的下端部均露置于横向钢筋(2)的下方。
2.根据权利要求1所述的反梁挂模支撑架,其特征在于:所述竖向钢筋(1)的下端部与横向钢筋(2)之间的距离=位于反梁(5)底部的混凝土楼板(6)的厚度。
CN 201120563722 2011-12-29 2011-12-29 反梁挂模支撑架 Expired - Lifetime CN202380731U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201120563722 CN202380731U (zh) 2011-12-29 2011-12-29 反梁挂模支撑架

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201120563722 CN202380731U (zh) 2011-12-29 2011-12-29 反梁挂模支撑架

Publications (1)

Publication Number Publication Date
CN202380731U true CN202380731U (zh) 2012-08-15

Family

ID=46629244

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201120563722 Expired - Lifetime CN202380731U (zh) 2011-12-29 2011-12-29 反梁挂模支撑架

Country Status (1)

Country Link
CN (1) CN202380731U (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111502266A (zh) * 2020-05-27 2020-08-07 中建四局第六建筑工程有限公司 一种结构反梁定位加固装置及加固方法

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111502266A (zh) * 2020-05-27 2020-08-07 中建四局第六建筑工程有限公司 一种结构反梁定位加固装置及加固方法

Similar Documents

Publication Publication Date Title
CN102561681B (zh) 填充墙构造柱浇筑成型模板及浇筑成型工艺
CN102392536B (zh) 大跨度悬空通廊式模板支撑体系施工方法
CN102121310A (zh) 大截面超高钢骨清水混凝土双柱施工模板及其施工方法
CN104295088A (zh) 一种变形缝两侧剪力墙的钢木组合模板结构及其施工方法
CN201666157U (zh) 仰拱整体式移动模架
CN201891260U (zh) 吊模板
CN208668596U (zh) 一种钢筋混凝土梁板体系与预制柱装配节点
CN104164951B (zh) 楼梯休息平台及其施工方法
CN105780922A (zh) 大跨度型钢混凝土转换桁架分段吊装支模体系施工方法
CN202900288U (zh) 一种隧道小半径段衬砌浇筑的型钢骨架组合结构
CN105421781A (zh) 一种混凝土坎台与结构楼板同步浇筑施工方法与模板体系
CN105544969A (zh) 模壳条铺施工方法、组合式分拆模壳及模壳快拆接头
CN103276894A (zh) 空心楼盖大截面梁式转换层的支撑体系及施工工艺
CN102677624B (zh) U型渡槽仿真试验装置及方法
CN202000265U (zh) 桥梁高墩混凝土施工模板
CN202380731U (zh) 反梁挂模支撑架
CN202672709U (zh) 散拼竹胶板双曲面模板及其支撑体系
CN219080981U (zh) 叠合板后浇带无支撑固定装置
CN202882227U (zh) 一种可预埋锯齿形混凝土马凳
CN203200982U (zh) 一种钢筋桁架扣挂式楼承板
CN202194392U (zh) 一种楼板厚度控制装置
CN104894943A (zh) 路桥排水沟施工混凝土浇注整体模板
CN213710401U (zh) 一种可拆卸钢筋绗架楼承板的底板支架
CN105625708B (zh) 一种建筑用铝木复合模板体系
CN202164555U (zh) 砼箱涵模板支架立柱底支撑

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CSCEC STRAIT CONSTRUCTION AND DEVELOPMENT CO., LTD

Free format text: FORMER NAME: THE THIRD COMPANY OF CHINA SEVENTH ENGINEERING BUREAU CO., LTD.

CP03 Change of name, title or address

Address after: 98-1 No. 350003 Fujian province Fuzhou Mawei District Jiangbin East Avenue

Patentee after: CSCEC Strait Construction and Development Co., Ltd.

Address before: Fuzhou City, Fujian Province, 350000 North Road, No. 148 in the construction of the third construction company seven

Patentee before: The Third Company of China Seventh Engineering Bureau Co., Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20120815