CN202228784U - Comprehensive pipeline trench of large workshop for processing copper and copper alloy plate strips - Google Patents

Comprehensive pipeline trench of large workshop for processing copper and copper alloy plate strips Download PDF

Info

Publication number
CN202228784U
CN202228784U CN2011201998375U CN201120199837U CN202228784U CN 202228784 U CN202228784 U CN 202228784U CN 2011201998375 U CN2011201998375 U CN 2011201998375U CN 201120199837 U CN201120199837 U CN 201120199837U CN 202228784 U CN202228784 U CN 202228784U
Authority
CN
China
Prior art keywords
trench
copper
comprehensive pipeline
pipeline
alloy plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011201998375U
Other languages
Chinese (zh)
Inventor
吴润华
田军涛
袁孚胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Nerin Engineering Co Ltd
Original Assignee
China Nerin Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Nerin Engineering Co Ltd filed Critical China Nerin Engineering Co Ltd
Priority to CN2011201998375U priority Critical patent/CN202228784U/en
Application granted granted Critical
Publication of CN202228784U publication Critical patent/CN202228784U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Rigid Pipes And Flexible Pipes (AREA)

Abstract

The utility model relates to a comprehensive pipeline trench of a large workshop for processing copper and copper alloy plate strips. A various medium pipeline and a main cable in a workshop are arranged in an underground comprehensive pipeline trench in the workshop, wherein a ventilation pipeline is arranged on an uppermost layer, the cable is arranged on a second layer, a various medium pipeline is arranged on a third layer, and distance among the layers are determined according to standards. A personnel and overhaul passage is reserved in the middle of a tunnel by considering factors of overhaul, safety and the like, and safe evacuation passages, a lighting system, a drainage system and the like are further arranged. By means of the comprehensive pipeline trench, the arrangement of the pipelines in the whole workshop is neat and attractive, later-stage expansion of the workshop has little influence on existing production, pipeline overhaul is convenient, and the comprehensive pipeline trench is high in reliability and suitable for various modern factories for processing high-precision copper and the copper alloy plate strips.

Description

The comprehensive pipeline trench of a kind of large-scale copper and copper alloy plate strip job shop
Technical field
The utility model relates to the complicated pipe line arrangement structure of a kind of large-scale copper and copper alloy plate strip job shop, relates in particular to the comprehensive pipeline trench of a kind of large-scale copper and copper alloy plate strip job shop.
Background technique
In large-scale in modern times copper and the copper alloy plate strip manufacturing enterprise, because complex manufacturing needs various processing mediums of lot of consumption and electric energy in its production process, these media and electric energy need be by conveyings such as a large amount of pipelines and cables.Copper and Cuprum alloy product surface quality are had relatively high expectations in addition; And along with the continuous development of science and technology, also increasingly high to requirement of products, surface quality especially; Its manufacturing shop of objective requirement is a clean room; The particularly production of highi degree of accuracy lead frame copper strip, requiring its finishing packing factory building is dustless dust proof workshop, therefore modern large-scale copper and copper alloy plate strip manufacturing shop all have the ventilation system of being made up of the ventilation duct of complicacy.Copper coin band complex manufacturing and belong to the high energy consumption industry; Operations such as casting wherein, quenching, cooling, rolling, annealing and cleaning all need consume a large amount of recirculated cooling waters, protective gas, emulsion, electric energy etc.; Therefore modern large-scale copper and copper alloy plate strip manufacturing shop all have complicated process pipeline and power supply system, make how these pipelines of reasonable Arrangement become a great problem.All have production capacity built by separate periods and technical innovation in this external large-scale copper coin band production plant, the later stage construction all need be laid new pipeline.Traditional copper strip production plant is that cable and process pipe lay or in-duct installation along factory building columns roof beam structure sky basically, and dispersed placement will cause whole machining process workshop pipeline in disorder like this, maintenance difficult, and mill floor destroys serious, and it is beautiful and clean to influence the workshop; The trench that disperses also can produce dust, influences the workshop cleanliness, and then influences Workshop Production.
The model utility content
The purpose of the utility model is to provide a kind of large-scale copper and copper alloy plate strip job shop comprehensive pipeline trench, overcomes that original dispersion pipeline is in disorder, the shortcoming of maintenance difficult, workshop tidiness difference.
The comprehensive pipeline trench of a kind of large-scale copper and copper alloy plate strip job shop comprehensively is arranged in leader cable in the job shop and various medium pipeline in the underground comprehensive pipeline trench, and it is characterized in that: ventilation duct is arranged in the superiors of comprehensive pipeline trench; Cable arrangements is at the second layer, and other medium pipelines are arranged the 3rd layer, middle People's Bank of China and the access path reserved.
The comprehensive pipeline trench of a kind of large-scale copper and copper alloy plate strip job shop is characterized in that: also comprise safety evacuation passage and illuminating system and drainage system.
The comprehensive pipeline trench of a kind of large-scale copper and copper alloy plate strip job shop is characterized in that: end and other correct position at comprehensive pipeline trench are provided with removable cover.
The advantage of the utility model is: significantly reduce pipe trench, cable channel, along factory building columns roof beam structure empty pipeline and cable testing bridge quantity, make the workshop neat and artistic; Reduce trench quantity, make ground failure few, improve the cleanliness in whole workshop; Pipeline layout is arranged, has reduced trench and aerial pipeline quantity, makes apparatus arrangement more nimbly and freely, has reduced the influence to apparatus arrangement of trench and aerial pipeline; For reconstruction, the enlarging of factory building, can avoid the destruction of laying of new pipeline to the ground that constructs the factory buildings, reduced the generation of dust, alleviated construction to existing influence of producing, make the rebuilding and expansion of the of the existing enterprises nimbly and freely; The pipeline centralized arrangement, the access path that is arranged on the tunnel can make things convenient for regularly concentrates the whole pipelines of maintenance, reduces the pipeline maintenance amount, also reduces the generation of pipeline accident simultaneously, thereby promotes the safety in production of full factory; Reduce aerial pipeline, also just alleviate the factory building columns load beam, reduced the cost of factory building.
Description of drawings
Fig. 1 is the comprehensive pipeline trench structural representation of the utility model;
Fig. 2 is the A-A schematic cross-section of Fig. 1;
Fig. 3 is the B-B schematic cross-section of Fig. 1.
Embodiment
Specify the mode of execution of the utility model below in conjunction with accompanying drawing:
The comprehensive pipeline trench of a kind of large-scale copper and copper alloy plate strip job shop, its structure are that leader cable in the workshop and various medium pipeline comprehensively are arranged in the underground comprehensive pipeline trench, and various pipelines are arranged in the prerequisite lower leaf of satisfying design code.Ventilation duct 1 is because diameter is bigger, keeps in repair lessly, and it is arranged in the superiors of comprehensive pipeline trench; Cable 2 quantity are more; For satisfying code requirement it is arranged in the second layer; Other arranges the 3rd layer like medium pipelines such as water pipe, latex vessel, compressed air hose, nitrogen tube, protective gas pipeline 3; Middle People's Bank of China and the access path reserved, the laying and change conveniently of pipeline when considering maintenance with the later stage enlarging in addition is provided with removable cover at end and other correct position of comprehensive pipeline trench; According to standards such as fire protection design of building safety evacuation passage and illuminating system etc. are set; And consider the drainage system that is provided with of fortuitous event; Like pipe leakage etc.; In comprehensive pipeline trench, gutter and plash are set, are discharged to the waste water of collecting in the comprehensive pipeline trench in the waste water pipe through the pump in the plash then, guaranteed in the whole comprehensive pipeline trench dry like this; Because copper coin band workshop energy consumption is higher, power cable is more, and it is many to produce the heat that power cable is sent, and can utilize the arm of the ventilation duct in the comprehensive pipeline trench to realize the ventilation and heat in tunnel.
Above content is the further explain that combines concrete preferred implementation that the utility model is done, and can not assert that the practical implementation of the utility model is confined to these explanations.Those of ordinary skill for technical field under the utility model; Under the prerequisite that does not break away from the utility model design, make some alternative or obvious modification that are equal to; And performance or purposes are identical, then should be regarded as belonging to the protection domain that claims that the utility model submits to are confirmed.

Claims (4)

1. comprehensive pipeline trench of large-scale copper and copper alloy plate strip job shop; Leader cable in the job shop and various medium pipeline comprehensively are arranged in the underground comprehensive pipeline trench; It is characterized in that: ventilation duct is arranged in the superiors of comprehensive pipeline trench; Cable arrangements is at the second layer, and other medium pipelines are arranged the 3rd layer, middle People's Bank of China and the access path reserved.
2. the comprehensive pipeline trench of large-scale copper according to claim 1 and copper alloy plate strip job shop is characterized in that: also comprise safety evacuation passage and illuminating system and drainage system.
3. the comprehensive pipeline trench of large-scale copper according to claim 1 and 2 and copper alloy plate strip job shop is characterized in that: end and other correct position at comprehensive pipeline trench are provided with removable cover.
4. the comprehensive pipeline trench of large-scale copper according to claim 3 and copper alloy plate strip job shop is characterized in that: in comprehensive pipeline trench, gutter and plash are set.
CN2011201998375U 2011-06-15 2011-06-15 Comprehensive pipeline trench of large workshop for processing copper and copper alloy plate strips Expired - Lifetime CN202228784U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011201998375U CN202228784U (en) 2011-06-15 2011-06-15 Comprehensive pipeline trench of large workshop for processing copper and copper alloy plate strips

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011201998375U CN202228784U (en) 2011-06-15 2011-06-15 Comprehensive pipeline trench of large workshop for processing copper and copper alloy plate strips

Publications (1)

Publication Number Publication Date
CN202228784U true CN202228784U (en) 2012-05-23

Family

ID=46079370

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011201998375U Expired - Lifetime CN202228784U (en) 2011-06-15 2011-06-15 Comprehensive pipeline trench of large workshop for processing copper and copper alloy plate strips

Country Status (1)

Country Link
CN (1) CN202228784U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103206097A (en) * 2012-12-21 2013-07-17 广州市设计院 Large complex underground life support pipeline system and supporting structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103206097A (en) * 2012-12-21 2013-07-17 广州市设计院 Large complex underground life support pipeline system and supporting structure
CN103206097B (en) * 2012-12-21 2016-06-15 广州市设计院 A kind of large complicated underground life support pipeline system

Similar Documents

Publication Publication Date Title
CN109614723B (en) Comprehensive construction method based on BIM technology
CN101481958B (en) Main power zone island type arrangement of thermal power generation plant
CN111561068A (en) Assembled wall, building and construction member management system thereof
CN204456189U (en) Subway station top Pipe rack
CN104034181A (en) Indirect cooling tower based on three-tower-in-one and two-machine in one tower and use method of indirect cooling tower
CN202228784U (en) Comprehensive pipeline trench of large workshop for processing copper and copper alloy plate strips
CN204455795U (en) Bridge pipeline crosses the river structure
CN202672811U (en) Beamless multi-storied garage
CN102278528A (en) Arranging method of composite line pipe of copper and copper alloy plate strip job shop
CN206035076U (en) Transformer substation's NOT AND occupies joint structure of building
CN203454182U (en) Central gas supply system of boiler
CN204571220U (en) The integrated assembling constructing structure of high residential building piping shaft subfeeder
CN201994584U (en) Underground transformer substation equipment layout structure
CN207846474U (en) A kind of conversion well for drawing comb evacuation rain sewage pipe for pipe gallery
CN110439214B (en) Optimized installation construction method for underground antistatic floor lower channel
CN204436467U (en) Cross-river tunnel line construction
CN107142958B (en) Double shield pattern synthesis piping lane node wells
CN206467688U (en) Include the pipe gallery of sewage pipe and rain pipe
CN206325940U (en) A kind of soil remediation ventilating system
CN206143844U (en) Can overhaul incessant confession drainage system
Liu Green planning and simulation study on outdoor wind environment of central business district
Mussorina et al. Energy-efficiency of industrial area as a part of renovation project
CN206091446U (en) Efficiency of park is improved garage
CN204752642U (en) Gasifier water -cooling wall
CN204455990U (en) Flood-control wall structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20120523