CN201994584U - Underground transformer substation equipment layout structure - Google Patents

Underground transformer substation equipment layout structure Download PDF

Info

Publication number
CN201994584U
CN201994584U CN201020668966XU CN201020668966U CN201994584U CN 201994584 U CN201994584 U CN 201994584U CN 201020668966X U CN201020668966X U CN 201020668966XU CN 201020668966 U CN201020668966 U CN 201020668966U CN 201994584 U CN201994584 U CN 201994584U
Authority
CN
China
Prior art keywords
underground
transformer substation
equipment
transformer
layers
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201020668966XU
Other languages
Chinese (zh)
Inventor
王怡风
倪镭
许建华
乐党救
张景峰
王洁
刘爱勤
陈宝运
苏青松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Jiulong Electric Power Science & Technology Co ltd
State Grid Shanghai Electric Power Design Co ltd
State Grid Shanghai Electric Power Co Ltd
Original Assignee
Shanghai Jiulong Electric Power Technology Co Ltd
Shanghai Municipal Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Jiulong Electric Power Technology Co Ltd, Shanghai Municipal Electric Power Co filed Critical Shanghai Jiulong Electric Power Technology Co Ltd
Priority to CN201020668966XU priority Critical patent/CN201994584U/en
Application granted granted Critical
Publication of CN201994584U publication Critical patent/CN201994584U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Housings And Mounting Of Transformers (AREA)

Abstract

The utility model relates to an underground transformer substation equipment layout structure. A transformer substation adopts the full underground design, only an air outlet opening, a personnel inlet and outlet opening and a main control chamber are reserved on the ground, the body is in a shape of a round structure, and the underground body structure is in four layers. Compared with the prior art, the underground transformer substation equipment layout structure has the advantages that the layout of the transformer substation is reasonable, on the premise of ensuring the functions, the ground occupation area is reduced, the work environment is optimized, the safe operation of the equipment is ensured, the underground transformer substation equipment layout structure is harmonious with the peripheral environment, and a good demonstrative effect is realized on the layout design of the underground transformer substation in future.

Description

Underground substation device layout structure
Technical field
The utility model relates to the device layout structure, especially relates to underground substation device layout structure.
Background technology
At present, because down town land used anxiety, implement relatively difficulty of transformer station site, sometimes can be in suitable site in conjunction with the stage variable pressure construction, such as 500kV and 220kV, 220kV and 110kV transformer station in conjunction with construction.Such construction mode can improve the support situation that the superelevation power grid construction can't really obtain engineering location units concerned.The optimization of emphasis consideration electric network composition when building superhigh pressure transformer station in the past, but can not take into account the on-site terminal workload demand of solution because the outlet electric pressure is too high, after adopting multistage step-down mode, can increase the outlet of the low-voltage that can solve the needs of electricity consumption on the spot, need take local need for electricity into account like this when building the superhigh pressure engineering, be a technical problem to be solved for the layout of the so large-scale underground substation of 500kV Expo transformer station.
The utility model content
The purpose of this utility model is exactly to provide underground substation device layout structure for the defective that overcomes above-mentioned prior art existence.
The purpose of this utility model can be achieved through the following technical solutions:
Underground substation device layout structure, it is characterized in that, transformer station is by complete underground design, ground only keeps inlet and outlet, personnel gateway and main control device, the rounded structure of body shape, four layers of underground agent structures, B1 is mainly arranged and is provided with 220kVGIS, 110kVGIS, 35kVGIS, relay, station power consumption equipment outside standing, indoor type cooling tower and part hydraulic facility, the B1 interlayer is furnished with the fire-fighting steel cylinder, fire pump and part producing auxiliary equipment, underground two layers of main electric function room are provided with the cable tunnel interface, the forced draft fan equipment of cable floor and cooling tower, the import department of 500kV cable tunnel is provided with special-purpose cable interface transition well, F3/B3 is provided with the 500kV main transformer, 500kVGIS, the 220kV main transformer, the 220kV reactor, the 66kV power distribution equipment of 500kV main transformer, the 35kV reactor of 220kV transformer station part, 35kV ground connection becomes, stand power consumption equipment and circulating water pump, the F3/B3 interlayer is provided with relay and heating and ventilating equipment, and underground four layers are provided with cable floor, the air intake machine, water conservancy project auxiliary pump and pond, transformer and reactor basis and oil sump.
Compared with prior art, the utility model makes the rationally distributed of transformer station, under the prerequisite of assurance function, reduced floor space, optimized operational environment, guaranteed the operation of device security, and with the environment coordination of periphery, the layout of underground substation is from now on had good exemplary role.
Description of drawings
Fig. 1 is the utility model structural representation.
Embodiment
Below in conjunction with the drawings and specific embodiments the utility model is elaborated.
Underground substation device layout structure, it is characterized in that, transformer station is by complete underground design, ground only keeps inlet and outlet, personnel gateway and main control device, the rounded structure of body shape, four layers of underground agent structures, B1 is mainly arranged and is provided with 220kVGIS, 110kVGIS, 35kVGIS, relay, station power consumption equipment outside standing, indoor type cooling tower and part hydraulic facility, the B1 interlayer is furnished with the fire-fighting steel cylinder, fire pump and part producing auxiliary equipment, underground two layers of main electric function room are provided with the cable tunnel interface, the forced draft fan equipment of cable floor and cooling tower, the import department of 500kV cable tunnel is provided with special-purpose cable interface transition well, F3/B3 is provided with the 500kV main transformer, 500kVGIS, the 220kV main transformer, the 220kV reactor, the 66kV power distribution equipment of 500kV main transformer, the 35kV reactor of 220kV transformer station part, 35kV ground connection becomes, stand power consumption equipment and circulating water pump, the F3/B3 interlayer is provided with relay and heating and ventilating equipment, and underground four layers are provided with cable floor, the air intake machine, water conservancy project auxiliary pump and pond, transformer and reactor basis and oil sump.

Claims (1)

1. underground substation device layout structure, it is characterized in that, transformer station is by complete underground design, ground only keeps inlet and outlet, personnel gateway and main control device, the rounded structure of body shape, four layers of underground agent structures, B1 is mainly arranged and is provided with 220kVGIS, 110kVGIS, 35kVGIS, relay, station power consumption equipment outside standing, indoor type cooling tower and part hydraulic facility, the B1 interlayer is furnished with the fire-fighting steel cylinder, fire pump and part producing auxiliary equipment, underground two layers of main electric function room are provided with the cable tunnel interface, the forced draft fan equipment of cable floor and cooling tower, the import department of 500kV cable tunnel is provided with special-purpose cable interface transition well, F3/B3 is provided with the 500kV main transformer, 500kVGIS, the 220kV main transformer, the 220kV reactor, the 66kV power distribution equipment of 500kV main transformer, the 35kV reactor of 220kV transformer station part, 35kV ground connection becomes, stand power consumption equipment and circulating water pump, the F3/B3 interlayer is provided with relay and heating and ventilating equipment, and underground four layers are provided with cable floor, the air intake machine, water conservancy project auxiliary pump and pond, transformer and reactor basis and oil sump.
CN201020668966XU 2010-12-20 2010-12-20 Underground transformer substation equipment layout structure Expired - Fee Related CN201994584U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201020668966XU CN201994584U (en) 2010-12-20 2010-12-20 Underground transformer substation equipment layout structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201020668966XU CN201994584U (en) 2010-12-20 2010-12-20 Underground transformer substation equipment layout structure

Publications (1)

Publication Number Publication Date
CN201994584U true CN201994584U (en) 2011-09-28

Family

ID=44671062

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201020668966XU Expired - Fee Related CN201994584U (en) 2010-12-20 2010-12-20 Underground transformer substation equipment layout structure

Country Status (1)

Country Link
CN (1) CN201994584U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103633573A (en) * 2012-08-27 2014-03-12 国家电网公司 Substation
CN104167680A (en) * 2014-07-30 2014-11-26 国家电网公司 Underground arrangement system and method for cable trough embedding type substation secondary equipment
CN104538873A (en) * 2014-07-30 2015-04-22 国家电网公司 Pipeline-type transformer substation secondary equipment underground arrangement system and method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103633573A (en) * 2012-08-27 2014-03-12 国家电网公司 Substation
CN103633573B (en) * 2012-08-27 2016-02-24 国家电网公司 Transformer station
CN104167680A (en) * 2014-07-30 2014-11-26 国家电网公司 Underground arrangement system and method for cable trough embedding type substation secondary equipment
CN104538873A (en) * 2014-07-30 2015-04-22 国家电网公司 Pipeline-type transformer substation secondary equipment underground arrangement system and method
CN104167680B (en) * 2014-07-30 2016-09-07 国家电网公司 A kind of cable trench embedded transformer station secondary device underground system and method

Similar Documents

Publication Publication Date Title
CN201994584U (en) Underground transformer substation equipment layout structure
CN205245877U (en) Cooling tower composite control system
CN113638634B (en) Novel arrangement structure of nuclear island refrigeration station factory building and novel nuclear island plant area
CN203373815U (en) System utilizing solar water heating system for preventing freezing and preserving heat for fire water tank compartment
CN203404877U (en) Modular unit of integral type cold and heat source tower heat pump air-conditioning system
CN206094369U (en) Communication base station heat abstractor
CN210032787U (en) Main power house layout structure of gas and steam combined cycle generator set
CN204497643U (en) A kind of box-type substation
CN104567005A (en) Building photovoltaic integrated system equipment
CN204494843U (en) A kind of building integrated photovoltaic system equipment
CN203478402U (en) Direct-connection water-mixing heat supply system for high-rise and low-rise buildings
CN204156379U (en) A kind of Combined intelligent box-type transformer substation
CN2793618Y (en) Automatic hot-water supplying system with solar-air source
CN203130377U (en) Temperature difference ventilation power generation system for bottom layer of high-rise building
CN207815478U (en) A kind of solar energy optical-thermal heat and power supply system
CN207039042U (en) A kind of intelligent photovoltaic preassembled transformer station air channel suitable for severe cold area
CN103375860B (en) Cold supply system in the concentration chamber of residential quarters
CN111076264A (en) Container type phase-change high-voltage energy storage small-sized heat supply unit
CN201195017Y (en) Water fire extinguishing system of transforming plant with integrated structure
CN205231731U (en) Green building electric energy electric system
CN212884440U (en) Full-automatic production line for anti-seismic support
CN204465094U (en) A kind of new forms of energy canopy body
CN102570333A (en) Arrangement method for underground substations
CN207907323U (en) The setting structure of thermal substation small pump more than dual system
CN202885089U (en) Intelligent electromagnetic photoelectric hot-water floor heating system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: SHANGHAI JIULONG ELECTRIC SCIENCE + TECHNOLOGY CO.

Free format text: FORMER OWNER: SHANGHAI JIULONG ELECTRIC SCIENCE + TECHNOLOGY CO., LTD.

Effective date: 20140717

C41 Transfer of patent application or patent right or utility model
C56 Change in the name or address of the patentee

Owner name: STATE GRID SHANGHAI ELECTRIC POWER COMPANY

Free format text: FORMER NAME: SHANGHAI ELECTRIC POWER CORP.

CP01 Change in the name or title of a patent holder

Address after: 200122 Shanghai City, Pudong New Area source deep road, No. 1122

Patentee after: STATE GRID SHANGHAI MUNICIPAL ELECTRIC POWER Co.

Patentee after: Shanghai Jiulong Electric Power Science & Technology Co.,Ltd.

Address before: 200122 Shanghai City, Pudong New Area source deep road, No. 1122

Patentee before: SHANGHAI MUNICIPAL ELECTRIC POWER Co.

Patentee before: Shanghai Jiulong Electric Power Science & Technology Co.,Ltd.

TR01 Transfer of patent right

Effective date of registration: 20140717

Address after: 200122 Shanghai City, Pudong New Area source deep road, No. 1122

Patentee after: STATE GRID SHANGHAI MUNICIPAL ELECTRIC POWER Co.

Patentee after: Shanghai Jiulong Electric Power Science & Technology Co.,Ltd.

Patentee after: STATE GRID SHANGHAI ELECTRIC POWER DESIGN Co.,Ltd.

Address before: 200122 Shanghai City, Pudong New Area source deep road, No. 1122

Patentee before: STATE GRID SHANGHAI MUNICIPAL ELECTRIC POWER Co.

Patentee before: Shanghai Jiulong Electric Power Science & Technology Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110928

Termination date: 20191220

CF01 Termination of patent right due to non-payment of annual fee