CN204456189U - Subway station top Pipe rack - Google Patents

Subway station top Pipe rack Download PDF

Info

Publication number
CN204456189U
CN204456189U CN201520098903.8U CN201520098903U CN204456189U CN 204456189 U CN204456189 U CN 204456189U CN 201520098903 U CN201520098903 U CN 201520098903U CN 204456189 U CN204456189 U CN 204456189U
Authority
CN
China
Prior art keywords
subway
top board
concourse
accommodation space
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520098903.8U
Other languages
Chinese (zh)
Inventor
黄浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai camp city planning Tsukito design Inc
Original Assignee
Shanghai Ying Yi City Planning Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Ying Yi City Planning Design Co Ltd filed Critical Shanghai Ying Yi City Planning Design Co Ltd
Priority to CN201520098903.8U priority Critical patent/CN204456189U/en
Application granted granted Critical
Publication of CN204456189U publication Critical patent/CN204456189U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a kind of subway station top Pipe rack, comprises subway subway concourse top board, two vertical wallboards, and two vertical wallboard intervals arrange and are fixedly connected on described subway subway concourse cover top surface; Horizontal top board, horizontal top board parallel subway subway concourse top board is arranged, and with two described vertical wallboard fixed-link, horizontal top board, two described vertical wallboards are wrapped in the tunnel accommodation space formed above subway subway concourse top board for pipeline installation.Solve subway station earthing less, the problem of municipal pipeline cannot be laid, also achieve the unification on the planning of urban operating mechanism and municipal pipeline, design, Construction and management, more attractive in appearance in appearance, maintenance and repairing problem are more prone to convenient.

Description

Subway station top Pipe rack
Technical field
The utility model belongs to Construction Technique of Underground Works field, particularly relates to a kind of subway station top Pipe rack.
Background technology
Usual subway station earthing is less, cannot lay municipal pipeline, and therefore subway station pipeline is set directly at above the subway concourse top board of subway station mostly, without any pipeline protection measure, has a strong impact on the application life of pipeline, and very easily occurs security incident.In addition, on the planning of urban operating mechanism and municipal pipeline, design, Construction and management, easily there is the problems such as follow-up repairing is difficult, difficult in maintenance in construction disunity.Along with the development in city, in the face of accident, having to start to set up defences in city, is badly in need of a kind of pipeline safeguard structure can protecting subway subway concourse top board.
Utility model content
For overcoming the defect existing for prior art, the purpose of this utility model is to provide a kind of subway station top Pipe rack, using the base plate of subway subway concourse top board as pipeline protection, two vertical wallboards and a horizontal top board are provided, to be wrapped in the tunnel accommodation space being formed above subway subway concourse top board and install for pipeline, designed and layout by rational line construction, thus it is less to solve subway station earthing, the problem of municipal pipeline cannot be laid, also achieve the planning of urban operating mechanism and municipal pipeline, design, unification on Construction and management, maintenance and repairing problem are more prone to convenient.
A kind of subway station top Pipe rack, comprises subway subway concourse top board, also comprises: two vertical wallboards, and two described vertical wallboard intervals arrange and are fixedly connected with described subway subway concourse cover top surface; Horizontal top board, the parallel described subway subway concourse top board of described horizontal top board is arranged, and with two described vertical wallboard fixed-link, described horizontal top board, two described vertical wallboards are wrapped in the tunnel accommodation space formed above described subway subway concourse top board for pipeline installation jointly.
Preferably, the described subway subway concourse top board of accommodation space inside, described tunnel is also provided with drainage channel.
Preferably, the described vertical wallboard of accommodation space inside, described tunnel is also provided with vent passages.
Preferably, the pipeline of the accommodated inside of described tunnel accommodation space comprises: the power pipeline group be located at the water pipe group on described horizonal base plate and be located on described vertical wallboard.
Preferably, described water pipe group comprises multiple water pipe, and multiple described water pipe is divided into described subway subway concourse top board both sides along described tunnel accommodation space through direction, and the middle part for the described subway subway concourse top board in described tunnel accommodation space is formed with maintenance channel.
Preferably, described power pipeline group comprises interval and arranges the multiple power pipelines be located on each described vertical wallboard.
Subway station top provided by the utility model Pipe rack; by using the base plate of subway subway concourse top board as pipeline protection structure; and coordinate horizontal top board, two vertical wallboards are enclosed to form a tunnel-shaped accommodation space jointly; designed and layout by rational line construction; thus it is less to solve subway station earthing; the problem of municipal pipeline cannot be laid; also achieve the unification on the planning of urban operating mechanism and municipal pipeline, design, Construction and management; more attractive in appearance in appearance, maintenance and repairing problem are more prone to convenient.
Accompanying drawing explanation
Fig. 1 is the structural representation of the utility model subway station top Pipe rack.
Detailed description of the invention
For the benefit of to the understanding of structure of the present utility model, be described below in conjunction with drawings and Examples.
Fig. 1 is the structural representation of the utility model subway station top Pipe rack, shown in composition graphs 1, the utility model provides a kind of subway station top Pipe rack, comprise: subway subway concourse top board 10, two vertical wallboards 20, horizontal top boards 30, and by the tunnel accommodation space 40 for accommodating pipeline that two vertical wallboards 20, horizontal top board 30 jointly parcel subway subway concourse top board 10 are formed.
The upper surface of subway subway concourse top board 10 is used for jointly forming enclosed construction with horizontal top board 30 and two vertical wallboards 20, and this upper surface leaves the walking passageway that maintenance personal passes through.In the present embodiment, described subway subway concourse top board 10 is also provided with drainage channel, this drainage channel is arranged in the subway subway concourse top board 10 of tunnel accommodation space 40 and the angle of cut place of any vertical wallboard 20, so that the discharge of ponding.
Parallel and the interval of two vertical wallboards 20 is arranged, all vertical and be fixedly connected on the upper surface of subway subway concourse top board 10.Further, the described vertical wallboard 20 of accommodation space 40 inside, described tunnel is also provided with vent passages, circulates for tunnel accommodation space 40 inner air.
Horizontal top board 30, the parallel described subway subway concourse top board 10 of described horizontal top board 30 is arranged, and with two described vertical wallboard 20 fixed-link.In the present embodiment, the vertical wallboard 20 of 30, two, horizontal top board is enclosed to form a cube enclosed construction with subway subway concourse top board 10.
Tunnel accommodation space 40 is wrapped up by subway subway concourse top board 10, two vertical wallboards 20, horizontal top boards 30, forms the common trench installed for pipeline.Further, the pipeline of the accommodated inside of described tunnel accommodation space 40 comprises: the power pipeline group 52 be located at the water pipe group 51 on described subway subway concourse top board 10 and be located on described vertical wallboard.
Further, described water pipe group 51 comprises multiple water pipe, multiple described water pipe is divided into the both sides of described subway subway concourse top board 10 along described common trench direction, maintenance channel is vacateed at middle part for described horizonal base plate, and described power pipeline group 52 comprises interval and arranges the multiple power pipelines be located on each described vertical wallboard.
Now the embody rule of a kind of subway station top Pipe rack that the utility model provides is described in detail.
This subway station top Pipe rack by the upper surface of subway subway concourse top board 10 as the bottom metope of subway station top Pipe rack, and need the quantity of installing to determine two vertical wallboard 30 spacing distances according to pipeline, to determine the size of tunnel accommodation space 40, thus guarantee to hold various municipal public use pipeline, and make subway subway concourse top board 10 leave enough spaces for maintainer's walking, finally the supporting facility such as draining ventilation are installed.Further, subway subway concourse top board 10 is as the base plate of tunnel accommodation space 40, combine together with subway subway concourse, attractive in appearance and make full use of the underground space, thus it is less and cannot lay the problem of municipal public use pipeline to solve bridge construction inner space, has unified the planning of urban operating mechanism and municipal pipeline, design, Construction and management simultaneously.
Subway station top provided by the utility model Pipe rack; by using the base plate of subway subway concourse top board as pipeline protection structure; and coordinate horizontal top board, two vertical wallboards are enclosed to form a tunnel-shaped accommodation space jointly; designed and layout by rational line construction; thus it is less to solve subway station earthing; the problem of municipal pipeline cannot be laid; also achieve the unification on the planning of urban operating mechanism and municipal pipeline, design, Construction and management; more attractive in appearance in appearance, maintenance and repairing problem are more prone to convenient.
Below embodiment has been described in detail the utility model by reference to the accompanying drawings, and those skilled in the art can make many variations example to the utility model according to the above description.Thus, some details in embodiment should not formed restriction of the present utility model, the utility model by the scope that defines using appended claims as protection domain.

Claims (6)

1. a subway station top Pipe rack, comprises subway subway concourse top board, it is characterized in that, also comprise:
Two vertical wallboards, two described vertical wallboard intervals arrange and are fixedly connected with described subway subway concourse cover top surface;
Horizontal top board, the parallel described subway subway concourse top board of described horizontal top board is arranged, and with two described vertical wallboard fixed-link, described horizontal top board, two described vertical wallboards are wrapped in the tunnel accommodation space formed above described subway subway concourse top board for pipeline installation jointly.
2. subway station top according to claim 1 Pipe rack, is characterized in that, the described subway subway concourse top board of accommodation space inside, described tunnel is also provided with drainage channel.
3. subway station top according to claim 1 Pipe rack, is characterized in that, the described vertical wallboard of accommodation space inside, described tunnel is also provided with vent passages.
4. subway station top according to claim 1 Pipe rack, is characterized in that, the pipeline of the accommodated inside of described tunnel accommodation space comprises: the power pipeline group be located at the water pipe group on described horizonal base plate and be located on described vertical wallboard.
5. subway station top according to claim 4 Pipe rack, it is characterized in that, described water pipe group comprises multiple water pipe, multiple described water pipe is divided into described subway subway concourse top board both sides along described tunnel accommodation space through direction, and the middle part for the described subway subway concourse top board in described tunnel accommodation space is formed with maintenance channel.
6. subway station top according to claim 4 Pipe rack, is characterized in that, described power pipeline group comprises interval and arranges the multiple power pipelines be located on each described vertical wallboard.
CN201520098903.8U 2015-02-11 2015-02-11 Subway station top Pipe rack Active CN204456189U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520098903.8U CN204456189U (en) 2015-02-11 2015-02-11 Subway station top Pipe rack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520098903.8U CN204456189U (en) 2015-02-11 2015-02-11 Subway station top Pipe rack

Publications (1)

Publication Number Publication Date
CN204456189U true CN204456189U (en) 2015-07-08

Family

ID=53663098

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520098903.8U Active CN204456189U (en) 2015-02-11 2015-02-11 Subway station top Pipe rack

Country Status (1)

Country Link
CN (1) CN204456189U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106087701A (en) * 2016-08-10 2016-11-09 上海市城市建设设计研究总院 Elevated bridge and underground pipe gallery build structure jointly
CN106592625A (en) * 2016-12-12 2017-04-26 珠海市规划设计研究院 Urban road comprehensive pipe gallery wire-outgoing connection structure
CN109853614A (en) * 2017-11-30 2019-06-07 上海浦东建筑设计研究院有限公司 A kind of multifunctional integrated device that pipe gallery is built jointly with resistant Capacity of Shallow-buried Subway Station
CN110080284A (en) * 2019-04-18 2019-08-02 广州地铁设计研究院股份有限公司 A kind of Metro Station Structure and build engineering method
CN110607806A (en) * 2019-09-26 2019-12-24 广州地铁设计研究院股份有限公司 Structure, construction structure and construction method for municipal ditch crossing underground station

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106087701A (en) * 2016-08-10 2016-11-09 上海市城市建设设计研究总院 Elevated bridge and underground pipe gallery build structure jointly
CN106087701B (en) * 2016-08-10 2017-09-12 上海市城市建设设计研究总院(集团)有限公司 Elevated bridge and underground pipe gallery build structure jointly
CN106592625A (en) * 2016-12-12 2017-04-26 珠海市规划设计研究院 Urban road comprehensive pipe gallery wire-outgoing connection structure
CN109853614A (en) * 2017-11-30 2019-06-07 上海浦东建筑设计研究院有限公司 A kind of multifunctional integrated device that pipe gallery is built jointly with resistant Capacity of Shallow-buried Subway Station
CN110080284A (en) * 2019-04-18 2019-08-02 广州地铁设计研究院股份有限公司 A kind of Metro Station Structure and build engineering method
CN110607806A (en) * 2019-09-26 2019-12-24 广州地铁设计研究院股份有限公司 Structure, construction structure and construction method for municipal ditch crossing underground station

Similar Documents

Publication Publication Date Title
CN204456189U (en) Subway station top Pipe rack
CN205576972U (en) Three storehouse formula utility tunnel structures
CN105673021A (en) Comprehensive pipe rack of shield tunnel and construction method of comprehensive pipe rack
CN204455795U (en) Bridge pipeline crosses the river structure
CN204608830U (en) Novel underground pipe gallery
CN204436467U (en) Cross-river tunnel line construction
CN102570321B (en) Anti-waterlogging distribution box and buried transformer station with same
CN204455990U (en) Flood-control wall structure
CN203855944U (en) Outgoing line hole structure for underground powerhouse
CN204567664U (en) The semi-underground station of platform open type
CN204571220U (en) The integrated assembling constructing structure of high residential building piping shaft subfeeder
CN107294044A (en) Plow-in cable ditch with protection structure
CN201953104U (en) Main station area of power station
CN206844150U (en) A kind of shallow embedding formula pipe gallery
CN203312742U (en) Dismountable fire wall used for cable channel
CN203011973U (en) Single-phase electric meter box with capability of convenient installation
CN204391512U (en) A kind of control cables arrangement of intelligent substation 10kV Machine Room
CN203834522U (en) Waterproof structure for concrete box culvert deformation joint
CN203239354U (en) Arranging structure utilizing large-tunnel construction space comprehensively
CN208830354U (en) A kind of underground pipe gallery for municipal integration engineering
CN206016820U (en) A kind of municipal tunnel
CN204212182U (en) The waterproof treatment structure of exterior wall worn by a kind of cable trench
CN206673539U (en) A kind of cable laying piping lane
CN204179617U (en) A kind of flush system communication pipe
CN104234197A (en) Container portable house

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: Jiading District new area, 201800 Ring Road Shanghai City No. 2222 room 1205 -3

Patentee after: Shanghai camp city planning Tsukito design Inc

Address before: 201800 Shanghai City, Jiading, Qinghe Road, No. 390, room 6, building 416

Patentee before: Shanghai Ying Yi city planning design Co., Ltd