CN204455795U - Bridge pipeline crosses the river structure - Google Patents
Bridge pipeline crosses the river structure Download PDFInfo
- Publication number
- CN204455795U CN204455795U CN201520100197.6U CN201520100197U CN204455795U CN 204455795 U CN204455795 U CN 204455795U CN 201520100197 U CN201520100197 U CN 201520100197U CN 204455795 U CN204455795 U CN 204455795U
- Authority
- CN
- China
- Prior art keywords
- base plate
- bridge
- pipeline
- horizonal base
- crosses
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model provides a kind of bridge pipeline and to cross the river structure, comprises bridge base plate, two vertical wallboards, and two described vertical wallboard intervals arrange and are fixedly connected on described bridge base plate soffit; Horizonal base plate, the parallel described bridge base plate of described horizonal base plate is arranged, and is fixedly connected with two described vertical wallboards, and described horizonal base plate, two described vertical wallboards are wrapped in the tunnel accommodation space being formed below described bridge base plate and install for pipeline.Solve bridge construction inner space less and the problem of municipal public use pipeline cannot be laid, also achieve the unification on the planning of urban operating mechanism and municipal pipeline, design, Construction and management, more attractive in appearance in appearance, maintenance and repairing problem are more prone to convenient.
Description
Technical field
The utility model belongs to field of engineering technology, particularly relates to a kind of bridge pipeline and to cross the river structure.
Background technology
Usual bridge construction inner space is less; bridge pipeline cannot be laid in bridge construction inside; therefore large multiple span bridge pipeline is set directly at below bridge base plate; without any pipeline protection measure; pipeline is exposed to outdoor for a long time; have a strong impact on the application life of pipeline, and when the tidewater that happens suddenly overflows, very easily occur security incident.In addition, on the planning of urban operating mechanism and municipal pipeline, design, Construction and management, easily there is the problems such as follow-up repairing is difficult, difficult in maintenance in construction disunity.Along with the development in city, in the face of the invasion of burst tidewater, have to start to set up defences in city, with the attack of the climax and typhoon of tackling annual flood season.
Utility model content
For overcoming the defect existing for prior art, the purpose of this utility model is to provide a kind of bridge pipeline to cross the river structure, using the top board of bridge base plate as pipeline protection, two vertical wallboards and a horizonal base plate are provided, to be wrapped in the tunnel accommodation space being formed below described bridge base plate and install for pipeline, designed and layout by rational line construction, thus it is less and cannot lay the problem of municipal public use pipeline to solve bridge construction inner space, also achieve the planning of urban operating mechanism and municipal pipeline, design, unification on Construction and management, maintenance and repairing problem are more prone to convenient.
A kind of bridge pipeline crosses the river structure, and comprise bridge base plate, also comprise: two vertical wallboards, two described vertical wallboard intervals arrange and are fixedly connected on the soffit of described bridge base plate; Horizonal base plate, the parallel described bridge base plate of described horizonal base plate is arranged, and is fixedly connected with two described vertical wallboards, and described horizonal base plate, two described vertical wallboards are wrapped in below described bridge base plate to form the tunnel accommodation space installed for pipeline.
Preferably, the described horizonal base plate of accommodation space inside, described tunnel is also provided with drainage channel.
Preferably, the described vertical wallboard of accommodation space inside, described tunnel is also provided with vent passages.
Preferably, the pipeline of the accommodated inside of described tunnel accommodation space comprises: the power pipeline group be located at the water pipe group on described horizonal base plate and be located on described vertical wallboard.
Preferably, described water pipe group comprises multiple water pipe, and multiple described water pipe wears direction along described tunnel accommodation space and is divided into described horizonal base plate both sides, and the middle part for described horizonal base plate is formed with maintenance channel.
Preferably, described power pipeline group comprises interval and arranges the multiple power pipelines be located on each described vertical wallboard.
Bridge pipeline provided by the utility model crosses the river structure; by using the top board of bridge base plate as pipeline protection structure; and hydrous water base slab, two vertical wallboards are enclosed to form a tunnel-shaped accommodation space jointly; designed and layout by rational line construction; thus it is less and cannot lay the problem of municipal public use pipeline to solve bridge construction inner space; also achieve the unification on the planning of urban operating mechanism and municipal pipeline, design, Construction and management; more attractive in appearance in appearance, maintenance and repairing problem are more prone to convenient.
Accompanying drawing explanation
Fig. 1 is that the utility model bridge pipeline crosses the river the structural representation of structure.
Detailed description of the invention
For the benefit of to the understanding of structure of the present utility model, be described below in conjunction with drawings and Examples.
Shown in composition graphs 1, the utility model provides a kind of bridge pipeline and to cross the river structure, comprise: bridge base plate 10, two vertical wallboards 20, horizonal base plates 30, and the tunnel accommodation space 40 for accommodating pipeline be wrapped to form by bridge base plate 10, two vertical wallboards 20, horizonal base plates 30.
The joint face that the soffit of bridge base plate 10 crosses the river in structure as bridge pipeline, closes pipeline contained structure for jointly forming one with two vertical wallboards 20 and horizonal base plate 30.
Parallel and the interval of two vertical wallboards 20 is arranged, and is all vertically fixedly connected on the soffit of bridge base plate 10.Further, the described vertical wallboard 20 of accommodation space 40 inside, described tunnel is also provided with vent passages, circulates for tunnel accommodation space 40 inner air.
Horizonal base plate 30, the parallel described bridge base plate 10 of described horizonal base plate 30 is arranged, and is fixedly connected with two described vertical wallboards 20, and two vertical wallboards 20, horizonal base plate 30 and bridge base plate 10 are enclosed to form with the cube structure closed.Further, this horizonal base plate 30 also can be used for maintenance personal pass through.In the present embodiment, described horizonal base plate 30 is also provided with drainage channel, this drainage channel is positioned at the angle of cut place of horizonal base plate 30 and arbitrary vertical wallboard 20, so that the discharge of ponding.
Tunnel accommodation space 40 is wrapped up by bridge base plate 10, two vertical wallboards 20, horizonal base plate 30 phase, forms the common trench installed for pipeline.Further, the pipeline of the accommodated inside of described tunnel accommodation space 40 comprises: the power pipeline group 52 be located at the water pipe group 51 on described horizonal base plate and be located on described vertical wallboard.
Further, described water pipe group 51 comprises multiple water pipe, and multiple described water pipe is divided into the both sides of described horizonal base plate 30 along described common trench direction, and maintenance channel is vacateed at the middle part for described horizonal base plate.Described power pipeline group 52 comprises interval and arranges the multiple power pipelines be located on each described vertical wallboard.
The cross the river embody rule of structure of a kind of bridge pipeline now provided the utility model is described in detail.
This bridge pipeline soffit of structure by bridge base plate 10 that cross the river crosses the river as bridge pipeline the top metope of structure, and need the quantity of installing to determine two vertical wallboard 20 spacing distances according to pipeline, to determine the size of tunnel accommodation space 40, guarantee to hold various municipal public use pipeline, and make horizonal base plate 30 leave enough spaces for maintainer's walking, finally the supporting facility such as draining ventilation are installed.Further, bridge base plate 10 is as the top board of tunnel accommodation space 40, combine together with bridge, attractive in appearance and make full use of the underground space, thus it is less and cannot lay the problem of municipal public use pipeline to solve bridge construction inner space, has unified the planning of urban operating mechanism and municipal pipeline, design, Construction and management simultaneously.
Bridge pipeline provided by the utility model crosses the river structure; by using the top board of bridge base plate as pipeline protection structure; and hydrous water base slab, two vertical wallboards are enclosed to form a tunnel-shaped accommodation space jointly; designed and layout by rational line construction; thus it is less and cannot lay the problem of municipal public use pipeline to solve bridge construction inner space; also achieve the unification on the planning of urban operating mechanism and municipal pipeline, design, Construction and management; more attractive in appearance in appearance, maintenance and repairing problem are more prone to convenient.
Below embodiment has been described in detail the utility model by reference to the accompanying drawings, and those skilled in the art can make many variations example to the utility model according to the above description.Thus, some details in embodiment should not formed restriction of the present utility model, the utility model by the scope that defines using appended claims as protection domain.
Claims (6)
1. bridge pipeline crosses the river a structure, comprises bridge base plate, it is characterized in that, also comprise:
Two vertical wallboards, two described vertical wallboard intervals arrange and are fixedly connected on the soffit of described bridge base plate;
Horizonal base plate, the parallel described bridge base plate of described horizonal base plate is arranged, and is fixedly connected with two described vertical wallboards, and described horizonal base plate, two described vertical wallboards are wrapped in below described bridge base plate to form the tunnel accommodation space installed for pipeline.
2. bridge pipeline according to claim 1 crosses the river structure, it is characterized in that, the described horizonal base plate of accommodation space inside, described tunnel is also provided with drainage channel.
3. bridge pipeline according to claim 1 crosses the river structure, it is characterized in that, the described vertical wallboard of accommodation space inside, described tunnel is also provided with vent passages.
4. bridge pipeline according to claim 1 crosses the river structure, and it is characterized in that, the pipeline of the accommodated inside of described tunnel accommodation space comprises: the power pipeline group be located at the water pipe group on described horizonal base plate and be located on described vertical wallboard.
5. bridge pipeline according to claim 4 crosses the river structure, it is characterized in that, described water pipe group comprises multiple water pipe, and multiple described water pipe wears direction along described tunnel accommodation space and is divided into described horizonal base plate both sides, and the middle part for described horizonal base plate is formed with maintenance channel.
6. bridge pipeline according to claim 4 crosses the river structure, and it is characterized in that, described power pipeline group comprises interval and arranges the multiple power pipelines be located on each described vertical wallboard.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520100197.6U CN204455795U (en) | 2015-02-11 | 2015-02-11 | Bridge pipeline crosses the river structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520100197.6U CN204455795U (en) | 2015-02-11 | 2015-02-11 | Bridge pipeline crosses the river structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204455795U true CN204455795U (en) | 2015-07-08 |
Family
ID=53662704
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520100197.6U Active CN204455795U (en) | 2015-02-11 | 2015-02-11 | Bridge pipeline crosses the river structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204455795U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106087701A (en) * | 2016-08-10 | 2016-11-09 | 上海市城市建设设计研究总院 | Elevated bridge and underground pipe gallery build structure jointly |
CN106090433A (en) * | 2016-08-09 | 2016-11-09 | 中铁大桥局集团有限公司 | The support means of a kind of pipeline of passing a bridge and be provided with the bridge of this support means |
CN110144808A (en) * | 2019-05-09 | 2019-08-20 | 福建侨龙应急装备有限公司 | A kind of collapsible Option of Piping across Bridge |
-
2015
- 2015-02-11 CN CN201520100197.6U patent/CN204455795U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106090433A (en) * | 2016-08-09 | 2016-11-09 | 中铁大桥局集团有限公司 | The support means of a kind of pipeline of passing a bridge and be provided with the bridge of this support means |
CN106087701A (en) * | 2016-08-10 | 2016-11-09 | 上海市城市建设设计研究总院 | Elevated bridge and underground pipe gallery build structure jointly |
CN106087701B (en) * | 2016-08-10 | 2017-09-12 | 上海市城市建设设计研究总院(集团)有限公司 | Elevated bridge and underground pipe gallery build structure jointly |
CN110144808A (en) * | 2019-05-09 | 2019-08-20 | 福建侨龙应急装备有限公司 | A kind of collapsible Option of Piping across Bridge |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204456189U (en) | Subway station top Pipe rack | |
CN204455795U (en) | Bridge pipeline crosses the river structure | |
CN109099738A (en) | Thin shell type heat exchanger for subway tunnel and installation and construction method thereof | |
CN202450483U (en) | Three-dimensional composite box culvert structure for urban rivers | |
CN204455990U (en) | Flood-control wall structure | |
CN203855944U (en) | Outgoing line hole structure for underground powerhouse | |
CN103603376A (en) | Concrete box culvert deformation joint waterproof structure and manufacturing technology thereof | |
CN204436467U (en) | Cross-river tunnel line construction | |
CN206477361U (en) | A kind of connection land, island, the seabed pipe gallery system of reef | |
CN109296006A (en) | The double-deck assembly concrete pipe gallery | |
CN204959684U (en) | Flood prevention device | |
Hunt et al. | Sustainable utility placement for University campuses | |
CN203834522U (en) | Waterproof structure for concrete box culvert deformation joint | |
CN206844150U (en) | A kind of shallow embedding formula pipe gallery | |
CN204326099U (en) | The antifreeze escape way of New pipe gauze | |
CN207032291U (en) | It is a kind of to be easy to buried protection tube passage | |
Beckett et al. | Sustainable and affordable rammed earth houses in Kalgoorlie, Western Australia: Development of thermal monitoring techniques | |
CN109372021A (en) | Assembly concrete bilayer pipe gallery shell and media layer damage plate connecting node | |
CN206110174U (en) | A waterproof board for utility tunnel | |
CN204212182U (en) | The waterproof treatment structure of exterior wall worn by a kind of cable trench | |
CN218678275U (en) | Prefabricated assembled cable duct bank | |
CN209227605U (en) | Assembly concrete bilayer pipe gallery shell and media layer damage plate connecting node | |
Ahilan et al. | Flood risk management in small urban river using a sustainable urban drainage system: Wortley Beck, Leeds, UK | |
CN217758934U (en) | Single-layer basement with equipment pipe gallery | |
CN209227607U (en) | Multilayer assembly concrete pipe gallery bottom gusset |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: Jiading District new area, 201800 Ring Road Shanghai City No. 2222 room 1205 -3 Patentee after: Shanghai camp city planning Tsukito design Inc Address before: 201800 Shanghai City, Jiading, Qinghe Road, No. 390, room 6, building 416 Patentee before: Shanghai Ying Yi city planning design Co., Ltd |