Assembly concrete bilayer pipe gallery shell and media layer damage plate connecting node
Technical field
The utility model belongs to technical field of buildings, more particularly to a kind of assembly concrete bilayer pipe gallery shell
With media layer damage plate connecting node.
Background technique
The concept of underground utilities pipe gallery is built in city, the Europe originating from 19th century primarily occur ins France.
Paris since 1833 has been born after first underground utilities pipe gallery system in the world, has been had so far nearly 182 years
Development course.It is explored by a century, research, improvement and practice, technical level full maturity, and in external many cities
The modernization symbol and city public administration for having obtained tremendous expansion, and having had become for the flourishing urban municipal construction management of foreign countries
A part.
Underground pipe gallery system not only solves Urban Traffic Jam Based, also greatly facilitate electric power, communication, combustion gas,
The maintenance and maintenance of the urban operating mechanisms such as water supply and sewage.In addition, the system also has certain protection against and mitigation of earthquake disasters effect.Such as nineteen ninety-five Japan
During the big earthquakes in Osaka and Kobe, a large amount of house collapses in Kobe city, road are ruined, but the local most intact nothing of underground pipe gallery
Damage, this significantly reduces the difficulty of the disaster relief and reconstruction after shake.Underground pipe gallery is to meeting people's livelihood primary demand and raising
City integrated bearing capacity plays an important role.
Pipe gallery construction is avoided frequently excavates road and goes out to traffic and resident due to laying and repairing underground utilities
Row is impacted and is interfered, and keeps the appearance of a street complete and beautiful.Reduce the maintenance of expense and utilities pipeline that road surface is repeatedly overhauled
Expense.Maintain the integrality on road surface and the durability of all kinds of pipelines.Convenient for the laying of various pipelines, increase and decrease, maintenance and daily
Management.Pipe gallery gut line compact and reasonable arrangement, is effectively utilized the space under road, has saved urban land.Reduce
The inspection shaft of the roofbolt of road and various pipelines, room etc., the graceful landscape in city.Aerial pipeline enters ground together, reduces aerial
The contradiction of line and greening.
Domestic pipe gallery construction is started late.It is generally only empty in the underground of palace before reform and opening-up
Between or large size industrial enterprise in be set as needed some pipeline corridors, or be only the simple comprehensive cable placed based on light current
Duct.Domestic first municipal administration synthesis pipe gallery appears in 1994, according to the planning requirement of high-level development & construction Pudong New District,
After by early period, necessary technical data collects subject study related to progress, in Shanghai Pudong New Area, Zhang Yanglu has built up the country
First biggish pipe gallery of scale.The pipe gallery overall length about 11km, is embedded under the pavement of both sides of the road.It is comprehensive
Piping lane body is reinforced concrete structure, and cross section is rectangle, by fuel chamber's (being individually for a Room, interior laying gas pipeline) and synthesis
Room (interior to lay all kinds of communications, electric power and upper hose) two parts composition.According to the needs of pipe gallery operational management, Zhang Yanglu is comprehensive
The affiliated facility system of conjunction piping lane includes that fire-fighting, ventilation and drainage, powered lighting, monitoring management and the information in pipe gallery are received
Collect processing system etc..
In recent years, in all parts of the country that the construction criteria of civilian infrastructure is constantly promoted, it is numerous and confused to explore through construction synthesis
Piping lane is in the hope of reaching the intensive use and sustainable development of the town road underground space.BeiJing ZhongGuanCun, Guangzhou College City,
The large- and-medium size cities such as Shanghai Anting New Town, Jinan, Ningbo, Shenzhen, Kunming, Nanning, Harbin, Hefei, Jiamusi have all been built
At or be prepared for construction pipe gallery.Wherein, Guangzhou College City and Shanghai Anting New Town have used for reference Pudong's Zhang Yanglu integrated pipe
Corridor construction experiences and lesson, and on the basis of drawing the states such as Japan more mature design standard, build up respectively 17 km of overall length and
The more storehouses more on a large scale 6 km or single storehouse pipe gallery system, and started step by step input use.
The General Office of the State Council announced on August 10th, 2015 about the instruction for promoting the construction of Urban Underground pipe gallery
(Office of the State Council sends out (2015) No. 61).Target is to build up the underground pipe gallery that a batch has international most advanced level to the year two thousand twenty
And put into effect, " road zipper " problem for excavating ground repeatedly is obviously improved, and pipeline safety level and ability of preventing and fighting natural adversities are bright
Aobvious to be promoted, successive elimination arterial street cobweb formula overhead line, urban ground landscape is clearly better.
Currently, pipe gallery to build expense still high, the especially entirety of multilayer assembly concrete pipe gallery
Space layout is more difficult to accomplish that rationally both assurance function, guaranteed stress again, in addition also takes into account the production of component, transports and apply
Work connects very difficult at the scene.And each story shear problem of dry type connection is than more serious, it is more difficult to solve.
Utility model content
The purpose of this utility model is to provide for a kind of assembly concrete bilayer pipe gallery shell and media layer damage
Plate connecting node, the node not only assurance function, but also guarantee stress, and it is good water-proof effect, applied widely, avoid work progress
In complex operations, cost can be greatly reduced.
Of the existing technology in order to solve the problems, such as, the technical solution adopted in the utility model is as follows:
Assembly concrete bilayer pipe gallery shell and media layer damage plate connecting node, including pipe gallery concrete-shell
Body plate a plate, pipe gallery concrete shell plate b plate and assembly concrete media layer damage,
It is two blocks of pipe gallery concrete shell plate a plates below on the circumferential direction in a cross section, is above two pieces
Pipe gallery concrete shell plate b plate;In the longitudinal direction of pipeline, pipe gallery concrete shell plate b plate with following integrated pipe
Corridor concrete shell plate a plate be staggered one third plate it is wide;There are every block of pipe gallery concrete shell plate a plate 3 uniformly to be divided
The middle layer of cloth connects two-way protruding bar stretching vertical plate section and double plates connect the top of short plate, and is inserted into synthesis above
In the metal connection box of piping lane concrete shell plate b plate, metal connection box is the can of one side opening, split shed side water
It is flat to be directed toward inside piping lane, and the vertical connection installing port of circumferential connection is opened up in the corresponding position of vertical plate section, circumferential direction connection
Vertical connection installing port stretches out always the surface of pipe gallery concrete shell plate b plate, is connected using nut;Wherein 2 middle layers
It connects in two-way protruding bar insertion same pipe gallery concrete shell plate b plate, another 1 middle layer connects two-way protruding bar
It is inserted into another block of pipe gallery concrete shell plate b plate;Pipe gallery concrete shell plate a plate and pipe gallery concrete-shell
Body plate b plate is symmetrical above and below on the whole, pair of pipe gallery concrete shell plate a plate and pipe gallery concrete shell plate b plate
Plate connects short plate and is mutually close to, and in the external alignment of piping lane, connects in double plates of internal pipe gallery concrete shell plate a plate
Short plate plate shorter than the connection of double plates of pipe gallery concrete shell plate b plate is 150 ~ 300mm protruding;Pipe gallery coagulation
Double plates of native shell plates a plate connect the shear connector on short plate and connect short put down with double plates of pipe gallery concrete shell plate b plate
The shearing slot of the same location of plate mutually agrees with;The upper overhanging step of assembly concrete media layer damage is placed on following pipe gallery
Double plates of concrete shell plate a plate connect on short plate;Step and upper overhang table are taken under assembly concrete media layer damage
Rank connect with the double plates of the pipe gallery concrete shell plate b plate of the pipe gallery concrete shell plate a plate of lower part and top respectively
Agree with the outer end of short plate;It is connected in installing port in the lower part lower layer of assembly concrete media layer damage, passes through lower connection spiral shell
Connection bolt is worn in hole, is connected bolt by the intermediate ladder connecting screw hole of pipe gallery concrete shell plate a plate and is penetrated into centre
In the installing port of plate upper layer, connected using nut;It connects in installing port, leads on the upper layer on the top of assembly concrete media layer damage
It crosses connecting screw hole and wears connection bolt, connection bolt is connected by the intermediate ladder of the pipe gallery concrete shell plate b plate on top
It connects screw hole to penetrate into the installing port of intermediate plate upper layer, be connected using nut.
Further, the pipe gallery concrete shell plate a plate includes pipe gallery concrete shell plate, described
The structure of pipe gallery concrete shell plate is as follows: mainly by level board section, vertical plate section, connection segmental arc, vertical arc hook segment, water
Flat arc hook segment, double plates connect short riser, double plates connect short plate, riser connection is partly risen as high as the banks, riser connects half skewed slot, riser connection
Ribs, plate connect cantilever plate, plate connects overhanging diagonal rib, the half storey fourth of the twelve Earthly Branches, the overhanging half storey tenon of internal layer, waterproof enhancing are received in outer layer
The half storey fourth of the twelve Earthly Branches, the overhanging half storey tenon of outer layer, shear connector, shearing slot, intermediate plate upper layer installing port, intermediate ladder company are received in ladder, internal layer
Connect screw hole, circumferential connecting screw hole, the level that middle layer connects two-way protruding bar, middle layer connects unidirectional protruding bar, circumferential direction connects
Installing port, the vertical connection installing port of circumferential connection, metal connection box composition are connected, level board section is level board, vertical plate section
It is the connection segmental arc of arc between level board section and vertical plate section for vertical plate;It is one section shorter at the plate end of level board section
Double plates connect short riser, and level board section and double plates connect the vertical arc hook segment between short riser for arc;In the plate of vertical plate section
End connects short plate for one section shorter of double plates, and vertical plate section and double plates connect the arc of horizon hook segment between short plate for arc;
Double plates connect short plate top be it is ladder-like, the connection of the horizontal riser of lower position is partly risen as high as the banks and is connected with the horizontal riser of high position
It connects ribs and the connection of half skewed slot is connected by inclined-plane riser, three's horizontal width is equal;The horizontal end that double plates connect short plate is
Ladder-like, the upper half is that the plate of vertical end face connects cantilever plate, and lower half portion is that the plate inwardly taken in connects overhanging diagonal rib;
Along level board section, vertical plate section, connection segmental arc, vertical arc hook segment, arc of horizon hook segment by entire plate label three
Circumferential connecting screw hole is respectively set in three uniform aliquots that double plates connect on short plate in uniform aliquot, circumferential
Shearing slot is respectively provided at left and right sides of connecting screw hole;Shearing slot and circumferential connecting screw hole are uniformly distributed, and equal at three respectively
The same position of even aliquot;
Intermediate plate upper layer is opened up in centre respectively in the bottom that plate connects three uniform aliquots of overhanging diagonal rib
Installing port, intermediate plate upper layer installing port are rectangular channel, more than the height middle line of upward fluting to plate connection cantilever plate 30 ~
60mm, setting level leads to the intermediate ladder connection spiral shell of the plate connection horizontal port of cantilever plate in the installing port of intermediate plate upper layer
Hole, intermediate ladder connecting screw hole are horizontal and are located at the intermediate altitude that plate connects cantilever plate;In each intermediate plate upper layer installing port
Double plates of two sides connect shear connector be respectively set at the top of short plate, intermediate plate upper layer installing port, intermediate ladder connecting screw hole
Respectively in the same position of three uniform aliquots;
Enhance ladder in the half setting waterproof of the both ends plate thickness of the plate of level board section, vertical plate section, connection segmental arc, wherein
The half storey fourth of the twelve Earthly Branches, the overhanging half storey tenon of internal layer are received in side setting outer layer, the receipts half storey fourth of the twelve Earthly Branches, outer layer are overhanging in corresponding other side setting internal layer
Half storey tenon, the interior receipts half storey fourth of the twelve Earthly Branches of outer layer, the overhanging half storey tenon of internal layer and the interior receipts half storey fourth of the twelve Earthly Branches of internal layer, the overhanging half storey tenon of outer layer mutually agree with;?
The inside that double plates connect short riser starts the horizontal connection installing port of 3 circumferential connections;In pipe gallery concrete shell plate three
Etc. the center setting middle layers of scoreboards connect two-way protruding bar, middle layer connects two-way protruding bar and wears vertically upwards in vertical plate section
It crosses double plates and connects short plate, and vertically extend 200 ~ 500mm upwards;It is downward in vertical plate section that middle layer connects two-way protruding bar
It curves through connection segmental arc and horizontal by level board section, is bent in the short riser of double plates connection and stretches out riser connection straight up
Half skewed slot, and 200 ~ 500mm is vertically extended upwards;The pipe gallery concrete shell plate b plate and pipe gallery concrete-shell
The setting symmetrical above and below of body plate a plate, includes pipe gallery concrete shell plate, in the third scoreboard of pipe gallery concrete shell plate
Center setting middle layer connect unidirectional protruding bar, middle layer connects unidirectional protruding bar and connect in the bottom of vertical plate section with metal
Box connection, metal connection box are the can of one side opening, and split shed side is horizontally directed to inside piping lane, and in vertical plate section
Corresponding position open up the vertical connection installing port of circumferential connection, the vertical connection installing port of circumferential direction connection stretches out always integrated pipe
The surface of corridor concrete shell plate b plate;It passes vertically through double plates and connects short plate, and vertically extend 200 ~ 500mm upwards;Middle layer connects
Order curves through connection segmental arc downwards in vertical plate section to protruding bar and level is by level board section, connects in double plates short
Riser, which is bent and stretches out riser straight up, connects half skewed slot, and vertically extends 200 ~ 500mm upwards.
Further, the assembly concrete media layer damage mainly includes plate body, lower layer's connection installing port, upper layer connection
Installing port, under take in step, upper overhanging step, lower connecting screw hole, upper connecting screw hole, plate body generally rectangle, the two of plate body
Ladder is respectively set in end, and here is inwardly to take in down to take in step, and the above is outwardly directed overhanging step;
Lower layer's connection installing port is opened up in the plate body lower surface for takeing in step under;Lower layer's connection installing port opens up upwards
30 ~ 60mm of step height middle line or more is taken under, and is taken in stepped ends level downwards and opened up lower connecting screw hole;Close
The plate body upper surface of upper overhanging step opens up upper layer connection installing port;It is high that upper layer connection installing port opens up downwards overhanging step
30 ~ 60mm of middle line or less is spent, and overhanging step end horizontal opens up connecting screw hole upwards.
Advantage and beneficial effect possessed by the utility model are:
The utility model assembly concrete bilayer pipe gallery shell and media layer damage plate connecting node, can substantially drop
Low pipe gallery builds cost, rationally distributed, both assurance function, guarantees stress again, in addition also takes into account production, the transport of component
With construction.Make the simpler connection of each component, safety, efficiency, durable, and good water-proof effect, applied widely, construction party
Just, speed of application is fast, good economical benefit, avoids the complex operations in work progress, cost can be greatly reduced.
Detailed description of the invention
The utility model is described in further detail with reference to the accompanying drawing:
Fig. 1 is assembly concrete bilayer pipe gallery shell and media layer damage plate connecting node schematic diagram;
Fig. 2 is longitudinal fissure of displacement schematic diagram of assembly concrete bilayer pipe gallery shell;
Fig. 3 is pipe gallery concrete shell plate a plate schematic elevation view;
Fig. 4 is pipe gallery concrete shell plate a plate schematic top plan view;
Fig. 5 is pipe gallery concrete shell plate a plate schematic side view;
Fig. 6 is that pipe gallery concrete shell plate a plate connects reinforcing bar configuration schematic diagram;
Fig. 7 is that pipe gallery concrete shell plate b plate connects reinforcing bar configuration schematic diagram;
Fig. 8 is assembly concrete media layer damage plate schematic elevation view;
Fig. 9 is assembly concrete media layer damage plate schematic top plan view;
Figure 10 is assembly concrete media layer damage plate schematic side view.
In figure, 1a is pipe gallery concrete shell plate a plate;1b is pipe gallery concrete shell plate b plate;2 be assembly
Formula concrete media layer damage;3 be connection bolt;4 be nut.
1-1 is level board section;1-2 is vertical plate section;1-3 connection segmental arc;1-4 is vertical arc hook segment;1-5 is arc of horizon hook
Section;1-6 is that double plates connect short riser;1-7 is that double plates connect short plate;1-8 is that riser connection is partly risen as high as the banks;1-9 is riser connection
Half skewed slot;1-10 is riser connection reinforcement rib;1-11 is that plate connects cantilever plate;1-12 is that plate connects overhanging diagonal rib;1-13
To receive the half storey fourth of the twelve Earthly Branches in outer layer;1-14 is the overhanging half storey tenon of internal layer;1-15 is that waterproof enhances ladder;1-16 is that half storey is received in internal layer
The fourth of the twelve Earthly Branches;1-17 is the overhanging half storey tenon of outer layer;1-18 is shear connector;1-19 is shearing slot;1-20 is intermediate plate upper layer installing port;1-21
For intermediate ladder connecting screw hole;1-22 is circumferential connecting screw hole;1-23 is that middle layer connects two-way protruding bar;1-25 is middle layer company
Order is to protruding bar;1-25 is the horizontal connection installing port of circumferential connection;1-26 is the vertical connection installing port of circumferential connection;
1-27 is metal connection box.
2-1 is plate body;2-2 is that lower layer connects installing port;2-3 is that upper layer connects installing port;2-4 takes in step under being;2-5
For upper overhanging step;2-6 is lower connecting screw hole;2-7 is upper connecting screw hole.
Specific embodiment
In order to further illustrate the utility model, the utility model is retouched in detail with reference to the accompanying drawings and embodiments
It states, but they cannot be interpreted as to the restriction to scope of protection of the utility model.
As shown in Figure 1, 2, the utility model assembly concrete bilayer pipe gallery shell connect section with media layer damage plate
Point, including pipe gallery concrete shell plate a plate 1a, pipe gallery concrete shell plate b plate 1b and assembly concrete middle layer
Structure 2,
It is two pieces of pipe gallery concrete shell plate a plate 1a below on the circumferential direction in a cross section, is above two
Block pipe gallery concrete shell plate b plate 1b;In the longitudinal direction of pipeline, pipe gallery concrete shell plate b plate 1b with it is following
Pipe gallery concrete shell plate a plate 1a be staggered one third plate it is wide.
As shown in Fig. 1,3,6, every piece of pipe gallery concrete shell plate a plate 1a has 3 equally distributed middle layer connections
Two-way protruding bar 1-23 stretches out vertical plate section 1-2 and double plates connect the top of short plate, and is inserted into pipe gallery above
In the metal connection box 1-27 of concrete shell plate b plate 1b, metal connection box 1-27 is the can of one side opening, split shed
Side is horizontally directed to inside piping lane, and opens up the vertical connection installing port 1- of circumferential connection in the corresponding position of vertical plate section 1-2
26, the vertical connection installing port 1-26 of circumferential direction connection stretches out always the surface of pipe gallery concrete shell plate b plate 1b, using spiral shell
Mother 4 connects;Wherein 2 middle layers connect in two-way protruding bar 1-23 insertion same pipe gallery concrete shell plate b plate 1b,
Another 1 middle layer connects two-way protruding bar 1-23 and is inserted into another piece of pipe gallery concrete shell plate b plate 1b.
As shown in Figure 1, pipe gallery concrete shell plate a plate 1a and pipe gallery concrete shell plate b plate 1b are on the whole
Symmetrical above and below, pipe gallery concrete shell plate a plate 1a connects short flat with double plates of pipe gallery concrete shell plate b plate 1b
Plate is mutually close to, and in the external alignment of piping lane, connects short plate ratio in double plates of internal pipe gallery concrete shell plate a plate 1a
Double plates of pipe gallery concrete shell plate b plate 1b connect the short protruding 150 ~ 300mm of plate;Pipe gallery concrete shell
Double plates of plate a plate 1a connect the shear connector 1-18 on short plate connect with double plates of pipe gallery concrete shell plate b plate 1b it is short
The shearing slot 1-19 phase of the same location of plate is agreed with.
As shown in Fig. 1,8,10, the upper overhanging step 2-5 of assembly concrete media layer damage 2 is placed on following pipe gallery
Double plates of concrete shell plate a plate 1a connect on short plate;Step 2-4 and upper is taken under assembly concrete media layer damage 2
The overhanging step 2-5 pipe gallery concrete shell plate b with the pipe gallery concrete shell plate a plate 1a of lower part and top respectively
Agree with the outer end that the bis- plates of plate 1b connect short plate.
As shown in Figure 1,5, it is connected in installing port 2-2 in the lower part lower layer of assembly concrete media layer damage 2, passes through lower company
It meets screw hole 2-6 and wears connection bolt 3, connection bolt 3 passes through the intermediate ladder connecting screw hole of pipe gallery concrete shell plate a plate 1a
1-21 is penetrated into the installing port 1-20 of intermediate plate upper layer, is connected using nut 4;On the top of assembly concrete media layer damage 2
Upper layer connection installing port 2-3 in, by upper connecting screw hole 2-7 wear connection bolt 3, connect integrated pipe of the bolt 3 by top
The intermediate ladder connecting screw hole 1-21 of corridor concrete shell plate b plate 1b is penetrated into the installing port 1-20 of intermediate plate upper layer, using spiral shell
Mother 4 connects.
As shown in Fig. 1,3,4,5,6, pipe gallery concrete shell plate a plate 1a includes pipe gallery concrete shell
The structure of plate, the pipe gallery concrete shell plate is as follows: mainly by level board section 1-1, vertical plate section 1-2, connection segmental arc
1-3, vertical arc hook segment 1-4, arc of horizon hook segment 1-5, double plates connect short riser 1-6, double plates connect short plate 1-7, riser connection
1-8, half skewed slot 1-9 of riser connection, riser connection reinforcement rib 1-10, plate connection cantilever plate 1-11, plate connection partly rise as high as the banks outside
Diagonal rib 1-12 is stretched, half storey fourth of the twelve Earthly Branches 1-13 is received in outer layer, the overhanging half storey tenon 1-14 of internal layer, waterproof enhancing ladder 1-15, receives half in internal layer
Layer fourth of the twelve Earthly Branches 1-16, the overhanging half storey tenon 1-17 of outer layer, shear connector 1-18, shearing slot 1-19, intermediate plate upper layer installing port 1-20, scala media
Terraced connecting screw hole 1-21, circumferential connecting screw hole 1-22, middle layer connects two-way protruding bar 1-23, middle layer connects unidirectional protruding bar
1-24, the horizontal connection installing port 1-25 of circumferential connection, circumferential vertical connection installing port 1-26, the metal connection box 1-27 connected
Composition,
Level board section 1-1 is level board, and vertical plate section 1-2 is vertical plate, between level board section 1-1 and vertical plate section 1-2
For the connection segmental arc 1-3 of arc;
Short riser 1-6 is connected in double plates that the plate end of level board section 1-1 is one section shorter, level board section 1-1 and double plates connect
Meet the vertical arc hook segment 1-4 between short riser 1-6 for arc;It is connected in double plates that the plate end of vertical plate section 1-2 is one section shorter
Short plate 1-7, vertical plate section 1-2 and double plates connect the arc of horizon hook segment 1-5 between short plate 1-7 for arc;
Double plates connect short plate 1-7 top be it is ladder-like, the connection of the horizontal riser of lower position partly rise as high as the banks 1-8 and with a high position
The horizontal riser connection reinforcement rib 1-10 set connects half skewed slot 1-9 connection by inclined-plane riser, and three's horizontal width is equal;
Double plates connect short plate 1-7 horizontal end be it is ladder-like, the upper half be vertical end face plate connect cantilever plate
1-11, lower half portion are that the plate inwardly taken in connects overhanging diagonal rib 1-12;
It is incited somebody to action along level board section 1-1, vertical plate section 1-2, connection segmental arc 1-3, vertical arc hook segment 1-4, arc of horizon hook segment 1-5
Entire plate three uniform aliquots of label, are respectively set in three uniform aliquots that double plates connect on short plate 1-7
Shearing slot 1-19 is respectively provided at left and right sides of circumferential connecting screw hole 1-22, circumferential connecting screw hole 1-22;Shear slot 1-19 and circumferential direction
Connecting screw hole 1-22 is uniformly distributed, and respectively in the same position of three uniform aliquots;
Intermediate plate is opened up in centre respectively in the bottom that plate connects three uniform aliquots of overhanging diagonal rib 1-12
Upper layer installing port 1-20, intermediate plate upper layer installing port 1-20 are rectangular channel, upwards the height of fluting to plate connection cantilever plate 1-11
30 ~ 60mm of middle line or more is spent, it is horizontal to lead to plate connection cantilever plate 1-11 for setting level in the installing port 1-20 of intermediate plate upper layer
The intermediate ladder connecting screw hole 1-21 of port, intermediate ladder connecting screw hole 1-21 are horizontal and are located at plate connection cantilever plate 1-11
Intermediate altitude;Double plates in the two sides of each intermediate plate upper layer installing port 1-20 are connected to be respectively set at the top of short plate 1-7 and be cut
Power key 1-18, intermediate plate upper layer installing port 1-20, intermediate ladder connecting screw hole 1-21 are respectively in three uniform aliquots
Same position;
Enhance in the half setting waterproof of the both ends plate thickness of the plate of level board section 1-1, vertical plate section 1-2, connection segmental arc 1-3
Ladder 1-15, wherein side, which is arranged in outer layer, receives half storey fourth of the twelve Earthly Branches 1-13, the overhanging half storey tenon 1-14 of internal layer, in corresponding other side setting
Half storey fourth of the twelve Earthly Branches 1-16, the overhanging half storey tenon 1-17 of outer layer are received in layer, receive in outer layer half storey fourth of the twelve Earthly Branches 1-13, the overhanging half storey tenon 1-14 of internal layer with it is interior
Half storey fourth of the twelve Earthly Branches 1-16 is received in layer, the overhanging half storey tenon 1-17 phase of outer layer is agreed with;
Start the horizontal connection installing port 1-25 of 3 circumferential connections in the inside that double plates connect short riser 1-6;
Two-way protruding bar 1-23, middle layer are connected in the center of the third scoreboard of pipe gallery concrete shell plate setting middle layer
It connects two-way protruding bar 1-23 and passes vertically through the short plate 1-7 of double plates connections upwards in vertical plate section 1-2, and vertically extend upwards
200~500mm;Middle layer connects two-way protruding bar 1-23 and curves through connection segmental arc 1-3 and water downwards in vertical plate section 1-2
It puts down through level board section 1-1, connects short riser 1-6 bending in double plates and stretch out riser half skewed slot 1-9 of connection straight up, and to
On vertically extend 200 ~ 500mm;
As shown in fig. 7, on the pipe gallery concrete shell plate b plate 1b and pipe gallery concrete shell plate a plate 1a
Lower to be symmetrical arranged, pipe gallery concrete shell plate b plate 1b also includes pipe gallery concrete shell plate, and the pipe gallery is mixed
Solidifying soil shell plates are identical with the hardened structure of pipe gallery concrete shell in pipe gallery concrete shell plate a plate 1a.?
The center setting middle layer of the third scoreboard of pipe gallery concrete shell plate connects unidirectional protruding bar 1-24, and middle layer connection is unidirectional outer
It stretches reinforcing bar 1-24 to connect in the bottom of vertical plate section 1-2 with metal connection box 1-27, metal connection box 1-27 is one side opening
Can, split shed side are horizontally directed to inside piping lane, and open up the perpendicular of circumferential connection in the corresponding position of vertical plate section 1-2
Direct-connected to meet installing port 1-26, the vertical connection installing port 1-26 of circumferential direction connection stretches out always pipe gallery concrete shell plate b plate
The surface of 1b;It passes vertically through double plates and connects short plate 1-7, and vertically extend 200 ~ 500mm upwards;Middle layer connects unidirectional overhanging steel
Muscle 1-24 curves through downwards connection segmental arc 1-3 in vertical plate section 1-2 and level is by level board section 1-1, connects in double plates
Short riser 1-6, which is bent and stretches out riser straight up, connects half skewed slot 1-9, and vertically extends 200 ~ 500mm upwards.
As shown in Figure 8,9, 10, the assembly concrete media layer damage 2 mainly includes plate body 2-1, lower layer's connection installation
Mouthful 2-2, upper layer connection installing port 2-3, under take in step 2-4, upper overhanging step 2-5, lower connecting screw hole 2-6, upper connecting screw hole
2-7,
Ladder is respectively set at the both ends of plate body 2-1 in plate body 2-1 generally rectangle, and here is the lower receipts inwardly taken in
Into step 2-4, the above is outwardly directed overhanging step 2-5;
Lower layer connection installing port 2-2 is opened up in the lower surface plate body 2-1 for takeing in step 2-4 under;Lower layer's connection installation
Mouth 2-2 is opened up down upwards takes in 30 ~ 60mm of step 2-4 height middle line or more, and takes in step 2-4 end horizontal downwards and open up
Lower connecting screw hole 2-6;
Upper layer connection installing port 2-3 is being opened up in the upper surface plate body 2-1 close to upper overhanging step 2-5;Upper layer connection peace
Dress mouth 2-3 opens up downwards 30 ~ 60mm of overhanging step 2-5 height middle line or less, and overhanging step 2-5 end horizontal is opened upwards
If upper connecting screw hole 2-7.
The above is only the preferred embodiment of the utility model, it is noted that for the common skill of the art
For art personnel, without departing from the principle of this utility model, several improvements and modifications can also be made, these improve and
Retouching also should be regarded as the protection scope of the utility model.