A kind of cable laying piping lane
Technical field
It the utility model is related to cable channel laying field, more particularly to a kind of cable laying piping lane.
Background technology
In cable laying engineering, it is often necessary to by cable laying in cable duct, to meet the needs of signal transmission.It is existing
Some cable laying methods are usually:A trench is first dug out, cable etc. is laid in trench, it is then overall with concrete again
Moulding by casting.It is difficult to be opened and inspect after this arrangement completion, once the cable in somewhere sustains damage, it is necessary to by concrete
With cable overall pulling down, maintenance difficulty is very big, extremely inefficient.
Utility model content
The purpose of this utility model is to provide a kind of cable laying piping lane, has convenient to install and maintain and replaceability strong
Advantage.
To achieve the above object, the utility model adopts the following technical scheme that:
A kind of cable laying piping lane, including cover plate, bottom plate and two side plates, cover plate, bottom plate and two side plates, which surround, to be had
The piping lane of cavity volume, for cable laying in piping lane, described two side plates are L-type, and the end of the horizontal part of two side plates is correspondingly set
Boss is equipped with, the bottom plate is T-shaped, and the both ends of bottom plate are overlapped on the boss of two side plates, and the outside of two side plates is integral
It is provided with panel, the upper end of panel is higher than the upper end of corresponding side plate, and the upper end of panel and side plate cooperatively forms breach, the lid
Plate is arranged in breach.
Preferably, the vertical portion of described two side plates is relatively set with the groove for fixing pipe pillow, and groove hangs down with ground
Directly.
Preferably, the groove has multiple, is uniformly arranged respectively along the vertical portion of corresponding side plate.
Preferably, the side plate is made up of some sub- side plate docking, the side that adjacent two sub- side plates are in contact point
Positioning boss and locating slot are not provided with, and adjacent two sub- located boss of side plate are fixedly connected with locating slot.
Preferably, the cover plate is made up of some sub- cover plate splices, and some sub- cover plates are sequentially embedded in breach, each
The corner of sub- cover plate is provided with suspension ring.
Preferably, the depth of the breach is not less than the thickness of the cover plate.
Preferably, the thickness of the horizontal part of the side plate is equal to the thickness of bottom plate.
The utility model is simple in construction, encloses the piping lane for being set as having cavity volume by cover plate, two side plates and bottom plate, instead of
Traditional cement pours, not only easy for installation, and after somewhere cable breaks down, can be easily by the pipe at the place that breaks down
Corridor is removed, and so as to be repaired to cable, greatly reduces the labor intensity of staff, easy to maintenance, and replaceability is strong and pacifies
Overall height.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model(Suspension ring are not drawn into);
Fig. 2 is left view of the present utility model.
Embodiment
The technical solution of the utility model is clearly and completely described below in conjunction with accompanying drawing, it is clear that described reality
It is only section Example of the present utility model to apply example, rather than whole embodiments.Based on the embodiment in the utility model,
Other all embodiments that those of ordinary skill in the art are obtained on the premise of creative work is not made, belong to this
The protection domain of utility model.
As shown in Figures 1 and 2, a kind of cable laying piping lane described in the utility model, including cover plate 1, bottom plate 4 and two
Side plate 3, cover plate 1, bottom plate 4 and two side plates 3 surround the cable laying piping lane with cavity volume, and cable laying is in cable laying piping lane
It is interior.
Two side plates 3 are L-type, and the end of the horizontal part of two side plates 3 is correspondingly arranged on boss 9, and bottom plate 4 is T-shaped, T
The both ends of type bottom plate 4 are overlapped on the boss 9 of the end of side plate 3, and the thickness of the horizontal part of side plate 3 is equal to the thickness of bottom plate 4;Two
The outside of side plate 3 is integrally provided with panel 2, and the upper end of panel 2 is higher than the upper end of corresponding side plate 3, panel 2 and side plate 3
Upper end cooperatively forms breach 7, and cover plate 1 is arranged in breach 7, and in the present embodiment, the depth of breach 7 is not less than the thickness of cover plate 1
Degree, so that cover plate 1 can be fully sunk in side plate 3, cover plate 1 only could be opened by special instrument, reduce cable and be stolen
Risk;The vertical portion of two side plates 3 is relatively set with the groove 6 for fixing pipe pillow 5, and groove 6 is perpendicular to the ground, in this reality
Apply in example, groove 6 has multiple, is uniformly arranged respectively along the vertical portion of side plate 3;The side plate 3 is by some sub- side plate docking groups
Into the side that adjacent two sub- side plates 3 are in contact is respectively arranged with positioning boss 10 and locating slot 11, adjacent two sub- sides
The located boss 10 of plate 3 is fixedly connected with locating slot 11, and cover plate 1 is made up of some sub- cover plate splices, some sub- cover plates according to
In secondary embedded breach 7, the quantity of sub- side plate and sub- cover plate can be selected according to the length of cable when in use, so that this practicality
The new cable that can be applied to various length and model.
In the present embodiment, the corner of every sub- cover plate is respectively and fixedly provided with the suspension ring 8 of convenient crawl, and suspension ring 8 can be replaced it
The structure of his convenient crawl cover plate 1.When the cable of certain produces failure, cover plate 1 need to only be opened, you can at failure
Cable is repaired, and greatly reduces the labor intensity of staff, easy to maintenance, and replaceability is strong and safety is high.