CN211948565U - Prefabricated integrative communication hand hole well - Google Patents

Prefabricated integrative communication hand hole well Download PDF

Info

Publication number
CN211948565U
CN211948565U CN201922387115.1U CN201922387115U CN211948565U CN 211948565 U CN211948565 U CN 211948565U CN 201922387115 U CN201922387115 U CN 201922387115U CN 211948565 U CN211948565 U CN 211948565U
Authority
CN
China
Prior art keywords
well body
well
inner chamber
thickening layer
prefabricated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922387115.1U
Other languages
Chinese (zh)
Inventor
宁英儒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201922387115.1U priority Critical patent/CN211948565U/en
Application granted granted Critical
Publication of CN211948565U publication Critical patent/CN211948565U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

The utility model discloses a prefabricated integrative communication hand hole well, including the well body, the well body is hexagonal prism, the inner chamber has been seted up to the inside of the well body, the well head has been seted up to the upper surface of the well body, the front surface of the well body is provided with the thickening layer, and the surface of thickening layer set up the pipe hole that link up with the inner chamber, the equal fixed mounting of the inner chamber left and right sides wall of the well body has pre-buried stores pylon bolt. The utility model relates to an ingenious, convenient and practical, novel structure, easy dismounting, it utilizes the mould shaping in mill's end in advance, need not the cast in situ, has consequently practiced thrift the time and the manpower of construction more to prefabricated reinforcing bar fashioned material makes its long service life, and is more practical.

Description

Prefabricated integrative communication hand hole well
Technical Field
The utility model relates to a communication system corollary equipment technical field specifically is a prefabricated integrative communication hand hole well.
Background
The existing underground communication well applied to communication engineering is mostly formed by brick piling, so that construction personnel need to use brick cement to pile on site, and therefore the communication well needs longer preparation time when an optical cable is laid in real construction, and the problem of consuming working hours exists.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a prefabricated integrative communication hand hole well to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a prefabricated integrative communication hand hole well, includes the well body, the well body is hexagonal prism, the inner chamber has been seted up to the inside of the well body, the well head has been seted up to the upper surface of the well body, the front surface of the well body is provided with the thickening layer, and the surface of thickening layer sets up the pipe hole that link up with the inner chamber, the equal fixed mounting of inner chamber left and right sides wall of the well body has pre-buried stores pylon bolt, well body and thickening layer integrated into one piece.
Preferably, a reinforcing ring is fixedly installed on the upper surface of the well body.
Preferably, the well body and the thickening layer are formed by pouring reinforced concrete.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model relates to an ingenious, convenient and practical, novel structure, easy dismounting, it utilizes the mould shaping in mill's end in advance, need not the cast in situ, has consequently practiced thrift the time and the manpower of construction more to prefabricated reinforcing bar fashioned material makes its long service life, and is more practical.
Drawings
Fig. 1 is a perspective view of the present invention.
Fig. 2 is a top view of the present invention.
Fig. 3 is a front view of the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Please refer to fig. 1-3, the utility model provides a prefabricated integrative communication hand hole well, including the well body 1, the well body 1 is hexagonal prism, inner chamber 5 has been seted up to the inside of the well body 1, well head 3 has been seted up to the upper surface of the well body 1, the front surface of the well body 1 is provided with thickening layer 2, and the surface of thickening layer 2 sets up the pipe hole 4 that link up with inner chamber 5, the equal fixed mounting of the inner chamber left and right sides wall of the well body 1 has pre-buried stores pylon bolt 6, well body 1 and thickening layer 2 integrated into one piece.
Particularly, the upper surface of the well body 1 is fixedly provided with a reinforcing steel bar ring 7, so that the well body 1 is convenient to move.
Specifically, the well body 1 and the thickening layer 2 are formed by pouring reinforced concrete.
The working principle is as follows: the well body 1 utilizes the mould shaping in mill's end in advance, need not the cast in situ, consequently has practiced thrift the time and the manpower of construction more to prefabricated reinforcing bar fashioned material makes its long service life, and is more practical. It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (3)

1. The utility model provides a prefabricated integrative communication hand hole well which characterized in that: including the well body (1), the well body (1) is hexagonal prism, inner chamber (5) have been seted up to the inside of the well body (1), well head (3) have been seted up to the upper surface of the well body (1), the front surface of the well body (1) is provided with thickening layer (2), and the surface of thickening layer (2) set up pipeline hole (4) that link up with inner chamber (5), the equal fixed mounting of the inner chamber left and right sides wall of the well body (1) has pre-buried hanger bolt (6), well body (1) and thickening layer (2) integrated into one piece.
2. The prefabricated integrated communication hand-hole well as claimed in claim 1, wherein: and a reinforcing steel bar ring (7) is fixedly arranged on the upper surface of the well body (1).
3. A prefabricated integrated communication hand-hole well according to claim 2, characterized in that: the well body (1) and the thickening layer (2) are formed by pouring reinforced concrete.
CN201922387115.1U 2019-12-27 2019-12-27 Prefabricated integrative communication hand hole well Active CN211948565U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922387115.1U CN211948565U (en) 2019-12-27 2019-12-27 Prefabricated integrative communication hand hole well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922387115.1U CN211948565U (en) 2019-12-27 2019-12-27 Prefabricated integrative communication hand hole well

Publications (1)

Publication Number Publication Date
CN211948565U true CN211948565U (en) 2020-11-17

Family

ID=73187659

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922387115.1U Active CN211948565U (en) 2019-12-27 2019-12-27 Prefabricated integrative communication hand hole well

Country Status (1)

Country Link
CN (1) CN211948565U (en)

Similar Documents

Publication Publication Date Title
CN204258238U (en) A kind of prefabricated assembled irrigation canals and ditches device
CN202840440U (en) Ground prefabricated cable trench
CN211948565U (en) Prefabricated integrative communication hand hole well
CN210263929U (en) A preformed hole template for building civil engineering
CN201671104U (en) Combined tower type crane base
CN204715149U (en) A kind of highway construction precast plate
CN208717918U (en) The enclosure structure of foundation pit of subway station of high-voltage line or overpass is worn under a kind of
CN204298845U (en) A kind of centrifuge ground based on existing terrace and spiral protecting wall
CN202247924U (en) Assembled steel structure open caisson in pipe jacking construction
CN205224094U (en) Power cable calandria worker well structure
CN206600524U (en) A kind of modularization assembling steel backrest
CN209798811U (en) Tower crane foundation structure in foundation ditch of reservation reinforcing bar
CN201390958Y (en) Precast concrete guide wall
CN209399990U (en) Open-air surface observation mound structure
CN206673539U (en) A kind of cable laying piping lane
CN209509006U (en) A kind of fixed device of tower crane
CN110258533A (en) A kind of band pull rod steel tube-concrete composite structure diaphram wall and its construction method
CN106592632A (en) Underground supporting structure for reverse construction method and construction method
CN213653957U (en) Brick for laying cable
CN210507462U (en) Foundation ditch temporary support structure convenient to usefulness of speedily carrying out rescue work
CN103274329A (en) Jacking-and-pulling jack and construction method applying jacking-and-pulling jack to pile-anchor support
CN204662936U (en) The fastening devices of overhanging type discharging platform anchored end
CN211517886U (en) A concrete placement workstation for building in room
CN203891006U (en) Protection plate for joint of underground continuous walls
CN214993894U (en) Support system of road deep foundation pit

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant