CN211517886U - A concrete placement workstation for building in room - Google Patents
A concrete placement workstation for building in room Download PDFInfo
- Publication number
- CN211517886U CN211517886U CN201921717060.XU CN201921717060U CN211517886U CN 211517886 U CN211517886 U CN 211517886U CN 201921717060 U CN201921717060 U CN 201921717060U CN 211517886 U CN211517886 U CN 211517886U
- Authority
- CN
- China
- Prior art keywords
- workstation
- workbench
- main part
- main body
- plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000005266 casting Methods 0.000 claims description 13
- 238000009435 building construction Methods 0.000 claims 5
- 230000003028 elevating Effects 0.000 claims 2
- 230000032258 transport Effects 0.000 abstract description 4
- 239000000203 mixture Substances 0.000 abstract description 2
- 238000007493 shaping process Methods 0.000 description 5
- 238000009434 installation Methods 0.000 description 3
- 230000003014 reinforcing Effects 0.000 description 2
- 238000004642 transportation engineering Methods 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 239000011083 cement mortar Substances 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 238000009440 infrastructure construction Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 229920003023 plastic Polymers 0.000 description 1
- 239000004033 plastic Substances 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 238000005728 strengthening Methods 0.000 description 1
- 238000010408 sweeping Methods 0.000 description 1
Images
Abstract
The utility model discloses a concrete placement workstation for building in room, including the workstation main part, the overhead backing plate is installed on the top of workstation main part, the roof is installed at the top of overhead backing plate, fixed riser is all installed to the front and the back both sides of workstation main part, the top mid-mounting that can dismantle the workstation has well backing plate, the mid-mounting of well backing plate has the support fence, can dismantle the both ends of workstation and install the pouring die utensil. The utility model discloses a mid-mounting of workstation main part has the detachable workbench, and can dismantle the workstation and install the middle part in the workstation main part through inlaying the concatenation mode, and this kind of design makes the convenient mutual dismantlement of workstation main part, makes the device conveniently dismantle the back and transports, facilitates the use, and installs the pouring mould that forms by two semi-circular pouring mould combinations in workstation main part and detachable workbench's inboard, will pour fashioned pile foundation through this kind of design convenience and take out.
Description
Technical Field
The utility model relates to a concrete placement workstation field specifically is a concrete placement workstation for building in room.
Background
A concrete placement workstation for building is used for pouring the shaping to building foundation and pile foundation and wallboard structure according to the building foundation condition, and the building is built, and is the building such as building on the soil that accomplishes infrastructure construction, and concrete placement means pours concrete into the mould until plastify process, should clear away debris such as rubbish in the template, earth, the greasy dirt on the reinforcing bar before pouring, and whether check the cement mortar cushion block of reinforcing bar, plastics cushion block are filled up, should water when using wooden formwork and make the template moist, the mouth of sweeping away of post template should be sealed after clearing away debris and ponding.
The concrete placement workstation installation in present stage is dismantled inconveniently, and pours getting after the shaping inconvenient, inconvenient transportation, and the volume is great, transports comparatively troublesome.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a concrete placement workstation for room is built to the installation of solving among the prior art is dismantled inconveniently, and pours getting after the shaping inconvenient, inconvenient transportation, the volume is great, transports more troublesome problem.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a concrete placement workstation for building in room, includes the workstation main part, the overhead backing plate is installed on the top of workstation main part, the roof is installed at the top of overhead backing plate, fixed riser is all installed to the front and the back both sides of workstation main part, fixed diaphragm is installed to fixed riser's both sides, install the guardrail between the fixed diaphragm, fixed ear is installed at the both ends of guardrail, the mid-mounting of workstation main part has the workstation of dismantling, the top mid-mounting that can dismantle the workstation has well backing plate, the mid-mounting of well backing plate has the support fence, can dismantle the both ends of workstation and install casting mold.
Preferably, the fixed transverse plate is fixedly connected with the fixed vertical plate through bolts, and the fixed vertical plate is fixedly connected with the workbench main body through bolts.
Preferably, the guardrail and the fixing lugs are arranged into an integral structure, and the guardrail is fixedly connected with the fixing transverse plate through the fixing lugs.
Preferably, the detachable workbench is arranged in the middle of the workbench main body in a splicing mode.
Preferably, the pouring mold is formed by splicing two semicircular structures, and the number of the pouring molds is four.
Preferably, the elevated backing plate is of a buffer structure and is connected with the workbench main body in an embedded manner.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model discloses a mid-mounting of workstation main part has the detachable workbench, and can dismantle the workstation and install the middle part in the workstation main part through inlaying the concatenation mode, and this kind of design makes the convenient mutual dismantlement of workstation main part, makes the device conveniently dismantle the back and transports, facilitates the use, and installs the pouring mould that forms by two semi-circular pouring mould combinations in workstation main part and detachable workbench's inboard, will pour fashioned pile foundation through this kind of design convenience and take out.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a top view of the table main body of the present invention.
Fig. 3 is a top view of the detachable workbench according to the present invention.
In the figure: 1. a top plate; 2. raising a base plate; 3. a table main body; 4. fixing the transverse plate; 5. fixing a vertical plate; 6. fixing the ear; 7. a guardrail; 8. pouring a mold; 9. a support fence; 10. a detachable work table; 11. and a middle cushion plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1 to 3, in the embodiment of the present invention, a concrete casting working platform for building comprises a working platform main body 3, an elevated backing plate 2 is installed on the top end of the working platform main body 3, the elevated backing plate 2 can buffer a top plate 1, and can buffer and protect workers, so that the bearing capacity of the concrete casting working platform is greatly increased, the elevated backing plate 2 is arranged as a buffer structure, the elevated backing plate 2 is connected with the working platform main body 3 in an embedded manner, the top plate 1 is installed on the top of the elevated backing plate 2, fixed vertical plates 5 are installed on both the front side and the back side of the working platform main body 3, fixed transverse plates 4 are installed on both sides of the fixed vertical plates 5, the fixed transverse plates 5 facilitate installation of the fixed transverse plates 4, the fixed transverse plates 4 are fixedly connected with the fixed vertical plates 5 through bolts, the fixed vertical plates 5 are fixedly connected with the working platform main body 3 through bolts, the fixed transverse plates, a guardrail 7 is arranged between the fixed transverse plates 4, the guardrail 7 is used for strengthening protection, the guardrail 7 and the fixed lug 6 are arranged into an integral structure, the guardrail 7 is fixedly connected with the fixed transverse plate 4 through the fixed lugs 6, the fixed lugs 6 are arranged at the two ends of the guardrail 7, the detachable workbench 10 is arranged at the middle part of the workbench main body 3, the detachable workbench 10 is assembled and spliced with the workbench main body 3, is convenient to assemble and disassemble, the detachable workbench 10 is arranged in the middle of the workbench main body 3 in a splicing way, the middle part of the top end of the detachable workbench 10 is provided with a middle cushion plate 11, the middle part of the middle cushion plate 11 is provided with a supporting fence 9, the supporting fence 9 is convenient for workers to tread, can dismantle the both ends of workstation 10 and install casting mold 8, casting mold 8 is used for the concrete placement shaping, and casting mold 8 is formed by two semicircle structures concatenation, and casting mold 8 is provided with four altogether.
The utility model discloses a theory of operation is: this equipment is when using, will dismantle workstation 10 and the mutual concatenation of workstation main part 3, then pass through the bolt fastening with fixed diaphragm 4 in the both sides of fixed riser 5, protect workstation main part 3 through fixed riser 5, install guardrail 7 between fixed riser 5, strengthen the protection, carry out concrete placement through the casting mold 8 that the concatenation was accomplished, treat to water behind the shaping, will dismantle workstation 10 and take out, dismantle can.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Claims (6)
1. A concrete pouring workbench for a house building comprises a workbench main body (3), the method is characterized in that: the top end of the workbench main body (3) is provided with an elevated base plate (2), the top of the elevated base plate (2) is provided with a top plate (1), the front and the back of the workbench main body (3) are both provided with a fixed vertical plate (5), fixing transverse plates (4) are arranged on two sides of the fixing vertical plates (5), a guardrail (7) is arranged between the fixing transverse plates (4), fixing lugs (6) are arranged at two ends of the guardrail (7), a detachable workbench (10) is arranged in the middle of the workbench main body (3), a middle base plate (11) is arranged in the middle of the top end of the detachable workbench (10), the middle part of the middle base plate (11) is provided with a supporting fence (9), and two ends of the detachable workbench (10) are provided with pouring molds (8).
2. A concrete casting work bench for building construction according to claim 1, characterized in that: the fixed transverse plate (4) is fixedly connected with the fixed vertical plate (5) through bolts, and the fixed vertical plate (5) is fixedly connected with the workbench main body (3) through bolts.
3. A concrete casting work bench for building construction according to claim 1, characterized in that: the guardrail (7) and the fixing lugs (6) are arranged into an integral structure, and the guardrail (7) is fixedly connected with the fixing transverse plate (4) through the fixing lugs (6).
4. A concrete casting work bench for building construction according to claim 1, characterized in that: the detachable workbench (10) is arranged in the middle of the workbench main body (3) in a splicing mode.
5. A concrete casting work bench for building construction according to claim 1, characterized in that: the pouring mold (8) is formed by splicing two semicircular structures, and the number of the pouring mold (8) is four.
6. A concrete casting work bench for building construction according to claim 1, characterized in that: the elevating base plate (2) is of a buffer structure, and the elevating base plate (2) is connected with the workbench main body (3) in an embedded mode.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921717060.XU CN211517886U (en) | 2019-10-14 | 2019-10-14 | A concrete placement workstation for building in room |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921717060.XU CN211517886U (en) | 2019-10-14 | 2019-10-14 | A concrete placement workstation for building in room |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211517886U true CN211517886U (en) | 2020-09-18 |
Family
ID=72442142
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921717060.XU Active CN211517886U (en) | 2019-10-14 | 2019-10-14 | A concrete placement workstation for building in room |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211517886U (en) |
-
2019
- 2019-10-14 CN CN201921717060.XU patent/CN211517886U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104631512B (en) | Hang modulus method after-pouring band beam-slab construction method | |
CN105908777A (en) | Comprehensive pipe gallery sliding mold and application method thereof | |
CN205676844U (en) | A kind of for one-piece casting trench furrow bank with the molding sliding formwork of base plate | |
CN211517886U (en) | A concrete placement workstation for building in room | |
CN106988319A (en) | A kind of rapid constructing method of large deep foundation pit agent structure side wall | |
CN206840385U (en) | A kind of prefab-form splicing frock of large volume tongue and groove box culvert | |
CN105133630A (en) | Prefabricated part for constructing foundation forming molds | |
CN213927071U (en) | Simple and easy angle steel lintel strutting arrangement | |
CN210086000U (en) | Town road curb construction equipment | |
CN207260574U (en) | The template fixed system of buildings waterproof structure | |
CN206917012U (en) | Assembly concrete lining structural assembly | |
CN205314542U (en) | Construction liquid die plate device that climbs | |
CN203022761U (en) | Novel vertical shaft formwork | |
CN213203839U (en) | Reusable box culvert slip form | |
CN217631252U (en) | Concrete turn-ups one shot forming die set | |
CN214657193U (en) | Splicing device of precast concrete foundation for tower crane | |
CN214941302U (en) | Ceramsite concrete metal net rack light wallboard and splicing structure thereof | |
CN208950298U (en) | A kind of new structure circular cross section cylinder mould | |
CN212336650U (en) | Template equipment for preventing cast-in-place concrete outer wall face brick from falling off | |
CN210263131U (en) | Assembled is from stagnant water underground pipe gallery structure | |
CN209854513U (en) | Town road curb mounting structure and construction equipment | |
CN213740894U (en) | But reuse's flood discharge ditch supports mechanical template | |
CN207348096U (en) | The pre-buried draw ring of the special bearing diagonal of piping lane | |
CN217580002U (en) | Integral cylinder mould of small-section vertical shaft | |
CN212027096U (en) | Civil engineering main part construction quick assembly disassembly template |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |