CN207260574U - Template fixing system of building waterproof structure - Google Patents
Template fixing system of building waterproof structure Download PDFInfo
- Publication number
- CN207260574U CN207260574U CN201720949382.1U CN201720949382U CN207260574U CN 207260574 U CN207260574 U CN 207260574U CN 201720949382 U CN201720949382 U CN 201720949382U CN 207260574 U CN207260574 U CN 207260574U
- Authority
- CN
- China
- Prior art keywords
- fixing device
- template
- device body
- fixing
- fastening clips
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000009415 formwork Methods 0.000 claims abstract description 63
- 229910000838 Al alloy Inorganic materials 0.000 claims description 6
- 239000000956 alloy Substances 0.000 claims description 5
- 230000007306 turnover Effects 0.000 abstract description 5
- 238000009434 installation Methods 0.000 abstract description 3
- 238000010276 construction Methods 0.000 description 10
- 238000010586 diagram Methods 0.000 description 6
- 238000013461 design Methods 0.000 description 3
- 238000003780 insertion Methods 0.000 description 3
- 230000037431 insertion Effects 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 230000003014 reinforcing effect Effects 0.000 description 3
- 229910045601 alloy Inorganic materials 0.000 description 1
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 description 1
- 229910052782 aluminium Inorganic materials 0.000 description 1
- 239000004411 aluminium Substances 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005266 casting Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000004134 energy conservation Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000003550 marker Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 238000004064 recycling Methods 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 238000005406 washing Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model discloses a template fixing system of a building waterproof structure, which comprises a first template fixing device, wherein the first template fixing device comprises a first template fixing clamp, a second template fixing clamp, an interval adjusting plate and an adjusting bolt; the first template fixing device and the second template fixing device both comprise first fixing device bodies; the spacing adjusting plate comprises an adjusting plate body, and strip-shaped adjusting holes are formed in the adjusting plate body; one end of the spacing adjusting plate is fixedly connected with one of the first template fixing clamp or the second template fixing clamp; one end of the adjusting bolt is fixedly connected with the template fixing clamp which is not connected with the interval adjusting plate and used for adjusting the distance between the first template fixing clamp and the second template fixing clamp. The utility model has the advantages of convenient installation, high turnover rate and high general rate; for different projects, the formwork can be erected and constructed only by selecting a proper formwork fixing device combination according to needs, and then concrete pouring is carried out.
Description
Technical field
The utility model belongs to secondary structure building wall technical field of construction, more particularly to a kind of buildings waterproof structure
Template fixed system.
Background technology
In secondary structure building wall work progress, construction code requirement is for toilet, washing machine seat in the plane etc.
There is the room more with water of waterproof requirement, the anti-bank of concrete is set in masonry panel bottom, and anti-bank is highly not less than
150mm.The anti-bank of concrete needs supporting module, then casting concrete.The anti-bank template shape that construction site generally uses at present
Formula is plank sheathing or aluminium alloy fixed shape template.The shortcomings that plank sheathing is the complex procedures such as processing, installation, reinforcing, dismounting, turnover time
Number is less, is unfavorable for energy conservation and environmental protection.Although the installation of aluminium alloy fixed shape template, reinforce, remove conveniently, the number of turnover is more, needs root
Customize dimensioned according to the wall size in each engineering, each room, therefore be only limited to the turnover of single engineering, different engineerings it
Between poor universality.
Utility model content
The purpose of this utility model is to provide a kind of template fixed system of buildings waterproof structure, to solve plank sheathing or aluminium
Construction shortcoming present in alloy typified form.
The utility model realizes that the technical solution of above-mentioned purpose is as follows:A kind of template fixed system of buildings waterproof structure,
It includes the first fixing templates, first fixing templates include the first formwork fastening clips, the second formwork fastening clips,
Spacing adjustable plate and adjusting bolt;
First fixing templates and the second fixing templates mirror-image structure each other, the two includes first and fixes
Device body, the first fixing device body section vertical with length direction are L-shaped;Two ends of the first fixing device body
Face sets the first template card slot and the second template card slot respectively;First fixing device body is set through its internal location hole,
The extending direction of location hole is consistent with the length direction of the first fixing device body;
Spacing adjustable plate includes adjustable plate body, and the adjustment hole of bar shaped is set on the adjustable plate body;Spacing adjustable plate
One end be fixedly connected with one of the first formwork fastening clips or the second formwork fastening clips;One end of adjusting bolt and not connected spacing
The first formwork fastening clips or the second formwork fastening clips of adjustable plate are fixedly connected, for adjusting the first formwork fastening clips or the second mould
The distance between plate fixing card.
The template fixed system of the utility model buildings waterproof structure as described above, further, the spacing adjustable plate
Including at least the first spacing adjustable plate and the second spacing adjustable plate;First spacing adjustable plate and the second spacing adjustable plate are spaced
Set;One end of first spacing adjustable plate is fixedly connected with one of the first formwork fastening clips or the second formwork fastening clips, between second
One end away from adjustable plate is fixedly connected with one of the first formwork fastening clips or the second formwork fastening clips.
The template fixed system of the utility model buildings waterproof structure as described above, further, the first spacing adjustable plate
One end be fixedly connected with the first formwork fastening clips, one end of the second spacing adjustable plate is fixedly connected with the first formwork fastening clips;
One end of adjusting bolt is fixedly connected with the second formwork fastening clips, for adjusting the first formwork fastening clips or the second formwork fastening clips
The distance between.
The template fixed system of the utility model buildings waterproof structure as described above, further, further includes the second template
Fixing device, the second fixing templates include the second fixing device body, and the second fixing device body is vertical with length direction
Section be L-shaped;Two end faces of the second fixing device body set the first template card slot and the second template card slot respectively;The
Two fixing device bodies set the length through its internal location hole, the extending direction of location hole and the second fixing device body
Direction is consistent.
The template fixed system of the utility model buildings waterproof structure as described above, further, further includes the 3rd template
Fixing device, the 3rd fixing templates include the 3rd fixing device body, and the 3rd fixing device body is vertical with length direction
Rectangular cross-section;One side of the 3rd fixing device body sets template card slot, and the side adjacent with first side is equipped with
The positioning protrusion of bar shaped;3rd fixing device body is set through its internal location hole, the extending direction of location hole and the 3rd
The length direction of fixing device body is consistent.
The template fixed system of the utility model buildings waterproof structure as described above, further, further includes the 4th template
Fixing device, the 4th fixing templates include the 4th fixing device body, and the 4th fixing device body is vertical with length direction
Section for square;One side of the 4th fixing device body is equipped with the positioning protrusion of bar shaped, adjacent with the side
Side also is provided with the positioning protrusion of bar shaped;4th fixing device body is set through its internal location hole, the extension of location hole
Direction is consistent with the length direction of the 4th fixing device body.
The template fixed system of the utility model buildings waterproof structure as described above, further, further includes locating rod, institute
The length for stating locating rod is more than the depth of the location hole;A diameter of 10mm~15mm of the location hole.
The template fixed system of the utility model buildings waterproof structure as described above, further, first template is consolidated
It is aluminum alloy material to determine device, the second fixing templates, the 3rd fixing templates, the 4th fixing templates.
The beneficial effects of the utility model are:Install, be fixed conveniently, fixing device turnover rate, general rate are high.For difference
Engineering, need to only select the i.e. achievable template of suitable fixing templates combination as needed installs construction, and then is mixed
Solidifying soil pours.
Brief description of the drawings
By the detailed description made in conjunction with the following drawings, the above-mentioned and/or otherwise advantage of the utility model will
Becoming more apparent upon and be easier to understand, these attached drawings are simply schematical, are not intended to limit the utility model, wherein:
Fig. 1 is a kind of the first fixing templates schematic diagram of embodiment of the utility model;
Fig. 2 is a kind of the second fixing templates schematic diagram of embodiment of the utility model;
Fig. 3 is a kind of the 3rd fixing templates schematic diagram of embodiment of the utility model;
Fig. 4 is a kind of the 4th fixing templates schematic diagram of embodiment of the utility model;
Fig. 5 is a kind of template fixed-system applications schematic diagram of the buildings waterproof structure of embodiment.
In attached drawing, parts list represented by the reference numerals is as follows:
1st, the first fixing templates, the 11, first formwork fastening clips, the 12, second formwork fastening clips, the 13, first spacing tune
Save plate, the 14, second spacing adjustable plate, 15, adjusting bolt, the 111, first fixing device body, the 112, first fixing templates
The first template card slot, the second template card slot of the 113, first fixing templates, the positioning of the 114, first fixing templates
Hole, 131, adjustment hole;
2nd, the second fixing templates, the 21, second fixing device body, the first template of the 22, second fixing templates
Card slot, the second template card slot of the 23, second fixing templates, the location hole of the 24, second fixing templates;
3rd, the 3rd fixing templates, the 31, the 3rd fixing device body, the 32, the 3rd fixing templates template card slot,
33rd, the 3rd fixing templates positioning protrusion, the location hole of the 34, the 3rd fixing templates;
4th, the 4th fixing templates, the 41, the 4th fixing device body, the positioning protrusion of the 42, the 4th fixing templates,
43rd, the location hole of the 4th fixing templates;
5th, Wood-plastic formwork;
6th, extruded sheet;
7th, shear wall.
Embodiment
Hereinafter, the implementation of the template fixed system of the buildings waterproof structure of the utility model is described with reference to the accompanying drawings
Example.
The embodiment recorded herein is the specific embodiment of the utility model, for illustrating the utility model
Design, is explanatory and exemplary, should not be construed as the limit to the utility model embodiment and the scope of the utility model
System.In addition to the embodiment recorded herein, those skilled in the art can also be based on the application claims and specification institute is public
The content opened includes doing using the embodiment to recording herein using obvious other technical solutions, these technical solutions
Go out the technical solution of any obvious substitutions and modifications.
The attached drawing of this specification is schematic diagram, aids in illustrating the design of the utility model, it is schematically indicated each several part
Shape and its correlation.Note that for the ease of clearly show the utility model embodiment each component structure, respectively
Do not drawn between attached drawing according to identical ratio.Identical reference marker is used to represent identical part.
Fig. 5 shows a kind of template fixed system of the buildings waterproof structure of embodiment of the utility model answering in construction
With it includes the first fixing templates 1, as shown in Figure 1, the first fixing templates 1 include the first formwork fastening clips 11, the
Two formwork fastening clips 12, spacing adjustable plate and adjusting bolt 15;
First fixing templates 1 and the second fixing templates 2 mirror-image structure each other, the two, which includes first, fixes and fills
Body 111 is put, the section vertical with its length direction of the first fixing device body is L-shaped;First fixing device body 111
Two end faces the first template card slot 112 of the first fixing templates and the second mould of the first fixing templates are set respectively
Board groove 113;First fixing device body sets the location hole 114 through its first internal fixing templates, location hole
Extending direction it is consistent with the length direction of the first fixing device body;
Spacing adjustable plate includes adjustable plate body, and the adjustment hole 131 of bar shaped is set on adjustable plate body;Spacing adjustable plate
One end is fixedly connected with one of the first formwork fastening clips 11 or the second formwork fastening clips 12;One end of adjusting bolt 15 is with being not connected with
The first formwork fastening clips 11 or the second formwork fastening clips 12 of spacing adjustable plate are fixedly connected, for adjusting the first formwork fastening clips
11 or second the distance between the formwork fastening clips 12.
The length of locating rod is more than the depth of location hole;A diameter of 10mm~15mm of location hole.The effect of locating rod is
Fixing templates are fixed on to the designated position of constructure ground by location hole.
Buildings waterproof structure is carried out using the first fixing templates(Such as anti-bank)The process poured is as follows:First by the first mould
Board fixer is well placed according to wall position line, and the width of the first fixing templates is adjusted according to width of wall body.Use hand
Electric drill is held by the location hole on the first fixing templates to concrete slab perforating, aperture 12mm, then using diameter 10mm
The first fixing templates are fixed in reinforcing bar insertion location hole.The mould that first fixing templates will configure after the completion of fixing
In plate insertion template card slot, installing for anti-bank template is completed.Process is used it is known that the first formwork fastening clips by above-mentioned
11st, the second formwork fastening clips 12, spacing adjustable plate, adjusting bolt 15, and locating rod need to be used in conjunction with each other, and could realize
Buildings waterproof structure pours, rather than is simply combined.
In a kind of preferred embodiment, as shown in Figure 1, spacing adjustable plate includes at least the first spacing adjustable plate 13 and the
Two spacing adjustable plates 14;The 14 spaced setting of first spacing adjustable plate 13 and the second spacing adjustable plate;First spacing adjustable plate
13 one end is fixedly connected with one of the first formwork fastening clips 11 or the second formwork fastening clips 12, and the one of the second spacing adjustable plate 14
End is fixedly connected with one of the first formwork fastening clips 11 or the second formwork fastening clips 12.For example, the one of the first spacing adjustable plate 13
End is fixedly connected with the first formwork fastening clips 11, and one end of the second spacing adjustable plate 14 is fixed with the first formwork fastening clips 11 to be connected
Connect;One end of adjusting bolt 15 is fixedly connected with the second formwork fastening clips 12, for adjusting the first formwork fastening clips 11 or the second
The distance between formwork fastening clips 12.Or first one end of spacing adjustable plate 13 be fixedly connected with the first formwork fastening clips 11,
One end of second spacing adjustable plate 14 is fixedly connected with the second formwork fastening clips 11.
In a kind of template fixed system of the buildings waterproof structure of preferred embodiment, except including described in above-described embodiment
First fixing templates, further include the second fixing templates 2, as shown in Fig. 2, the second fixing templates 2 include second
Fixing device body 21, the second fixing device body 21 section vertical with length direction are L-shaped;Second fixing device body
21 two end faces set respectively the second fixing templates the first template card slot 22 and the second fixing templates second
Template card slot 23;Second fixing device body 21 sets the location hole through its second internal fixing templates, the second mould
The extending direction of the location hole 24 of board fixer is consistent with the length direction of the second fixing device body 21.As shown in figure 5, the
One fixing templates combine the second fixing templates and are used to install and support the Wood-plastic formwork 5 of right side central in Fig. 5, and then
Carry out pouring for concrete.Use first fixing templates and two the second fixing templates in the position, second
Fixing templates are abutted with existing shear wall 7, and one of Wood-plastic formwork is inserted into the first mould of the first fixing templates
First template card slot of board groove and the second fixing templates;Another piece of Wood-plastic formwork is inserted into the of the first fixing templates
First template card slot of two template card slots and the second fixing templates.
In a kind of template fixed system of the buildings waterproof structure of preferred embodiment, except including described in above-described embodiment
First fixing templates, further include the 3rd fixing templates 3, as shown in figure 3, the 3rd fixing templates 3 include the 3rd
Fixing device body 31, the rectangular cross-section vertical with length direction of the 3rd fixing device body 31;3rd fixing device body
31 side sets the template card slot 32 of the 3rd fixing templates, and the side adjacent with first side is equipped with the of bar shaped
The positioning protrusion 33 of three fixing templates;3rd fixing device body 31 is set through its 3rd internal fixing templates
Location hole 34, the extending direction of location hole is consistent with the length direction of the 3rd fixing device body 31.
In a kind of template fixed system of the buildings waterproof structure of preferred embodiment, except including described in above-described embodiment
First fixing templates, further include the 4th fixing templates 4, as shown in figure 4, the 4th fixing templates 4 include the 4th
Fixing device body 41, the 4th fixing device body 41 section vertical with length direction are square;4th fixing device sheet
One side of body 41 is equipped with the positioning protrusion of bar shaped, and the side adjacent with side also is provided with the 4th fixing templates of bar shaped
Positioning protrusion 42;4th fixing device body 41 sets the location hole 43 through its 4th internal fixing templates, fixed
The extending direction in position hole is consistent with the length direction of the 4th fixing device body 41.
As shown in figure 5, the first fixing templates combine the 3rd fixing templates, the 4th fixing templates are used to pacify
Fill and support the Wood-plastic formwork 5 of lower right side in Fig. 5, and then carry out pouring for concrete.Two the first moulds are used in the position
Board fixer, the 3rd fixing templates and the 4th fixing templates, two the first fixing templates lead to
Cross the connection of the 4th fixing templates;3rd fixing templates and position relatively on the first fixing templates be connected.
Extruded sheet is set between the first formwork fastening clips and the second formwork fastening clips of one fixing templates.
In a kind of template fixed system of the buildings waterproof structure of preferred embodiment, the first fixing templates 1, second
Fixing templates 2, the 3rd fixing templates 3, the 4th fixing templates 4 are aluminum alloy material.Use aluminium alloy material
Matter can improve the recycling number of template fixed system, generally speaking can reduce production cost.
As shown in figure 5, the construction method of the buildings waterproof structure for a kind of embodiment of the utility model, in the embodiment
In, existed building includes the L-shaped second on right side in the first wall of inverted L-shaped on the left of Fig. 5, and close Fig. 5
Wall, the waterproof construction overall profile for finally needing to pour are rectangle;The construction method of buildings waterproof structure comprises the following steps:
Step 1, fixing templates are well placed according to the wall position line of waterproof construction;
Step 2, the width of the first fixing templates is adjusted according to width of wall body;
Step 3, using electric drill by the location hole on fixing templates to concrete slab perforating;
Step 4, fixing templates are fixed using in reinforcing bar insertion location hole;
Step 5, the template configured is inserted into template card slot after the completion of fixing templates are fixed, completes anti-bank template
Install, finally carry out concreting.
In step 1, the top of Fig. 5, puts three pair of second fixing templates between the first wall and the second wall;
The left side of Fig. 5, as figure puts two pair of second fixing templates.One pair of which is located at the square position of rectangle;In Fig. 5 lower parts
Centre sets a pair of second fixing templates;In the right side central of Fig. 5, the first fixing templates and two the second moulds are put
Board fixer;In the lower right side of Fig. 5, two the first fixing templates are vertically put, and dress is fixed using the 4th template
Put and be attached, the 3rd fixing templates are connected with the template card slot of one of them the first fixing templates.
In step 2, the width of the first fixing templates is adjusted respectively, it is met design needs;
Extruded sheet 6 is installed in two the first fixing templates of Fig. 5 lower right sides.Due to the first fixing templates
Inner length size be fixed(Width is adjustable), termination length can only be done more than above-mentioned length dimension, but by squeezing
The inside that mould plate is used for filling the first fixing templates can simply realize different termination length.
Each technical characteristic of above-mentioned disclosure is not limited to disclosed and further feature combination, and those skilled in the art are also
Other combinations between each technical characteristic can be carried out according to the purpose of utility model, are subject to the purpose for realizing the utility model.
Claims (8)
- A kind of 1. template fixed system of buildings waterproof structure, it is characterised in that including the first fixing templates, described first Fixing templates include the first formwork fastening clips, the second formwork fastening clips, spacing adjustable plate and adjusting bolt;First fixing templates and the second fixing templates mirror-image structure each other, the two includes the first fixing device Body, the first fixing device body section vertical with length direction are L-shaped;Two end faces of the first fixing device body point First template card slot and the second template card slot are not set;First fixing device body is set through its internal location hole, positioning The extending direction in hole is consistent with the length direction of the first fixing device body;Spacing adjustable plate includes adjustable plate body, and the adjustment hole of bar shaped is set on the adjustable plate body;The one of spacing adjustable plate End is fixedly connected with one of the first formwork fastening clips or the second formwork fastening clips;One end of adjusting bolt is adjusted with not connected spacing The first formwork fastening clips or the second formwork fastening clips of plate are fixedly connected, and are consolidated for adjusting the first formwork fastening clips or the second template The distance between fixed card.
- 2. the template fixed system of buildings waterproof structure according to claim 1, it is characterised in that the spacing adjustable plate Including at least the first spacing adjustable plate and the second spacing adjustable plate;First spacing adjustable plate and the second spacing adjustable plate are spaced Set;One end of first spacing adjustable plate is fixedly connected with one of the first formwork fastening clips or the second formwork fastening clips, between second One end away from adjustable plate is fixedly connected with one of the first formwork fastening clips or the second formwork fastening clips.
- 3. the template fixed system of buildings waterproof structure according to claim 1 or 2, it is characterised in that the first spacing tune One end of section plate is fixedly connected with the first formwork fastening clips, and one end of the second spacing adjustable plate is fixed with the first formwork fastening clips to be connected Connect;One end of adjusting bolt is fixedly connected with the second formwork fastening clips, is consolidated for adjusting the first formwork fastening clips or the second template The distance between fixed card.
- 4. the template fixed system of buildings waterproof structure according to claim 3, it is characterised in that further include the second template Fixing device, the second fixing templates include the second fixing device body, and the second fixing device body is vertical with length direction Section be L-shaped;Two end faces of the second fixing device body set the first template card slot and the second template card slot respectively;The Two fixing device bodies set the length through its internal location hole, the extending direction of location hole and the second fixing device body Direction is consistent.
- 5. the template fixed system of buildings waterproof structure according to claim 4, it is characterised in that further include the 3rd template Fixing device, the 3rd fixing templates include the 3rd fixing device body, and the 3rd fixing device body is vertical with length direction Rectangular cross-section;One side of the 3rd fixing device body sets template card slot, and the side adjacent with first side is equipped with The positioning protrusion of bar shaped;3rd fixing device body is set through its internal location hole, the extending direction of location hole and the 3rd The length direction of fixing device body is consistent.
- 6. the template fixed system of buildings waterproof structure according to claim 5, it is characterised in that further include the 4th template Fixing device, the 4th fixing templates include the 4th fixing device body, and the 4th fixing device body is vertical with length direction Section for square;One side of the 4th fixing device body is equipped with the positioning protrusion of bar shaped, adjacent with the side Side also is provided with the positioning protrusion of bar shaped;4th fixing device body is set through its internal location hole, the extension of location hole Direction is consistent with the length direction of the 4th fixing device body.
- 7. the template fixed system of buildings waterproof structure according to claim 6, it is characterised in that locating rod is further included, The length of the locating rod is more than the depth of the location hole;A diameter of 10mm~15mm of the location hole.
- 8. the template fixed system of the buildings waterproof structure according to claim 6 or 7, it is characterised in that first mould Board fixer, the second fixing templates, the 3rd fixing templates, the 4th fixing templates are aluminum alloy material.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720949382.1U CN207260574U (en) | 2017-08-01 | 2017-08-01 | Template fixing system of building waterproof structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720949382.1U CN207260574U (en) | 2017-08-01 | 2017-08-01 | Template fixing system of building waterproof structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207260574U true CN207260574U (en) | 2018-04-20 |
Family
ID=61927720
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720949382.1U Expired - Fee Related CN207260574U (en) | 2017-08-01 | 2017-08-01 | Template fixing system of building waterproof structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207260574U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107313587A (en) * | 2017-08-01 | 2017-11-03 | 中国建筑局(集团)有限公司 | Template fixing system of building waterproof structure and construction method of waterproof structure |
CN109162455A (en) * | 2018-09-12 | 2019-01-08 | 鼎宸建设科技有限公司 | A kind of aluminum alloy pattern plate installation Quick connection part and its installation method |
CN112502427A (en) * | 2020-12-18 | 2021-03-16 | 景建华 | Steel frame plastic plate building template mutually combined with aluminum alloy building template |
-
2017
- 2017-08-01 CN CN201720949382.1U patent/CN207260574U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107313587A (en) * | 2017-08-01 | 2017-11-03 | 中国建筑局(集团)有限公司 | Template fixing system of building waterproof structure and construction method of waterproof structure |
CN109162455A (en) * | 2018-09-12 | 2019-01-08 | 鼎宸建设科技有限公司 | A kind of aluminum alloy pattern plate installation Quick connection part and its installation method |
CN112502427A (en) * | 2020-12-18 | 2021-03-16 | 景建华 | Steel frame plastic plate building template mutually combined with aluminum alloy building template |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207260574U (en) | Template fixing system of building waterproof structure | |
CN104631512A (en) | Post-cast strip beam and slab construction method adopting formwork hanging method | |
CN107327050B (en) | Disassembly-free basement exterior wall flanging unilateral formwork supporting device and construction method | |
CN105019651B (en) | Hollow brick fills wall into the efficient installation engineering method of winding box | |
CN110374321A (en) | A kind of assembled waffle beam superstructure gang form and construction method | |
CN214497885U (en) | Connecting joint for connecting formwork column and wallboard | |
CN210658959U (en) | Constructional column concrete placement construction structures of smashing | |
CN207177286U (en) | Add region mould after fabricated shear wall is reserved | |
CN107313587A (en) | Template fixing system of building waterproof structure and construction method of waterproof structure | |
CN212642115U (en) | Clear water concrete indent arc roofing inner side roof beam hangs mould system | |
CN107379221A (en) | The side form that component goes out muscle installs device and its construction method | |
CN216075217U (en) | Accurate pre-buried device of complicated basic column base bolt of steel construction | |
CN217379518U (en) | Constructional column and horizontal tie beam formwork-free construction component | |
CN207376661U (en) | A kind of plugging structure of poured band of outer wall of basement | |
CN207143746U (en) | Support beam template system under concrete support trestle plate | |
CN207260636U (en) | Pipe die reinforced column supporting member | |
CN212715942U (en) | Template positioning device | |
CN216076318U (en) | Reinforcing device for aluminum alloy reverse ridge template | |
CN206873924U (en) | Assembly concrete Vierendeel girder Hou Jiao areas tool-typed formwork | |
CN215717196U (en) | Drawknot reinforcing clamp convenient to operate and used for constructional column side mold | |
CN212201280U (en) | Stagnant water bank platform template device | |
CN211447004U (en) | Reinforced GRC plate and pipe ditch foundation formwork system combining same | |
CN109235709B (en) | Full cast-in-place outer wall structure of building | |
CN207160052U (en) | A kind of skewback for connecting arcuate bead steel construction | |
CN202273345U (en) | Positioning and anti-floating device for BDF thin-walled cement hollow pipes |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180420 |
|
CF01 | Termination of patent right due to non-payment of annual fee |