CN206873924U - Assembly concrete Vierendeel girder Hou Jiao areas tool-typed formwork - Google Patents

Assembly concrete Vierendeel girder Hou Jiao areas tool-typed formwork Download PDF

Info

Publication number
CN206873924U
CN206873924U CN201720396047.3U CN201720396047U CN206873924U CN 206873924 U CN206873924 U CN 206873924U CN 201720396047 U CN201720396047 U CN 201720396047U CN 206873924 U CN206873924 U CN 206873924U
Authority
CN
China
Prior art keywords
vierendeel girder
precast concrete
hou jiao
tool
jiao areas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720396047.3U
Other languages
Chinese (zh)
Inventor
孙少辉
杨宇飞
孙岩波
李晨光
罗力勤
龚浩浦
张淑丽
阎明伟
辛伟
马恒
韩建朋
郑金祖
孙振世
刘书江
代军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Group Co Ltd
Beijing Building Construction Research Institute Co Ltd
Original Assignee
China Railway Construction Group Co Ltd
Beijing Building Construction Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Group Co Ltd, Beijing Building Construction Research Institute Co Ltd filed Critical China Railway Construction Group Co Ltd
Priority to CN201720396047.3U priority Critical patent/CN206873924U/en
Application granted granted Critical
Publication of CN206873924U publication Critical patent/CN206873924U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Rod-Shaped Construction Members (AREA)

Abstract

The utility model discloses a kind of assembly concrete Vierendeel girder Hou Jiao areas tool-typed formwork, for constructing Vierendeel girder Hou Jiao areas at the connecting node of precast concrete column and precast concrete beam, connected between precast concrete column and precast concrete beam beforehand through vertical muscle and stirrup.Tool-typed formwork includes bed die, side form, bed die is lifted on by U-shaped connector below some vertical muscle in bottom, the horizontal both sides of stirrup are respectively provided with a side form, two side forms are placed in above bed die and are connected by split bolt, and two side forms and a bed die are collectively forming the U-shaped Vierendeel girder Hou Jiao areas in open top, section.The utility model is simple for structure, practical, and installation rate is fast, and efficiency of construction is high, and securely and reliably, cost is low.

Description

Assembly concrete Vierendeel girder Hou Jiao areas tool-typed formwork
Technical field
A kind of tool-typed formwork used in assembly concrete Vierendeel girder Hou Jiao areas is the utility model is related to, belongs to assembling Formula concrete structure technique field.
Background technology
Prefabricated concrete structure is by being reliably connected the concrete knot that mode is assembled by precast concrete Structure, it has the advantages that situ wet operation amount is few, labour's dosage is few and green.Assembly concrete frame structure refers to All or part of Vierendeel girder, post use the fabricated construction that prefabricated components are formed, and wherein precast concrete beam, Column border node connection is No is reliably the whether safe key of assembling frame structure.When the construction of Vierendeel girder Hou Jiao areas is carried out in Practical Project, generally Concreting is carried out after installing some templates for the region.But can see from actual implement, install conventional template When, template composition is complex cumbersome with installing process, is not easy to workmen's installation, and so as to result in, speed of application is slow, applies Work efficiency rate is low, delays the construction period significantly, wastes time and energy, to be improved.
Utility model content
The purpose of this utility model is to provide a kind of assembly concrete Vierendeel girder Hou Jiao areas tool-typed formwork, and it is tied Close the design feature design in assembled concrete frame beam Hou Jiao areas, solve using conventional template support pour it is existing not Foot.
To achieve these goals, the utility model employs following technical scheme:
A kind of assembly concrete Vierendeel girder Hou Jiao areas tool-typed formwork, in precast concrete column and concrete Vierendeel girder Hou Jiao areas are constructed at Tu Liang connecting node, beforehand through vertical muscle between precast concrete column and precast concrete beam Connected with stirrup, it is characterised in that:Tool-typed formwork includes bed die, side form, and bed die is lifted in bottom by U-shaped connector Some vertical muscle below, the horizontal both sides of stirrup are respectively provided with a side form, and two side forms are placed in above bed die and by drawing spiral shell Bolt is connected, and two side forms and a bed die are collectively forming the U-shaped Vierendeel girder Hou Jiao areas in open top, section.
The U-shaped connector includes two ends and has a threaded U-shaped steel muscle, the two ends of U-shaped steel muscle respectively with supporting spiral shell Mother is spirally connected.
The utility model has the advantages that:
The utility model designs by the own structural characteristics in assembly concrete Vierendeel girder Hou Jiao areas, simple for structure, real Strong with property, versatility is good, and scene is easily operated, and installation rate is fast, and efficiency of construction is high, and securely and reliably, cost is low, is easy to construction to manage Reason, it is advantageously implemented the civilized construction of job site.
Brief description of the drawings
Fig. 1 is the structural representation of the utility model tool-typed formwork.
Fig. 2 is Fig. 1 A-A to section view enlarged diagram.
Fig. 3 is Fig. 1 B-B direction section view enlarged diagram (precast concrete column is not shown).
Fig. 4 is the structural representation of U-shaped connector.
Embodiment
As shown in Figures 1 to 4, the utility model assembly concrete Vierendeel girder Hou Jiao areas are used for pre- with tool-typed formwork Vierendeel girder Hou Jiao areas 15 are constructed at the connecting node of concrete column 11 processed and precast concrete beam 12, in Vierendeel girder Hou Jiao areas 15 Firm connection between precast concrete column 11 and precast concrete beam 12 can be realized after concrete by having poured.Precast concrete Connected between post 11 and precast concrete beam 12 beforehand through vertical muscle 21 and stirrup 23.As shown in Figure 1, Figure 2, from precast concrete column 11 Generally it is connected between the vertical muscle 21 stretched out and the corresponding vertical muscle 21 stretched out from precast concrete beam 12 by branch sleeve 22.
Such as figure, the utility model tool-typed formwork includes bed die 16, side form 17, and bed die 16 is lifted on by U-shaped connector Some vertical lower sections of muscle 21 in bottom are without supporting, along perpendicular to the direction of the axis of precast concrete beam 12, stirrup 23 Horizontal both sides be respectively provided with a side form 17, two side forms 17 are placed in bed die 16 above and are connected by split bolt 18, side For mould 17 between the outside of stirrup 23 and the nut of split bolt 18, two side forms 17 and a bed die 16 are collectively forming no backform And the Vierendeel girder Hou Jiao areas 15 that open top, section are U-shaped.
Such as Fig. 4, U-shaped connector includes two ends and has a threaded U-shaped steel muscle 13, the two ends of U-shaped steel muscle 13 respectively with Matching nut 14 is spirally connected.
In actual design, U-shaped steel muscle 13 in the two ends rolling of plain bar or Ribbed Bar by going out to set length Straight thread after bend and form.
When actually implementing, the width D of the bending part of U-shaped steel muscle 13 should be slightly bigger than precast concrete beam 12 and be mixed with prefabricated Exposed to the outer diameter of section of vertical muscle 21 between solidifying earth pillar 11.
When precast concrete column 11, the construction of precast concrete beam 12 finish and connect vertical muscle 21 and stirrup between the two After 23, it can start that the utility model tool-typed formwork is installed, specific installation process is as follows:
First by the opening down some vertical muscle 21 in bottom hung in the opening position of Vierendeel girder Hou Jiao areas 15 of U-shaped steel muscle 13 Upper (Fig. 1 shows the situation that two U-shaped steel muscle 13 are each hung on the vertical muscle 21 in outermost two of bottom), then will be U-shaped Reinforcing bar 13 penetrates on bed die 16 hole accomplished fluently in advance, then tightens matching nut 14 on two terminations of U-shaped steel muscle 13, so that The support of matching nut 14 bed die 16, hanging is realized on muscle 21 so as to which bed die 16 is indulged in bottom, reference picture 1 understands.
Then, on bed die 16, a side form 17 is respectively set in 23 horizontal both sides of stirrup, two side forms 17 pass through to drawing Bolt 18 is connected (Fig. 2 and Fig. 3 show the situation that two side forms 17 are connected by 4 split bolts 18), the quilt of side form 17 It is sandwiched between the outside of stirrup 23 and the nut of split bolt 18, so as to which two side forms 17 and a bed die 16 just together form frame Set a roof beam in place Hou Jiao areas 15.
In use, the casting concrete in Vierendeel girder Hou Jiao areas 15, so just realize precast concrete column 11 with it is prefabricated Firm connection between beams of concrete 12.
The utility model has the advantages that:
The utility model designs by the own structural characteristics in assembly concrete Vierendeel girder Hou Jiao areas, simple for structure, real Strong with property, versatility is good, and scene is easily operated, and installation rate is fast, and efficiency of construction is high, and securely and reliably, cost is low, is easy to construction to manage Reason, it is advantageously implemented the civilized construction of job site.
The technical principle described above for being the utility model preferred embodiment and its being used, for those skilled in the art It is any based on technical solutions of the utility model basis in the case of without departing substantially from spirit and scope of the present utility model for member On equivalent transformation, it is simple replace etc. it is obvious change, belong within scope of protection of the utility model.

Claims (4)

  1. A kind of 1. assembly concrete Vierendeel girder Hou Jiao areas tool-typed formwork, in precast concrete column and precast concrete Vierendeel girder Hou Jiao areas are constructed at the connecting node of beam, between precast concrete column and precast concrete beam beforehand through vertical muscle and Stirrup connects, it is characterised in that:Tool-typed formwork includes bed die, side form, and bed die is lifted in bottom by U-shaped connector Below some vertical muscle, the horizontal both sides of stirrup are respectively provided with a side form, and two side forms are placed in above bed die and pass through split bolt It is connected, two side forms and a bed die are collectively forming the U-shaped Vierendeel girder Hou Jiao areas in open top, section.
  2. 2. assembly concrete Vierendeel girder Hou Jiao areas as claimed in claim 1 tool-typed formwork, it is characterised in that:
    The U-shaped connector includes two ends and has a threaded U-shaped steel muscle, the two ends of U-shaped steel muscle respectively with matching nut spiral shell Connect.
  3. 3. assembly concrete Vierendeel girder Hou Jiao areas as claimed in claim 2 tool-typed formwork, it is characterised in that:
    The U-shaped steel muscle by bent after the two ends rolling of plain bar or Ribbed Bar goes out to set the straight thread of length and Into.
  4. 4. assembly concrete Vierendeel girder Hou Jiao areas as claimed any one in claims 1 to 3 tool-typed formwork, its feature It is:
    From the vertical muscle that the precast concrete column is stretched out and the corresponding vertical muscle that is stretched out from the precast concrete beam it Between be connected by branch sleeve.
CN201720396047.3U 2017-04-14 2017-04-14 Assembly concrete Vierendeel girder Hou Jiao areas tool-typed formwork Active CN206873924U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720396047.3U CN206873924U (en) 2017-04-14 2017-04-14 Assembly concrete Vierendeel girder Hou Jiao areas tool-typed formwork

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720396047.3U CN206873924U (en) 2017-04-14 2017-04-14 Assembly concrete Vierendeel girder Hou Jiao areas tool-typed formwork

Publications (1)

Publication Number Publication Date
CN206873924U true CN206873924U (en) 2018-01-12

Family

ID=61343375

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720396047.3U Active CN206873924U (en) 2017-04-14 2017-04-14 Assembly concrete Vierendeel girder Hou Jiao areas tool-typed formwork

Country Status (1)

Country Link
CN (1) CN206873924U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109306758A (en) * 2018-11-01 2019-02-05 沈阳建筑大学 Prefabricated plate superposed type floor connector and preparation method thereof and construction method
CN113482154A (en) * 2021-08-05 2021-10-08 苏州达康建筑科技有限公司 Assembly type beam-column joint structure, device and installation method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109306758A (en) * 2018-11-01 2019-02-05 沈阳建筑大学 Prefabricated plate superposed type floor connector and preparation method thereof and construction method
CN113482154A (en) * 2021-08-05 2021-10-08 苏州达康建筑科技有限公司 Assembly type beam-column joint structure, device and installation method

Similar Documents

Publication Publication Date Title
CN105804283B (en) Full assembly concrete-filled steel tube frame combined shear wall construction
CN107143034A (en) A kind of assembly concrete frame structure beam column rigid connection node
CN108678220B (en) Concrete shear wall with integrally installed reinforcing steel bar templates
CN108343148B (en) A kind of frame structure system and its construction method
CN206903022U (en) A kind of steel bar truss floor support plate
CN109372129A (en) The novel full assembly concrete frame joint of one kind and its construction method
CN207812838U (en) One kind is U-shaped to be exempted to tear construction column template open
CN206873924U (en) Assembly concrete Vierendeel girder Hou Jiao areas tool-typed formwork
CN108071169A (en) Assemble prefabricated components formula house
CN210976328U (en) Secondary structure capable of being assembled for construction
CN206157913U (en) Assembled square steel tube concrete post and girder steel connected node
CN106088640A (en) The method that existing frame structure is carried out demolishing columns
CN106759873A (en) A kind of new prefabricated integral frame structure prefabricated post is constructed with prefabricated beam connecting node
CN206769200U (en) First wear formula post stretching vertical prestressing cast-in-place concrete rod structure
CN206956979U (en) A kind of Linear shear wall with fore-set
CN206769199U (en) After wear formula post stretching vertical prestressing cast-in-place concrete rod structure
CN107100322B (en) Post stretching vertical prestressing cast-in-place concrete rod structure and construction method
CN105019645A (en) Template system for building concrete structure at earth-taking opening in top-down construction method, and construction method
CN105649259B (en) A kind of wallboard structural system of the dark framework of band of precast concrete wall panel and its structure
CN210396112U (en) Integrated cast-in-place concrete waterproof bank for kitchen and toilet
CN109518950B (en) Support-free tool-based template system applied to assembled cast-in-place section and use method thereof
CN204715764U (en) The structure that a kind of constructional column and agent structure are constructed simultaneously
CN218091465U (en) Assembled non-bearing masonry wall structure
CN108412036B (en) Assembled H profile steel column-isolated footing-concrete collar tie beam cross connecting node