CN205224094U - Power cable calandria worker well structure - Google Patents

Power cable calandria worker well structure Download PDF

Info

Publication number
CN205224094U
CN205224094U CN201521023461.7U CN201521023461U CN205224094U CN 205224094 U CN205224094 U CN 205224094U CN 201521023461 U CN201521023461 U CN 201521023461U CN 205224094 U CN205224094 U CN 205224094U
Authority
CN
China
Prior art keywords
power cable
work well
shaping
borehole wall
well
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201521023461.7U
Other languages
Chinese (zh)
Inventor
苏金城
邱万欣
杨宪
吴克俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wanshan Mountain Foochow Electric Power Advisory Co Ltd
Original Assignee
Wanshan Mountain Foochow Electric Power Advisory Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wanshan Mountain Foochow Electric Power Advisory Co Ltd filed Critical Wanshan Mountain Foochow Electric Power Advisory Co Ltd
Priority to CN201521023461.7U priority Critical patent/CN205224094U/en
Application granted granted Critical
Publication of CN205224094U publication Critical patent/CN205224094U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a power cable calandria worker well structure for lay power cable in heavy driveway department, worker's well includes base, cable support frame, the wall of a well, safe edge and well lid, the cable support frame includes channel -section steel spare and dowel, channel -section steel spare and dowel warp welding rigid coupling to pour rigid coupling in wall of a well department through the concrete, wall of a well rigid coupling is in base upper portion, and the wall of a well is in order to lay bricks or in order to pour the concrete shaping, to be equipped with the calandria on the wall of a well and to perforate, on wall of a well top end was located to the safe edge, the safe edge was with angle steel spare and the shaping of concrete placement rigid coupling, the safe edge coats with the well lid. The utility model is used for during the construction of the cable calandria on reconditioning trade, there is better bearing capacity.

Description

Power cable comb work well construction
Technical field
The utility model relates to electric power facility, especially power cable comb work well construction.
Background technology
Electricity channel is the common equipment laying power cable; for protecting the power cable of buried laying; in wiring installation; comb work well is usually used as the construction point of imbedded power cable operation; or the maintenance point of power cable, there is more important status, the cable duct bank work well arranged at loaded vehicle trade place; owing to being often subject to rolling of heavy vehicle, in load-bearing, there is higher requirement.
Summary of the invention
The utility model proposes power cable comb work well construction, have good weight capacity.
The utility model by the following technical solutions.
Power cable comb work well construction, for laying power cable at heavy goods vehicles trade place, described work well comprises pedestal, cable support frame, the borehole wall, safe edge and well lid, described cable support frame comprises channel member and dowel, described channel member is affixed through welding with dowel, and is fixed in borehole wall place through concrete placings; The described borehole wall is fixed in pedestal top, and the borehole wall is to lay bricks or shaping to build concrete, and the borehole wall is provided with comb perforation; Described safe edge is located on the end face of borehole wall top, safe edge with angle member and concreting affixed shaping; Coated with well lid on described safe edge.
It is shaping that described well lid is equipped with C30 concrete placings with reinforcing bar.
Described angle member and channel member, the topping shaping with galvanizing that its surface is covered.
When described work well is adjacent with outside storm sewer, is provided with gutter and is connected with outside storm sewer in work well, the longitudinal drainage gradient of gutter is more than 2%.
Comb perforation place at described borehole wall place has placed cable duct.
Described cable duct is shaping with glass fiber reinforced plastic.
Described pedestal is shaping with C25 concrete placings.
When the described borehole wall with build concrete shaping time, the borehole wall is shaping with C20 concrete placings.
The two ends of described channel member are fixed on two relative boreholes wall.
In the utility model, described work well comprises pedestal, cable support frame, the borehole wall, safe edge and well lid, and described cable support frame comprises channel member and dowel, and described channel member is affixed through welding with dowel, and is fixed in borehole wall place through concrete placings; It is shaping that well lid is equipped with C30 concrete placings with reinforcing bar, pedestal is shaping with C25 concrete placings, this structure has good weight capacity, and be fixed in the cable borehole wall due to cable support frame, and the two ends of channel member are fixed on two relative boreholes wall, therefore can promote anti-shearing force and the anti-impact force of work well construction significantly, make work well can tackle heavy vehicle and impact and roll.
In the utility model, angle member and channel member, the topping shaping with galvanizing that its surface is covered; This makes the steel work in the utility model have good antirust ability, not easily affects the intensity of steel work in Long-Time Service because of corrosion, makes the longer service life of work well.
In the utility model, when described work well is adjacent with outside storm sewer, is provided with gutter and is connected with outside storm sewer in work well, this to make in work well not easily ponding, is conducive to protecting the cable in work well.
Cable support frame is provided with in the utility model, cable support frame comprises channel member and dowel, and the two ends of channel member are fixed on two relative boreholes wall, and this gives cable in well with good support, and the charge inducing of cable surface also can be released to the borehole wall, is conducive to O&M safety.
Accompanying drawing explanation
Below in conjunction with the drawings and specific embodiments, the present invention is described in more detail:
Accompanying drawing 1 is schematic diagram of the present utility model;
Accompanying drawing 2 is the schematic diagrames on other direction of the present utility model;
In figure: 1-pedestal; 2-cable support frame; The 3-borehole wall; 4-safe edge; 5-well lid; 6-channel member; 7-dowel; 8-cable.
Detailed description of the invention
As shown in Figure 1 and Figure 2, power cable comb work well construction, for laying power cable at heavy goods vehicles trade place, described work well comprises pedestal 1, cable support frame 2, the borehole wall 3, safe edge 4 and well lid 5, described cable support frame 2 comprises channel member 6 and dowel 7, described channel member 6 is affixed through welding with dowel 7, and is fixed in the borehole wall 3 place through concrete placings; The described borehole wall 3 is fixed in pedestal 1 top, and the borehole wall 3 is to lay bricks or shaping to build concrete, and the borehole wall 3 is provided with comb perforation; Described safe edge 4 is located on the end face of borehole wall top, safe edge 4 with angle member and concreting affixed shaping; Coated with well lid 5 on described safe edge 4.
It is shaping that described well lid 5 is equipped with C30 concrete placings with reinforcing bar.
Described angle member and channel member 6, the topping shaping with galvanizing that its surface is covered.
When described work well is adjacent with outside storm sewer, is provided with gutter and is connected with outside storm sewer in work well, the longitudinal drainage gradient of gutter is more than 2%.
Comb perforation place at the described borehole wall 3 place has placed cable duct 8.
Described cable duct 8 is shaping with glass fiber reinforced plastic.
Described pedestal 1 is shaping with C25 concrete placings.
When the described borehole wall 3 with build concrete shaping time, the borehole wall 3 is shaping with C20 concrete placings.
The two ends of described channel member 6 are fixed on two relative boreholes wall.

Claims (9)

1. power cable comb work well construction, for laying power cable at heavy goods vehicles trade place, it is characterized in that: described work well comprises pedestal, cable support frame, the borehole wall, safe edge and well lid, described cable support frame comprises channel member and dowel, described channel member is affixed through welding with dowel, and is fixed in borehole wall place through concrete placings; The described borehole wall is fixed in pedestal top, and the borehole wall is to lay bricks or shaping to build concrete, and the borehole wall is provided with comb perforation; Described safe edge is located on the end face of borehole wall top, safe edge with angle member and concreting affixed shaping; Coated with well lid on described safe edge.
2. power cable comb work well construction according to claim 1, is characterized in that: it is shaping that described well lid is equipped with C30 concrete placings with reinforcing bar.
3. power cable comb work well construction according to claim 1, is characterized in that: described angle member and channel member, the topping shaping with galvanizing that its surface is covered.
4. power cable comb work well construction according to claim 1, is characterized in that: when described work well is adjacent with outside storm sewer, is provided with gutter and is connected with outside storm sewer in work well, the longitudinal drainage gradient of gutter is more than 2%.
5. power cable comb work well construction according to claim 1, is characterized in that: comb perforation place at described borehole wall place has placed cable duct.
6. power cable comb work well construction according to claim 5, is characterized in that: described cable duct is shaping with glass fiber reinforced plastic.
7. power cable comb work well construction according to claim 1, is characterized in that: described pedestal is shaping with C25 concrete placings.
8. power cable comb work well construction according to claim 1, is characterized in that: when the described borehole wall with build concrete shaping time, the borehole wall is shaping with C20 concrete placings.
9. power cable comb work well construction according to claim 1, is characterized in that: the two ends of described channel member are fixed on two relative boreholes wall.
CN201521023461.7U 2015-12-11 2015-12-11 Power cable calandria worker well structure Expired - Fee Related CN205224094U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521023461.7U CN205224094U (en) 2015-12-11 2015-12-11 Power cable calandria worker well structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521023461.7U CN205224094U (en) 2015-12-11 2015-12-11 Power cable calandria worker well structure

Publications (1)

Publication Number Publication Date
CN205224094U true CN205224094U (en) 2016-05-11

Family

ID=55899169

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521023461.7U Expired - Fee Related CN205224094U (en) 2015-12-11 2015-12-11 Power cable calandria worker well structure

Country Status (1)

Country Link
CN (1) CN205224094U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107268683A (en) * 2017-06-16 2017-10-20 郑州市市政工程总公司 Road lighting cable theft-prevention structure and its construction method and stolen maintaining method
CN106337445B (en) * 2016-08-24 2018-11-23 国网山东省电力公司蓬莱市供电公司 A kind of underground electricity channel Gong Jing detecting devices

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106337445B (en) * 2016-08-24 2018-11-23 国网山东省电力公司蓬莱市供电公司 A kind of underground electricity channel Gong Jing detecting devices
CN107268683A (en) * 2017-06-16 2017-10-20 郑州市市政工程总公司 Road lighting cable theft-prevention structure and its construction method and stolen maintaining method
CN107268683B (en) * 2017-06-16 2023-04-21 郑州市市政工程总公司 Street lamp cable anti-theft structure, construction method thereof and stolen maintenance method

Similar Documents

Publication Publication Date Title
CN103291076B (en) Multilayer steel truss fragmented reverse hoisting construction method in arc-shaped frame
CN205224094U (en) Power cable calandria worker well structure
CN203834373U (en) Lifting movement mold carriage trolley for box culvert side wall formwork
CN106567548A (en) Segmented mounting method for square raw coal hopper
CN204715149U (en) A kind of highway construction precast plate
CN107720542B (en) Hoisting track composite beam
CN204418654U (en) For the aluminum alloy pattern plate between body of wall
CN204282843U (en) The sliding hoisted in position device of steel girder erection in a kind of stiffness combination construction
CN204243626U (en) Cable unwinding device
CN103967332B (en) The construction method of a kind of building site enclosing
CN203461720U (en) Simple cantilever hoisting machine
CN205099298U (en) Adhere to installation and maintenance platform and tower machine
CN202245789U (en) Special typhoon prevention device for gantry crane
CN105804087A (en) Installation method for steel structure below large deep foundation pit supporting beam
CN204186064U (en) U-shaped aluminum alloy mould plate
CN202369932U (en) Bridge curtain board installation trolley
CN206722392U (en) A kind of structure of transvers plate of shear wall structure
CN206922396U (en) A kind of cable channel cover plate unit
CN205348499U (en) Cast -in -place and prefabricated reinforcing bar stromatolite floor
CN201525707U (en) Movable rock anchor of cable crane
CN204662936U (en) The fastening devices of overhanging type discharging platform anchored end
CN201358125Y (en) Concrete pre-embedded welding hook gate rail
CN203924605U (en) Be applicable to the indoor built on stilts floor structure of transformer station's flood control transformation
CN215759895U (en) Profiled steel sheet composite floor
CN204551797U (en) A kind of antiknock masonry wall structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160511

Termination date: 20211211

CF01 Termination of patent right due to non-payment of annual fee