CN202073113U - 地脚螺栓基础后灌浆支撑装置 - Google Patents

地脚螺栓基础后灌浆支撑装置 Download PDF

Info

Publication number
CN202073113U
CN202073113U CN2011200995755U CN201120099575U CN202073113U CN 202073113 U CN202073113 U CN 202073113U CN 2011200995755 U CN2011200995755 U CN 2011200995755U CN 201120099575 U CN201120099575 U CN 201120099575U CN 202073113 U CN202073113 U CN 202073113U
Authority
CN
China
Prior art keywords
backing plate
plate flange
flange
stone bolt
grouting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011200995755U
Other languages
English (en)
Inventor
朱宏兵
郑帅泉
宋连江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinovel Technology (Inner Mongolia) Co., Ltd.
Original Assignee
Sinovel Wind Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinovel Wind Group Co Ltd filed Critical Sinovel Wind Group Co Ltd
Priority to CN2011200995755U priority Critical patent/CN202073113U/zh
Application granted granted Critical
Publication of CN202073113U publication Critical patent/CN202073113U/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

本实用新型公开了一种地脚螺栓基础后灌浆支撑装置,包括:具有灌浆槽的混凝土基础承台、半径大于塔筒下法兰的垫板法兰、垫板法兰固定件、调平螺丝和地脚螺栓,塔筒下法兰通过垫板法兰固定件固定在垫板法兰上;地脚螺栓一端固定在混凝土基础承台内,另一端自下而上依次穿设在垫板法兰和塔筒下法兰中,垫板法兰和灌浆槽槽底之间设置有调平螺丝。本实用新型克服了现有技术的诸多缺点,实现了风机安装精度高、风机运转平稳、塔筒法兰面与垫板法兰贴合紧密、受力均匀、基础维护费用低、使用寿命长的优点。

Description

地脚螺栓基础后灌浆支撑装置
技术领域
本实用新型涉及风力发电机技术,尤其涉及一种风力发电机预埋地脚螺栓基础后灌浆支撑装置。
背景技术
风力发电机钢制塔筒是通过在混凝土基础内的预埋结构件来和混凝土基础实现连接固定的。预埋地脚螺栓是风力发电机基础中受力较为合理的一种基础预埋结构形式。
现有的预埋地脚螺栓基础锚固系统结构件中通常设置有垫板法兰,风力发电机塔筒安装在垫板法兰之上,通过预埋地脚螺栓与混凝土基础连接。由于垫板法兰与风力发电机塔筒下法兰的刚度不同,先将垫板法兰安装在混凝土基础混凝土承台上,调平后灌浆,等灌浆料强度达到设计等级后再吊装塔筒,会造成塔筒下法兰面与垫板法兰不能完全贴合,从而造成垫板法兰局部压力过大,致使灌浆层或承台混凝土局部区域压力超过混凝土设计抗压强度,影响结构安全。
实用新型内容
本实用新型提供一种地脚螺栓基础后灌浆支撑装置,用以解决现有技术中的缺陷,实现风机安装精度高、风机运转平稳、塔筒法兰面与垫板法兰贴合紧密、受力均匀、基础维护费用低、使用寿命长。
一种地脚螺栓基础后灌浆支撑装置,包括:具有灌浆槽的混凝土基础承台、半径大于塔筒下法兰的垫板法兰、垫板法兰固定件、调平螺丝和地脚螺栓;所述塔筒下法兰通过垫板法兰固定件固定在垫板法兰上;所述地脚螺栓一端浇注固定在混凝土基础承台内,另一端自下而上依次穿过垫板法兰和塔筒下法兰,所述垫板法兰和灌浆槽槽底之间设置有调平螺丝。
进一步地,所述垫板法兰为四分片、两分片或整个圈环。所述垫板法兰圆周上均匀的设置有调平螺丝螺纹孔,用于安装调平螺丝。
进一步地,所述调平螺丝包括一对带有螺纹的套筒,通过旋转套筒,来调整组件的支撑高度,用于垫板法兰和首节塔筒的支撑和二次精确调平(一次调平可通过粗调螺栓完成)。所述调平螺丝可应用在水平度要求较高的大型工业设备支脚上。所述调平螺丝为不锈钢或碳钢调平螺丝,单个支撑力高,能够满足首节塔筒的支撑与调平要求。所述调平螺丝为多个,均匀分布在垫片法兰下方。
进一步地,所述垫板法兰固定件包括:压板和垂直于垫板法兰的紧固螺杆及支持螺杆,所述压板一端压接于所述塔筒下法兰上、另一端穿装在垂直于垫板法兰上的支持螺杆上并与支持螺杆上螺接的螺母向下止推配合,所述紧固螺杆从中部穿过所述压板并螺接于所述垫板法兰上,所述紧固螺杆上螺接有紧固螺母,所述紧固螺母与所述压板向下顶压配合。
进一步地,所述灌浆槽中垫板法兰、调平螺丝和地脚螺栓之间灌注有混凝土层。
本实用新型结构简单、合理、紧凑,与现有技术相比较具有以下几方面优点:
1、本实用新型可实现先吊装首节塔筒之后再灌浆,将重量达百余吨的首节塔筒支撑在混凝土表面上,并能对塔筒垂直度或者是法兰的水平度进行调节;
2、采用调平螺丝可将首节塔筒和垫板法兰支撑在基础承台混凝土表面上,并进行二次精确调平,使风机安装精度显著提高,为风机平稳运转提供基础保障;
3、通过垫板法兰固定件将垫板法兰固定在首节塔筒下法兰面之下,从而完成整体吊装就位。塔筒法兰面与垫板法兰贴合紧密,受力均匀,降低了基础维护费用,延长基础使用寿命。
附图说明
附图用来提供对本实用新型的进一步理解,并且构成说明书的一部分,与本实用新型的实施例一起用于解释本实用新型,并不构成对本实用新型的限制。在附图中:
图1为实施例一的地脚螺栓基础后灌浆支撑装置的纵截面结构示意图;
图2为图1中垫板法兰的俯视图;
图3为实施例二的垫板法兰固定件使用状态示意图;
图4为实施例二的压板结构示意图。
结合附图,本实用新型实施例中附图标记如下:
1-塔筒下法兰               2-垫板法兰       3-灌浆槽
4-调平螺丝                 5-地脚螺栓       6-调平螺丝螺纹孔
7-垫板法兰固定件螺纹孔     8-压板           9-紧固螺杆
10-支持螺杆                11-混凝土基础承台
具体实施方式
为使本实用新型的目的、技术方案和优点更加清楚,下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。
实施例一
图1为实施例一的地脚螺栓基础后灌浆支撑装置纵截面结构示意图;图2为图1中垫板法兰的俯视图。
如图1所示,本实施例公开的地脚螺栓基础后灌浆支撑装置,包括:具有灌浆槽3的混凝土基础承台11、半径大于塔筒下法兰1的垫板法兰2、垫板法兰固定件、调平螺丝4和地脚螺栓5。垫板法兰2半径大于塔筒下法兰1可将塔筒下法兰面的压力分散传递到灌浆层上,灌浆层再将此压力传递给更大范围的混凝土基础承台11;塔筒下法兰1固定在垫板法兰2上;地脚螺栓5一端浇注固定在混凝土基础承台11内,另一端自下而上依次穿过垫板法兰2和塔筒下法兰1,垫板法兰2和灌浆槽3槽底之间设置有调平螺丝4。灌浆槽3中垫板法兰2、调平螺丝4和地脚螺栓5之间灌注有混凝土层。垫板法兰2为图2所示的整圆环结构,垫板法兰2圆周上均匀的设置有调平螺丝螺纹孔6,用于安装调平螺丝4,垫板法兰2圆周上还均匀的设置有垫板法兰固定件螺纹孔7,用于固定垫板法兰固定件。
本实施例的施工方法如下:具有灌浆槽的混凝土基础承台浇筑完成28天,验收合格后,开始进行首节塔筒的吊装就位工作,具体操作步骤为:
(1)清理灌浆槽,将灌浆槽槽底杂物清理干净,灌浆前24小时将灌浆槽内蓄水浸泡,使灌浆槽周边混凝土吸水饱和,灌浆前将灌浆槽内明水清理干净。(2)安装垫板法兰,将垫板法兰固定在首节塔筒下法兰面下。(3)安装调平螺丝,将多个调平螺丝平稳的安放到灌浆槽的槽底表面上,调平螺丝高度应保持一致,并且高度等于灌浆层设计厚度。(4)吊装塔筒,将首节塔筒连同垫板法兰整体吊起,对准地脚螺栓,安装就位。精确调整调平螺丝使垫板法兰水平。(5)灌浆,将拌制好的灌浆料缓缓灌入灌浆槽,养护7天。灌浆料养护期间严禁扰动垫板法兰和首节塔筒。(6)施加螺栓预紧力,采用液压张拉器按照张拉顺序将地脚螺栓张拉至设计预紧力的一半,全部完成后再张拉至设计预紧力。(7)风机的其余塔筒、机舱及叶轮吊装,灌浆28天后检查灌浆层施工质量,复测垫板法兰水平度,确认无误后吊装其余塔筒、机舱及叶轮等风机组件。
实施例二
图3为实施例二的垫板法兰固定件使用状态示意图;图4为实施例二的压板结构示意图。
本实施例公开的地脚螺栓基础后灌浆支撑装置,包括:具有灌浆槽的混凝土基础承台、半径大于塔筒下法兰1的垫板法兰2、垫板法兰固定件、调平螺丝和地脚螺栓;
塔筒下法兰1通过垫板法兰固定件固定在垫板法兰2上;垫板法兰固定件包括:压板8和垂直于垫板法兰2的紧固螺杆9及支持螺杆10,压板8一端压接于塔筒下法兰1上、另一端穿装在垂直于垫板法兰2上的支持螺杆10上并与支持螺杆10上螺接的螺母向下止推配合,紧固螺杆9从中部穿过压板8并螺接于垫板法兰2上,紧固螺杆9上螺接有紧固螺母,紧固螺母与压板8向下顶压配合。每块垫板法兰2都在两端的内外两侧分别与塔筒下法兰1连接固定。
地脚螺栓一端浇注固定在混凝土基础承台内,另一端自下而上依次穿过垫板法兰2和塔筒下法兰1,地脚螺栓两端带有螺纹,且上部的螺纹段长度较长共160个,此外还包括六角螺母160×3=480个。
垫板法兰2和灌浆槽槽底之间设置有调平螺丝,用于垫板法兰2和首节塔筒的支撑和二次精确调平。
垫板法兰2为四分片,垫板法兰2圆周为不影响垫板法兰2调平,在每片垫板法兰2端部适当位置设置有6个调平螺丝螺纹孔,用于安装调平螺丝,组装好之后6×4=24个调平螺丝螺纹孔在垫板法兰2的圆周上均匀分布。垫板法兰2圆周上还均匀的设置有垫板法兰固定件螺纹孔7,用于固定垫板法兰固定件。
灌浆槽中垫板法兰2、调平螺丝和地脚螺栓之间灌注有混凝土层。
调平螺丝包括一对带有螺纹的套筒,通过旋转套筒,来调整组件的支撑高度,用于垫板法兰和首节塔筒的支撑和二次精确调平(一次调平可通过粗调螺栓完成)。调平螺丝可应用在水平度要求较高的大型工业设备支脚上。调平螺丝为不锈钢或碳钢调平螺丝,单个支撑力高,能够满足首节塔筒的支撑与调平要求。调平螺丝为多个,均匀分布在垫片法兰下方。
本实施例的施工方法如下:具有灌浆槽的混凝土基础承台浇筑完成28天,验收合格后,开始进行首节塔筒的吊装就位工作,具体操作步骤为:(1)清理灌浆槽,将灌浆槽槽底杂物清理干净,灌浆前24小时将灌浆槽内蓄水浸泡,使灌浆槽周边混凝土吸水饱和,灌浆前将灌浆槽内明水清理干净。(2)安装垫板法兰,采用垫板法兰固定件将垫板法兰与首节塔筒下法兰进行临时定位。(3)安装调平螺丝,将24个调平螺丝平稳的安放到灌浆槽的槽底表面上,调平螺丝高度应保持一致,并且高度等于灌浆层设计厚度。(4)吊装塔筒,将首节塔筒连同垫板法兰整体吊起,对准地脚螺栓,安装就位。精确调整调平螺丝使垫板法兰水平。(5)灌浆,将拌制好的灌浆料缓缓灌入灌浆槽,养护7天。灌浆料养护期间严禁扰动垫板法兰和首节塔筒。(6)施加螺栓预紧力,采用液压张拉器按照张拉顺序将地脚螺栓张拉至设计预紧力的一半,全部完成后再张拉至设计预紧力。(7)风机的其余塔筒、机舱及叶轮吊装,灌浆28天后检查灌浆层施工质量,复测垫板法兰水平度,确认无误后吊装其余塔筒、机舱及叶轮等风机组件。(8)拆除垫板法兰固定件,并清理干净以备继续使用。
最后应说明的是:以上实施例仅用以说明本实用新型的技术方案,而非对其限制;尽管参照前述实施例对本实用新型进行了详细的说明,本领域的普通技术人员应当理解:其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换;而这些修改或者替换,并不使相应技术方案的本质脱离本实用新型各实施例技术方案的精神和范围。

Claims (5)

1.一种地脚螺栓基础后灌浆支撑装置,其特征在于,包括:具有灌浆槽的混凝土基础承台、半径大于塔筒下法兰的垫板法兰、垫板法兰固定件、调平螺丝和地脚螺栓,所述塔筒下法兰通过垫板法兰固定件固定在垫板法兰上;所述地脚螺栓一端固定在混凝土基础承台内,另一端自下而上依次穿设在垫板法兰和塔筒下法兰中,所述垫板法兰和灌浆槽槽底之间设置有调平螺丝。
2.根据权利要求1所述的地脚螺栓基础后灌浆支撑装置,其特征在于,所述垫板法兰为四分片、两分片或整圈。
3.根据权利要求1或2所述的地脚螺栓基础后灌浆支撑装置,其特征在于,所述垫板法兰圆周上均匀的设置有螺纹孔。
4.根据权利要求1所述的地脚螺栓基础后灌浆支撑装置,其特征在于,所述垫板法兰固定件包括:压板和垂直于垫板法兰的紧固螺杆及支持螺杆,所述压板一端压接于塔筒下法兰上、另一端穿装在垂直于垫板法兰上的支持螺杆上并与支持螺杆上螺接的螺母向下止推配合,所述紧固螺杆从中部穿过所述压板并螺接于所述垫板法兰上,所述紧固螺杆上螺接有紧固螺母,所述紧固螺母与所述压板向下顶压配合。
5.根据权利要求1所述的地脚螺栓基础后灌浆支撑装置,其特征在于,所述灌浆槽中垫板法兰、调平螺丝和地脚螺栓之间灌注有混凝土层。
CN2011200995755U 2011-04-07 2011-04-07 地脚螺栓基础后灌浆支撑装置 Expired - Lifetime CN202073113U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011200995755U CN202073113U (zh) 2011-04-07 2011-04-07 地脚螺栓基础后灌浆支撑装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011200995755U CN202073113U (zh) 2011-04-07 2011-04-07 地脚螺栓基础后灌浆支撑装置

Publications (1)

Publication Number Publication Date
CN202073113U true CN202073113U (zh) 2011-12-14

Family

ID=45111216

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011200995755U Expired - Lifetime CN202073113U (zh) 2011-04-07 2011-04-07 地脚螺栓基础后灌浆支撑装置

Country Status (1)

Country Link
CN (1) CN202073113U (zh)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102778249A (zh) * 2012-08-14 2012-11-14 中国水电顾问集团中南勘测设计研究院 一种活塞式可升降通用底座
CN102962895A (zh) * 2012-11-16 2013-03-13 中联重科股份有限公司 混凝土搅拌站、支腿安装结构及其加工和组装方法
CN103031892A (zh) * 2012-12-04 2013-04-10 北京龙源冷却技术有限公司 钢桁架支柱及钢桁架平台制造方法
CN103184743A (zh) * 2011-12-30 2013-07-03 华锐风电科技(集团)股份有限公司 模板法兰
CN103243651A (zh) * 2013-04-24 2013-08-14 山东科技大学 桥梁护栏金属立柱底座的安装固定及调平方法
CN103422512A (zh) * 2013-08-29 2013-12-04 中国水电顾问集团华东勘测设计研究院 可更换预埋螺栓式风机组混凝土基础及其施工方法
CN103510624A (zh) * 2012-06-21 2014-01-15 华锐风电科技(集团)股份有限公司 地脚螺栓锚固装置及该装置的施工方法
CN106931283A (zh) * 2015-12-31 2017-07-07 中机国际工程设计研究院有限责任公司 生产线装配岛安装固定方法
CN108474193A (zh) * 2015-12-21 2018-08-31 维斯塔斯风力系统有限公司 用于形成风轮机基座的方法及用于形成此基座的相关系统
CN108626533A (zh) * 2018-05-08 2018-10-09 四川石油天然气建设工程有限责任公司 一种大型石油天然气处理塔安装方法
US10180011B2 (en) 2014-09-02 2019-01-15 Jarrod Conway WHITE Post support apparatus
CN109469210A (zh) * 2018-10-19 2019-03-15 科能源科技(天津)有限公司 一种基础水平调节支撑连接装置
CN109945019A (zh) * 2017-12-21 2019-06-28 中国二十冶集团有限公司 预留孔地脚螺栓的临时固定装置及其使用方法
CN110904993A (zh) * 2019-12-16 2020-03-24 中国二冶集团有限公司 用于灌浆时固定地脚螺栓的工具
CN113530760A (zh) * 2021-08-18 2021-10-22 江苏金海风电塔筒科技有限公司 混凝土塔段及混合塔筒
JP2022526903A (ja) * 2019-04-15 2022-05-27 ヴォッベン プロパティーズ ゲーエムベーハー タワーセグメントおよびタワーの構築方法

Cited By (26)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103184743A (zh) * 2011-12-30 2013-07-03 华锐风电科技(集团)股份有限公司 模板法兰
CN103184743B (zh) * 2011-12-30 2016-03-02 华锐风电科技(集团)股份有限公司 模板法兰
CN103510624A (zh) * 2012-06-21 2014-01-15 华锐风电科技(集团)股份有限公司 地脚螺栓锚固装置及该装置的施工方法
CN103510624B (zh) * 2012-06-21 2016-03-02 华锐风电科技(集团)股份有限公司 地脚螺栓锚固装置及该装置的施工方法
CN102778249A (zh) * 2012-08-14 2012-11-14 中国水电顾问集团中南勘测设计研究院 一种活塞式可升降通用底座
CN102962895B (zh) * 2012-11-16 2015-09-09 中联重科股份有限公司 一种混凝土搅拌站的支腿安装结构的加工和组装方法
CN102962895A (zh) * 2012-11-16 2013-03-13 中联重科股份有限公司 混凝土搅拌站、支腿安装结构及其加工和组装方法
CN103031892B (zh) * 2012-12-04 2015-03-04 北京龙源冷却技术有限公司 钢桁架支柱及钢桁架平台制造方法
CN103031892A (zh) * 2012-12-04 2013-04-10 北京龙源冷却技术有限公司 钢桁架支柱及钢桁架平台制造方法
CN103243651A (zh) * 2013-04-24 2013-08-14 山东科技大学 桥梁护栏金属立柱底座的安装固定及调平方法
CN103422512A (zh) * 2013-08-29 2013-12-04 中国水电顾问集团华东勘测设计研究院 可更换预埋螺栓式风机组混凝土基础及其施工方法
CN103422512B (zh) * 2013-08-29 2016-01-27 中国水电顾问集团华东勘测设计研究院 可更换预埋螺栓式风机组混凝土基础及其施工方法
US10180011B2 (en) 2014-09-02 2019-01-15 Jarrod Conway WHITE Post support apparatus
CN108474193B (zh) * 2015-12-21 2020-05-15 维斯塔斯风力系统有限公司 一种形成风轮机基座的方法及用于形成此基座的相关系统
CN108474193A (zh) * 2015-12-21 2018-08-31 维斯塔斯风力系统有限公司 用于形成风轮机基座的方法及用于形成此基座的相关系统
US12000378B2 (en) 2015-12-21 2024-06-04 Vestas Wind Systems A/S System for forming a wind turbine foundation
US11236727B2 (en) 2015-12-21 2022-02-01 Vestas Wind Systems A/S Method for forming a wind turbine foundation and related system for forming such a foundation
CN106931283A (zh) * 2015-12-31 2017-07-07 中机国际工程设计研究院有限责任公司 生产线装配岛安装固定方法
CN109945019A (zh) * 2017-12-21 2019-06-28 中国二十冶集团有限公司 预留孔地脚螺栓的临时固定装置及其使用方法
CN109945019B (zh) * 2017-12-21 2021-12-07 中国二十冶集团有限公司 预留孔地脚螺栓的临时固定装置及其使用方法
CN108626533A (zh) * 2018-05-08 2018-10-09 四川石油天然气建设工程有限责任公司 一种大型石油天然气处理塔安装方法
CN109469210A (zh) * 2018-10-19 2019-03-15 科能源科技(天津)有限公司 一种基础水平调节支撑连接装置
JP2022526903A (ja) * 2019-04-15 2022-05-27 ヴォッベン プロパティーズ ゲーエムベーハー タワーセグメントおよびタワーの構築方法
JP7256895B2 (ja) 2019-04-15 2023-04-12 ヴォッベン プロパティーズ ゲーエムベーハー タワーセグメントおよびタワーの構築方法
CN110904993A (zh) * 2019-12-16 2020-03-24 中国二冶集团有限公司 用于灌浆时固定地脚螺栓的工具
CN113530760A (zh) * 2021-08-18 2021-10-22 江苏金海风电塔筒科技有限公司 混凝土塔段及混合塔筒

Similar Documents

Publication Publication Date Title
CN202073113U (zh) 地脚螺栓基础后灌浆支撑装置
EP3401464B1 (en) Automatic tensioning system and method for reinforcing beam, plate and column by pre-stressed frp plate
AU2012334092B2 (en) Foundation for a wind turbine
CN102095052B (zh) 地脚螺栓锚固系统的安装方法及安装工业设备的方法
CN201326524Y (zh) 风力发电机组混合式塔筒
CN207862749U (zh) 一种新型组合式吊杆
CN103114604A (zh) 预应力混凝土圆筒型风力发电机组基础
US20160251818A1 (en) Apparatus for securing, in particular remediating, the foundation of a wind turbine, as well as foundation and method for remediating
CN205874992U (zh) 一种预应力纤维板加固梁板的自动化张拉系统
CN207863430U (zh) 一种支座栓接斜拉式水平悬挑防护体系
CN106088136B (zh) 一种带有支架的风力发电塔基础及其施工工艺
CN204663030U (zh) 装配式住宅预制楼板安装用组合支架
CN205171381U (zh) 预制装配桥梁盖梁定位装置
CN203096756U (zh) 风机基础高强灌浆料灌浆施工结构
CN201695339U (zh) 盖梁施工钢支撑
CN204960456U (zh) 一种屋面配重通信杆塔结构
CN202836999U (zh) 一种隧洞手孔插筋拉拔装置
CN214329869U (zh) 一种用于筒仓仓壁桁架支撑的牛腿装置
CN205804981U (zh) 一体式预应力纤维板加固梁板的原位张拉系统
CN211080288U (zh) 一种用于风力发电机锚栓笼安装的调整装置
CN213359489U (zh) 一种用于支撑地下室顶板上施工电梯的可调加固装置
CN210530459U (zh) 一种混合结构风塔的固结拉索体系
CN208633584U (zh) 一种附墙式预制顶板安装支撑架体
CN206280351U (zh) 一种地脚螺栓
CN202055146U (zh) 一种熨平板附件的连接结构

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: SINOVEL WIND TECHNOLOGY (INNER MONGOLIA) CO., LTD.

Free format text: FORMER OWNER: SINOVEL WIND (GROUP) CO., LTD.

Effective date: 20131018

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 100872 HAIDIAN, BEIJING TO: 014030 BAOTOU, INNER MONGOLIA AUTONOMOUS REGION

TR01 Transfer of patent right

Effective date of registration: 20131018

Address after: 014030 Baotou equipment manufacturing industrial park, 666 km, 110 National Road, Qingshan District, the Inner Mongolia Autonomous Region, Baotou

Patentee after: Sinovel Technology (Inner Mongolia) Co., Ltd.

Address before: 100872, 21 building, 59 Zhongguancun Avenue, Beijing, Haidian District, 2103 (2)

Patentee before: Sinovel Wind Group Co., Ltd.

CX01 Expiry of patent term

Granted publication date: 20111214

CX01 Expiry of patent term