CN201695339U - 盖梁施工钢支撑 - Google Patents

盖梁施工钢支撑 Download PDF

Info

Publication number
CN201695339U
CN201695339U CN2010202362485U CN201020236248U CN201695339U CN 201695339 U CN201695339 U CN 201695339U CN 2010202362485 U CN2010202362485 U CN 2010202362485U CN 201020236248 U CN201020236248 U CN 201020236248U CN 201695339 U CN201695339 U CN 201695339U
Authority
CN
China
Prior art keywords
bent cap
construction steel
steel support
built
fitting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010202362485U
Other languages
English (en)
Inventor
吴志勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 19th Metallurgical Corp
Original Assignee
MCC Shijiu Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Shijiu Construction Co Ltd filed Critical MCC Shijiu Construction Co Ltd
Priority to CN2010202362485U priority Critical patent/CN201695339U/zh
Application granted granted Critical
Publication of CN201695339U publication Critical patent/CN201695339U/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本实用新型公开了一种施工钢支撑,尤其是一种盖梁施工钢支撑。本实用新型所要解决的技术问题是提供一种施工操作简单、节约人工和材料的盖梁施工钢支撑,包括预埋件、牛腿,预埋件预埋在墩柱内,预埋件上设置有两组螺纹孔,每组螺纹孔有2-6个,牛腿通过与螺纹孔相匹配的螺栓安装在预埋件上。通过螺栓将牛腿安装在预埋件上,使得牛腿可以轻易的拆除而得到反复利用,节约了材料;在安装牛腿时也无需使用其他能源和专用设备,使得施工简单快捷。

Description

盖梁施工钢支撑
技术领域
本实用新型涉及一种施工钢支撑,尤其是一种盖梁施工钢支撑。
背景技术
近年来,公路桥梁中有不少桥梁的下部结构采用简单的排架结构,即桥梁的下部基础为两根或多根桩基础,墩身为圆形或方形柱墩,桩间系梁联结(或不设系梁),墩顶盖梁联结。系梁或盖梁施工一般采用预埋钢板法、支架法和抱箍法作为承力支架。预埋钢板法将钢板预埋在柱墩上,然后通过焊接将支撑用的支撑架焊接在钢板上,然后在支撑架的基础上搭建施工平台,在施工结束后,焊接好的支撑架难以拆除,并且反复使用的寿命短,而且焊接还需要焊机,电源等其他设备,使得操作复杂,影响施工周期。支架法在地面搭设平台进行施工,这种方法受力状况良好,不会对桥梁外观造成影响,但其受环境影响大,在地理环境不好的地方,需要花费大量的人力财力。抱箍法采用抱箍安装在柱墩上,然后再将支撑架安装在抱箍上,然而抱箍仅靠摩擦力稳固在柱箍上,倘若其受力不均,则会造成抱箍安全系数降低,甚至出现危险事故。
实用新型内容
本实用新型所要解决的技术问题是提供一种施工操作简单、节约人工和材料的盖梁施工钢支撑。
本实用新型解决其技术问题所采用的盖梁施工钢支撑,包括预埋件、牛腿,预埋件预埋在墩柱内,预埋件上设置有两组螺纹孔,每组螺纹孔有2-6个,牛腿通过与螺纹孔相匹配的螺栓安装在预埋件上。
进一步的是,螺栓的头部预埋在墩柱内。
本实用新型的有益效果是:通过螺栓将牛腿安装在预埋件上,使得牛腿可以轻易的拆除而得到反复利用,节约了材料;在安装牛腿时也无需使用其他能源和专用设备,使得施工简单快捷。
附图说明
图1是本实用新型的结构示意图;
图2是本实用新型的安装示意图;
图中零部件、部位及编号:预埋件1、螺纹孔2、牛腿3、螺栓4、墩柱5。
具体实施方式
下面结合附图和实施例对本实用新型作进一步说明。
如图1所示,本实用新型包括预埋件1、牛腿3,预埋件1预埋在墩柱5内,预埋件1上设置有两组螺纹孔2,每组螺纹孔2有2-6个,牛腿3通过与螺纹孔2相匹配的螺栓4安装在预埋件1上。在施工过程中,首先将带有螺纹孔2的预埋件1预埋在柱墩上,并对螺纹孔2进行保护,螺纹孔2上的螺纹与连接牛腿3用的螺栓4相匹配。在柱墩施工完毕后,将预埋件1剔出,并清洗螺纹孔2,以使其上的螺纹保持干净,将焊接好的牛腿3用螺栓4与预埋件1连接,将螺栓4扭紧,两组螺纹孔2正好使预埋件1的两个长边与牛腿3相连接,螺栓4最好使用高强度螺栓以达到更高的安全系数。最后以牛腿3为基础搭建盖梁施工平台。螺纹孔2的个数根据具体的施工情况而定,倘若载荷较大,则用较多的螺纹孔2和强度较高的螺栓。在施工结束后,牛腿3可以完整的拆下,以待下次继续使用。
在一些不便于安装螺栓4的情况下,如图2所示,螺栓4的头部预埋在墩柱5内。此时牛腿3便可直接安在螺栓4上,再使用螺母拧紧,而不必再用螺栓4去找螺纹孔2,螺栓4也会有更多的丝扣受力,有利于达到更高的强度。

Claims (2)

1.盖梁施工钢支撑,包括预埋件(1)、牛腿(3),预埋件(1)预埋在墩柱(5)内,其特征在于:预埋件(1)上设置有两组螺纹孔(2),每组螺纹孔(2)有2-6个,牛腿(3)通过与螺纹孔(2)相匹配的螺栓(4)安装在预埋件(1)上。
2.如权利要求1所述的盖梁施工钢支撑,其特征在于:所述螺栓(4)的头部预埋在墩柱(5)内。
CN2010202362485U 2010-06-24 2010-06-24 盖梁施工钢支撑 Expired - Lifetime CN201695339U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010202362485U CN201695339U (zh) 2010-06-24 2010-06-24 盖梁施工钢支撑

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010202362485U CN201695339U (zh) 2010-06-24 2010-06-24 盖梁施工钢支撑

Publications (1)

Publication Number Publication Date
CN201695339U true CN201695339U (zh) 2011-01-05

Family

ID=43396579

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010202362485U Expired - Lifetime CN201695339U (zh) 2010-06-24 2010-06-24 盖梁施工钢支撑

Country Status (1)

Country Link
CN (1) CN201695339U (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102277834A (zh) * 2011-05-10 2011-12-14 吴江市明港道桥工程有限公司 一种桥梁盖梁的施工托架
CN108867845A (zh) * 2018-06-29 2018-11-23 中国二十冶集团有限公司 I梁挑台支架的安装方法
CN111827116A (zh) * 2019-04-15 2020-10-27 中交路桥建设有限公司 一种组合式高墩盖梁施工支架
CN113668370A (zh) * 2021-09-15 2021-11-19 中建三局第一建设工程有限责任公司 一种预制装配式桥墩及其施工方法

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102277834A (zh) * 2011-05-10 2011-12-14 吴江市明港道桥工程有限公司 一种桥梁盖梁的施工托架
CN108867845A (zh) * 2018-06-29 2018-11-23 中国二十冶集团有限公司 I梁挑台支架的安装方法
CN111827116A (zh) * 2019-04-15 2020-10-27 中交路桥建设有限公司 一种组合式高墩盖梁施工支架
CN113668370A (zh) * 2021-09-15 2021-11-19 中建三局第一建设工程有限责任公司 一种预制装配式桥墩及其施工方法
CN113668370B (zh) * 2021-09-15 2024-04-26 中建三局第一建设工程有限责任公司 一种预制装配式桥墩及其施工方法

Similar Documents

Publication Publication Date Title
CN103696498B (zh) 一种震后易修复钢异形柱-中心支撑架
CN102704491B (zh) 一种型钢与钢筋混凝土梁组合基坑支护围檩及其施工方法
CN201567532U (zh) 一种桥梁盖梁的新型支撑结构
CN101113604A (zh) 全预制装配式混凝土框架结构
CN201695339U (zh) 盖梁施工钢支撑
CN103711215B (zh) 一种震后易修复钢异形柱框架-偏心支撑架
CN202913420U (zh) 可重复使用的安装地脚螺栓的定位装置
CN205874992U (zh) 一种预应力纤维板加固梁板的自动化张拉系统
CN104005338A (zh) 一种大跨斜拉桥塔梁三向临时固结结构
CN104652600A (zh) 可恢复功能框架结构体系
CN105507169B (zh) 一种预应力frp布加固钢筋混凝土桥梁的张拉锚固定装置及加固方法
CN202090290U (zh) 预应力钢筋张拉工具
CN210134353U (zh) 一种用于盖梁施工的牛腿式抱箍托架
CN101265708A (zh) 塔状结构物的基础结构
CN202138969U (zh) 用于现浇混凝土结构中的塔吊附墙装置
CN202090291U (zh) 张拉支座
CN205205849U (zh) 可更换式预应力锚栓风机基础
CN203247601U (zh) 塔式起重机装配式基座
CN104674944A (zh) 新型可恢复功能框架-支撑结构体系
CN201347616Y (zh) 拼装式焊接操作钢平台
CN103938556B (zh) 混凝土t形截面梁桥空间双k字撑横向增强装置
CN110593301A (zh) 一种预制基础组件及其拼装方法
CN203514326U (zh) 基坑的鱼腹式钢桁架的连接结构
CN203145040U (zh) 一种便于拆卸运输的预制板铁塔基础
CN209162662U (zh) 一种连续t梁桥无支架维修加固施工平台

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHINA 19TH METALLURGICAL CORPORATION

Free format text: FORMER OWNER: MCC SHIJIU CONSTRUCTION CO., LTD.

Effective date: 20110317

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 617023 NO. 350, RENMIN STREET, PANZHIHUA CITY, SICHUAN PROVINCE TO: 617000 NO. 350, RENMIN STREET, EAST DISTRICT, PANZHIHUA CITY, SICHUAN PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20110317

Address after: 617000 Panzhihua, Sichuan, East Street, No. 350

Patentee after: China 19th Metallurgical Corporation

Address before: 617023 No. 350 Renmin Street, Sichuan, Panzhihua

Patentee before: MCC Shijiu Construction Co., Ltd.

Effective date of registration: 20110317

Address after: 617000 Panzhihua, Sichuan, East Street, No. 350

Patentee after: China 19th Metallurgical Corporation

Address before: 617023 No. 350 Renmin Street, Sichuan, Panzhihua

Patentee before: MCC Shijiu Construction Co., Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20110105