CN111827116A - 一种组合式高墩盖梁施工支架 - Google Patents

一种组合式高墩盖梁施工支架 Download PDF

Info

Publication number
CN111827116A
CN111827116A CN201910297956.5A CN201910297956A CN111827116A CN 111827116 A CN111827116 A CN 111827116A CN 201910297956 A CN201910297956 A CN 201910297956A CN 111827116 A CN111827116 A CN 111827116A
Authority
CN
China
Prior art keywords
pier
bracket
platform
bridge
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910297956.5A
Other languages
English (en)
Inventor
陈松洲
王晋
李玲玉
黄灿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Road and Bridge International Co Ltd
China Communication South Road and Bridge Co Ltd
Original Assignee
Road and Bridge International Co Ltd
China Communication South Road and Bridge Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Road and Bridge International Co Ltd, China Communication South Road and Bridge Co Ltd filed Critical Road and Bridge International Co Ltd
Priority to CN201910297956.5A priority Critical patent/CN111827116A/zh
Publication of CN111827116A publication Critical patent/CN111827116A/zh
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

本发明提供一种组合式高墩盖梁施工支架,在每个桥墩顺桥向的两侧分别安装有两个牛腿,牛腿上依次安装承重梁、分配梁、盖梁施工模板;在每个牛腿底部连接一L型吊架,L型吊架包括一竖杆和一横杆,竖杆紧贴墩身,上端与牛腿底部支撑板通过销轴连接,下端固定连接横杆的一端,横杆的另一端沿顺桥向水平延伸,在位于桥墩同一侧的所有L型吊架的横杆间搭设有多根支撑杆,支撑杆上铺设面板形成下平台,桥墩底部沿墩身设有通往下平台的下爬梯。本发明通过下平台进行支架的安装拆卸,解决了以往高墩支架无安装拆卸施工平台的问题。

Description

一种组合式高墩盖梁施工支架
技术领域
本发明涉及桥梁盖梁施工模板支架,具体涉及一种组合式盖梁施工模板支架系统。
背景技术
山岭及河谷地区桥梁高墩盖梁施工,因桥位处地形及地质原因而不能采用落地支架的情况下,可采用销棒式、抱箍式或牛腿式支架结构。销棒法需要预留一个贯穿墩柱的孔,后期采用混凝土填充,填充混凝土质量难以保证,而且销棒圆形截面抗弯效果不佳,承载力不高。采用抱箍法,抱箍与墩柱之间的摩擦系数取值难以掌握,施工时易发生抱箍滑脱事故,因此能承受的荷载有限。牛腿法是依靠预埋在墩身中的连接件,将牛腿安装在桥墩上,尽管会对墩身外观造成一定影响,但承载力强,因此在大体积盖梁施工时常采用。以上无论是销棒式、抱箍式还是牛腿式支架,由于支架都是安装在高墩顶部,无下部基础支撑,安装拆卸时无施工平台,因此均存在支架安装及拆卸困难的问题。
发明内容
本发明的目的在于解决现有盖梁支架施工存在的不足,提供一套便于安装及拆卸的组合式桥梁盖梁施工支架。
本发明的技术方案如下:
一种组合式高墩盖梁施工支架,在每个桥墩顺桥向的两侧分别通过墩身预埋件安装有两个牛腿,横桥向在桥墩同一侧的牛腿上搭设有承重梁,承重梁上搭设有分配梁,分配梁上安装盖梁施工模板,其特征在于:在每个牛腿底部连接一L型吊架,所述L型吊架包括一竖杆和一横杆,所述竖杆紧贴墩身,竖杆上端与牛腿底部支撑板通过销轴连接,下端固定连接所述横杆的一端,横杆的另一端沿顺桥向水平延伸;每个桥墩每侧的两L型吊架的竖杆间通过剪刀撑连接,在位于桥墩同一侧的所有L型吊架的横杆间搭设有多根支撑杆,支撑杆上铺设面板形成下平台,下平台周边设有下平台护栏;在桥墩底部沿墩身设有通往下平台的下爬梯。
本发明采用一种组合式盖梁施工支架,支架主梁放置在支撑牛腿上,由支撑牛腿及预埋件共同承受上部荷载,牛腿下方通过L形吊架设置了下平台,方便工人安装、拆除盖梁支架。解决了传统支架安装拆卸无操作平台的问题,并可保证施工过程安全。
附图说明
图1所示是本发明横桥向的立面结构示意图;
图2所示是本发明顺桥向的立面结构示意图。
具体实施方式
如图1、图2所示,本发明提供的一种组合式高墩盖梁施工支架,在每个桥墩1顺桥向的两侧分别通过墩身预埋件安装有两个牛腿2,横桥向在桥墩1同一侧的牛腿上搭设有承重梁3,承重梁3上搭设有分配梁4,分配梁4上安装盖梁施工模板5;在每个牛腿2底部连接一L型吊架,所述L型吊架包括一竖杆6和一横杆7。牛腿2包括侧板和顶板,侧板与墩身预埋件连接,顶板水平设置,顶板底部焊接两块竖向的支撑板。所述竖杆6紧贴墩身,竖杆上端位于牛腿两支撑板之间,在牛腿两支撑板及竖杆上端间横穿一销轴,将竖杆与牛腿底部支撑板通过销轴连接;竖杆6下端固定连接横杆7的一端,横杆7的另一端沿顺桥向水平延伸。每个桥墩每侧的两L型吊架的竖杆6间通过剪刀撑8连接,在位于桥墩同一侧的所有L型吊架的横杆7间搭设有多根支撑杆9,支撑杆9上铺设面板形成下平台,下平台周边设有下平台护栏10;在桥墩底部沿墩身设有通往下平台的下爬梯11。
本发明在安装施工时,先通过墩身预埋件安装牛腿2,牛腿2安装完成后,在牛腿底部连接L型吊架、搭设下平台,下平台搭设完成后,可借助下平台进行支架上部结构的安装施工。
为便于施工完成后支架拆卸,本发明在每个桥墩每侧的两牛腿顶部间安装有垫梁12,所述垫梁12上安装有楔形卸落架13,承重梁3搭设在楔形卸落架上。
为保证支架整体结构稳定,承重梁3安装完成后,将桥墩两侧的承重梁间通过多根对拉杆14连接。
本发明在所述分配梁4上铺设有面板形成上平台,上平台周边安装有上平台护栏15。盖梁浇筑施工时,施工人员主要在上平台上操作,下平台上可进行一些辅助操作。为便于施工人员上下平台,在所述下平台与上平台之间搭设有上爬梯16。

Claims (4)

1.一种组合式高墩盖梁施工支架,在每个桥墩顺桥向的两侧分别通过墩身预埋件安装有两个牛腿,横桥向在桥墩同一侧的牛腿上搭设有承重梁,承重梁上搭设有分配梁,分配梁上安装盖梁施工模板,其特征在于:在每个牛腿底部连接一L型吊架,所述L型吊架包括一竖杆和一横杆,所述竖杆紧贴墩身,竖杆上端与牛腿底部支撑板通过销轴连接,下端固定连接所述横杆的一端,横杆的另一端沿顺桥向水平延伸;每个桥墩每侧的两L型吊架的竖杆间通过剪刀撑连接,在位于桥墩同一侧的所有L型吊架的横杆间搭设有多根支撑杆,支撑杆上铺设面板形成下平台,下平台周边设有下平台护栏;在桥墩底部沿墩身设有通往下平台的下爬梯。
2.根据权利要求1所述的组合式高墩盖梁施工支架,其特征在于:每个桥墩每侧的两牛腿顶部间安装有垫梁,所述垫梁上安装有楔形卸落架,所述承重梁搭设在楔形卸落架上。
3.根据权利要求1所述的组合式高墩盖梁施工支架,其特征在于:桥墩两侧的承重梁间通过多根对拉杆连接。
4.根据权利要求1所述的组合式高墩盖梁施工支架,其特征在于:所述分配梁上铺设有面板形成上平台,所述上平台周边安装有上平台护栏;在所述下平台与上平台之间搭设有上爬梯。
CN201910297956.5A 2019-04-15 2019-04-15 一种组合式高墩盖梁施工支架 Pending CN111827116A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910297956.5A CN111827116A (zh) 2019-04-15 2019-04-15 一种组合式高墩盖梁施工支架

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910297956.5A CN111827116A (zh) 2019-04-15 2019-04-15 一种组合式高墩盖梁施工支架

Publications (1)

Publication Number Publication Date
CN111827116A true CN111827116A (zh) 2020-10-27

Family

ID=72914508

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910297956.5A Pending CN111827116A (zh) 2019-04-15 2019-04-15 一种组合式高墩盖梁施工支架

Country Status (1)

Country Link
CN (1) CN111827116A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113481869A (zh) * 2021-08-06 2021-10-08 中交路桥华东工程有限公司 一种盖梁平台装卸方法
CN113622322A (zh) * 2021-08-13 2021-11-09 中铁十五局集团有限公司 一种桥梁支座的更换维修装置及方法

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1335057A (fr) * 1962-07-02 1963-08-16 Stup Procedes Freyssinet Perfectionnements aux procédés et dispositifs de construction de ponts en encorbellement
CN101922143A (zh) * 2010-07-02 2010-12-22 上海市第二市政工程有限公司 盖梁施工方法
CN201695339U (zh) * 2010-06-24 2011-01-05 中冶实久建设有限公司 盖梁施工钢支撑
CN103882813A (zh) * 2014-04-10 2014-06-25 中铁二局股份有限公司 用于桥墩与横系梁同步施工的牛腿托架平台及其搭建方法
CN204023422U (zh) * 2014-09-05 2014-12-17 中铁二十四局集团安徽工程有限公司 一种装配式盖梁施工操作平台
CN106120562A (zh) * 2016-07-08 2016-11-16 杭州市市政工程集团有限公司 高架桥钢棒牛腿盖梁支模架整体吊装施工方法
CN107165056A (zh) * 2017-07-13 2017-09-15 中交二航局第四工程有限公司 用于悬臂盖梁混凝土浇筑的抗倾覆钢棒支架及其安装方法
CN210066507U (zh) * 2019-04-15 2020-02-14 中交路桥建设有限公司 一种组合式高墩盖梁施工支架

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1335057A (fr) * 1962-07-02 1963-08-16 Stup Procedes Freyssinet Perfectionnements aux procédés et dispositifs de construction de ponts en encorbellement
CN201695339U (zh) * 2010-06-24 2011-01-05 中冶实久建设有限公司 盖梁施工钢支撑
CN101922143A (zh) * 2010-07-02 2010-12-22 上海市第二市政工程有限公司 盖梁施工方法
CN103882813A (zh) * 2014-04-10 2014-06-25 中铁二局股份有限公司 用于桥墩与横系梁同步施工的牛腿托架平台及其搭建方法
CN204023422U (zh) * 2014-09-05 2014-12-17 中铁二十四局集团安徽工程有限公司 一种装配式盖梁施工操作平台
CN106120562A (zh) * 2016-07-08 2016-11-16 杭州市市政工程集团有限公司 高架桥钢棒牛腿盖梁支模架整体吊装施工方法
CN107165056A (zh) * 2017-07-13 2017-09-15 中交二航局第四工程有限公司 用于悬臂盖梁混凝土浇筑的抗倾覆钢棒支架及其安装方法
CN210066507U (zh) * 2019-04-15 2020-02-14 中交路桥建设有限公司 一种组合式高墩盖梁施工支架

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113481869A (zh) * 2021-08-06 2021-10-08 中交路桥华东工程有限公司 一种盖梁平台装卸方法
CN113622322A (zh) * 2021-08-13 2021-11-09 中铁十五局集团有限公司 一种桥梁支座的更换维修装置及方法

Similar Documents

Publication Publication Date Title
CN210066507U (zh) 一种组合式高墩盖梁施工支架
JP5047680B2 (ja) 連続高架橋の施工方法
CN201221206Y (zh) 一种可移动式防电防护棚架
CN102661054B (zh) 平面钢桁架整体提升中的侧向加固结构及整体提升方法
CN103643800B (zh) 屈曲约束支撑构件的提升安装体系及其施工方法
CN201933419U (zh) 一种拱桥拱肋现浇支架
CN112411391A (zh) 一种独柱盖梁钢管柱贝雷梁施工支撑系统及其施工方法
CN115369749A (zh) 墩柱-横梁-盖梁一体化公轨双层高架桥及施工方法
CN105484164B (zh) 一种跨式贝雷梁支架及其施工方法
CN206768611U (zh) 桥墩吊篮安装作业平台
CN209780193U (zh) 一种悬吊式脚手架
CN110409318A (zh) 一种大跨度简支钢混结合梁拼装架设方法
CN103469735B (zh) 曲线超高型空心柱板式桥墩墩顶实心段模板的安装方法
CN104314013A (zh) 一种极不对称组合梁的双悬臂施工方法
CN218322325U (zh) 墩柱-横梁-盖梁一体化公轨双层高架桥
CN104452598A (zh) 水中墩超长预应力盖梁施工支撑体系的施工方法
CN106758855B (zh) 圆弧形墩帽施工用拱形支架组件及圆弧形墩帽施工方法
CN222990595U (zh) 一种悬索桥施工多功能门架
CN219080110U (zh) 钢管柱支架施工安全平台装置
CN204386135U (zh) 移动式挂篮
CN108797380B (zh) 悬灌连续梁托架悬吊施工装置及施工方法
CN204401462U (zh) 用于水中墩超长预应力盖梁施工支撑体系的支架
CN207862777U (zh) 移动式桥梁临时支座拆除通道装置
CN203741727U (zh) 一种矮塔斜拉桥长悬臂零号节段现浇支架
CN206581578U (zh) 用于悬挑式脚手架的双层吊篮施工装置

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20201027