CN202073100U - 一种弥补钢格柱移位或漏打所用的临时竖向钢支撑结构 - Google Patents
一种弥补钢格柱移位或漏打所用的临时竖向钢支撑结构 Download PDFInfo
- Publication number
- CN202073100U CN202073100U CN2011201574819U CN201120157481U CN202073100U CN 202073100 U CN202073100 U CN 202073100U CN 2011201574819 U CN2011201574819 U CN 2011201574819U CN 201120157481 U CN201120157481 U CN 201120157481U CN 202073100 U CN202073100 U CN 202073100U
- Authority
- CN
- China
- Prior art keywords
- steel
- steel pipe
- support
- pipe section
- supporting steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
本实用新型公开了一种弥补钢格柱移位或漏打所用的临时竖向钢支撑结构,包括同轴设置的上节支撑钢管和下节支撑钢管,上节支撑钢管的顶部固接有钢质上托板,钢质上托板通过锚栓与结构顶板连接;下节支撑钢管的底部固接有钢质下托板,钢质下托板通过锚栓与基桩连接,基桩为与预弥补钢格柱支撑基桩相邻或共同支撑一个承台的基桩中的一个;上节支撑钢管的下部和下节支撑钢管的上部的外面设有钢套管,钢套管与上节支撑钢管和下节支撑钢管焊接,下节支撑钢管与钢质下托板之间焊接有加劲板,上节支撑钢管与钢质上托板之间焊接有加劲板,钢套管与上节支撑钢管和下节支撑钢管之间焊接有连接板。本实用新型结构简单,安装施工快捷,安全可靠,能够周转使用。
Description
技术领域
本实用新型涉及一种竖向钢支撑结构,特别是涉及一种弥补钢格柱移位或漏打所用的临时竖向钢支撑结构。
背景技术
目前,深基坑逆作法施工,多采用桩基型钢格构柱进行竖向支撑。但在施工过程中经常会出现以下问题:钢格构柱上端低于设计要求标高或钢格构柱漏打或打错位置。由此造成基础土方开挖和基础底板施工阶段,钢格构柱形成的支顶不能满足设计要求,存在施工质量和施工安全隐患。因此需要在开挖过程中,重新按照设计要求施工钢格构柱,在钢格构柱的施工过程中,为了保证施工质量和施工安全,应当在原设计部位形成结构顶板的临时支撑结构。
实用新型内容
本实用新型为解决公知技术中存在的技术问题而提供一种弥补钢格柱移位或漏打所用的临时竖向钢支撑结构。
本实用新型为解决公知技术中存在的技术问题所采取的技术方案是:一种弥补钢格柱移位或漏打所用的临时竖向钢支撑结构,包括同轴设置的上节支撑钢管和下节支撑钢管,所述上节支撑钢管的顶部固接有钢质上托板,所述钢质上托板通过锚栓与结构顶板连接;所述下节支撑钢管的底部固接有钢质下托板,所述钢质下托板通过锚栓与基桩连接,所述基桩为与预弥补钢格柱支撑基桩相邻或共同支撑一个承台的基桩中的一个;所述上节支撑钢管的下部和所述下节支撑钢管的上部的外面设有钢套管,所述钢套管与所述上节支撑钢管和所述下节支撑钢管焊接,所述下节支撑钢管与所述钢质下托板之间焊接有加劲板,所述上节支撑钢管与所述钢质上托板之间焊接有加劲板,所述钢套管与所述上节支撑钢管和所述下节支撑钢管之间焊接有连接板。
本实用新型具有的优点和积极效果是:采用钢套管连接上节支撑钢管和下节支撑钢管的结构,结构简单,安装施工快捷,安全可靠,能够周转使用;等效换撑后,能达到设计结构顶板的支撑要求;拆除后,可重复周转使用,施工成本低。
附图说明
图1为本实用新型的结构示意图;
图2为本实用新型上节支撑钢管和下节支撑钢管连接的结构示意图;
图3为图1的A-A和B-B剖示图。
图中:1、结构顶板,2、锚栓,3-1、钢质上托板,3-2、钢质下托板,4-1、上节支撑钢管,4-2、下节支撑钢管,5、混凝土平面,6、基桩,7、钢套管,8、连接板,9、铁楔子,10、加劲板。
具体实施方式
为能进一步了解本实用新型的发明内容、特点及功效,兹例举以下实施例,并配合附图详细说明如下:
请参阅图1~图3,一种弥补钢格柱移位或漏打所用的临时竖向钢支撑结构,包括同轴设置的上节支撑钢管4-1和下节支撑钢管4-2,所述上节支撑钢管4-1的顶部固接有钢质上托板3-1,所述钢质上托板3-1通过锚栓2与结构顶板1连接;所述下节支撑钢管4-2的底部固接有钢质下托板3-2,所述钢质下托板3-2通过锚栓2与基桩6连接,所述基桩6为与预弥补钢格柱支撑基桩相邻或共同支撑一个承台的基桩中的一个;所述上节支撑钢管4-1的下部和所述下节支撑钢管4-2的上部的外面设有钢套管7,所述钢套管7与所述上节支撑钢管4-1和所述下节支撑钢管4-2焊接,所述下节支撑钢管4-2与所述钢质下托板3-2之间焊接有加劲板10,所述上节支撑钢管4-1与所述钢质上托板3-1之间焊接有加劲板10,所述钢套管7与所述上节支撑钢管4-1和所述下节支撑钢管4-2之间焊接有连接板8。
本实用新型的施工方法:
先在与预弥补钢格柱支撑基桩相邻或共同支撑一个承台的基桩中选择一个基桩6将其截至设计标高,同时进行混凝土找平,形成混凝土平面5,然后利用这根桩作为新增临时竖向钢支撑的支点,在上、下节支撑钢管上下分设钢质上、下托板3-1、3-2,将钢质上、下托板3-1、3-2分别与结构顶板1、基桩6进行锚栓2植筋固定连接,然后将上节支撑钢管4-1与钢质上托板3-1焊接,之后再与钢套管7进行焊接,之后焊接钢套管7与下节支撑钢管4-2,在下节支撑钢管4-2底部采用铁楔子9顶紧,再将钢套管7和钢质下托板3-2进行焊接,最后焊接加劲板10和连接板8。待换撑成功后,将有问题的钢格构柱拆除,并将其支撑基桩剔凿至设计要求标高。钢管外进行防腐防锈处理后,能在相当长的时间内满足地下室结构施工需求。在设计位置上完成钢格构柱的施工,拆除本实用新型所述的临时竖向钢支撑结构。
尽管上面结合附图对本实用新型的优选实施例进行了描述,但是本实用新型并不局限于上述的具体实施方式,上述的具体实施方式仅仅是示意性的,并不是限制性的,本领域的普通技术人员在本实用新型的启示下,在不脱离本实用新型宗旨和权利要求所保护的范围情况下,还可以作出很多形式,这些均属于本实用新型的保护范围之内。
Claims (1)
1.一种弥补钢格柱移位或漏打所用的临时竖向钢支撑结构,其特征在于,包括同轴设置的上节支撑钢管和下节支撑钢管,所述上节支撑钢管的顶部固接有钢质上托板,所述钢质上托板通过锚栓与结构顶板连接;所述下节支撑钢管的底部固接有钢质下托板,所述钢质下托板通过锚栓与基桩连接,所述基桩为与预弥补钢格柱支撑基桩相邻或共同支撑一个承台的基桩中的一个;所述上节支撑钢管的下部和所述下节支撑钢管的上部的外面设有钢套管,所述钢套管与所述上节支撑钢管和所述下节支撑钢管焊接,所述下节支撑钢管与所述钢质下托板之间焊接有加劲板,所述上节支撑钢管与所述钢质上托板之间焊接有加劲板,所述钢套管与所述上节支撑钢管和所述下节支撑钢管之间焊接有连接板。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011201574819U CN202073100U (zh) | 2011-05-17 | 2011-05-17 | 一种弥补钢格柱移位或漏打所用的临时竖向钢支撑结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011201574819U CN202073100U (zh) | 2011-05-17 | 2011-05-17 | 一种弥补钢格柱移位或漏打所用的临时竖向钢支撑结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202073100U true CN202073100U (zh) | 2011-12-14 |
Family
ID=45111203
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011201574819U Expired - Fee Related CN202073100U (zh) | 2011-05-17 | 2011-05-17 | 一种弥补钢格柱移位或漏打所用的临时竖向钢支撑结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202073100U (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103225308A (zh) * | 2013-05-08 | 2013-07-31 | 周正海 | 立柱结构及包括该立柱结构的基坑支护系统 |
CN105003090A (zh) * | 2015-08-18 | 2015-10-28 | 广西建工集团第五建筑工程有限责任公司 | 装配式钢结构安装用临时支撑架 |
CN105134250A (zh) * | 2015-10-16 | 2015-12-09 | 中铁十局集团济南铁路工程有限公司 | 一种软弱围岩地铁车站免拆支撑直接衬砌的方法 |
CN106917504A (zh) * | 2017-03-07 | 2017-07-04 | 中铁大桥局集团第六工程有限公司 | 一种带有接头装置的横撑钢管结构及其施工方法 |
CN110005136A (zh) * | 2019-04-26 | 2019-07-12 | 中建四局第六建筑工程有限公司 | 一种钢棒群的快速安装结构 |
-
2011
- 2011-05-17 CN CN2011201574819U patent/CN202073100U/zh not_active Expired - Fee Related
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103225308A (zh) * | 2013-05-08 | 2013-07-31 | 周正海 | 立柱结构及包括该立柱结构的基坑支护系统 |
CN103225308B (zh) * | 2013-05-08 | 2016-05-25 | 周正海 | 立柱结构及包括该立柱结构的基坑支护系统 |
CN105003090A (zh) * | 2015-08-18 | 2015-10-28 | 广西建工集团第五建筑工程有限责任公司 | 装配式钢结构安装用临时支撑架 |
CN105003090B (zh) * | 2015-08-18 | 2017-07-21 | 广西建工集团第五建筑工程有限责任公司 | 装配式钢结构安装用临时支撑架 |
CN105134250A (zh) * | 2015-10-16 | 2015-12-09 | 中铁十局集团济南铁路工程有限公司 | 一种软弱围岩地铁车站免拆支撑直接衬砌的方法 |
CN106917504A (zh) * | 2017-03-07 | 2017-07-04 | 中铁大桥局集团第六工程有限公司 | 一种带有接头装置的横撑钢管结构及其施工方法 |
CN110005136A (zh) * | 2019-04-26 | 2019-07-12 | 中建四局第六建筑工程有限公司 | 一种钢棒群的快速安装结构 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202073100U (zh) | 一种弥补钢格柱移位或漏打所用的临时竖向钢支撑结构 | |
CN101775807B (zh) | 软土地基深基坑支护结构 | |
CN205024690U (zh) | 一种深基坑内支撑的拆撑加强结构 | |
CN103866693B (zh) | 一种钢筋混凝土系杆拱桥拱肋的安装方法 | |
CN103882869A (zh) | 一种用于基坑围护的斜向支撑桩结构及其施工方法 | |
CN202577325U (zh) | 钢管桩平台与钢板桩围堰协同作业装置 | |
CN104947681A (zh) | 一种超大超深地下室基坑的施工方法 | |
CN203547753U (zh) | 型钢混凝土井筒壁座 | |
CN111456032B (zh) | 一种基坑支护体系及其施工方法 | |
CN103074899A (zh) | 分仓支墩式基坑支护结构及施工方法 | |
CN201172830Y (zh) | 塔式起重机锚杆静压桩基础 | |
CN111622268B (zh) | 基于电力管廊下穿大型刚性箱涵的保护施工方法 | |
CN102305091A (zh) | 一种硬岩大断面隧道施工的支撑结构及其施工方法 | |
CN204715366U (zh) | 一种大面积深基坑分区顺逆工况下的支撑体系 | |
CN101148888B (zh) | 气压沉箱锚桩自主纠偏装置 | |
CN104032767A (zh) | 一种深基坑内塔吊基础及其施工方法 | |
CN203768914U (zh) | 一种用于基坑围护的斜向支撑桩结构 | |
CN107013046B (zh) | 一种大截面钢管混凝土组合柱的矫正方法 | |
CN204040042U (zh) | 一种超大超深人工挖孔桩支护结构 | |
CN210106749U (zh) | 一种软土地基超大断面顶管顶进作业的反力结构 | |
CN110004942A (zh) | 一种大跨度组合支撑结构及其施工方法 | |
CN205296173U (zh) | 利用基坑支撑体系承托塔吊的结构 | |
CN212801554U (zh) | 一种土木工程软土深基坑台阶式斜坡格式护板 | |
CN212054727U (zh) | 一种亭式盾板支架 | |
CN201605583U (zh) | 钢结构桁架与预应力混凝土管桩连接节点 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20111214 Termination date: 20200517 |