CN101148888B - 气压沉箱锚桩自主纠偏装置 - Google Patents

气压沉箱锚桩自主纠偏装置 Download PDF

Info

Publication number
CN101148888B
CN101148888B CN200610116424XA CN200610116424A CN101148888B CN 101148888 B CN101148888 B CN 101148888B CN 200610116424X A CN200610116424X A CN 200610116424XA CN 200610116424 A CN200610116424 A CN 200610116424A CN 101148888 B CN101148888 B CN 101148888B
Authority
CN
China
Prior art keywords
caisson
steel
slotted
pile
compressed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN200610116424XA
Other languages
English (en)
Other versions
CN101148888A (zh
Inventor
李耀良
袁芬
王涛
邓前锋
张敏佳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Foundation Engineering Group Co Ltd
Original Assignee
SHANGHAI FOUNDATION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI FOUNDATION ENGINEERING Co Ltd filed Critical SHANGHAI FOUNDATION ENGINEERING Co Ltd
Priority to CN200610116424XA priority Critical patent/CN101148888B/zh
Publication of CN101148888A publication Critical patent/CN101148888A/zh
Application granted granted Critical
Publication of CN101148888B publication Critical patent/CN101148888B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明公开了一种气压沉箱锚桩自主纠偏装置,包括锚桩、锚箱三角钢架,锚桩位于沉箱四角,沉箱每角各设置两根锚桩,三角钢架钢与沉箱固定连接,该装置还包括穿心千斤顶,钢锚箱,锚桩主筋伸出桩顶,钢锚箱与锚桩主筋焊接固定,穿心千斤顶设置在三角钢架上,穿心千斤顶下部的锚固头穿过钢架与钢锚箱固定连接。本发明能对气压沉箱锚桩在沿海及软土地区,浅层土土质较差,承载力低,土层之间的差异大,土性不均匀,地下水位高等不利因素下的沉箱下沉过程中易发生的倾斜进行自主纠偏。解决了长期以来无法解决的技术问题,使气压沉箱的施工方法能够在沿海及软土地区中得到应用。

Description

气压沉箱锚桩自主纠偏装置
技术领域
本发明涉及地下空间开发利用的新技术——现代气压沉箱技术,尤其是一种用于气压沉箱的纠偏装置。
背景技术
气压沉箱工法是在其下部设置一个气密性高的钢筋混凝土结构工作室,向工作室内注入压力与刃口处地下水压力相等的压缩空气,使在无水的环境下进行挖土排土,箱体在本身自重以及上部荷载的作用下下沉到指定深度,最后在沉箱结构面底部浇筑混凝土底板的一种工法。
自上世纪70年代以后的近三十多年,由于其在人力操作上的低效率、施工高成本以及对工人人身安全及施工管理上的风险,并随着其他特种地下工程施工技术如地下连续墙、灌注桩、盾构等等工法的快速发展,气压沉箱工法逐渐在我国应用越来越少进而趋止。
为增强这种工法在深基础领域内的竞争能力,不断结合其先进的科学技术对该工法进行革新和改良,同时在沉箱病的防治上有了新的改进,使得气压沉箱这一古老的施工技术得到了新生。现代气压沉箱进入了无人化、自动化施工的时代,成为了大深度地下工程领域的一项关键技术。
在沿海及软土地区,浅层土土质较差,承载力低,土层之间的差异大,土性不均匀,地下水位高,这些因素使沉箱在下沉过程中容易发生倾斜,需要对其进行纠偏。目前,还没有发现用于气压沉箱自主纠偏的装置。
发明内容
本发明是要解决气压沉箱在下沉过程中容易发生倾斜,需要对其进行纠偏的技术问题,提供一种气压沉箱锚桩自主纠偏装置。
为实现上述目的,本发明采用的技术方案如下:
一种气压沉箱锚桩自主纠偏装置,包括锚桩、三角钢架,锚桩位于沉箱四角,沉箱每角各设置两根锚桩,三角钢架钢与沉箱固定连接,该装置还包括穿心千斤顶,钢锚箱,锚桩主筋伸出桩顶,钢锚箱与锚桩主筋焊接固定,穿心千斤顶设置在三角钢架上,穿心千斤顶下部的锚固头穿过钢架与钢锚箱固定连接。
三角钢架通过螺栓与沉箱固定连接;钢锚箱由圆形钢套管内加钢板构成,圆形钢套管内的钢板焊接成井字网格,井字网格中心空格与穿心千斤顶锚固端相配。
本发明由于采用了锚桩主筋伸出桩顶,钢锚箱与锚桩主筋焊接固定,穿心千斤顶设置在三角钢架上,穿心千斤顶下部的锚固头穿过钢架与钢锚箱固定连接结构。该装置由穿心千斤顶3产生顶力,对下部锚桩5产生拉力,相当于锚桩5对上部结构产生向下的拉力。按照沉箱纠偏的要求,调节八个装置使其产生不同的顶力,从而起到纠偏沉箱的作用。
因此,本发明能对气压沉箱锚桩在沿海及软土地区,浅层土土质较差,承载力低,土层之间的差异大,土性不均匀,地下水位高等不利因素下的沉箱下沉过程中发生的倾斜进行自主纠偏。解决了长期以来无法解决的技术问题,使气压沉箱的施工方法能够在沿海及软土地区中得到应用。
附图说明
图1是本发明的结构示意图;
图2是锚桩布置图;
图3是钢锚箱与锚桩焊接示意图;
图4是钢锚箱结构示意图;
图5是三角钢架的结构示意图。
具体实施方式
下面结合附图与实施例对本发明作进一步的描述。
如图1,2所示,气压沉箱锚桩自主纠偏装置,由锚桩5、钢锚箱7、穿心千斤顶3、三角钢架2组成。锚桩5属于抗拔桩,位于沉箱1四周,每角各设置两根;锚桩5主筋6伸出桩顶,钢锚箱7与主筋6焊接,用于固定穿心千斤顶锚固头4;穿心千斤顶3安装于三角钢架2上,下部的锚固头4穿过钢架2与钢锚箱7固定;三角钢架2通过螺栓与沉箱1结构连接,作为穿心千斤顶3的工作平台。该装置由穿心千斤顶3产生顶力,对下部锚桩5产生拉力,相当于锚桩5对上部结构产生向下的拉力。按照沉箱纠偏的要求,调节八个装置使其产生不同的顶力,从而起到纠偏沉箱的作用。
本发明具体实施例如下:
一.锚桩5
锚桩5作为抗拔桩,承受来自千斤顶3的拉力。锚桩5位于沉箱四角(图2所示),每角两根,共八根。锚桩5离结构的距离可根据锚桩的桩型,直径等确定,深度根据该地区土层地质状况和上部荷载确定,单桩承受荷载不应超过其单桩承载力。锚桩主筋6伸出桩顶,用于与钢锚箱7的连接。
二.钢锚箱7
钢锚箱7用于固定穿心千斤顶3锚固段。由圆形钢套管9内加钢板8组成(图4所示)。钢板8焊接形成井字网格,中心空格大小应满足可使穿心千斤顶3锚固端通过的要求。钢锚箱7外部与锚桩5预留主筋焊接(图3所示)。
三.三角钢架2(图5所示)
三角钢架2分为横杆10与斜杆11两部分组成。横杆10与沉箱1结构顶端连接,斜杆11与沉箱1结构侧墙连接。横杆11采用双拼H型钢的形式,双拼之间留出空隙,以便穿心千斤顶3钢绞线穿越;斜杆11采用箱型截面的形式。连接方式采用螺栓连接。螺栓于沉箱1制作时预埋在沉箱1中,横杆10与连杆11相应位置处开孔,待结构达到设计强度后进行装配。横杆10与斜杆11的连接方式同样采用螺栓连接。横杆10、斜杆11、螺栓型号及数目都需经过计算确定。
四.穿心千斤顶3
穿心千斤顶3位于三角钢架2上(图1所示),钢绞线与锚固端穿越横杆10后固定于锚箱7底。穿心千斤顶3的型号,顶力大小根据现场情况确定。

Claims (3)

1.一种气压沉箱锚桩自主纠偏装置,包括锚桩(5)、三角钢架(2),锚桩(5)位于沉箱(1)四角,沉箱(1)每角各设置两根锚桩(5),三角钢架(2)与沉箱(1)固定连接,其特征在于,该装置还包括穿心千斤顶(3),钢锚箱(7),所述锚桩主筋(6)伸出桩顶,钢锚箱(7)与锚桩主筋(6)焊接固定,穿心千斤顶(3)设置在三角钢架(2)上,穿心千斤顶(3)下部的锚固头(4)穿过三角钢架(2)与钢锚箱(7)固定连接。
2.根据权利要求1所述的气压沉箱锚桩自主纠偏装置,其特征在于,所述三角钢架(2)通过螺栓与沉箱(1)固定连接。
3.根据权利要求1所述的气压沉箱锚桩自主纠偏装置,其特征在于,所述钢锚箱(7)由圆形钢套管(9)内加钢板(8)构成,圆形钢套管(9)内的钢板(8)焊接成井字网格,井字网格中心空格与穿心千斤顶(3)锚固端相配。
CN200610116424XA 2006-09-22 2006-09-22 气压沉箱锚桩自主纠偏装置 Active CN101148888B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200610116424XA CN101148888B (zh) 2006-09-22 2006-09-22 气压沉箱锚桩自主纠偏装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200610116424XA CN101148888B (zh) 2006-09-22 2006-09-22 气压沉箱锚桩自主纠偏装置

Publications (2)

Publication Number Publication Date
CN101148888A CN101148888A (zh) 2008-03-26
CN101148888B true CN101148888B (zh) 2010-10-13

Family

ID=39249578

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200610116424XA Active CN101148888B (zh) 2006-09-22 2006-09-22 气压沉箱锚桩自主纠偏装置

Country Status (1)

Country Link
CN (1) CN101148888B (zh)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101736744B (zh) * 2009-12-25 2012-04-04 张子良 自平衡下沉大直径管桩及其施工方法
CN102926394B (zh) * 2010-06-05 2015-03-25 朱虹 一种利用石灰桩纠偏沉井的方法
CN104032764A (zh) * 2014-06-13 2014-09-10 上海市基础工程集团有限公司 压入式沉井反力系统
CN104088289B (zh) * 2014-07-22 2016-06-22 上海市基础工程集团有限公司 气压沉箱起沉临时支墩及施工方法
CN106337428A (zh) * 2016-08-26 2017-01-18 中国十七冶集团有限公司 一种千斤顶回缩预控沉井倾斜的方法
CN109797763A (zh) * 2019-01-25 2019-05-24 中交二航局第四工程有限公司 一种水中沉井近邻锚桩定位方法及定位结构

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3871181A (en) * 1974-02-15 1975-03-18 Delong Corp Method of forming an enclosure in a body of water
CN1065698A (zh) * 1991-02-18 1992-10-28 挪威承包公司 离岸重力平台
CN1306131A (zh) * 2001-02-28 2001-08-01 上海交通大学 组合式简易隧道管段沉放平台

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3871181A (en) * 1974-02-15 1975-03-18 Delong Corp Method of forming an enclosure in a body of water
CN1065698A (zh) * 1991-02-18 1992-10-28 挪威承包公司 离岸重力平台
CN1306131A (zh) * 2001-02-28 2001-08-01 上海交通大学 组合式简易隧道管段沉放平台

Also Published As

Publication number Publication date
CN101148888A (zh) 2008-03-26

Similar Documents

Publication Publication Date Title
CN101148888B (zh) 气压沉箱锚桩自主纠偏装置
CN111622281A (zh) 一种筏板基础建筑物同步顶升纠偏的施工方法
CN105421474B (zh) 用于岩石地层低桩承台的植桩围堰平台一体化施工方法
CN208152052U (zh) 一种可控变形的钢板桩基坑支护结构
CN105155602A (zh) 一种多支点地基加固综合纠倾方法
CN109898521A (zh) 一种用于基坑阳角的桩锚支护结构及施工方法
CN110468873B (zh) 一种小空间下桥台桩基托换结构及使用方法
CN109056710B (zh) 一种硬质地层钢管桩及其施工方法
CN101793098B (zh) 一种协调互动组合纠倾方法
CN101148889B (zh) 气压沉箱锚桩支承装置
CN106400814B (zh) 一种基坑支护方法
CN210106749U (zh) 一种软土地基超大断面顶管顶进作业的反力结构
CN110241863B (zh) 软土基坑开挖过程管廊变形控制装置及其控制方法
CN104088292A (zh) 轴心单桩多脚架基础及其施工方法
CN216194894U (zh) 具有倒凸型承台结构的筒型结构风机基础及风电机组
CN114541439B (zh) 一种无封底双壁钢围堰结构的施工方法
CN203113515U (zh) 一种滑模顶升一体化装置
CN212052780U (zh) 一种斜支式深基坑支护结构
CN209779672U (zh) 一种海上风电嵌岩区风机基础
CN210031875U (zh) 顶推用沉井装置
CN111962549B (zh) 邻近基桩作业工况下既有塔吊抗倾覆施工方法
CN212582763U (zh) 一种浅基础纠偏装置
CN220433745U (zh) 一种旋流井施工期间利用支护桩进行抗浮的结构
CN113027102B (zh) 一种软土地基施工支护内支撑施工操作平台及搭建方法
CN113898002B (zh) 具有倒凸型承台结构的筒型结构风机基础及其施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: SHANGHAI FOUNDATION ENGINEERING GROUP CO., LTD.

Free format text: FORMER NAME: SHANGHAI FOUNDATION ENGINEERING CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: 200002, room 406, 612 middle Jiangxi Road, Shanghai, Huangpu District

Patentee after: Shanghai Foundation Engineering Group Co., Ltd.

Address before: 200002, room 406, 612 middle Jiangxi Road, Shanghai, Huangpu District

Patentee before: Shanghai Foundation Engineering Co., Ltd.