CN201818682U - 一种高速列车粉末冶金闸片的安装结构 - Google Patents

一种高速列车粉末冶金闸片的安装结构 Download PDF

Info

Publication number
CN201818682U
CN201818682U CN2010205803899U CN201020580389U CN201818682U CN 201818682 U CN201818682 U CN 201818682U CN 2010205803899 U CN2010205803899 U CN 2010205803899U CN 201020580389 U CN201020580389 U CN 201020580389U CN 201818682 U CN201818682 U CN 201818682U
Authority
CN
China
Prior art keywords
brake lining
brake pad
powder metallurgy
brake
steel backing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010205803899U
Other languages
English (en)
Inventor
吴佩芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Tian Ren Dao and new material Co., Ltd.
Original Assignee
Beijing Tianyishangjia New Material Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Tianyishangjia New Material Co Ltd filed Critical Beijing Tianyishangjia New Material Co Ltd
Priority to CN2010205803899U priority Critical patent/CN201818682U/zh
Application granted granted Critical
Publication of CN201818682U publication Critical patent/CN201818682U/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Braking Arrangements (AREA)

Abstract

本实用新型涉及一种高速列车粉末冶金闸片的安装结构,包括弧形的大钢背和三角形的小三角托,大钢背包括一块基板和四块立板,大钢背还包括6组小三角托的安装位,每组安装位包括球面凹槽、导位孔、定位孔以及3个闸片孔和紧固件凹槽,小三角托包括球面、导位柱、定位柱以及闸片球面槽。本实用新型的粉末冶金闸片安装结构是一种浮动方式,以利于安装在钢背上的闸片尽快地实现磨合到位,并且在制动过程中能够紧密地贴合到制动盘上。

Description

一种高速列车粉末冶金闸片的安装结构
技术领域
本实用新型涉及一种高速列车粉末冶金闸片的安装结构,属于列车制动系统领域。
背景技术
粉末冶金摩擦材料,是以金属及其合金为基体,添加摩擦组元和润滑组元,用粉末冶金方法制成的复合材料。粉末冶金摩擦材料具有足够的强度,合适而稳定的摩擦系数,工作平稳可靠,耐磨及污染少等优点,是现代刹车材料家族中应用较广泛的材料之一。
现在我国经济快速发展,铁路客货运输量迅速增加,铁路运输的高速化已成为必然的发展趋势。目前我国已经开通时速300km以上高速列车。列车高速化对制动系统具有很高的要求,特别是制动系统的制动闸片提出了更高的要求,其中技术最成熟、应用最广泛的是粉末冶金制动闸片。
粉末冶金工艺制成的闸片组装在闸片托上,再装配到制动系统中。为了使安装在闸片托上的闸片在制动过程中可靠接触制动盘,闸片在闸片托上的排列保留适当间隙。并且为了使闸片在制动过程中保持平稳,闸片都设计成一定形状。现有的闸片形状包括圆形、六边形、三角形等等。
目前闸片和钢背普遍采用铆接、焊接等工艺实现。这种方法对于常规的摩擦材料以及中低速列车,由于摩擦材料耐磨性一般,可以在使用过程中较快地达到磨合的程度。但随着高速列车的发展,摩擦材料的耐磨性大幅度提高,因此需要一种闸片和钢背的安装实现一种浮动方式,以利于安装在钢背上的闸片尽快地实现磨合到位,并且在制动过程中能够紧密地贴合到制动盘上。
发明内容
本实用新型提供一种新型的高速列车粉末冶金闸片的安装结构,用于克服以上的不足。
本实用新型的高速列车粉末冶金闸片的安装结构,包括弧形的大钢背和三角形的小三角托,大钢背包括一块基板和四块立板,大钢背还包括6组小三角托的安装位,每组安装位包括球面凹槽、导位孔、定位孔以及3个闸片孔和紧固件凹槽,小三角托包括球面、导位柱、定位柱以及闸片球面槽。
本实用新型的粉末冶金闸片安装结构是一种浮动方式,以利于安装在钢背上的闸片尽快地实现磨合到位,并且在制动过程中能够紧密地贴合到制动盘上。
附图说明
图1是本实用新型闸片安装结构的大钢背的正面视图;
图2是本实用新型闸片安装结构的大钢背的反面视图;
图3是本实用新型闸片安装结构的大钢背的侧视图;
图4是沿图1中A-A的放大剖视图;
图5是本实用新型闸片安装结构的小三角托的正视图;
图6是本实用新型闸片安装结构的小三角托的侧剖视图;以及
图7是本实用新型闸片安装结构在安装闸片时的组装图。
具体实施方式
下面参照附图说明本实用新型。
本实用新型的粉末冶金闸片的安装结构,包括弧形的大钢背1和三角形的小三角托2,大钢背1包括一块基板105和四块立板106、106’,大钢背还包括6组小三角托2的安装位,每组安装位包括球面凹槽101、导位孔102、定位孔103以及3个闸片孔104和紧固件凹槽107,小三角托2包括球面201、导位柱202、定位柱203以及闸片球面槽204。
本实用新型的闸片安装结构在使用时,先将小三角托2安装到大钢背1上,使小三角托2的导位柱202和定位柱203分别插入大钢背1的导位孔102和定位孔103中,小三角托2的球面201与大钢背1的球面凹槽101贴合。再将闸片3装在小三角托2上,使闸片3的紧固连接件31穿过小三角托2的闸片球面槽204以及大钢背1的闸片孔104,利用弹簧卡子4将闸片3紧固。这样,当一个小三角托2上安装3个闸片后,3个弹簧卡子4将3个闸片3紧固的同时,也将此三角托2固定在大钢背1上。如此可以完成6组小三角托及闸片的安装固定。
本实用新型的粉末冶金闸片安装结构是一种浮动方式,以利于安装在钢背上的闸片尽快地实现磨合到位,并且在制动过程中能够紧密地贴合到制动盘上。

Claims (1)

1.一种粉末冶金闸片的安装结构,包括弧形的大钢背(1)和三角形的小三角托(2),大钢背(1)包括一块基板(105)和四块立板(106、106’),大钢背还包括6组小三角托(2)的安装位,每组安装位包括球面凹槽(101)、导位孔(102)、定位孔(103)以及3个闸片孔(104)和紧固件凹槽(107),小三角托(2)包括球面(201)、导位柱(202)、定位柱(203)以及闸片球面槽(204)。
CN2010205803899U 2010-10-28 2010-10-28 一种高速列车粉末冶金闸片的安装结构 Expired - Lifetime CN201818682U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010205803899U CN201818682U (zh) 2010-10-28 2010-10-28 一种高速列车粉末冶金闸片的安装结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010205803899U CN201818682U (zh) 2010-10-28 2010-10-28 一种高速列车粉末冶金闸片的安装结构

Publications (1)

Publication Number Publication Date
CN201818682U true CN201818682U (zh) 2011-05-04

Family

ID=43916638

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010205803899U Expired - Lifetime CN201818682U (zh) 2010-10-28 2010-10-28 一种高速列车粉末冶金闸片的安装结构

Country Status (1)

Country Link
CN (1) CN201818682U (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103742576A (zh) * 2013-11-13 2014-04-23 安徽淮化股份有限公司 一种机动车制动片
CN103883654A (zh) * 2014-03-19 2014-06-25 博深工具股份有限公司 双背板两级浮动式制动闸片

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103742576A (zh) * 2013-11-13 2014-04-23 安徽淮化股份有限公司 一种机动车制动片
CN103883654A (zh) * 2014-03-19 2014-06-25 博深工具股份有限公司 双背板两级浮动式制动闸片
CN103883654B (zh) * 2014-03-19 2016-01-13 博深工具股份有限公司 双背板两级浮动式制动闸片

Similar Documents

Publication Publication Date Title
CN205806293U (zh) 一种列车用弹性调节式制动闸片
CN201714879U (zh) 弹性铆接结构刹车片
CN104583631A (zh) 盘式制动片底座以及保持系统和方法
CN104583630A (zh) 盘式制动片底座以及保持系统和方法
CN201818682U (zh) 一种高速列车粉末冶金闸片的安装结构
CN111396474B (zh) 一种优化摩擦粒子组合及安装方式的高速列车制动闸片
CN202790228U (zh) 一种新型摩擦块可浮动、燕尾连接钢背结构的制动闸片
CN105952828B (zh) 一种列车用弹性调节式制动闸片
CN204226509U (zh) 一种新型粉末冶金闸片
CN106763341A (zh) 一种低拖滞液压卡钳
CN102537158A (zh) 一种高速列车粉末冶金闸片的安装结构
CN102705405A (zh) 一种高速列车用浮动式制动闸片
CN110296167A (zh) 一种弧三角形状的高速动车组用粉末冶金闸片
CN206592457U (zh) 一种高速列车制动粉末冶金闸片
CN102537159A (zh) 一种动车组粉末冶金闸片的安装结构
CN202790230U (zh) 可弹性调节的制动闸片
CN202056231U (zh) 扇形摩擦盘的粉末冶金闸片
CN102588473B (zh) 一种高速列车粉末冶金闸片的安装钢背
CN102537160A (zh) 一种动车组制动闸片的安装结构
CN204419934U (zh) 一种高速列车制动闸片总成
CN202056232U (zh) 八边形摩擦盘的粉末冶金闸片
CN210440501U (zh) 一种高速列车制动闸片背板
CN211778659U (zh) 一种优化摩擦粒子组合及安装方式的高速列车制动闸片
CN110273954A (zh) 一种动车组列车用粉末冶金闸片
CN201963788U (zh) 一种粉末冶金闸片的结构

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: BEIJING TIANYI SHANGJIA NEW MATERIAL CO., LTD.

Free format text: FORMER OWNER: WU PEIFANG

Effective date: 20120926

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 102206 HAIDIAN, BEIJING TO: 100094 HAIDIAN, BEIJING

TR01 Transfer of patent right

Effective date of registration: 20120926

Address after: 100094 Beijing city Haidian District Town West Xin Li Tun Cun Nan Railway North 500 meters

Patentee after: Beijing Tianyishangjia New Materials Co., Ltd.

Address before: 102206 Beijing city Haidian District town Yongtai Village No. 198

Patentee before: Wu Peifang

PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Mounting structure for powder metallurgy brake pad of high-speed train

Effective date of registration: 20130326

Granted publication date: 20110504

Pledgee: Bank of Communications Ltd Beijing Zhongguancun Park sub branch

Pledgor: Beijing Tianyishangjia New Materials Co., Ltd.

Registration number: 2013990000172

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20141201

Granted publication date: 20110504

Pledgee: Bank of Communications Ltd Beijing Zhongguancun Park sub branch

Pledgor: Beijing Tianyishangjia New Materials Co., Ltd.

Registration number: 2013990000172

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 100094 Beijing city Haidian District Town West Xin Li Tun Cun Nan Railway North 500 meters

Patentee after: Beijing Tianyi good new materials Limited by Share Ltd

Address before: 100094 Beijing city Haidian District Town West Xin Li Tun Cun Nan Railway North 500 meters

Patentee before: Beijing Tianyishangjia New Materials Co., Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20171127

Address after: 102400 Beijing city Fangshan District Doudian town Yingbin No. 1 South Street Hospital

Patentee after: Beijing Tian Ren Dao and new material Co., Ltd.

Address before: 100094 Beijing city Haidian District Town West Xin Li Tun Cun Nan Railway North 500 meters

Patentee before: Beijing Tianyi good new materials Limited by Share Ltd

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20110504