CN102588473B - 一种高速列车粉末冶金闸片的安装钢背 - Google Patents

一种高速列车粉末冶金闸片的安装钢背 Download PDF

Info

Publication number
CN102588473B
CN102588473B CN201110082250.0A CN201110082250A CN102588473B CN 102588473 B CN102588473 B CN 102588473B CN 201110082250 A CN201110082250 A CN 201110082250A CN 102588473 B CN102588473 B CN 102588473B
Authority
CN
China
Prior art keywords
steel backing
boss
brake pad
installation steel
brake lining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201110082250.0A
Other languages
English (en)
Other versions
CN102588473A (zh
Inventor
吴佩芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Tianyishangjia New Material Co Ltd
Original Assignee
Beijing Tianyishangjia New Material Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Tianyishangjia New Material Co Ltd filed Critical Beijing Tianyishangjia New Material Co Ltd
Priority to CN201110082250.0A priority Critical patent/CN102588473B/zh
Publication of CN102588473A publication Critical patent/CN102588473A/zh
Application granted granted Critical
Publication of CN102588473B publication Critical patent/CN102588473B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Braking Arrangements (AREA)

Abstract

本发明涉及一种高速列车粉末冶金闸片的安装钢背,其特征在于包括凸台、球面凹槽、闸片连接件过孔和紧固件凹槽。凸台的外形是圆形,凸台比钢背基面高出的3-5mm。本发明安装钢背的特征在于还包括导流筋,导流筋在凸台中间,处于与钢背的内外弧同心的圆上。导流筋与凸台的高度相同。本发明的粉末冶金闸片的安装钢背,使闸片与安装钢背之间留出空隙,有利于制动过程中闸片的散热,降低闸片以及制动盘的温度。形成导流筋,能强制空气在闸片与安装钢背之间对流,更加有利于闸片以及制动盘的温度降低。这对于制动系统的寿命以及安全行车都有极大的优势。

Description

一种高速列车粉末冶金闸片的安装钢背
技术领域
本发明涉及一种高速列车粉末冶金闸片的安装钢背,属于列车制动系统领域。
背景技术
粉末冶金摩擦材料,是以金属及其合金为基体,添加摩擦组元和润滑组元,用粉末冶金方法制成的复合材料。粉末冶金摩擦材料具有足够的强度,合适而稳定的摩擦系数,工作平稳可靠,耐磨及污染少等优点,是现代刹车材料家族中应用较广泛的材料之一。
现在我国经济快速发展,铁路客货运输量迅速增加,铁路运输的高速化已成为必然的发展趋势。目前我国已经开通时速300km以上高速列车。列车高速化对制动系统具有很高的要求,特别是制动系统的制动闸片提出了更高的要求,其中技术最成熟、应用最广泛的是粉末冶金制动闸片。
粉末冶金工艺制成的闸片组装在闸片托上,再装配到制动系统中。为了使安装在闸片托上的闸片在制动过程中可靠接触制动盘,闸片在闸片托上的排列保留适当间隙。并且为了使闸片在制动过程中保持平稳,闸片都设计成一定形状。现有的闸片形状包括圆形、六边形、三角形等等。
目前闸片和钢背普遍采用铆接、焊接等工艺实现。这种方法对于常规的摩擦材料以及中低速列车,由于摩擦材料耐磨性一般,可以在使用过程中较快地达到磨合的程度。但随着高速列车的发展,摩擦材料的耐磨性大幅度提高,因此需要一种闸片和钢背的安装实现一种位置调节方式,以利于安装在钢背上的闸片尽快地实现磨合到位。
图1至图7是现有技术粉末冶金闸片的安装结构。这种粉末冶金闸片的安装结构,包括弧形的大钢背1、三角形的小三角托2和弹簧卡子4,大钢背1包括一块基板105和四块立板106、106’,大钢背还包括6组小三角托2的安装位,每组安装位包括球面凹槽101、导位孔102、定位孔103以及3个闸片过孔104和紧固件凹槽107,小三角托2包括球面201、导位柱202、定位柱203以及闸片球面槽204。
现有技术闸片安装结构在使用时,先将小三角托2安装到大钢背1上,使小三角托2的导位柱202和定位柱203分别插入大钢背1的导位孔102和定位孔103中,小三角托2的球面201与大钢背1的球面凹槽101贴合。再将闸片3装在小三角托2上,使闸片3的紧固连接件31穿过小三角托2的闸片球面槽204以及大钢背1的闸片过孔104,利用弹簧卡子4将闸片3紧固。这样,当一个小三角托2上安装3个闸片后,3个弹簧卡子4将3个闸片3紧固的同时,也将此三角托2固定在大钢背1上。如此可以完成6组小三角托及闸片的安装固定。
现有技术这种结构为了解决闸片位置的自我调整以及制动过程中闸片的散热,使用了小三角托2,但这种结构过于复杂,安装程序多,生产成本高。
发明内容
本发明提供一种新型的高速列车粉末冶金闸片的安装钢背,用于克服以上的不足。
本发明安装钢背的特征在于包括凸台、球面凹槽、闸片连接件过孔和紧固件凹槽。凸台的外形是圆形,凸台比钢背基面高出的3-5mm。
本发明安装钢背的特征在于包括导流筋,导流筋在凸台中间,处于与钢背的内外弧同心的圆上。导流筋与凸台的高度相同。
本发明的粉末冶金闸片的安装钢背,在闸片安装位置周围形成高出钢背基面的凸台,使闸片与安装钢背之间留出空隙,有利于制动过程中闸片的散热,降低闸片以及制动盘的温度。在凸台中形成球面凹槽,与闸片的球面配合可以实现闸片位置的调整,使闸片与制动盘接触紧密,达到快速磨合和可靠制动的目的。通过在凸台之间进一步形成导流筋,强制空气在闸片与安装钢背之间对流,能够有利于闸片以及制动盘的温度降低。这对于制动系统的寿命以及安全行车都有极大的优势。
附图说明
图1是现有技术闸片安装结构的大钢背的正面视图;
图2是现有技术闸片安装结构的大钢背的反面视图;
图3是现有技术闸片安装结构的大钢背的侧视图;
图4是沿图1中A-A的剖视图;
图5是现有技术闸片安装结构的小三角托的正视图;
图6是现有技术闸片安装结构的小三角托的侧剖视图;
图7是现有技术闸片安装结构在安装闸片时的组装图;
图8是本发明闸片安装钢背的一个实施例正视图;
图9是沿图8中的B-B的剖视图;
图10是本发明闸片安装钢背的另一个实施例的正视图;
图11是沿图9中的C-C的剖视图。
具体实施方式
下面参照附图说明本发明。
图8是本发明的一个实施例的闸片安装钢背10,图9是沿图8中的B-B的剖视图。本发明安装钢背的特征在于包括凸台1010、球面凹槽1001、闸片连接件过孔1002和紧固件凹槽1007。优选地,凸台的外形是圆形,凸台1010比基面1005高出3-5mm。本发明的粉末冶金闸片的安装钢背10,在闸片安装位置周围形成高出钢背基面1005的凸台1010,使闸片与安装钢背10之间留出空隙,有利于制动过程中闸片的散热,降低闸片以及制动盘的温度。在凸台1010中形成球面凹槽1001,与闸片的球面配合可以实现闸片位置的调整,使闸片与制动盘接触紧密,达到快速磨合和可靠制动的目的。
图10是本发明的另一个实施例的闸片安装钢背20,图11是沿图10中的C-C的剖视图。本发明安装钢背的特征在于包括导流筋1020、凸台1010、球面凹槽1001、闸片连接件过孔1002和紧固件凹槽1007。导流筋1020在凸台1010中间,处于与钢背20的内外弧同心的圆上。优选地,凸台1010比基面1005高出3-5mm,导流筋1020与凸台1010的高度相同。本发明通过在凸台之间进一步形成导流筋1020,强制空气在闸片与安装钢背20之间对流,能够有利于闸片以及制动盘的温度降低。这对于制动系统的寿命以及安全行车都有极大的优势。

Claims (2)

1.一种粉末冶金闸片的安装钢背,其特征在于:包括凸台、球面凹槽、闸片连接件过孔和紧固件凹槽;所述凸台固定设置在所述安装钢背的用于安装闸片的一侧,所述球面凹槽设置在所述凸台的端面上,所述闸片连接件过孔从所述球面凹槽的底部向所述安装钢背一侧延伸并贯通所述安装钢背,所述紧固件凹槽设置在所述安装钢背的与所述凸台相背的一侧,所述紧固件凹槽与所述闸片连接件过孔同轴,包括导流筋,所述导流筋设在所述凸台中间,处于与钢背的内外弧同心的圆上,所述导流筋与所述凸台的高度相同。
2.根据权利要求1所述的安装钢背,其特征在于:所述凸台的外形是圆形,其高度比所述安装钢背的基面高出3-5mm。
CN201110082250.0A 2011-04-02 2011-04-02 一种高速列车粉末冶金闸片的安装钢背 Active CN102588473B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110082250.0A CN102588473B (zh) 2011-04-02 2011-04-02 一种高速列车粉末冶金闸片的安装钢背

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110082250.0A CN102588473B (zh) 2011-04-02 2011-04-02 一种高速列车粉末冶金闸片的安装钢背

Publications (2)

Publication Number Publication Date
CN102588473A CN102588473A (zh) 2012-07-18
CN102588473B true CN102588473B (zh) 2015-03-25

Family

ID=46477561

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110082250.0A Active CN102588473B (zh) 2011-04-02 2011-04-02 一种高速列车粉末冶金闸片的安装钢背

Country Status (1)

Country Link
CN (1) CN102588473B (zh)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105065521A (zh) * 2015-09-08 2015-11-18 湖南鼎懋科技有限公司 一种列车用制动闸片组件结构

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3503475A (en) * 1968-03-06 1970-03-31 Carlo A Mione Vented disc brake friction pad and disc brake system employing same
GB2036214A (en) * 1978-11-16 1980-06-25 Tokico Ltd Disc brake
CN201606435U (zh) * 2010-01-14 2010-10-13 贵州新安航空机械有限责任公司 弹性浮动结构刹车片

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3806348B2 (ja) * 2001-12-21 2006-08-09 株式会社エンドレスプロジェクト 摩擦材の取り付け構造及び摩擦材の取り付け方法
CN101493127B (zh) * 2008-10-31 2012-12-12 贵州新安航空机械有限责任公司 铜基粉末冶金高速闸片
CN201621211U (zh) * 2009-12-25 2010-11-03 比亚迪股份有限公司 一种制动盘

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3503475A (en) * 1968-03-06 1970-03-31 Carlo A Mione Vented disc brake friction pad and disc brake system employing same
GB2036214A (en) * 1978-11-16 1980-06-25 Tokico Ltd Disc brake
CN201606435U (zh) * 2010-01-14 2010-10-13 贵州新安航空机械有限责任公司 弹性浮动结构刹车片

Also Published As

Publication number Publication date
CN102588473A (zh) 2012-07-18

Similar Documents

Publication Publication Date Title
CN205806293U (zh) 一种列车用弹性调节式制动闸片
CN105952828B (zh) 一种列车用弹性调节式制动闸片
CN204610642U (zh) 一种高速轨道客车用粉末冶金闸片
CN202790228U (zh) 一种新型摩擦块可浮动、燕尾连接钢背结构的制动闸片
CN111396474B (zh) 一种优化摩擦粒子组合及安装方式的高速列车制动闸片
CN102588473B (zh) 一种高速列车粉末冶金闸片的安装钢背
CN202833773U (zh) 高温预老化汽车用盘式制动器衬片
CN201818682U (zh) 一种高速列车粉末冶金闸片的安装结构
CN209245121U (zh) 一种轨道交通列车用浮动式碳陶制动闸片
CN204419934U (zh) 一种高速列车制动闸片总成
CN102537159A (zh) 一种动车组粉末冶金闸片的安装结构
CN102927170A (zh) 一种新型摩擦块可浮动、燕尾连接钢背结构的制动闸片
CN210440501U (zh) 一种高速列车制动闸片背板
CN102537158A (zh) 一种高速列车粉末冶金闸片的安装结构
CN202056231U (zh) 扇形摩擦盘的粉末冶金闸片
CN201034132Y (zh) 带固定底盘的高速列车闸片
CN205553773U (zh) 一种花盘式汽车车桥后轮毂
CN202056232U (zh) 八边形摩擦盘的粉末冶金闸片
CN211574097U (zh) 动车组用粉末冶金制动闸片
CN211624025U (zh) 一种耐热耐摩擦粉末冶金闸片
CN201779194U (zh) 一种高速列车粉末冶金闸片结构
CN209212842U (zh) 一种具有高效率散热筋及通道的制动盘
CN104863995A (zh) 一种汽车制动器总成和一种汽车
CN102537160A (zh) 一种动车组制动闸片的安装结构
CN201818679U (zh) 一种高速列车粉末冶金闸片的钢背结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: BEIJING TIANYI SHANGJIA NEW MATERIAL CO., LTD.

Free format text: FORMER OWNER: WU PEIFANG

Effective date: 20120925

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 102206 HAIDIAN, BEIJING TO: 100094 HAIDIAN, BEIJING

TA01 Transfer of patent application right

Effective date of registration: 20120925

Address after: 100094 Beijing city Haidian District Town West Xin Li Tun Cun Nan Railway North 500 meters

Applicant after: Beijing Tianyishangjia New Materials Co., Ltd.

Address before: 102206 Beijing city Haidian District town Yongtai Village No. 198

Applicant before: Wu Peifang

C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 100094 Beijing city Haidian District Town West Xin Li Tun Cun Nan Railway North 500 meters

Patentee after: Beijing Tianyi good new materials Limited by Share Ltd

Address before: 100094 Beijing city Haidian District Town West Xin Li Tun Cun Nan Railway North 500 meters

Patentee before: Beijing Tianyishangjia New Materials Co., Ltd.

CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 102206 Haidian District, Beijing, Shanghai town, xinxinli village, South Railway 500 meters north.

Patentee after: Beijing Tianyi good high-tech materials Limited by Share Ltd

Address before: 100094 Haidian District, Beijing, Shanghai town, xinxinli village, South Railway 500 meters north.

Patentee before: Beijing Tianyi good new materials Limited by Share Ltd