CN201730547U - Multifunctional rapid drilling machine - Google Patents

Multifunctional rapid drilling machine Download PDF

Info

Publication number
CN201730547U
CN201730547U CN2010202756114U CN201020275611U CN201730547U CN 201730547 U CN201730547 U CN 201730547U CN 2010202756114 U CN2010202756114 U CN 2010202756114U CN 201020275611 U CN201020275611 U CN 201020275611U CN 201730547 U CN201730547 U CN 201730547U
Authority
CN
China
Prior art keywords
forward beam
frame
functional quick
lift arm
drilling tool
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010202756114U
Other languages
Chinese (zh)
Inventor
王金祥
韩志刚
赵保久
吴平
白晓军
陈雁斌
李金标
程良
刘俊平
崔海龙
时国友
王宝宝
马桂敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qinhuangdao Tianye Tolian Heavy Industry Co Ltd
Original Assignee
Qinhuangdao Tianye Tolian Heavy Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qinhuangdao Tianye Tolian Heavy Industry Co Ltd filed Critical Qinhuangdao Tianye Tolian Heavy Industry Co Ltd
Priority to CN2010202756114U priority Critical patent/CN201730547U/en
Application granted granted Critical
Publication of CN201730547U publication Critical patent/CN201730547U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to a multifunctional rapid drilling machine which is used for advanced geological drilling in tunnel construction and reinforcing treatment for soft foundation; the upper part of a stand (11) is provided with a lifting arm (8) and a lifting arm rotating mechanism (10); the lifting arm (8) is connected with a propelling beam (3) by a propelling beam rotating device (7); and the propelling beam (3) is provided with a holder (1) used for installing a drilling tool (2), and a power head device (4). The device is mainly used for advanced geological drilling in tunnel construction and pipe shed construction, is high in drilling efficiency, and serves multiple purposes.

Description

Multi-functional quick rig
Technical field
The utility model relates to a kind of advance geologic probing in constructing tunnel, to the multi-functional quick rig of soft foundation consolidation process.
Background technology
In constructing tunnel, need multifunctional drill to carry out advance geologic probing and pipe roof construction at present.In the drilling and blasting method constructing tunnel, safety and rapid be the constructing tunnel basic demand, especially more outstanding in this requirement in the stratum of some wall rock condition differences, promoted research and development like this to constructing tunnel equipment.Existing equipment generally can not satisfy safety and rapid requirement.Its major defect is: the rig function singleness, and a bench drill machine can not only be beaten the pipe canopy but also beat the advance geologic hole; Speed of application is slow, and common rig is the back jump bit not, can not creep into fast after running into cobble; Adopt diesel engine to do power, power is single, during construction in the tunnel air pollution serious; The boring location is slow, and the adjustment time is long; Do not have hoist engine, unit head can not sidesway, changes drilling tool and the inconvenience of coring; The level height in high hole is little, need be the equipment bed hedgehopping; Operating desk is fixed, can not remote control.
The utility model content:
The purpose of this utility model is to be to provide a kind of multi-functional quick rig, and it can adapt to the safety of constructing tunnel and rapid requirement, and high efficiency, complete function, easy to operate.
The purpose of this utility model is realized by following technical proposals: a kind of multi-functional quick rig, the frame that mainly comprises forward beam and bottom installation running gear, the top of described frame is provided with lift arm and lift arm rotating mechanism, described lift arm is connected with described forward beam by the forward beam whirligig, is provided for installing the clamper and the power head device of drilling tool on the described forward beam.
As optimal way of the present utility model, described power head device comprises the walking dolly that is installed on the described forward beam, the unit head that has jump bit and hydraulic jack.
As optimal way of the present utility model, diesel power plant that is connected with described running gear and the motor power device that is connected with described drilling tool are installed on the described frame.
As optimal way of the present utility model, the crawler belt that can swing is set on the described running gear, between described crawler belt and the frame hydraulic cylinder is set.
As optimal way of the present utility model, be provided for the hoist engine that takes off drilling tool and core on the described forward beam.
The utility model optimal design the manipulation control section, comprise fixedly console and mobile console.Fixedly console is in driver's cabin, and the startup of control rig stops, walking, drill boom posture etc.; Mobile console adopts remote control control, the boring of major control rig.This equipment is provided with data record and memory function, can note relevant parameter in the drilling process, analyzes rock matter situation by related software, and the situation of change of curve plotting reflection rock stratum.By adopting diesel engine and motor double dynamical.Adopt motor that power is provided during rig work, can stop toxic emission, air is not contaminated in the maintenance tunnel.During walking, use diesel powered, dispense with outer connecting power guarantees the flexibility of car load; Can provide low-speed big by the working power head, satisfy the requirement of pipe roof construction, also can use and carry out the advance geologic probing at a high speed; When running into cobble or hard rock, can use the back jump bit to increase rate of penetration, reach the purpose of creeping into fast; When coring, can make the unit head sidesway, cooperate elevator to finish again and core by oil cylinder; When relying on oil cylinder to keep drill boom perpendicular to face, drill boom can about swing significantly, need not move fuselage and can finish the operation of large-scale pipe canopy and other bore operation, accurate positioning is quick, has significantly improved the operating efficiency of pipe roof construction.The utility model has carried out optimal design, and the level height in high hole can reach 5 meters, can satisfy the requirement of benching tunnelling method construction
Description of drawings
Fig. 1 is multi-functional quick rig front view;
Fig. 2 is multi-functional quick rig vertical view;
Fig. 3 is the power head device front view;
Fig. 4 is the forward beam structure chart;
Fig. 5 is the motor power setting drawing;
Fig. 6 is diesel power plant figure;
Fig. 7 is multi-functional quick rig working state schematic representation;
Fig. 8 is the revolution range schematic diagram.
The specific embodiment
The multi-functional quick rig that the application proposed is fully understanding on the basis of digesting and assimilating similar rig product, forms by a series of improvement and transformation.
Multi-functional quick rig mainly comprises compositions such as clamper 1, drilling tool 2, forward beam 3, power head device 4, hoist engine 5, assembly pulley 6, forward beam whirligig 7, lift arm 8, running gear 9, lift arm rotating mechanism 10, frame 11, water pump 12, motor power device 13, diesel power plant 14, driver's cabin 15, hydraulic system 16 and electrical control system 17, as depicted in figs. 1 and 2.
Wherein, between described running gear 9 and the frame 11 balancing cylinder 33 is set, balancing cylinder 33 can make frame 11 swing up and down with respect to crawler belt.
Described power head device 4 structures are seen shown in Figure 3, comprise the walking dolly 18, unit head 19 and the sideslip oil cylinder 20 that are connected with forward beam 3.But sideslip oil cylinder 20 motive forces 19 sidesway conveniently utilize hoist engine 5 to take off drilling tool and core by assembly pulley 6; Unit head 19 has jump bit, under the promotion that advances oil cylinder 23, can realize impacting and rotating and carry out simultaneously.
Described forward beam 3 structures are seen Fig. 4, mainly comprise front jocket wheel 21, movable pulley 22, propelling oil cylinder 23, back guide wheel 24, advance guide rail 25, chain 26.Advance oil cylinder 23 two ends that front jocket wheel 21 and back guide wheel 24 are installed, front jocket wheel 21 and back guide wheel 24 advance oil cylinder 23 to promote movable pulley 22 and move forward and backward by chain 26 engagements, drive power head device 4 by chain 26 again and move forward and backward.
Described motor power device 13 structure charts are seen Fig. 5, and motor 29 drives hydraulic pump 27 runnings by yielding coupling 28, is respectively walking, unit head and drill boom ability of posture control power is provided.
Described diesel power plant 14 structures are seen Fig. 6, and diesel engine 32 drives hydraulic pump 30 runnings by shaft coupling 31, is respectively walking and drill boom ability of posture control power is provided.
The drill boom controlling organization of described rig is in order to adjust the position of boring, the forward beam whirligig 7 that it comprises lift arm 8, flexibly connects with lift arm 8, and described lift arm 8 is arranged on the lift arm rotating mechanism 10, control the posture that drill boom is controlled in elevating rams 34, pitching oil cylinder 35, pivot angle oil cylinder 36 and sliding oil cylinder 37 actions, keyhole position by hydraulic system 16; When balancing cylinder 33 actions, frame 11 can swing up and down with respect to crawler unit 9, and the height H in maximum horizontal hole can reach 5m when balancing cylinder 33 piston rods stretch out, as shown in Figure 7.
Described lift arm rotating mechanism 10 is arranged on the frame 11, can drive lift arm 8 and forward beam 3 left rotation and right rotation θ=95 degree by the rotary reducer 38 that is arranged on the lift arm rotating mechanism 10, situation in not telephone-moving is issued to maximum coverage rate, as shown in Figure 8.
By the remote controller (not shown) of electrical system 17,19 rotations of control unit head and impact advanced oil cylinder 23 propulsion power heads 19 to move simultaneously, finish bore operation when described rig was worked.
The utility model is provided with water pump 12 on frame 11, for boring provides the water source, and convenient construction.
Aforementioned every utility model summary of the invention all is applied to this rig in design.The structure of most component is all different with the design of part of existing rig product.

Claims (5)

1. multi-functional quick rig, the frame (11) that comprises forward beam (3) and bottom installation running gear (9), it is characterized in that: the top of described frame (11) is provided with lift arm (8) and lift arm rotating mechanism (10), described lift arm (8) is connected with described forward beam (3) by forward beam whirligig (7), is provided for installing the clamper (1) and the power head device (4) of drilling tool (2) on the described forward beam (3).
2. multi-functional quick rig according to claim 1 is characterized in that: described power head device (4) comprises the walking dolly (18) that is installed on the described forward beam (3), the unit head (19) that has jump bit and hydraulic jack (20).
3. multi-functional quick rig according to claim 1 and 2 is characterized in that: described frame (11) goes up installs diesel power plant (14) that is connected with described running gear (9) and the motor power device (13) that is connected with described drilling tool (2).
4. multi-functional quick rig according to claim 3 is characterized in that: described running gear is provided with the crawler belt that can swing on (9), and described crawler belt and frame are provided with hydraulic cylinder between (11).
5. multi-functional quick rig according to claim 1 and 2 is characterized in that: be provided for taking off drilling tool and the hoist engine (5) of coring on the described forward beam (3).
CN2010202756114U 2010-07-23 2010-07-23 Multifunctional rapid drilling machine Expired - Fee Related CN201730547U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010202756114U CN201730547U (en) 2010-07-23 2010-07-23 Multifunctional rapid drilling machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010202756114U CN201730547U (en) 2010-07-23 2010-07-23 Multifunctional rapid drilling machine

Publications (1)

Publication Number Publication Date
CN201730547U true CN201730547U (en) 2011-02-02

Family

ID=43521704

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010202756114U Expired - Fee Related CN201730547U (en) 2010-07-23 2010-07-23 Multifunctional rapid drilling machine

Country Status (1)

Country Link
CN (1) CN201730547U (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102364028A (en) * 2011-11-22 2012-02-29 阜新工大力为科技有限公司 Multifunctional full-hydraulic drilling machine
CN103061675A (en) * 2012-12-29 2013-04-24 沈阳北方交通重工集团有限公司 Super-deep hole double-tube drilling directional drilling rig
CN104775837A (en) * 2015-04-28 2015-07-15 蒲长晏 Railway tunnel anchor jumb drill
CN105626090A (en) * 2014-10-31 2016-06-01 徐州徐工铁路装备有限公司 Multifunctional operation arm and underground tunnel excavation device
CN106015136A (en) * 2016-07-29 2016-10-12 徐州徐工铁路装备有限公司 Multi-freedom-degree work device and comprehensive control system thereof
CN107035317A (en) * 2017-05-14 2017-08-11 刘奇美 A kind of New type drilling device
CN107882504A (en) * 2017-11-10 2018-04-06 北京朝旭鼎新市政工程检测科技有限公司 Comprehensive construction drill
CN108678666A (en) * 2018-07-28 2018-10-19 徐工集团工程机械有限公司 A kind of multifunctional drill and pipe canopy mounting device
CN109441347A (en) * 2018-11-27 2019-03-08 江苏徐工工程机械研究院有限公司 A kind of tunnel multifunctional drill
CN110486070A (en) * 2019-09-19 2019-11-22 武威 A kind of constructing structure of the prestressed anchor of tunnel or Culvert engineering
CN111706250A (en) * 2020-06-30 2020-09-25 中国铁建重工集团股份有限公司 Multifunctional drilling machine
CN113685193A (en) * 2021-09-16 2021-11-23 中煤科工集团重庆研究院有限公司 Annular drilling method and drilling machine suitable for TBM advanced drilling
CN115163104A (en) * 2022-07-05 2022-10-11 四川省煤田地质工程勘察设计研究院 Hydraulic advance pre-splitting based drill rod pushing device, comprehensive excavator and construction method

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102364028A (en) * 2011-11-22 2012-02-29 阜新工大力为科技有限公司 Multifunctional full-hydraulic drilling machine
CN102364028B (en) * 2011-11-22 2013-04-17 阜新工大力为科技有限公司 Multifunctional full-hydraulic drilling machine
CN103061675A (en) * 2012-12-29 2013-04-24 沈阳北方交通重工集团有限公司 Super-deep hole double-tube drilling directional drilling rig
CN105626090A (en) * 2014-10-31 2016-06-01 徐州徐工铁路装备有限公司 Multifunctional operation arm and underground tunnel excavation device
CN105626090B (en) * 2014-10-31 2018-06-19 徐州徐工铁路装备有限公司 Multi-functional operation arm and subterranean tunnel excavating equipment
CN104775837A (en) * 2015-04-28 2015-07-15 蒲长晏 Railway tunnel anchor jumb drill
CN106015136B (en) * 2016-07-29 2018-06-01 徐州徐工铁路装备有限公司 A kind of multiple degrees of freedom equipment and its complex control system
CN106015136A (en) * 2016-07-29 2016-10-12 徐州徐工铁路装备有限公司 Multi-freedom-degree work device and comprehensive control system thereof
CN107035317A (en) * 2017-05-14 2017-08-11 刘奇美 A kind of New type drilling device
CN107882504A (en) * 2017-11-10 2018-04-06 北京朝旭鼎新市政工程检测科技有限公司 Comprehensive construction drill
CN108678666A (en) * 2018-07-28 2018-10-19 徐工集团工程机械有限公司 A kind of multifunctional drill and pipe canopy mounting device
CN108678666B (en) * 2018-07-28 2024-02-02 江苏徐工工程机械研究院有限公司 Multifunctional drilling machine and pipe shed mounting device
CN109441347A (en) * 2018-11-27 2019-03-08 江苏徐工工程机械研究院有限公司 A kind of tunnel multifunctional drill
CN110486070A (en) * 2019-09-19 2019-11-22 武威 A kind of constructing structure of the prestressed anchor of tunnel or Culvert engineering
CN111706250A (en) * 2020-06-30 2020-09-25 中国铁建重工集团股份有限公司 Multifunctional drilling machine
CN113685193A (en) * 2021-09-16 2021-11-23 中煤科工集团重庆研究院有限公司 Annular drilling method and drilling machine suitable for TBM advanced drilling
CN115163104A (en) * 2022-07-05 2022-10-11 四川省煤田地质工程勘察设计研究院 Hydraulic advance pre-splitting based drill rod pushing device, comprehensive excavator and construction method
CN115163104B (en) * 2022-07-05 2023-09-22 四川省煤田地质工程勘察设计研究院 Hydraulic advanced pre-splitting drill rod pushing device, fully-mechanized excavating machine and construction method

Similar Documents

Publication Publication Date Title
CN201730547U (en) Multifunctional rapid drilling machine
CN201106451Y (en) Track-mounted liftable top-side construction drilling machine for anchor bar and anchor wire
CN101832102B (en) Movable two-platform partitioned four-arm hanging wall anchor rod and anchor cable construction drill carriage
CN104612586B (en) Tunneling boring rapid drilling drill carriage for the big emptying aperture parallel cut blasting in tunnel
CN201723151U (en) Downhole excavator
CN101832103B (en) Movable two-arm hanging wall anchor rod and anchor cable construction drill carriage
CN201826837U (en) Movable double-platform partitioned four-arm drill carriage for construction of hangwall anchor rods and anchor cables
CN101086205A (en) Tunneling, anchoring and drilling composite machine
CN102278110A (en) Movable two-arm of lifting platform hanging wall anchor rod and anchor cable construction drill carriage
CN105840110B (en) A kind of multifunctional rotary digging machine
CN102242602A (en) Spiral pile drilling machine
CN102155161A (en) Novel omnibearing drill boom of drill loader
CN110671107A (en) Tunneling, supporting and anchoring all-in-one machine system for underground rapid tunneling and using method thereof
CN204754953U (en) Railway tunnel stock platform truck and drilling device thereof
CN207728309U (en) Scraper changes rock drilling machine equipment
CN202055821U (en) Two-arm top slope anchor rod and anchor rope construction drill wagon with movable lifting platform
CN202100192U (en) Spiral ground pile drilling rig
CN107939286A (en) A kind of scraper changes rock drilling machine equipment
CN205370442U (en) Drill jumbo
CN105756678A (en) Cantilever-mounted auxiliary device and working method as well as application thereof
CN201306118Y (en) Hydraulic shaft-well drill
CN201635656U (en) Side-propping anchor rod-anchor cable construction drill carriage with three movable arms
CN101845952B (en) Movable three-arm top-assisting anchor rod and anchor cable construction drill carriage
CN201598980U (en) Full hydraulic multifunctional machine for drilling and excavation
CN209040760U (en) A kind of digging drills steel sharpener

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110202

Termination date: 20130723