CN101845952B - Movable three-arm top-assisting anchor rod and anchor cable construction drill carriage - Google Patents
Movable three-arm top-assisting anchor rod and anchor cable construction drill carriage Download PDFInfo
- Publication number
- CN101845952B CN101845952B CN 201010170138 CN201010170138A CN101845952B CN 101845952 B CN101845952 B CN 101845952B CN 201010170138 CN201010170138 CN 201010170138 CN 201010170138 A CN201010170138 A CN 201010170138A CN 101845952 B CN101845952 B CN 101845952B
- Authority
- CN
- China
- Prior art keywords
- drilling rig
- square steel
- arm
- drill
- movable
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Earth Drilling (AREA)
Abstract
本发明的可移动三臂顶帮锚杆锚索施工钻车,包括履带行走部分、机体平台、基座、钻臂部分、液压钻机装置、操作系统、泵站部分和电动机;所述的液压钻机装置装于钻臂部分的顶端;所述操作系统、泵站部分和电动机等安装在机体平台上后部;其特征是:该施工钻车有三套独立的钻臂部分和液压钻机装置,分别在基座上以左、中、右布置,并安装在基座上,基座固定安装在机体平台上,左侧与右侧钻臂和液压钻机装置能够向外滑动。该机可减小施工人员劳动强度和减少施工人员,提高了掘进速度和作业效率,创造安全作业环境,并具有自行移动、可升降、双平台、顶帮锚杆锚索同时施工、具备超高巷道支护等功能。
The movable three-arm roof bolt anchor cable construction drilling rig of the present invention includes a crawler walking part, a body platform, a base, a drilling arm part, a hydraulic drilling rig device, an operating system, a pumping station part and an electric motor; the hydraulic drilling rig The device is installed on the top of the drilling boom; the operating system, the pumping station and the motor are installed on the rear of the body platform; The base is arranged in left, middle and right, and is installed on the base. The base is fixedly installed on the body platform, and the left and right drilling arms and hydraulic drilling rig devices can slide outwards. This machine can reduce the labor intensity of construction personnel and construction personnel, improve the speed of excavation and operation efficiency, and create a safe operation environment. Roadway support and other functions.
Description
技术领域 technical field
本发明涉及煤矿井下掘进设备,适用于大、中、小型煤矿,是连采、连掘、综掘施工各种巷道所需的顶帮锚杆锚索施工机械。The invention relates to coal mine underground excavation equipment, which is suitable for large, medium and small coal mines, and is a roof bolt and anchor cable construction machine required for continuous mining, continuous excavation, and fully mechanized excavation construction of various roadways.
背景技术 Background technique
目前,各类煤矿巷道掘进的主要方式为连采、连掘、综掘,支护方式均为锚杆、锚索、托梁、锚网组合支护,对于顶锚杆锚索施工采用单体钻机或履带式可升降顶帮锚杆锚索施工钻机,如中国专利号为:200720102731.2公开的履带式可升降顶帮锚杆锚索施工钻机,有两个钻机装置,一个超前支护,履带式行走机构,超前支护;行走机构由液压马达驱动,在行走机构的机架上安装钻机平台;钻机平台的下方履带行走部分的前部装有一个推煤铲板;平台的最前端装有一个液压油缸式的超前支护,超前支护的一侧装有一台用于顶帮锚杆锚索的施工的液压钻机;顶帮锚杆锚索施工液压钻机采用双立柱,左右移动部分的滑道装在双立柱上,液压钻机向左或右旋转30度;用于帮锚杆锚索的施工的液压钻机装于钻机平台中部一侧,或偏左侧,或偏右侧,液压钻机向左或向右旋转90度,在钻机平台上设有前后布置的滑道,液压钻机的立柱坐落在滑道上,并由装在钻机平台上的油缸推动钻机整体前后移动。At present, the main methods of roadway excavation in various coal mines are continuous mining, continuous excavation, and fully mechanized excavation. The support methods are bolts, anchor cables, joists, and anchor nets. Drilling rig or crawler type liftable roof bolt and anchor cable construction drilling rig, such as Chinese Patent No.: 200720102731.2 disclosed crawler type liftable roof anchor bolt and cable construction drilling rig, there are two drilling rig devices, one advance support, crawler type The traveling mechanism is advanced support; the traveling mechanism is driven by a hydraulic motor, and the drilling rig platform is installed on the frame of the traveling mechanism; a coal pushing shovel is installed at the front of the crawler walking part of the drilling rig platform; the front end of the platform is equipped with a Hydraulic cylinder type advance support, one side of the advance support is equipped with a hydraulic drilling rig for the construction of roof anchor rod and anchor cable; Installed on the double column, the hydraulic drilling rig rotates 30 degrees to the left or right; the hydraulic drilling rig used to help the construction of anchor rods and cables is installed on the middle side of the drilling rig platform, or to the left, or to the right, and the hydraulic drilling rig is to the left Or rotate 90 degrees to the right, the rig platform is provided with a slideway arranged front and back, the column of the hydraulic drilling rig is located on the slideway, and the oil cylinder installed on the rig platform pushes the rig to move back and forth as a whole.
对于帮锚杆锚索施工采用手持式风钻,这种锚杆锚索施工方法存在以下问题:Hand-held pneumatic drills are used for the construction of anchor bolts and cables. This method of construction of anchor bolts and cables has the following problems:
1、巷道掘进断面小:掘进断面一般在15M2左右,巷道高度超过2米时,必须搭脚手架才能进行顶帮锚杆锚索施工。1. The excavation section of the roadway is small: the excavation section is generally about 15M 2 , and when the height of the roadway exceeds 2 meters, scaffolding must be set up to carry out the construction of the roof bolt and anchor cable.
2、非机械化作业,采用连采、连掘工艺的矿井顶锚杆锚索施工已基本实现了机械化,采用综掘工艺的矿井顶锚杆锚索施工仍为单体钻机人工作业,而帮锚杆锚索施工所有掘进工艺均采用手持式风钻施工,打眼的推力来源于人的臂膀和手臂,职工劳动强度大。由于帮锚杆锚索施工主要依靠人力,帮锚杆锚索的施工质量不能从根本上得到保证。2. Non-mechanized operations. The construction of mine roof bolts and cables using continuous mining and continuous excavation technology has basically realized mechanization. All the excavation processes of bolt and anchor cable construction are carried out by hand-held pneumatic drills. The thrust of the drilling comes from the human arm and arm, and the labor intensity of the workers is high. Because the construction of the anchor bolts and cables mainly depends on manpower, the construction quality of the anchor bolts and cables cannot fundamentally be guaranteed.
3、施工速度慢,施工断面超过2米时搭建和拆除脚手架需要大量的时间。3. The construction speed is slow, and it takes a lot of time to build and dismantle scaffolding when the construction section exceeds 2 meters.
4、效率低:由于打眼数量多,施工人员也多,造成作业效率低。4. Low efficiency: Due to the large number of drilling holes and the large number of construction workers, the operation efficiency is low.
5、安全系数低:施工人员在高空交错作业,作业安全环境差。5. Low safety factor: construction workers work alternately at high altitude, and the working safety environment is poor.
对于履带式可升降顶帮锚杆锚索施工钻机存在的不足和问题如下:The deficiencies and problems that exist for the crawler-type liftable roof bolt and anchor cable construction drilling rig are as follows:
1、须两台履带式可升降顶帮锚杆锚索钻机成套使用,即使用的是用于帮锚杆锚索的施工的液压钻机装于钻机平台左、右一侧的各一台,两台液压钻机的旋转方向不同的。在巷道掘进时两台履带式可升降顶帮锚杆锚索施工钻机前后依次排放在巷道的两侧进行施工。1. Two crawler-type liftable roof anchor rod and cable drilling rigs must be used in a complete set, that is, the hydraulic drilling rig used for the construction of the anchor rod and anchor cable should be installed on the left and right sides of the drilling rig platform. The direction of rotation of hydraulic drilling rigs is different. When the roadway is excavated, two crawler-type drilling rigs with liftable roof, side and side anchor rods and cables are arranged in sequence on both sides of the roadway for construction.
2、进退机时间长,辅助工作量大。由于掘进施工时,需两台钻机依次开进或退出掘进工作面,再加上电缆的拖移,时间长,辅助工作量大。2. It takes a long time to advance and retreat the machine, and the auxiliary workload is large. During excavation construction, two drilling rigs are required to drive into or withdraw from the excavation face in turn, plus the dragging of cables, the time is long and the auxiliary workload is large.
3、对复杂地质条件适应性差。遇断层、高瓦斯区、高含水区等复杂地质条件,该钻车不能完成瓦斯预测孔、瓦斯排放孔、地质探测孔、震动炮眼的施工。3. Poor adaptability to complex geological conditions. In case of complex geological conditions such as faults, high gas areas, and high water content areas, the drilling rig cannot complete the construction of gas prediction holes, gas discharge holes, geological detection holes, and vibration blastholes.
4、顶帮锚杆锚索的施工达不到零滞后,对巷帮的控制不利。4. The construction of the roof anchor rod and anchor cable cannot reach zero lag, which is unfavorable for the control of the road side.
5、顶帮锚杆锚索施工的工作量不匹配,顶钻的工作量大,帮钻的工作量小,影响支护时间,造成人员窝工。5. The workload of the roof bolt and anchor cable construction does not match, the workload of the top drill is large, and the workload of the auxiliary drill is small, which affects the support time and causes personnel to stop working.
6、施工人员在高空交错作业,作业安全环境差。6. The construction workers work alternately at high altitude, and the working safety environment is poor.
7、用人多,两台钻车需配备人员8个。7. Many people are employed, and two drilling rigs need to be equipped with 8 people.
发明内容 Contents of the invention
本发明的目的就是解决上述煤矿井下掘进巷道顶帮锚杆锚索施工存在的问题,提供一种减小施工人员劳动强度和减少施工人员,提高掘进速度和作业效率,创造安全作业环境,并具有自行移动、可升降、顶帮锚杆锚索同时施工、具备超高巷道支护等功能,采用全液压系统传动,防爆性能和安全性能好的可移动三臂顶帮锚杆锚索施工钻车。The purpose of the present invention is to solve the problems existing in the construction of the top side anchor rod and anchor cable of the above-mentioned coal mine tunneling roadway, provide a method to reduce the labor intensity of the construction personnel and reduce the construction personnel, improve the speed of excavation and operation efficiency, create a safe working environment, and have Self-moving, liftable, simultaneous construction of roof anchor and anchor cable, with super high roadway support and other functions, using full hydraulic system transmission, mobile three-arm roof anchor and anchor cable construction drilling rig with good explosion-proof performance and safety performance .
为了实现上述目的本发明的技术方案是:In order to realize the above object, the technical scheme of the present invention is:
可移动三臂顶帮锚杆锚索施工钻车,包括履带行走部分1、机体平台2、基座3、钻臂部分4、液压钻机装置5、操作系统6、泵站部分7和电动机8;所述的液压钻机装置装于钻臂部分的顶端;所述操作系统、泵站部分和电动机等安装在机体平台上后部;其特征是:该施工钻车有三套独立的钻臂部分和液压钻机装置,分别在基座上以左、中、右布置,并安装在基座上,基座固定安装在机体平台上。Movable three-arm roof bolt anchor cable construction drilling rig, including crawler walking part 1, body platform 2, base 3, drilling arm part 4, hydraulic drilling rig device 5, operating system 6, pumping station part 7 and motor 8; The hydraulic drilling rig device is installed on the top of the drilling arm; the operating system, the pumping station and the motor are installed on the rear of the body platform; The drilling device is arranged on the base in the left, middle and right respectively, and is installed on the base, and the base is fixedly installed on the machine body platform.
所述的基座的底部并排布置有四个固定套筒307,固定套筒固定安装在机体平台上,所述的固定套筒内插装有四根无缝方钢,左侧两根方钢301、303,右侧两根方钢302、304,四根方钢在套筒内可自由滑动,在所述的固定套筒上固定着钻臂部分4的中间钻臂底座403;其中:在所述的方钢301、302内与固定套筒之间装有向左、向右推动方钢的两个推拉油缸305、306;所述的左侧两根方钢301、303在固定套筒的左侧相连,并在左侧两根方钢301、303上方固定有钻臂部分的左侧钻臂底座401;而所述的右侧两根方钢302、304在固定套筒的右侧相连,并右侧两根方钢302、304的上方固定有钻臂部分的右侧钻臂底座402。Four
本发明提供的可移动三臂顶帮锚杆锚索施工钻车与现有履带式可升降顶帮锚杆锚索施工钻机技术相比,具有突出的实质性特点和显著技术进步是:Compared with the existing crawler-type liftable roof bolt and cable construction drilling rig technology, the movable three-arm roof bolt and anchor cable construction drilling rig provided by the present invention has outstanding substantive features and significant technological progress as follows:
1、可移动三臂顶帮锚杆锚索施工钻车两侧的钻臂可分别整体向外平行移动800mm的距离,机组整体更稳定,适应巷道宽度大,适应范围更广,更安全。1. The drill arms on both sides of the movable three-arm top support anchor rod and anchor cable construction drilling rig can move a distance of 800mm in parallel to the outside as a whole. The unit is more stable as a whole, suitable for a wide roadway width, a wider application range, and safer.
2、可移动三臂顶帮锚杆锚索施工钻车三台钻臂可同时施工,大大缩短了作业时间,提高了支护效率。2. Movable three-arm top support bolt and anchor cable construction The three drilling rigs of the drilling rig can work at the same time, which greatly shortens the working time and improves the support efficiency.
3、可移动三臂顶帮锚杆锚索施工钻车钻机旋转采用两台180°摆动油缸控制,可实现前后、左右180°旋转,比履带式可升降顶帮锚杆锚索施工钻机使用旋转齿轮控制钻机摆动更加安全、灵活、可靠。3. The rotation of the movable three-arm roof anchor rod and anchor cable construction drilling rig is controlled by two 180° swing cylinders, which can realize 180° rotation front and rear, left and right, which is better than the crawler-type liftable roof anchor rod and anchor cable construction drilling rig. The gear controls the swing of the drilling rig to be safer, more flexible and more reliable.
4、可移动三臂顶帮锚杆锚索施工钻车可以利用机械臂垂直于工作面迎头进行打眼,实现瓦斯预测孔、瓦斯排放孔、地质探测孔的机械化施工,有效地减少了辅助工作量、辅助工作时间和辅助工作人员。4. The movable three-arm roof anchor rod and anchor cable construction drilling rig can use the mechanical arm to drill holes perpendicular to the working face, realizing the mechanized construction of gas prediction holes, gas discharge holes, and geological detection holes, effectively reducing the auxiliary workload , ancillary working hours, and ancillary staff.
5、可移动三臂顶帮锚杆锚索施工钻车采用单机三臂支护工艺,一条巷道只需配备1台钻车,比履带式可升降顶帮锚杆锚索施工钻机的配备减少了一台,有效地减少了支护过程中的进退机时间和检修过程中的检修工作量,降低了机电检修成本。5. The movable three-arm roof anchor rod and cable construction drilling rig adopts the single-machine three-arm support technology. One roadway only needs to be equipped with one drilling rig, which is less equipped than the crawler-type liftable roof anchor rod and anchor cable construction drilling rig. One machine effectively reduces the time for advancing and retreating machines during the support process and the maintenance workload during the maintenance process, and reduces the cost of mechanical and electrical maintenance.
6、可移动三臂顶帮锚杆锚索施工钻车支护过程中定岗人员为4人,比履带式可升降顶帮锚杆锚索施工钻机的定岗人员8人减少了一半,达到减人增效,高产高效的目的。6. There are 4 fixed-post personnel in the support process of the movable three-arm top support anchor rod and anchor cable construction drilling rig, which is reduced by half compared with the 8 fixed-post personnel of the crawler-type liftable top support support anchor rod and cable construction drilling rig. The purpose of increasing efficiency, high yield and high efficiency.
7、顶帮锚杆锚索可以同时施工,顶帮锚杆锚索可以达到零滞后,对软煤层掘进非常有利,可以有效地控制片帮,防止顶板事故的发生,安全系数高。7. Roof bolts and cables can be constructed at the same time, and the roof bolts and cables can reach zero lag, which is very beneficial to the excavation of soft coal seams. It can effectively control the roof and prevent the occurrence of roof accidents, with a high safety factor.
8、非常适用于综掘单巷掘进。单巷掘进时,可移动三臂顶帮锚杆锚索施工钻车停放在巷道的一侧,原则是不影响综掘机割煤;综掘机割煤后,退综掘机至永久支护下,可移动三臂顶帮锚杆锚索施工钻车进入空顶下进行支护。8. It is very suitable for comprehensive excavation and single lane excavation. When excavating a single roadway, the movable three-arm roof anchor rod and anchor cable construction drilling rig is parked on one side of the roadway. The principle is not to affect the coal cutting of the fully mechanized excavator; Next, the mobile three-arm top support anchor rod and anchor cable construction drilling rig enters under the empty roof for support.
9、可移动三臂顶帮锚杆锚索施工钻车的采用,可以改变现有连采、连掘双巷或三巷掘进工艺,由连采机或大功率掘进机和锚杆机的对倒作业场地改为交替进退机作业,减少了影响时间,提高了掘进速度。9. The adoption of the movable three-arm roof anchor rod and anchor cable construction drilling rig can change the existing continuous mining, continuous excavation double-lane or three-lane excavation technology, and the combination of continuous miner or high-power roadheader and bolter The inverted operation site is changed to alternate advancing and retreating machine operation, which reduces the impact time and improves the excavation speed.
10、环保效果好。液压锚杆钻车采用湿式打眼,可有效降低粉尘对职工的危害,同时远距离操作钻车,能够使职工避开打眼淋水,有效的改善职工作业环境,减少矽肺病和风湿病的发生,保护职工的身心健康。10. Good environmental protection effect. The hydraulic bolt drilling rig adopts wet drilling, which can effectively reduce the harm of dust to the workers. At the same time, the long-distance operation of the drilling rig can make the workers avoid the drilling water, effectively improve the working environment of the workers, and reduce the occurrence of silicosis and rheumatism. Protect the physical and mental health of employees.
总之,本发明的可移动三臂顶帮锚杆锚索施工钻车提高了煤矿井下掘进技术水平,尤其是为实现大中小型煤矿连采、连掘、综掘的顶帮锚杆锚索施工机械化,提供了成套的技术装备,为大中小型煤矿实现安全生产创造了最基本的条件,同时极大地提高资源回收率,用最小投入可取得较大的产出,全面的、系统的、彻底的解决了现有掘进支护装备存在的严重问题。In a word, the movable three-arm roof bolt and anchor cable construction drilling rig of the present invention has improved the technical level of coal mine underground excavation, especially for the realization of continuous mining, continuous excavation, and comprehensive excavation of large, medium and small coal mines. Mechanization, providing a complete set of technical equipment, creates the most basic conditions for large, medium and small coal mines to achieve safe production, and at the same time greatly improves the resource recovery rate, and can achieve greater output with the smallest input. Comprehensive, systematic and thorough It solves the serious problems existing in the existing tunneling support equipment.
附图说明 Description of drawings
图1是可移动三臂顶帮锚杆锚索施工钻车的主视图;Fig. 1 is the front view of the movable three-arm roof anchor rod and anchor cable construction drilling rig;
图2是可移动三臂顶帮锚杆锚索施工钻车的俯视图;Fig. 2 is the top view of the movable three-arm roof anchor rod and anchor cable construction drilling rig;
图3是可移动三臂顶帮锚杆锚索施工钻车基座的主视图;Fig. 3 is the front view of the pedestal of the movable three-arm roof anchor rod and anchor cable construction drilling rig;
图4是可移动三臂顶帮锚杆锚索施工钻车基座的俯视图;Fig. 4 is a top view of the base of the drilling rig for the construction of the movable three-arm roof anchor rod and anchor cable;
图5是钻臂部分结构示意图;Fig. 5 is a schematic diagram of the structure of the drill arm;
图6是液压钻机装置的主视图;Fig. 6 is the front view of hydraulic drilling rig device;
图7是液压钻机装置的俯视图。Fig. 7 is a top view of the hydraulic drilling device.
具体实施方式 Detailed ways
以下结合附图进行详细说明:Describe in detail below in conjunction with accompanying drawing:
图1、图2所示,本发明的可移动三臂顶帮锚杆锚索施工钻车。它包括履带行走部分1、机体平台2、基座3、钻臂部分4和液压钻机装置5、操作系统6、泵站部分7和电动机8。该施工钻车有三套独立的钻臂部分和液压钻机装置,分别在基座3上以左、中、右布置,并安装在基座3上,基座3固定安装在机体平台2上;所述液压钻机装置装于钻臂部分的顶端。所述操作系统、泵站部分和电动机等安装在机体平台2上后部。Shown in Fig. 1 and Fig. 2, the movable three-arm roof anchor rod and anchor cable construction drilling rig of the present invention. It includes a crawler walking part 1 , a body platform 2 , a base 3 , a drill boom part 4 and a hydraulic drilling rig device 5 , an operating system 6 , a pump station part 7 and an electric motor 8 . The construction drilling rig has three sets of independent drilling boom parts and hydraulic drilling rig devices, which are respectively arranged on the left, middle and right sides of the base 3, and are installed on the base 3, and the base 3 is fixedly installed on the body platform 2; The above-mentioned hydraulic drilling rig device is mounted on the top of the drill arm part. The operating system, the pumping station part, the motor, etc. are installed on the rear part of the body platform 2 .
图3、图4所示,基座的底部并排布置有四个固定套筒307,固定套筒固定安装在机体平台上,所述的固定套筒内插装有四根无缝方钢,左侧两根方钢301、303,右侧两根方钢302、304,四根方钢在套筒内可自由滑动,在所述的固定套筒上固定着钻臂部分4的中间钻臂底座403;其中:在所述的方钢301、302内与固定套筒之间装有向左、向右推动方钢的两个推拉油缸305、306;所述的左侧两根方钢301、303在固定套筒的左侧相连,并在左侧两根方钢301、303上方固定有钻臂部分的左侧钻臂底座401;而所述的右侧两根方钢302、304在固定套筒的右侧相连,并右侧两根方钢302、304的上方固定有钻臂部分的右侧钻臂底座402。方钢在推拉油缸的推动下可带动左侧与右侧钻臂底座向外滑动800mm。As shown in Fig. 3 and Fig. 4, four fixing
图5所示,每套钻臂部分包括钻臂底座40、钻臂座41、钻臂上连杆42、钻臂下连杆43、钻臂升降油缸44、钻臂摆动油缸45;所述钻臂座由轴装于钻臂底座上;所述钻臂上连杆和钻臂下连杆的下端铰接在钻臂座上;所述钻臂升降油缸装于钻臂座与钻臂上连杆或钻臂下连杆上;所述的钻臂摆动油缸装于钻臂底座与钻臂座上;液压钻机装置铰接在钻臂上连杆或钻臂下连杆的上端。As shown in Fig. 5, each set of drill arm parts includes a drill arm base 40, a drill arm seat 41, an upper link 42 of a drill arm, a lower link 43 of a drill arm, a lifting cylinder 44 of a drill arm, and a swing cylinder 45 of a drill arm; The arm base is mounted on the base of the drill arm by a shaft; the lower ends of the upper link of the drill arm and the lower link of the drill arm are hinged on the arm seat; the lifting cylinder of the drill arm is installed on the arm seat and the upper link of the drill arm or on the lower link of the drill arm; the swing oil cylinder of the drill arm is installed on the base of the drill arm and the base of the drill arm; the hydraulic drilling rig device is hinged on the upper end of the upper link of the drill arm or the lower link of the drill arm.
该液压钻机装置的上升与下降由钻臂升降油缸完成,该液压钻机装置、钻臂上连杆和钻臂下连杆的左右摆动由钻臂摆动油缸完成。The ascent and descent of the hydraulic drilling rig device is completed by the boom lifting cylinder, and the left and right swings of the hydraulic drilling rig device, the upper connecting rod of the drilling boom and the lower connecting rod of the drilling boom are completed by the swinging cylinder of the drilling boom.
如图6和图7所示,该施工钻车上的液压钻机装置有液压钻机501与回转机座;所述的回转机座包括机座502、180°左右旋转油缸503与左右旋转油缸的滑动连接板504、180°上方旋转油缸505与上方旋转油缸的连接板506、钻机伸出油缸507;所述的机座中插装着左右旋转油缸滑动连接板,机座与滑动连接板之间安装着钻机伸出油缸,所述的左右旋转油缸固定装在缸体滑动连接板上,左右旋转油缸的活塞连接在上方旋转油缸的连接板上,上方旋转油缸的缸体固定在上方旋转油缸连接板上,上方旋转油缸的活塞与液压钻机连接;左右旋转油缸与上方旋转油缸的轴线相互垂直。液压钻机部分可以使钻头实现向前方移动,向左或右方、及上方转动。As shown in Figure 6 and Figure 7, the hydraulic drilling rig device on the construction drilling rig has a
该液压钻机可以实现向前方、左或右方、上方的转动,液压钻机向左或右方、上方的转动由180°左右旋转油缸503和180°上方旋转油缸505完成,液压钻机向前方的伸出由钻机伸出油缸507完成,可将液压钻机整体向前推移600mm。This hydraulic drilling rig can realize the rotation to the front, left or right, and the top. The rotation of the hydraulic drilling rig to the left or the right and the top is completed by the 180 ° left and right
可移动三臂顶帮锚杆锚索施工钻车中履带行走部分、液压操作系统、钻臂部分和液压钻机装置等各部分都是使用现有技术,如:履带行走部分是采用工程机械的履带行走部分,钻臂部分和液压钻机装置也是现有技术。本发明主要对该施工钻车液压钻机装置布置和临时支护装置进行了改进,布置上做了优化组合和集成。The crawler walking part, the hydraulic operating system, the drill arm part and the hydraulic drilling rig device in the movable three-arm top support bolt and anchor cable construction drilling rig all use existing technologies, such as: the crawler walking part is the crawler of construction machinery The traveling part, the boom part and the hydraulic drilling rig device are also prior art. The present invention mainly improves the arrangement of the hydraulic drilling rig device of the construction drilling rig and the temporary support device, and optimizes the combination and integration of the arrangement.
本发明的可移动三臂顶帮锚杆锚索施工钻车部分改进为:The movable three-arm roof anchor rod and anchor cable construction drilling rig of the present invention is partially improved as follows:
(1)、可移动三臂顶帮锚杆锚索施工钻车三台钻臂可同时施工,大大缩短了作业时间,提高了支护效率。(1) The three drilling rigs of the movable three-arm roof anchor rod and anchor cable construction drilling rig can work at the same time, which greatly shortens the working time and improves the support efficiency.
(2)可移动三臂顶帮锚杆锚索施工钻车两侧的钻臂底座安装在抽屉式基座上,可分别整体向外平行移动800mm的距离,机组整体更稳定,适应巷道宽度大,适应范围更广,更安全。(2) The drill arm bases on both sides of the movable three-arm top support anchor rod and anchor cable construction drilling rig are installed on the drawer-type base, which can move 800mm outward in parallel as a whole. The unit is more stable as a whole and adapts to large roadway widths , a wider range of adaptation and safer.
(3)、顶帮锚杆锚索的施工的液压钻机可完成前方、左或右方、上方三个方位的施工。(3) The hydraulic drilling rig for the construction of the roof anchor rod and anchor cable can complete the construction in three directions: front, left or right, and above.
Claims (2)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 201010170138 CN101845952B (en) | 2010-04-20 | 2010-04-20 | Movable three-arm top-assisting anchor rod and anchor cable construction drill carriage |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 201010170138 CN101845952B (en) | 2010-04-20 | 2010-04-20 | Movable three-arm top-assisting anchor rod and anchor cable construction drill carriage |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN101845952A CN101845952A (en) | 2010-09-29 |
| CN101845952B true CN101845952B (en) | 2013-04-03 |
Family
ID=42770741
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN 201010170138 Expired - Fee Related CN101845952B (en) | 2010-04-20 | 2010-04-20 | Movable three-arm top-assisting anchor rod and anchor cable construction drill carriage |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN101845952B (en) |
Families Citing this family (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102287142B (en) * | 2011-07-25 | 2013-03-06 | 山西天巨重工机械有限公司 | Drill arm device capable of rotating 360 degrees |
| CN104612586B (en) * | 2014-11-13 | 2017-03-15 | 山东科技大学 | Tunneling boring rapid drilling drill carriage for the big emptying aperture parallel cut blasting in tunnel |
| CN105626108B (en) * | 2015-12-24 | 2018-03-20 | 蒲长晏 | A kind of side jumbolter and the side roofboltier comprising the rig |
| CN106593298B (en) * | 2016-12-28 | 2018-11-13 | 南京科工煤炭科学技术研究有限公司 | A kind of coal road side bottom anchoring drill carriage |
| CN117266898B (en) * | 2023-10-19 | 2025-12-16 | 中国煤炭科工集团太原研究院有限公司 | Six-arm anchor rod drill carriage |
| CN117846493B (en) * | 2024-03-06 | 2024-06-04 | 河北景隆智能装备股份有限公司 | Six-arm anchor rod drill carriage with top wall anchor rod supporting function |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN200949419Y (en) * | 2006-03-27 | 2007-09-19 | 南京华煤采掘机械有限公司 | Pneumatic impact type rockbolt drilling machine |
| CN201031700Y (en) * | 2007-06-12 | 2008-03-05 | 辽宁工程技术大学 | Excavation bolt drilling combined unit |
| CN201047250Y (en) * | 2007-01-05 | 2008-04-16 | 江阴长力科技有限公司 | Pneumatic power supporting leg type accessory anchor bolt drilling machine |
| CN201635656U (en) * | 2010-04-20 | 2010-11-17 | 闫振东 | Side-propping anchor rod-anchor cable construction drill carriage with three movable arms |
Family Cites Families (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| AUPR576501A0 (en) * | 2001-06-18 | 2001-07-12 | Russell Mineral Equipment Pty Ltd | Rock bolting apparatus and method |
| SE525690C2 (en) * | 2003-05-12 | 2005-04-05 | Atlas Copco Rock Drills Ab | Device for rock bolting as well as for automated rock bolting and method for rock bolting |
-
2010
- 2010-04-20 CN CN 201010170138 patent/CN101845952B/en not_active Expired - Fee Related
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN200949419Y (en) * | 2006-03-27 | 2007-09-19 | 南京华煤采掘机械有限公司 | Pneumatic impact type rockbolt drilling machine |
| CN201047250Y (en) * | 2007-01-05 | 2008-04-16 | 江阴长力科技有限公司 | Pneumatic power supporting leg type accessory anchor bolt drilling machine |
| CN201031700Y (en) * | 2007-06-12 | 2008-03-05 | 辽宁工程技术大学 | Excavation bolt drilling combined unit |
| CN201635656U (en) * | 2010-04-20 | 2010-11-17 | 闫振东 | Side-propping anchor rod-anchor cable construction drill carriage with three movable arms |
Also Published As
| Publication number | Publication date |
|---|---|
| CN101845952A (en) | 2010-09-29 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN101832102B (en) | Movable two-platform partitioned four-arm hanging wall anchor rod and anchor cable construction drill carriage | |
| CN101832103B (en) | Movable two-arm hanging wall anchor rod and anchor cable construction drill carriage | |
| CN201106451Y (en) | Track-mounted liftable top-side construction drilling machine for anchor bar and anchor wire | |
| CN102900362B (en) | Narrow-machine-body full-hydraulic bolt and anchor cable drill carriage for coal mine tunnel | |
| CN103485717B (en) | The all-hydraulic anchor shaft anchor cable drill carriage of a kind of four arm | |
| CN102278110A (en) | Movable two-arm of lifting platform hanging wall anchor rod and anchor cable construction drill carriage | |
| CN101169036B (en) | Single-lane rapid excavation technology of crawler-type liftable roof anchor rod and anchor cable construction drilling rig | |
| CN101403302B (en) | Crawler-type liftable roof anchor rod and anchor cable construction drilling rig and double-lane rapid excavation technology | |
| CN100559013C (en) | Tunneling, anchoring and drilling composite machine | |
| CN201826837U (en) | Movable double-platform partitioned four-arm drill carriage for construction of hangwall anchor rods and anchor cables | |
| CN104989272B (en) | Upward Raise Drilling Technology | |
| CN101845952B (en) | Movable three-arm top-assisting anchor rod and anchor cable construction drill carriage | |
| CN104695871A (en) | Drilling boom device of two-boom hydraulic rock bolt drilling carriage | |
| CN204716247U (en) | Suspension stone drifting machinery arm device | |
| CN110295934A (en) | Portal frame Anchor Care device | |
| CN103899249A (en) | Coal mine roadway bottom board anchoring drill carriage | |
| CN101781972B (en) | Crawler-type lifting top and slope bolt and anchor construction drill | |
| CN202055821U (en) | Two-arm top slope anchor rod and anchor rope construction drill wagon with movable lifting platform | |
| CN105822316A (en) | Integrated pit tunnel heading machine | |
| CN106948826A (en) | A kind of multifunctional tunnel repair machine | |
| CN100516465C (en) | Bolter miner integrated with digging and anchor | |
| CN110080783A (en) | A kind of tunnel equipment of the foot section brought jumbolter | |
| CN204024470U (en) | The all-hydraulic anchor shaft anchor cable drill carriage of a kind of narrow fuselage six arm | |
| CN101598002A (en) | A gantry drilling rig | |
| CN104196446A (en) | Six-arm full hydraulic anchor rod and anchor cable drill carriage used in cooperation with continuous miner |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130403 |