CN201169916Y - 可调节翼缘坡度的t梁模板 - Google Patents

可调节翼缘坡度的t梁模板 Download PDF

Info

Publication number
CN201169916Y
CN201169916Y CNU2008200895859U CN200820089585U CN201169916Y CN 201169916 Y CN201169916 Y CN 201169916Y CN U2008200895859 U CNU2008200895859 U CN U2008200895859U CN 200820089585 U CN200820089585 U CN 200820089585U CN 201169916 Y CN201169916 Y CN 201169916Y
Authority
CN
China
Prior art keywords
template
release
frange plate
angle
formwork
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008200895859U
Other languages
English (en)
Inventor
程万祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fourth Engineering Co Ltd of China Railway Construction Bridge Engineering Bureau Group Co Ltd
Original Assignee
Fourth Engineering Co Ltd of China Railway 13th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fourth Engineering Co Ltd of China Railway 13th Bureau Group Co Ltd filed Critical Fourth Engineering Co Ltd of China Railway 13th Bureau Group Co Ltd
Priority to CNU2008200895859U priority Critical patent/CN201169916Y/zh
Application granted granted Critical
Publication of CN201169916Y publication Critical patent/CN201169916Y/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

可调节翼缘坡度的T梁模板,它涉及一种T梁模板。本实用新型解决了现有的T梁模板存在的每片梁都要进行调整、工序多、时间长;混凝土接缝接合不严密,易造成混凝土在接缝处出现漏浆现象,影响了混凝土的外观质量;模板加固难度大,容易出现跑模现象;浪费材料和人力资源,增加施工成本等问题。本实用新型的翼缘板模板(4)通过支撑系统(2)与模板外托架(1)连接,连接槽钢(9)固装在模板外托架(1)的上端面上,丝杆(7)的一端与翼缘连接槽(6)固接,丝杆(7)的另一端穿过第一过孔(9-1)和第二过孔(1-1)与第一螺母(8)固接。本实用新型便于调整、工序少、时间短;混凝土接缝接合严密、外观质量好;模板加固容易,不易出现跑模现象;节约材料和人力资源,减少了施工成本。

Description

可调节翼缘坡度的T梁模板
技术领域
本实用新型涉及一种T梁模板,属于建筑结构技术领域。
背景技术
现有的T梁模板是利用分解模板再连接技术,使翼缘板模板与腹板模板分开进行调整,并分别加固。采用该技术的T梁模板存在以下问题:a、每片梁都要进行调整,工序多,时间长;b、混凝土接缝接合不严密,易造成混凝土在接缝处出现漏浆现象,影响了混凝土的外观质量;c、模板加固难度大,容易出现跑模现象;d、浪费材料,浪费人力资源,增加施工成本。
实用新型内容
本实用新型的目的是为了解决现有的T梁模板存在的每片梁都要进行调整、工序多、时间长;混凝土接缝接合不严密,易造成混凝土在接缝处出现漏浆现象,影响了混凝土的外观质量;模板加固难度大,容易出现跑模现象;浪费材料和人力资源,增加施工成本等问题,进而提供一种可调节翼缘坡度的T梁模板。
本实用新型的技术方案是:可调节翼缘坡度的T梁模板由模板外托架、支撑系统和带开角的T梁模板组成,所述带开角的T梁模板由翼缘板模板和腹板模板组成,所述翼缘板模板和腹板模板制成一体,所述翼缘板模板与腹板模板之间的开角为α,所述腹板模板固装在模板外托架的内壁上,所述翼缘板模板通过支撑系统与模板外托架连接,所述支撑系统由翼缘连接槽、丝杆、第一螺母、第二螺母和连接槽钢组成,所述翼缘连接槽固装在翼缘板模板上,所述连接槽钢固装在模板外托架的上端面上,所述丝杆的一端与翼缘连接槽固接,丝杆的另一端穿过连接槽钢上的第一过孔和模板外托架上的第二过孔与第一螺母固接,所述第二螺母固装在翼缘板模板和连接槽钢之间的丝杆上。
本实用新型与现有技术相比具有以下有益效果:本实用新型的在模板外托架1的支撑下,上下调整支撑系统2的丝杆7,使带开角的T梁模板3的翼缘坡度可调。本实用新型便于调整、工序少、时间短;混凝土接缝接合严密、外观质量好;模板加固容易,不易出现跑模现象;节约材料和人力资源,减少了施工成本。
附图说明
图1是本实用新型的整体结构示意图,图2是图1中a处的局部放大图,图3是图1中b处的局部放大图。
具体实施方式
具体实施方式一:结合图1、图2和图3说明本实施方式,本实施方式由模板外托架1、支撑系统2和带开角的T梁模板3组成,所述模板外托架1由角钢加工而成,所述带开角的T梁模板3由翼缘板模板4和腹板模板5组成,所述翼缘板模板4和腹板模板5制成一体,所述翼缘板模板4与腹板模板5之间的开角为α,所述腹板模板5固装在模板外托架1的内壁上,所述翼缘板模板4通过支撑系统2与模板外托架1连接,所述支撑系统2由翼缘连接槽6、丝杆7、第一螺母8、第二螺母10和连接槽钢9组成,所述翼缘连接槽6固装在翼缘板模板4上,所述连接槽钢9固装在模板外托架1的上端面上,所述丝杆7的一端与翼缘连接槽6固接,丝杆7的另一端穿过连接槽钢9上的第一过孔9-1和模板外托架1上的第二过孔1-1与第一螺母8固接,所述第二螺母10固装在翼缘板模板4和连接槽钢9之间的丝杆7上。
具体实施方式二:结合图1和图3说明本实施方式,本实施方式的翼缘板模板4与腹板模板5之间的开角α为15°~45°。如此设置,使带开角的T梁模板3的可调范围更宽。
具体实施方式三:结合图1和图3说明本实施方式,本实施方式的翼缘板模板4与腹板模板5之间的开角α为15°~25°。如此设置,使带开角的T梁模板3的可调范围更宽。
具体实施方式四:结合图1和图3说明本实施方式,本实施方式的翼缘板模板4与腹板模板5之间的开角α为26°~35°。如此设置,使带开角的T梁模板3的可调范围更宽。
具体实施方式五:结合图1和图3说明本实施方式,本实施方式的翼缘板模板4与腹板模板5之间的开角α为36°~45°。如此设置,使带开角的T梁模板3的可调范围更宽。
具体实施方式六:结合图1和图3说明本实施方式,本实施方式的翼缘板模板4与腹板模板5之间的开角α为20°。如此设置,使带开角的T梁模板3的可调范围更宽。
具体实施方式七:结合图1和图3说明本实施方式,本实施方式的翼缘板模板4与腹板模板5之间的开角α为30°。如此设置,使带开角的T梁模板3的可调范围更宽。
具体实施方式八:结合图1和图3说明本实施方式,本实施方式的翼缘板模板4与腹板模板5之间的开角α为40°。如此设置,使带开角的T梁模板3的可调范围更宽。

Claims (8)

1、一种可调节翼缘坡度的T梁模板,它由模板外托架(1)、支撑系统(2)和带开角的T梁模板(3)组成,其特征在于所述带开角的T梁模板(3)由翼缘板模板(4)和腹板模板(5)组成,所述翼缘板模板(4)和腹板模板(5)制成一体,所述翼缘板模板(4)与腹板模板(5)之间的开角为α,所述腹板模板(5)固装在模板外托架(1)的内壁上,所述翼缘板模板(4)通过支撑系统(2)与模板外托架(1)连接,所述支撑系统(2)由翼缘连接槽(6)、丝杆(7)、第一螺母(8)、第二螺母(10)和连接槽钢(9)组成,所述翼缘连接槽(6)固装在翼缘板模板(4)上,所述连接槽钢(9)固装在模板外托架(1)的上端面上,所述丝杆(7)的一端与翼缘连接槽(6)固接,丝杆(7)的另一端穿过连接槽钢(9)上的第一过孔(9-1)和模板外托架(1)上的第二过孔(1-1)与第一螺母(8)固接,所述第二螺母(10)固装在翼缘板模板(4)和连接槽钢(9)之间的丝杆(7)上。
2、根据权利要求1所述可调节翼缘坡度的T梁模板,其特征在于所述翼缘板模板(4)与腹板模板(5)之间的开角α为15°~45°。
3、根据权利要求1所述可调节翼缘坡度的T梁模板,其特征在于所述翼缘板模板(4)与腹板模板(5)之间的开角α为15°~25°。
4、根据权利要求1所述可调节翼缘坡度的T梁模板,其特征在于所述翼缘板模板(4)与腹板模板(5)之间的开角α为26°~35°。
5、根据权利要求1所述可调节翼缘坡度的T梁模板,其特征在于所述翼缘板模板4与腹板模板5之间的开角α为36°~45°。
6、根据权利要求1所述可调节翼缘坡度的T梁模板,其特征在于所述翼缘板模板(4)与腹板模板(5)之间的开角α为20°。
7、根据权利要求1所述可调节翼缘坡度的T梁模板,其特征在于所述翼缘板模板(4)与腹板模板(5)之间的开角α为30°。
8、根据权利要求1所述可调节翼缘坡度的T梁模板,其特征在于所述翼缘板模板(4)与腹板模板(5)之间的开角α为40°。
CNU2008200895859U 2008-03-26 2008-03-26 可调节翼缘坡度的t梁模板 Expired - Fee Related CN201169916Y (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008200895859U CN201169916Y (zh) 2008-03-26 2008-03-26 可调节翼缘坡度的t梁模板

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008200895859U CN201169916Y (zh) 2008-03-26 2008-03-26 可调节翼缘坡度的t梁模板

Publications (1)

Publication Number Publication Date
CN201169916Y true CN201169916Y (zh) 2008-12-24

Family

ID=40208968

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008200895859U Expired - Fee Related CN201169916Y (zh) 2008-03-26 2008-03-26 可调节翼缘坡度的t梁模板

Country Status (1)

Country Link
CN (1) CN201169916Y (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102909778A (zh) * 2012-11-06 2013-02-06 天津二十冶建设有限公司 一种山区桥梁梁体模板
CN103273559A (zh) * 2013-06-06 2013-09-04 浙江金筑交通建设有限公司 一种预制t梁吊带位置的活动钢模块及施工方法
WO2015044714A1 (es) * 2013-09-26 2015-04-02 Andamios Y Encofrados S.A.S. Sistema de encofrado para la construccion de vigas en i
CN104760125A (zh) * 2015-03-12 2015-07-08 成都迅德科技有限公司 模板调节结构
CN104816380A (zh) * 2015-05-13 2015-08-05 中铁建大桥工程局集团第四工程有限公司 一种在t梁预制施工中使用的钢筋绑扎模架组件
CN113308971A (zh) * 2021-05-21 2021-08-27 中铁十六局集团第三工程有限公司 箱梁模板

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102909778A (zh) * 2012-11-06 2013-02-06 天津二十冶建设有限公司 一种山区桥梁梁体模板
CN103273559A (zh) * 2013-06-06 2013-09-04 浙江金筑交通建设有限公司 一种预制t梁吊带位置的活动钢模块及施工方法
CN103273559B (zh) * 2013-06-06 2015-08-12 浙江金筑交通建设有限公司 一种预制t梁吊带位置的活动钢模块及施工方法
WO2015044714A1 (es) * 2013-09-26 2015-04-02 Andamios Y Encofrados S.A.S. Sistema de encofrado para la construccion de vigas en i
CN104760125A (zh) * 2015-03-12 2015-07-08 成都迅德科技有限公司 模板调节结构
CN104816380A (zh) * 2015-05-13 2015-08-05 中铁建大桥工程局集团第四工程有限公司 一种在t梁预制施工中使用的钢筋绑扎模架组件
CN104816380B (zh) * 2015-05-13 2017-01-18 中铁建大桥工程局集团第四工程有限公司 一种在t梁预制施工中使用的钢筋绑扎模架组件
CN113308971A (zh) * 2021-05-21 2021-08-27 中铁十六局集团第三工程有限公司 箱梁模板

Similar Documents

Publication Publication Date Title
CN201169916Y (zh) 可调节翼缘坡度的t梁模板
CN203945479U (zh) 一种防漏浆t梁预制台座
CN201037313Y (zh) 拼缝t形胶条
CN203403666U (zh) 一种中空塑料模板
CN201685317U (zh) 预制梁板台座与侧模的止浆结构
CN106607989A (zh) 轨道交通后张预应力u型梁施工工艺
CN208518330U (zh) 一种曲面箱梁施工简易组合模板
CN207194438U (zh) 包边胶合板模板
CN202787307U (zh) 一种地脚螺栓定位模板
CN209990143U (zh) 一种悬挂式的楼板模板支撑体系
CN202672726U (zh) 一种清水混凝土浇筑模板的拼接结构
CN201193401Y (zh) 钢框覆膜竹胶合板模板
CN202338070U (zh) 一种用于墙板安装的垫块
CN203200982U (zh) 一种钢筋桁架扣挂式楼承板
CN205369922U (zh) 一种可调节悬挂式c型钢模板支撑装置
CN208415307U (zh) 一种明挖车站施工用底纵梁模板结构
CN206581601U (zh) 一种模板根部防漏浆结构
CN202755655U (zh) 建筑施工模板多功能拉杆装置
CN208473296U (zh) 一种圆弧柱成型模具
CN203603481U (zh) 地坪混凝土模板支设工具
WO2016127275A1 (zh) 一种多用型组合式模板
CN206625561U (zh) 一种新型建筑工程用成型模块支撑装置
CN203213319U (zh) 建筑施工止水钢板固定装置
CN101864834B (zh) 采用钢管作为背楞的墙体木模施工方法
CN201144518Y (zh) 一种门字形拼装式墙体大模板

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CHINA RAILWAY BRIDGE BUREAU GROUP FOURTH ENGINEERI

Free format text: FORMER NAME: THE FOURTH ENGINEERING COMPANY OF CHINA RAILWAY NO.13 BUREAU GROUP

CP01 Change in the name or title of a patent holder

Address after: 150008 No. 459 Xianfeng Road, Daowai District, Heilongjiang, Harbin

Patentee after: Middle iron is built the 4th Engineering Co., Ltd of group of Bridge Project office

Address before: 150008 No. 459 Xianfeng Road, Daowai District, Heilongjiang, Harbin

Patentee before: The Fourth Engineering Co., Ltd. of China Railway 13 Civil

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20081224

Termination date: 20170326