CN201127959Y - 中宽钢带轧机的层流冷却装置 - Google Patents

中宽钢带轧机的层流冷却装置 Download PDF

Info

Publication number
CN201127959Y
CN201127959Y CNU2007200160788U CN200720016078U CN201127959Y CN 201127959 Y CN201127959 Y CN 201127959Y CN U2007200160788 U CNU2007200160788 U CN U2007200160788U CN 200720016078 U CN200720016078 U CN 200720016078U CN 201127959 Y CN201127959 Y CN 201127959Y
Authority
CN
China
Prior art keywords
flange cover
cooling
outward flange
laminar flow
hydraulic cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007200160788U
Other languages
English (en)
Inventor
魏金刚
刘宁
杨庆光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Heavy Industries Co Ltd
CFHI Dalian Design and Research Institute Co Ltd
Original Assignee
China First Heavy Industries Co Ltd
CFHI Dalian Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China First Heavy Industries Co Ltd, CFHI Dalian Design and Research Institute Co Ltd filed Critical China First Heavy Industries Co Ltd
Priority to CNU2007200160788U priority Critical patent/CN201127959Y/zh
Application granted granted Critical
Publication of CN201127959Y publication Critical patent/CN201127959Y/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Metal Rolling (AREA)

Abstract

本实用新型涉及一种中宽钢带轧机的层流冷却装置;包括若干个冷却段,每个冷却段上的总送水管,由供水管、支柱、布有鹅颈管的上喷集管组成的冷却架体,其特征在于:在供水管居中位置的机架底部外侧装设液压缸,液压缸活塞杆的伸出杆端铰接在支柱的中段上,总供水管两端对称装设由内凸缘套、外凸缘套、密封环、圆珠、紧固螺钉组成的转动机构,通过驱动液压缸使冷却架体从水平位置扬起到传动侧上方;所述的冷却架体扬起的水平夹角在70°以下。本实用新型不仅设计结构合理,既便于装、卸和维修,又冷却均匀而且具操作安全,使用十分方便等优点。

Description

中宽钢带轧机的层流冷却装置
技术领域
本实用新型涉及一种中宽钢带轧机的层流冷却装置。
背景技术
目前,在轧压大宽度钢带的轧机生产线中,已广泛使用层流冷却装置,它包括若干个冷却段组成,通常是使用十个冷却段,每个冷却段上有一个冷却架体,其冷却架体是由与总送水管相连接的供水管、由多根支柱、多根带气动阀的供水支管和每根供水支管上连接布有鹅颈管的上喷集管组成;当轧压后的钢板需要进行层流冷却时,开启每个供水支管的气动阀,总送水管中的冷却水经供水管进入每个供水支管,然后冷却水又流经上喷集管进入每个供水支管专供的鹅颈管中,对处于它下面的,由辊道输送来的钢带上板面进行淋洒冷却,与此同时,其热钢带还受到下喷集管和侧喷嘴中冷却水的不同方向、位置的冷却,藉以保持带钢全长方向和宽度方向、上下面的冷却均匀性,这样使带钢各处性能的一致性。上述层流冷却装置尚存在下列缺点和不足之处:
1、由供水管、支柱、布有鹅颈管的上喷集管组成的冷却架体,与总送水管是固定的;非常有碍于轧机的装、卸和维修;尤其是不便于处理生产中的事故。
2、分布于上喷集管上的鹅颈管的出水口的水柱经常出现紊乱、滴流,不利于钢板的均匀冷却。
发明内容
本实用新型旨在为了避免上述技术中存在的缺点和不足之处,而提供不仅设计结构合理,既便于装、卸和维修,又冷却均匀而且具操作安全,使用十分方便的一种中宽钢带轧机的层流冷却装置。
本实用新型的目的是采用如下的技术方案实现的:所述的中宽钢带轧机的层流冷却装置,包括若干个冷却段,每个冷却段上的总送水管,由供水管、支柱、布有鹅颈管的上喷集管组成的冷却架体,其特征在于:在供水管居中位置的机架底部外侧装设液压缸,液压缸活塞杆的伸出杆端铰接在支柱的中段上,总供水管两端对称装设转动机构,通过驱动液压缸使冷却架体从水平位置扬起到传动侧上方。
所述的冷却架体扬起的水平夹角在70°以下。
所述的装设于总供水管两端的转动机构,每个转动机构由内凸缘套、外凸缘套、密封环、圆珠、紧固螺钉组成,或是内凸缘套中的凸缘端与总送水管连接,内凸缘套中的另一端插入外凸缘套内,内凸缘套底面与外凸缘套之间装有密封环,外凸缘套的凸缘端与供水管端相接,或是内凸缘套中的凸缘端与供水管连接,内凸缘套中的另一端插入外凸缘套内,内凸缘套底面与外凸缘套之间装有密封环,外凸缘套的凸缘端与总送水管端相接,在内、外凸缘套的接触面上均分布设有能容纳圆珠滚动的半圆的环形槽,于环形槽内置放若干圆珠后,于外凸缘套的外圆周面上布以紧固螺钉将两套连接为一体。
所述的上喷集管上的每根鹅颈管的出水管底端装有节流孔板。用来保证冷却水流出鹅颈管后成为层流水柱时不紊乱、不滴流。
综以上所采取的技术措施,实现本实用新型的目的。
与现有技术相比,本实用新型不仅设计结构合理,既便于装、卸和维修,又冷却均匀而且具操作安全,使用十分方便等优点。
附图说明
本实用新型共有三幅附图。其中:
附图1是本实用新型具体实施例中的每个冷却段的主视结构示意图;
附图2是图1中沿A-A线的示意图;
附图3是图1的I部放大视图。
图中:1、总送水管,2、供水管,3、支柱,4、供水支管,5、气动阀,6、上喷集管,7、鹅颈管,8、液压缸,9、辊道架,10、内凸缘套,11、外凸缘套,12、圆珠,13、密封环。
具体实施方式
图1、2、3所示是本实用新型的具体实施例,它是安装在轧压钢板宽度为1250mm轧机线上的中宽钢带轧机的层流冷却装置;包括10个冷却段,每个冷却段上的总送水管1,由供水管2、三个支柱3、布有鹅颈管7的上喷集管6组成的冷却架体,其特征在于:在供水管2的居中位置的机架9底部外侧装设液压缸8,液压缸活塞杆的伸出杆端铰接在中央的支柱3的中段上,供水管2两端对称装设由内凸缘套10、外凸缘套11、密封环13、圆珠12、紧固螺钉14组成转动机构,通过驱动液压缸8使冷却架体从水平位置扬起到传动侧上方;所述的冷却架体扬起的水平夹角为50°左右。
以上所述,仅为本实用新型的较佳的具体实施方式,但本实用新型的保护范围并不局限于此,所有熟悉本技术领域的技术人员在本实用新型公开的技术范围内,根据本实用新型的技术方案及其本实用新型的构思加以等同替换或改变均应涵盖在本实用新型的保护范围之内。

Claims (4)

1、一种中宽钢带轧机的层流冷却装置,包括若干个冷却段、每个冷却段上的总送水管(1)、由供水管(2)、支柱(3)、布有鹅颈管(7)的上喷集管(6)组成的冷却架体,其特征在于:在供水管(2)居中位置的机架(9)底部外侧装设液压缸(8),液压缸(8)活塞杆的伸出杆端铰接在支柱(3)的中段上,供水管(2)两端对称装设转动机构,通过驱动液压缸(8)使冷却架体从水平位置扬起到传动侧上方。
2、按权利要求1所述的中宽钢带轧机的层流冷却装置,其特征在于:所述的冷却架体扬起的水平夹角在70°以下。
3、按权利要求1所述的中宽钢带轧机的层流冷却装置,其特征在于:所述的装设于供水管(2)两端的转动机构,每个转动机构由内凸缘套(10)、外凸缘套(11)、密封环(13)、圆珠(12)、紧固螺钉(14)组成,或是内凸缘套(10)中的凸缘端与总送水管(1)连接,内凸缘套(10)中的另一端插入外凸缘套(11)内,内凸缘套(10)底面与外凸缘套(11)之间装有密封环(13),外凸缘套(11)的凸缘端与供水管(2)端相接,或是内凸缘套(10)中的凸缘端与供水管(2)连接,内凸缘套(10)中的另一端插入外凸缘套(11)内,内凸缘套(10)底面与外凸缘套(11)之间装有密封环(13),外凸缘套(11)的凸缘端与总送水管(11)端相接,在内、外凸缘套的接触面上均分布设有能容纳圆珠(12)滚动的半圆的环形槽,于环形槽内置放若干圆珠(12)后,于外凸缘套(11)的外圆周面上布以紧固螺钉(14)将两套连接为一体。
4、按权利要求1所述的中宽钢带轧机的层流冷却装置,其特征在于:所述的上喷集管(6)上的每根鹅颈管(7)的出水管底端装有节流孔板。
CNU2007200160788U 2007-11-22 2007-11-22 中宽钢带轧机的层流冷却装置 Expired - Fee Related CN201127959Y (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007200160788U CN201127959Y (zh) 2007-11-22 2007-11-22 中宽钢带轧机的层流冷却装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007200160788U CN201127959Y (zh) 2007-11-22 2007-11-22 中宽钢带轧机的层流冷却装置

Publications (1)

Publication Number Publication Date
CN201127959Y true CN201127959Y (zh) 2008-10-08

Family

ID=40015785

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007200160788U Expired - Fee Related CN201127959Y (zh) 2007-11-22 2007-11-22 中宽钢带轧机的层流冷却装置

Country Status (1)

Country Link
CN (1) CN201127959Y (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010105577A1 (zh) * 2009-03-20 2010-09-23 宝山钢铁股份有限公司 活塞式层流冷却装置
CN101837376B (zh) * 2009-03-20 2011-09-21 宝山钢铁股份有限公司 一种柱塞式上喷层流冷却装置
CN102189129A (zh) * 2010-03-19 2011-09-21 宝山钢铁股份有限公司 设于精轧机架间的上喷冷却装置
CN102189130A (zh) * 2010-03-19 2011-09-21 宝山钢铁股份有限公司 一种自平衡柱塞式上喷层流冷却装置
CN102189132A (zh) * 2010-03-19 2011-09-21 宝山钢铁股份有限公司 设于精轧机架间的上喷冷却装置
CN102794316A (zh) * 2012-07-13 2012-11-28 中冶南方工程技术有限公司 一种中厚钢板快速控制冷却装置
CN109482661A (zh) * 2018-11-29 2019-03-19 太原科技大学 一种层流冷却设备中下集管转角调整装置

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010105577A1 (zh) * 2009-03-20 2010-09-23 宝山钢铁股份有限公司 活塞式层流冷却装置
CN101837376B (zh) * 2009-03-20 2011-09-21 宝山钢铁股份有限公司 一种柱塞式上喷层流冷却装置
CN102189129A (zh) * 2010-03-19 2011-09-21 宝山钢铁股份有限公司 设于精轧机架间的上喷冷却装置
CN102189130A (zh) * 2010-03-19 2011-09-21 宝山钢铁股份有限公司 一种自平衡柱塞式上喷层流冷却装置
CN102189132A (zh) * 2010-03-19 2011-09-21 宝山钢铁股份有限公司 设于精轧机架间的上喷冷却装置
CN102189130B (zh) * 2010-03-19 2013-04-24 宝山钢铁股份有限公司 一种自平衡柱塞式上喷层流冷却装置
CN102794316A (zh) * 2012-07-13 2012-11-28 中冶南方工程技术有限公司 一种中厚钢板快速控制冷却装置
CN109482661A (zh) * 2018-11-29 2019-03-19 太原科技大学 一种层流冷却设备中下集管转角调整装置

Similar Documents

Publication Publication Date Title
CN201127959Y (zh) 中宽钢带轧机的层流冷却装置
CN103736618A (zh) 一种多功能防冻液喷洒装置及其使用方法
CN104742787B (zh) 喷洒车用喷洒机构和喷洒车
CN202152889U (zh) 旋转快速接头
CN114618630A (zh) 一种桥梁工程施工用碎石加工设备
CN104236352B (zh) 双层钢带冷却装置
CN103317455B (zh) 一种容器快速夹紧机构
CN206083435U (zh) 一种钢管辊道冷却调整装置
CN205836643U (zh) 一种气动式重型卡车上装用篷布系统
CN106914383B (zh) 一种铸件表面处理装置
CN205048103U (zh) 一种气动式地铲结构
CN207310493U (zh) 一种轮胎挤出冷却成型槽
CN210252160U (zh) 具有提升机构的整粒机
CN209791486U (zh) 一种新型制粒成球设备
CN208687185U (zh) 湿式球磨机入口密封
CN209613803U (zh) 一种通用型六辊塑性装置
CN208711907U (zh) 塑料型材高速磨粉装置
CN208290313U (zh) 一种新型二步法黑夹克管生产线发泡平台
CN206754417U (zh) 一种刀闸阀
CN201603972U (zh) 混凝土搅拌机的搅拌筒焊接工装
CN205220921U (zh) 一种乘坐式转运车
CN205818800U (zh) 一种装备车厢用活动导轮装置
CN201140322Y (zh) 节流冲氮保护装置
CN202962645U (zh) 内置式矿浆水力控制器
CN204321737U (zh) 一种连铸机液压剪内循环冷却冲渣装置

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHINA FIRST HEACY MACHINE STOCK CO., LTD.

Free format text: FORMER OWNER: CHINESE NO.1 HEAVY MECHANICAL GROUP CO.

Effective date: 20090814

C41 Transfer of patent application or patent right or utility model
C56 Change in the name or address of the patentee
CP03 Change of name, title or address

Address after: Zhang Qian Road, Fulaerji District, Qigihar City, Heilongjiang Province, zip code: 161042

Co-patentee after: DALIAN DESIGN INSTITUTE Co.,Ltd. CHINA FIRST HEAVY INDUSTRIES

Patentee after: China First Heavy Industries

Address before: Zhang Qian Road, Fulaerji District, Qigihar City, Heilongjiang Province, zip code: 161042

Co-patentee before: Dalian Design and Research Institute, First Heavy Industries Group

Patentee before: China First Heavy Industries

TR01 Transfer of patent right

Effective date of registration: 20090814

Address after: Zhang Qian Road, Fulaerji District, Qigihar City, Heilongjiang Province, zip code: 161042

Co-patentee after: DALIAN DESIGN INSTITUTE Co.,Ltd. CHINA FIRST HEAVY INDUSTRIES

Patentee after: China First Heavy Machinery Co., Ltd.

Address before: Zhang Qian Road, Fulaerji District, Qigihar City, Heilongjiang Province, zip code: 161042

Co-patentee before: DALIAN DESIGN INSTITUTE Co.,Ltd. CHINA FIRST HEAVY INDUSTRIES

Patentee before: China First Heavy Industries

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20081008

Termination date: 20131122