CN201106173Y - Pile terminal pressure slip-casting machine for prestressed concrete pipe pile - Google Patents

Pile terminal pressure slip-casting machine for prestressed concrete pipe pile Download PDF

Info

Publication number
CN201106173Y
CN201106173Y CNU2007200291341U CN200720029134U CN201106173Y CN 201106173 Y CN201106173 Y CN 201106173Y CN U2007200291341 U CNU2007200291341 U CN U2007200291341U CN 200720029134 U CN200720029134 U CN 200720029134U CN 201106173 Y CN201106173 Y CN 201106173Y
Authority
CN
China
Prior art keywords
pile
grouting
pressure
top board
stake
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007200291341U
Other languages
Chinese (zh)
Inventor
王庆海
王洪冰
于克萌
宗可锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG WANXIN CONSTRUCTION CO Ltd
Original Assignee
SHANDONG WANXIN CONSTRUCTION CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG WANXIN CONSTRUCTION CO Ltd filed Critical SHANDONG WANXIN CONSTRUCTION CO Ltd
Priority to CNU2007200291341U priority Critical patent/CN201106173Y/en
Application granted granted Critical
Publication of CN201106173Y publication Critical patent/CN201106173Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model relates to a pressure grouter at the end of a pre-stress concrete tubular pile, which is characterized in that the pressure grouter comprises a base plate, a top board, a cushion block and a pile tip. The base plate is welded with a grouting pipe at the center; the base plate and the top board are connected through the cushion block; a cavity therein is a pressure cavity for grouting; the top board is connected with the pile tip. High-pressure grout is grouted into the pressure cavity between the base plate and the top board through the grouting pipe in the grouter; by adopting a transversal injecting and penetrating method, the grout first reinforces soil horizon at the pile tip through grouting sinks around the pressure cavity, then backflows upwards along the body of the tubular pile under the action of high pressure and reinforces soil horizon at the side of the pile through penetration. Being arranged at the four sides of the pressure cavity, the grouting sinks have the protection function of a guard plate, and the phenomenon that the grouting pipe is blocked and can not be opened is not going to happen during the peening and pile pressing process, and grouting at the end of the tubular pile is 100 percent guaranteed to be successful.

Description

Prestressed concrete pipe pile pile-end pressure grouting device
Technical field
The utility model relates to a kind of prestressed concrete pipe pile pile-end pressure grouting device.
Background technology
Prestressed concrete pipe pile is the domestic in recent years pile foundation engineering that develops application rapidly, because it is the commodity stake of adopting batch production, mechanization, scale, producing in serial form, is one of stake type commonly used of guaranteeing of at present domestic tool reliable quality.At stake end setting pressure slurry casting machine, with cement paste soil layer infiltration filling around the stake end, be used to reinforce bearing course at pile end, improve the bearing capacity of single pile of pile foundation.It is terminal that the Grouting Pipe of present applied slip casing by pressure device extends to the stake point always, stops up Grouting Pipe during slip casting easily, and slip casting is not smooth, influences work quality and efficient.
Summary of the invention
Technical problem to be solved in the utility model provides a kind of prestressed concrete pipe pile pile-end pressure grouting device, solves Grouting Pipe and occurs easily stopping up the phenomenon of not opening, and guarantees the success of pile tube pile end grouting 100%.
The utility model prestressed concrete pipe pile pile-end pressure grouting device, it is characterized in that comprising chassis, top board, cushion block and stake point, center chassis welding Grouting Pipe connects by cushion block between chassis and the top board, cavity therebetween is the grouting pressure chamber, and top board connects the stake point.
Described stake point is made up of the sharp floor of stake that is " ten " word shape, is convenient to clash into pile.
During construction, Grouting Pipe should be arranged in the pile tube stake hole in advance, and length must not surpass every joint bump pile tube stake top, use the pipe collar screwed connection during pile extension, when carrying out pile-end pressure grouting behind the pile, use bar dowel at stake top place fixing with the Grouting Pipe welding, the Grouting Pipe swing of trembling when preventing high-pressure slip-casting.The chassis of slurry casting machine is directly welded with stake end end plate and is got final product.Be provided with the slip casting groove around the pressure chamber, this slip casting groove grouting amount is big, and slip casting is even, and the resistance degree of depth little, that be penetrated into stake end soil layer is dark, and slip casting effect is good.
After pile tube enters bearing stratum, this slurry casting machine is injected into the high pressure cement paste in the pressure chamber between chassis and the top board by Grouting Pipe, cement paste is at first reinforced stake end soil layer with the method for horizontal injection infiltration by the slip casting groove around the pressure chamber, stake end soil layer is reinforced, improved the end resistance of stake end soil layer; And then cement paste upwards backflows along pile body under the high pressure effect, the soil layer of the penetration reinforcement stake side by cement paste, improve the collateral resistance of stake side soil layer, thereby the bearing capacity of stake is greatly improved, difference according to soil layer property, generally can improve 40~60%, especially sandy soil be improved better effects if.Because this slip casting groove is located at four sides of pressure chamber, has the backplate protective effect, in knocking piling process, Grouting Pipe can not occur and stop up the phenomenon of not opening, guarantee the success of pile tube pile end grouting 100%.The utility model has been owing to improved the bearing capacity of stake, makes engineering can reduce the quantity of stake or shortens pile body length, or use small bore stake etc. instead, can reduce construction costs.
Description of drawings
Fig. 1 is structure of the present utility model and user mode schematic diagram;
Fig. 2 is the structural representation of looking up of Fig. 1;
Fig. 3 is the A-A view of Fig. 2.
Among the figure: 7 pile tubes of 4 sharp floor 5 Grouting Pipe of 1 chassis, 2 top boards, 3 cushion blocks, 6 grouting pressure chambeies
The specific embodiment
As shown in the figure, slip casing by pressure device of the present utility model, comprise chassis 1, top board 2, cushion block 3 and the stake point of forming by the sharp floor 4 of stake that is " ten " word shape, 1 center, chassis welding Grouting Pipe 5, weld together by cushion block 3 between chassis 1 and the top board 2, cavity therebetween is grouting pressure chamber 6, and top board 2 connects the sharp floor 4 of stake.
Construct according to mode described in the utility model.

Claims (2)

1, a kind of prestressed concrete pipe pile pile-end pressure grouting device, it is characterized in that comprising chassis (1), top board (2), cushion block (3) and stake point, center, chassis (1) welding Grouting Pipe (5), connect by cushion block (3) between chassis and the top board, cavity therebetween is grouting pressure chamber (6), and top board (2) connects the stake point.
2, slip casing by pressure device according to claim 1 is characterized in that described stake point is made up of the sharp floor of stake (4) that is " ten " word shape.
CNU2007200291341U 2007-10-17 2007-10-17 Pile terminal pressure slip-casting machine for prestressed concrete pipe pile Expired - Fee Related CN201106173Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007200291341U CN201106173Y (en) 2007-10-17 2007-10-17 Pile terminal pressure slip-casting machine for prestressed concrete pipe pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007200291341U CN201106173Y (en) 2007-10-17 2007-10-17 Pile terminal pressure slip-casting machine for prestressed concrete pipe pile

Publications (1)

Publication Number Publication Date
CN201106173Y true CN201106173Y (en) 2008-08-27

Family

ID=39957971

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007200291341U Expired - Fee Related CN201106173Y (en) 2007-10-17 2007-10-17 Pile terminal pressure slip-casting machine for prestressed concrete pipe pile

Country Status (1)

Country Link
CN (1) CN201106173Y (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103590392A (en) * 2013-10-31 2014-02-19 杭州小尔科技有限公司 High-layer and super-high-layer super-strong grouting tension prefabricated pile and grouting method
CN103603363A (en) * 2013-10-31 2014-02-26 周兆弟 Cement mixing grouting protruding sectional pile foundations and forming method
CN104895071A (en) * 2015-06-29 2015-09-09 山东省建筑科学研究院 Direction-controllable grouting device and method applicable to prefabricated hollow pile
CN105756066A (en) * 2016-04-22 2016-07-13 江苏巨鑫石油钢管有限公司 Grouting system used for wharf and bridge piling steel pipe and processing technology thereof
CN107254875A (en) * 2017-07-10 2017-10-17 浙江大学 Pile for prestressed pipe pile grouting constructing device and method
CN107460869A (en) * 2017-07-26 2017-12-12 大成科创基础建设股份有限公司 Extra high load bearing capacity large-diameter tubular pile and quick pile sinking secondary grouting method
CN109518685A (en) * 2018-11-14 2019-03-26 天津中海水利水电工程有限公司 A kind of prefabricated pilework and its construction method under water
CN110241813A (en) * 2019-05-16 2019-09-17 国家电网有限公司 A kind of buried prefabricated tubular pile of transmission line of electricity brill
CN110847178A (en) * 2019-11-12 2020-02-28 浙江二十冶建设有限公司 Grouting pipe construction device and grouting pipe construction method
CN113006074A (en) * 2021-03-09 2021-06-22 中建三局集团有限公司 TSC pile grouting device and construction method thereof
CN113699980A (en) * 2021-07-26 2021-11-26 宁波华宇建设有限公司 Deep foundation treatment method
CN114411741A (en) * 2022-01-19 2022-04-29 三峡大学 Pressure grouting device and method for pile hole protecting wall
CN114960638A (en) * 2022-05-06 2022-08-30 东南大学 A novel back slip casting PHC tubular pile for closely knit sandy soil

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103603363A (en) * 2013-10-31 2014-02-26 周兆弟 Cement mixing grouting protruding sectional pile foundations and forming method
CN103590392B (en) * 2013-10-31 2016-04-06 杭州小尔科技有限公司 High-rise, Super High superpower slip casting stretch-draw preformed pile
CN103590392A (en) * 2013-10-31 2014-02-19 杭州小尔科技有限公司 High-layer and super-high-layer super-strong grouting tension prefabricated pile and grouting method
CN104895071A (en) * 2015-06-29 2015-09-09 山东省建筑科学研究院 Direction-controllable grouting device and method applicable to prefabricated hollow pile
CN105756066A (en) * 2016-04-22 2016-07-13 江苏巨鑫石油钢管有限公司 Grouting system used for wharf and bridge piling steel pipe and processing technology thereof
CN107254875A (en) * 2017-07-10 2017-10-17 浙江大学 Pile for prestressed pipe pile grouting constructing device and method
CN107460869A (en) * 2017-07-26 2017-12-12 大成科创基础建设股份有限公司 Extra high load bearing capacity large-diameter tubular pile and quick pile sinking secondary grouting method
CN109518685B (en) * 2018-11-14 2021-05-04 天津中海水利水电工程有限公司 Underwater precast pile structure and construction method thereof
CN109518685A (en) * 2018-11-14 2019-03-26 天津中海水利水电工程有限公司 A kind of prefabricated pilework and its construction method under water
CN110241813A (en) * 2019-05-16 2019-09-17 国家电网有限公司 A kind of buried prefabricated tubular pile of transmission line of electricity brill
CN110847178A (en) * 2019-11-12 2020-02-28 浙江二十冶建设有限公司 Grouting pipe construction device and grouting pipe construction method
CN113006074A (en) * 2021-03-09 2021-06-22 中建三局集团有限公司 TSC pile grouting device and construction method thereof
CN113699980A (en) * 2021-07-26 2021-11-26 宁波华宇建设有限公司 Deep foundation treatment method
CN113699980B (en) * 2021-07-26 2022-10-14 宁波华宇建设有限公司 Deep foundation treatment method
CN114411741A (en) * 2022-01-19 2022-04-29 三峡大学 Pressure grouting device and method for pile hole protecting wall
CN114411741B (en) * 2022-01-19 2023-12-19 三峡大学 Pressure grouting device and method for pile hole protection wall
CN114960638A (en) * 2022-05-06 2022-08-30 东南大学 A novel back slip casting PHC tubular pile for closely knit sandy soil

Similar Documents

Publication Publication Date Title
CN201106173Y (en) Pile terminal pressure slip-casting machine for prestressed concrete pipe pile
CN101761074B (en) Method for improving bearing capacity and tensile capacity of tubular pile end
CN203514315U (en) Reinforced connecting structure between pile and pile cap
CN101812843B (en) Centre grouted poured post-grouting pile construction methods, and grouter and grout injector used thereby
CN101294385A (en) Pressure casting non-sand concrete pile
CN102587366A (en) Self-drilling type spiral anchor rod and construction process using self-drilling type spiral anchor rod for grouting along with drilling, stirring and curing
CN100535262C (en) Method for reinforcing and increasing foundation pit passive earth pressure
CN201581394U (en) Large pile toe grout-injection precast pile
JP2003268767A (en) Construction method for double tube digging small diameter pile using hole excavating rod
KR20100124028A (en) Construction method of lower end expanded type cast-in-place piles
CN202482860U (en) Self-drilling helical anchor rod
CN2154288Y (en) Tube type mud auto-anchor solum anchor rod
CN208472713U (en) A kind of composite structure mini pile for administering small-sized landslide
CN208472716U (en) Crack geology mortar leakage prevention drill-pouring pilework
CN202787275U (en) Tubular soil nailing wall of novel pneumatic impact anchor
CN102493436A (en) Novel manual tunneling construction method of rectangular anti-slide pile
CN108999227A (en) A kind of ruggedized construction and its construction method on building basis
CN205875146U (en) Broken pile's reinforced structure
CN114922172A (en) Anchor rod pile device capable of eliminating negative frictional resistance of collapsible loess and construction method
CN205857167U (en) A kind of boring extruding reinforcement support disk pile
CN112281818B (en) Novel building concrete pipe pile based on anti-permeation technology and preparation method thereof
CN110359449B (en) Post-grouting reinforcement CFG pile manufacturing method for anti-broken pile head
CN208039240U (en) A kind of built pile
CN101545255A (en) Method for manufacturing a PHC tubular pile in soft soil region through chambering and grouting
JP3921657B2 (en) Construction method of large-diameter rock bolt anchors for ground reinforcement

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080827

Termination date: 20121017