CN201106173Y - Pile terminal pressure slip-casting machine for prestressed concrete pipe pile - Google Patents
Pile terminal pressure slip-casting machine for prestressed concrete pipe pile Download PDFInfo
- Publication number
- CN201106173Y CN201106173Y CNU2007200291341U CN200720029134U CN201106173Y CN 201106173 Y CN201106173 Y CN 201106173Y CN U2007200291341 U CNU2007200291341 U CN U2007200291341U CN 200720029134 U CN200720029134 U CN 200720029134U CN 201106173 Y CN201106173 Y CN 201106173Y
- Authority
- CN
- China
- Prior art keywords
- pile
- grouting
- pressure
- top board
- stake
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model relates to a pressure grouter at the end of a pre-stress concrete tubular pile, which is characterized in that the pressure grouter comprises a base plate, a top board, a cushion block and a pile tip. The base plate is welded with a grouting pipe at the center; the base plate and the top board are connected through the cushion block; a cavity therein is a pressure cavity for grouting; the top board is connected with the pile tip. High-pressure grout is grouted into the pressure cavity between the base plate and the top board through the grouting pipe in the grouter; by adopting a transversal injecting and penetrating method, the grout first reinforces soil horizon at the pile tip through grouting sinks around the pressure cavity, then backflows upwards along the body of the tubular pile under the action of high pressure and reinforces soil horizon at the side of the pile through penetration. Being arranged at the four sides of the pressure cavity, the grouting sinks have the protection function of a guard plate, and the phenomenon that the grouting pipe is blocked and can not be opened is not going to happen during the peening and pile pressing process, and grouting at the end of the tubular pile is 100 percent guaranteed to be successful.
Description
Technical field
The utility model relates to a kind of prestressed concrete pipe pile pile-end pressure grouting device.
Background technology
Prestressed concrete pipe pile is the domestic in recent years pile foundation engineering that develops application rapidly, because it is the commodity stake of adopting batch production, mechanization, scale, producing in serial form, is one of stake type commonly used of guaranteeing of at present domestic tool reliable quality.At stake end setting pressure slurry casting machine, with cement paste soil layer infiltration filling around the stake end, be used to reinforce bearing course at pile end, improve the bearing capacity of single pile of pile foundation.It is terminal that the Grouting Pipe of present applied slip casing by pressure device extends to the stake point always, stops up Grouting Pipe during slip casting easily, and slip casting is not smooth, influences work quality and efficient.
Summary of the invention
Technical problem to be solved in the utility model provides a kind of prestressed concrete pipe pile pile-end pressure grouting device, solves Grouting Pipe and occurs easily stopping up the phenomenon of not opening, and guarantees the success of pile tube pile end grouting 100%.
The utility model prestressed concrete pipe pile pile-end pressure grouting device, it is characterized in that comprising chassis, top board, cushion block and stake point, center chassis welding Grouting Pipe connects by cushion block between chassis and the top board, cavity therebetween is the grouting pressure chamber, and top board connects the stake point.
Described stake point is made up of the sharp floor of stake that is " ten " word shape, is convenient to clash into pile.
During construction, Grouting Pipe should be arranged in the pile tube stake hole in advance, and length must not surpass every joint bump pile tube stake top, use the pipe collar screwed connection during pile extension, when carrying out pile-end pressure grouting behind the pile, use bar dowel at stake top place fixing with the Grouting Pipe welding, the Grouting Pipe swing of trembling when preventing high-pressure slip-casting.The chassis of slurry casting machine is directly welded with stake end end plate and is got final product.Be provided with the slip casting groove around the pressure chamber, this slip casting groove grouting amount is big, and slip casting is even, and the resistance degree of depth little, that be penetrated into stake end soil layer is dark, and slip casting effect is good.
After pile tube enters bearing stratum, this slurry casting machine is injected into the high pressure cement paste in the pressure chamber between chassis and the top board by Grouting Pipe, cement paste is at first reinforced stake end soil layer with the method for horizontal injection infiltration by the slip casting groove around the pressure chamber, stake end soil layer is reinforced, improved the end resistance of stake end soil layer; And then cement paste upwards backflows along pile body under the high pressure effect, the soil layer of the penetration reinforcement stake side by cement paste, improve the collateral resistance of stake side soil layer, thereby the bearing capacity of stake is greatly improved, difference according to soil layer property, generally can improve 40~60%, especially sandy soil be improved better effects if.Because this slip casting groove is located at four sides of pressure chamber, has the backplate protective effect, in knocking piling process, Grouting Pipe can not occur and stop up the phenomenon of not opening, guarantee the success of pile tube pile end grouting 100%.The utility model has been owing to improved the bearing capacity of stake, makes engineering can reduce the quantity of stake or shortens pile body length, or use small bore stake etc. instead, can reduce construction costs.
Description of drawings
Fig. 1 is structure of the present utility model and user mode schematic diagram;
Fig. 2 is the structural representation of looking up of Fig. 1;
Fig. 3 is the A-A view of Fig. 2.
Among the figure: 7 pile tubes of 4 sharp floor 5 Grouting Pipe of 1 chassis, 2 top boards, 3 cushion blocks, 6 grouting pressure chambeies
The specific embodiment
As shown in the figure, slip casing by pressure device of the present utility model, comprise chassis 1, top board 2, cushion block 3 and the stake point of forming by the sharp floor 4 of stake that is " ten " word shape, 1 center, chassis welding Grouting Pipe 5, weld together by cushion block 3 between chassis 1 and the top board 2, cavity therebetween is grouting pressure chamber 6, and top board 2 connects the sharp floor 4 of stake.
Construct according to mode described in the utility model.
Claims (2)
1, a kind of prestressed concrete pipe pile pile-end pressure grouting device, it is characterized in that comprising chassis (1), top board (2), cushion block (3) and stake point, center, chassis (1) welding Grouting Pipe (5), connect by cushion block (3) between chassis and the top board, cavity therebetween is grouting pressure chamber (6), and top board (2) connects the stake point.
2, slip casing by pressure device according to claim 1 is characterized in that described stake point is made up of the sharp floor of stake (4) that is " ten " word shape.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2007200291341U CN201106173Y (en) | 2007-10-17 | 2007-10-17 | Pile terminal pressure slip-casting machine for prestressed concrete pipe pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2007200291341U CN201106173Y (en) | 2007-10-17 | 2007-10-17 | Pile terminal pressure slip-casting machine for prestressed concrete pipe pile |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201106173Y true CN201106173Y (en) | 2008-08-27 |
Family
ID=39957971
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2007200291341U Expired - Fee Related CN201106173Y (en) | 2007-10-17 | 2007-10-17 | Pile terminal pressure slip-casting machine for prestressed concrete pipe pile |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201106173Y (en) |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103590392A (en) * | 2013-10-31 | 2014-02-19 | 杭州小尔科技有限公司 | High-layer and super-high-layer super-strong grouting tension prefabricated pile and grouting method |
CN103603363A (en) * | 2013-10-31 | 2014-02-26 | 周兆弟 | Cement mixing grouting protruding sectional pile foundations and forming method |
CN104895071A (en) * | 2015-06-29 | 2015-09-09 | 山东省建筑科学研究院 | Direction-controllable grouting device and method applicable to prefabricated hollow pile |
CN105756066A (en) * | 2016-04-22 | 2016-07-13 | 江苏巨鑫石油钢管有限公司 | Grouting system used for wharf and bridge piling steel pipe and processing technology thereof |
CN107254875A (en) * | 2017-07-10 | 2017-10-17 | 浙江大学 | Pile for prestressed pipe pile grouting constructing device and method |
CN107460869A (en) * | 2017-07-26 | 2017-12-12 | 大成科创基础建设股份有限公司 | Extra high load bearing capacity large-diameter tubular pile and quick pile sinking secondary grouting method |
CN109518685A (en) * | 2018-11-14 | 2019-03-26 | 天津中海水利水电工程有限公司 | A kind of prefabricated pilework and its construction method under water |
CN110241813A (en) * | 2019-05-16 | 2019-09-17 | 国家电网有限公司 | A kind of buried prefabricated tubular pile of transmission line of electricity brill |
CN110847178A (en) * | 2019-11-12 | 2020-02-28 | 浙江二十冶建设有限公司 | Grouting pipe construction device and grouting pipe construction method |
CN113006074A (en) * | 2021-03-09 | 2021-06-22 | 中建三局集团有限公司 | TSC pile grouting device and construction method thereof |
CN113699980A (en) * | 2021-07-26 | 2021-11-26 | 宁波华宇建设有限公司 | Deep foundation treatment method |
CN114411741A (en) * | 2022-01-19 | 2022-04-29 | 三峡大学 | Pressure grouting device and method for pile hole protecting wall |
CN114960638A (en) * | 2022-05-06 | 2022-08-30 | 东南大学 | A novel back slip casting PHC tubular pile for closely knit sandy soil |
-
2007
- 2007-10-17 CN CNU2007200291341U patent/CN201106173Y/en not_active Expired - Fee Related
Cited By (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103603363A (en) * | 2013-10-31 | 2014-02-26 | 周兆弟 | Cement mixing grouting protruding sectional pile foundations and forming method |
CN103590392B (en) * | 2013-10-31 | 2016-04-06 | 杭州小尔科技有限公司 | High-rise, Super High superpower slip casting stretch-draw preformed pile |
CN103590392A (en) * | 2013-10-31 | 2014-02-19 | 杭州小尔科技有限公司 | High-layer and super-high-layer super-strong grouting tension prefabricated pile and grouting method |
CN104895071A (en) * | 2015-06-29 | 2015-09-09 | 山东省建筑科学研究院 | Direction-controllable grouting device and method applicable to prefabricated hollow pile |
CN105756066A (en) * | 2016-04-22 | 2016-07-13 | 江苏巨鑫石油钢管有限公司 | Grouting system used for wharf and bridge piling steel pipe and processing technology thereof |
CN107254875A (en) * | 2017-07-10 | 2017-10-17 | 浙江大学 | Pile for prestressed pipe pile grouting constructing device and method |
CN107460869A (en) * | 2017-07-26 | 2017-12-12 | 大成科创基础建设股份有限公司 | Extra high load bearing capacity large-diameter tubular pile and quick pile sinking secondary grouting method |
CN109518685B (en) * | 2018-11-14 | 2021-05-04 | 天津中海水利水电工程有限公司 | Underwater precast pile structure and construction method thereof |
CN109518685A (en) * | 2018-11-14 | 2019-03-26 | 天津中海水利水电工程有限公司 | A kind of prefabricated pilework and its construction method under water |
CN110241813A (en) * | 2019-05-16 | 2019-09-17 | 国家电网有限公司 | A kind of buried prefabricated tubular pile of transmission line of electricity brill |
CN110847178A (en) * | 2019-11-12 | 2020-02-28 | 浙江二十冶建设有限公司 | Grouting pipe construction device and grouting pipe construction method |
CN113006074A (en) * | 2021-03-09 | 2021-06-22 | 中建三局集团有限公司 | TSC pile grouting device and construction method thereof |
CN113699980A (en) * | 2021-07-26 | 2021-11-26 | 宁波华宇建设有限公司 | Deep foundation treatment method |
CN113699980B (en) * | 2021-07-26 | 2022-10-14 | 宁波华宇建设有限公司 | Deep foundation treatment method |
CN114411741A (en) * | 2022-01-19 | 2022-04-29 | 三峡大学 | Pressure grouting device and method for pile hole protecting wall |
CN114411741B (en) * | 2022-01-19 | 2023-12-19 | 三峡大学 | Pressure grouting device and method for pile hole protection wall |
CN114960638A (en) * | 2022-05-06 | 2022-08-30 | 东南大学 | A novel back slip casting PHC tubular pile for closely knit sandy soil |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201106173Y (en) | Pile terminal pressure slip-casting machine for prestressed concrete pipe pile | |
CN101761074B (en) | Method for improving bearing capacity and tensile capacity of tubular pile end | |
CN203514315U (en) | Reinforced connecting structure between pile and pile cap | |
CN101812843B (en) | Centre grouted poured post-grouting pile construction methods, and grouter and grout injector used thereby | |
CN101294385A (en) | Pressure casting non-sand concrete pile | |
CN102587366A (en) | Self-drilling type spiral anchor rod and construction process using self-drilling type spiral anchor rod for grouting along with drilling, stirring and curing | |
CN100535262C (en) | Method for reinforcing and increasing foundation pit passive earth pressure | |
CN201581394U (en) | Large pile toe grout-injection precast pile | |
JP2003268767A (en) | Construction method for double tube digging small diameter pile using hole excavating rod | |
KR20100124028A (en) | Construction method of lower end expanded type cast-in-place piles | |
CN202482860U (en) | Self-drilling helical anchor rod | |
CN2154288Y (en) | Tube type mud auto-anchor solum anchor rod | |
CN208472713U (en) | A kind of composite structure mini pile for administering small-sized landslide | |
CN208472716U (en) | Crack geology mortar leakage prevention drill-pouring pilework | |
CN202787275U (en) | Tubular soil nailing wall of novel pneumatic impact anchor | |
CN102493436A (en) | Novel manual tunneling construction method of rectangular anti-slide pile | |
CN108999227A (en) | A kind of ruggedized construction and its construction method on building basis | |
CN205875146U (en) | Broken pile's reinforced structure | |
CN114922172A (en) | Anchor rod pile device capable of eliminating negative frictional resistance of collapsible loess and construction method | |
CN205857167U (en) | A kind of boring extruding reinforcement support disk pile | |
CN112281818B (en) | Novel building concrete pipe pile based on anti-permeation technology and preparation method thereof | |
CN110359449B (en) | Post-grouting reinforcement CFG pile manufacturing method for anti-broken pile head | |
CN208039240U (en) | A kind of built pile | |
CN101545255A (en) | Method for manufacturing a PHC tubular pile in soft soil region through chambering and grouting | |
JP3921657B2 (en) | Construction method of large-diameter rock bolt anchors for ground reinforcement |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20080827 Termination date: 20121017 |