CN101294385A - Pressure casting non-sand concrete pile - Google Patents

Pressure casting non-sand concrete pile Download PDF

Info

Publication number
CN101294385A
CN101294385A CNA2008100976988A CN200810097698A CN101294385A CN 101294385 A CN101294385 A CN 101294385A CN A2008100976988 A CNA2008100976988 A CN A2008100976988A CN 200810097698 A CN200810097698 A CN 200810097698A CN 101294385 A CN101294385 A CN 101294385A
Authority
CN
China
Prior art keywords
grouting
sleeve valve
valve pipe
pipe
pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2008100976988A
Other languages
Chinese (zh)
Inventor
高永涛
吴顺川
孙金海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
University of Science and Technology Beijing USTB
Original Assignee
University of Science and Technology Beijing USTB
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by University of Science and Technology Beijing USTB filed Critical University of Science and Technology Beijing USTB
Priority to CNA2008100976988A priority Critical patent/CN101294385A/en
Publication of CN101294385A publication Critical patent/CN101294385A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

A pressure grouting non-fines concrete pile belongs to the construction engineering field, and is particularly applicable to strengthening river levees and reinforcing road-widening lap joints. The pressure grouting non-fines concrete pile comprises a borehole (1), a grouting pipe (2), a sleeve valve pipe (3), graded gravels or crushed stones (4) and a grouting body (5), wherein, the sleeve valve pipe (3) is composed of a sleeve valve pipe grout stop piston (6), a sleeve valve pipe grout injecting hole (7), a sleeve valve pipe screen tube (8) and a rubber bush (9). During the implementation process, a boring machine is firstly utilized to form the borehole (1) until the design depth of the non-fines concrete pile is reached, the grouting pipe (2) and the sleeve valve pipe (3) with the length of the both equal to the depth of the borehole (1) are inserted, then the graded gravels or the crushed stones (4) are filled in, and finally the grouting pipe (2) is utilized to carry out first grouting, the amount of which is equal to the grout output of the borehole (1); after the grout is initially condensed, the sleeve valve pipe (3) is utilized for carrying out secondary middle-high pressure grouting, the pressure of which is 1 to 5 MPa, and the grouting flow rate is 10 to 60 L/min. The pressure grouting non-fines concrete pile has the advantages that the design is reasonable, the construction is simple, the bearing capacity is high, and the anti-seepage capacity of the reinforced section is improved.

Description

A kind of pressure casting non-sand concrete pile
Technical field:
The invention belongs to building engineering field, particularly be applicable to the pressure casting non-sand concrete pile that the rivers embankment is reinforced, the road widening overlap joint is reinforced.
Background technology:
China is vast in territory, geological conditions is intricate, soft rock, weak soil and weak soil that the various origin causes of formation are arranged, special in the east and the flourishing relatively area of southeast economy show particularly outstandingly, the main feature of such geotechnical body comprises: resistance to compression (or shearing resistance) intensity is low, porosity is high, compression coefficient is big etc.At such ground problem, compound base is simple with its technology, easy construction, advantage such as cheap have obtained using widely.Yet for the soil body comparatively closely knit rivers embankment or existing roadbed, common crushed stone pile, powder spray piling are difficult to reach the reinforcing purpose owing to be difficult to construction; And the pore-forming broken stone pile is in construction works, owing to can't improve the characteristic of inter-pile soil, its composite foundation often is difficult to satisfy the requirement of high-bearing capacity ground; In addition, for the rivers embankment, antiseepage is its most important technical requirements, and common compound base is difficult to guarantee and improve the antiseepage grade of rivers embankment.
Summary of the invention
Be to solve the problem that common compound base is difficult to satisfy simultaneously rivers embankment bearing capacity and antiseepage class requirement, a kind of easy construction, bearing capacity height be provided, can satisfy the pressure casting non-sand concrete pile of rivers embankment antiseepage class requirement again.
A kind of pressure casting non-sand concrete pile comprises boring 1, Grouting Pipe 2, sleeve valve pipe 3, graded gravel or rubble 4, injecting cement paste 5; Its half sleeve valve pipe 3 is only starched piston 6 by sleeve valve pipe, and sleeve valve pipe is penetrated slurry hole 7, sleeve valve pipe floral tube 8, and rubber case 9 is formed.
At first utilize boring machine to form boring 1 in the implementation process to non-fine concrete stake projected depth, insert Grouting Pipe 2 and sleeve valve pipe 3, Grouting Pipe 2 and sleeve valve pipe 3 length are with boring 1 degree of depth, insert graded gravel or rubble 4 then, utilize Grouting Pipe 2 to implement once grouting earlier, once grouting is as the criterion with the 1 aperture pulp of holing, after the slurries initial set, utilize sleeve valve pipe 3 to implement secondary high-pressure slip-casting, secondary high-pressure slip-casting is relevant with undisturbed soil condition, stake hole depth, position and grouting sequence etc.Secondary mesohigh grouting pressure is 1~5MPa, and flow rate of grouting is 10~60L/min.In the secondary grouting process, sleeve valve pipe is set only starches piston 6, penetrate slurry hole 7 pulps,, finally implement secondary high-pressure slip-casting, form injecting cement paste 5 at each different parts of pile body because slurries pressure backs down rubber case 9 from sleeve valve pipe in diverse location.In the secondary high-pressure slip-casting process, the control flow rate of grouting is very important, and during greater than 3MPa, flow is the smaller the better, generally is controlled at 10~30L/min at grouting pressure.Also can adopt the grouting mode of interruption, make that the high pressure slurry can effectively spread, release of pressure, thereby reach the design grouting amount.
Injecting cement paste carries out slip casing by pressure by pre-buried Grouting Pipe in the non-fine concrete stake or sleeve valve pipe, make the bearing capacity of a side and end resistance and soil layer and the raising that modulus of deformation all has suitable amplitude, determined it to form higher Bearing Capacity of Composite Foundation and stronger controlled deformation ability.
The advantage of pressure casting non-sand concrete pile is: reasonable in design, and easy construction, the bearing capacity height can improve the section antiseepage ability of reinforcing.This makes full use of the pressure-bearing characteristic of pile body, the works on one end and top joins, the other end then links to each other with the geotechnical body that underlies by boring, under the effect of mesohigh slip casting, formed continuous special-shaped enlarged body (Fig. 1) around " non-fine concrete stake ", therefore during " pressure casting non-sand concrete pile " pressure loading on bearing vertical direction, not only to overcome the frictional resistance of pile body and geotechnical body, also to overcome the compressive strength of enlarged body pressurized position geotechnical body and the shear strength of injecting cement paste simultaneously, thereby can effectively improve the supporting effect of " pressure casting non-sand concrete pile ".In implementing the high-pressure slip-casting process, slurries remove becomes rigid pile with rubble by the discrete material gluing, also has most of stake week soil that infiltrates.This part slurries is except taking place the chemical reaction with stake week soil, and combination that can also be by infiltration, compacted, filling or various ways etc. are same-action not, changes the physical and mechanical property of stake week soil.This is the key character that pressure casting non-sand concrete pile composite foundation is different from other composite foundation.The pressure casting non-sand concrete pile can also limit the lateral deformation of inter-pile soil body, makes the ability of slip casting non-fine concrete pile composite foundation opposing vertical deformation strengthen.Compare with common composite foundation pile body, it is about 30%~40% that pressure casting non-sand concrete pile bearing capacity improves, and Bearing Capacity of Composite Foundation improves 50%~60%.
In addition, by the construction of pressure casting non-sand concrete pile, make that being reinforced the rivers embankment reinforces the leakage preventing structure that section formation is similar to the vertical seepage control wall, on the one hand, because it is less that the slip casting section forms the permeability of the cement soil body own, make that reinforcing the section barrier performance is improved; In addition, because slurries in the gluing of rubble and the splitting diffusion of slurries, make the ability of reinforcing the peripheral hydrostatic pressure of section opposing rivers embankment improve greatly, guaranteed to reinforce the flood fighting flood control capacity of back rivers embankment.This also is the important technology characteristics that pressure casting non-sand concrete pile composite foundation is different from common compound base.The present invention be applied to meet after testing in the actual engineering People's Republic of China's industry standard and national standard " technical code for building pile foundation " (JGJ79-2002), " highway soft soil ground embankment design and construction technical specification " (JTJ017-96), " building foundation engineering construction quality standards of acceptance " (GB50202-2002), " highway subgrade design specifications " (JTJ031-95) and " Code for design of building " (GB50007).
Description of drawings
Fig. 1 pressure casting non-sand concrete pile structure schematic diagram.
Fig. 2 pressure casting non-sand concrete pile structure schematic cross-section.
Fig. 3 valve tubular structure schematic diagram of tucking inside the sleeve.
Fig. 4 valve tube section schematic diagram of tucking inside the sleeve.
The specific embodiment
Below in conjunction with drawings and Examples to the detailed description of the invention.
Embodiment 1
Pressure casting non-sand concrete pile shown in the figure, 1 for holing, and 2 is Grouting Pipe, and 3 are sleeve valve pipe, and 4 is graded gravel or rubble, and 5 is injecting cement paste, and 6 is that sleeve valve pipe is only starched piston, and 7 is that sleeve valve pipe is penetrated the slurry hole, and 8 is sleeve valve pipe floral tube, and 9 is rubber case.At first utilize boring machine to form boring 1 in the implementation process to the pile body projected depth, insert Grouting Pipe 2 and sleeve valve pipe 3, Grouting Pipe 2 and sleeve valve pipe 3 length are with boring 1 degree of depth, insert graded gravel or rubble 4 then, utilize Grouting Pipe 2 to implement once grouting earlier, once grouting is as the criterion with 1 aperture pulp, after the slurries initial set, utilize sleeve valve pipe 3 to implement secondary grouting, secondary high-pressure slip-casting and undisturbed soil condition, the stake hole depth, position and grouting sequence etc. are relevant, according to present embodiment Dike Along Lower Yellow River field condition, design secondary mesohigh grouting pressure is 3~4MPa, and flow-control is at 10~30L/min.In the secondary grouting process, the valve pipe that is set to tuck inside the sleeve is only starched piston 6 in diverse location, penetrates slurry hole 7 pulps from sleeve valve pipe, because slurries pressure backs down rubber case 9, finally implements secondary high-pressure slip-casting at each different parts of pile body, forms injecting cement paste 5.
Embodiment 2
At first utilize boring machine to form boring 1 in the implementation process to the pile body projected depth, insert Grouting Pipe 2 and sleeve valve pipe 3, Grouting Pipe 2 and sleeve valve pipe 3 length are with boring 1 degree of depth, insert graded gravel or rubble 4 then, utilize Grouting Pipe 2 to implement once grouting earlier, once grouting is as the criterion with 1 aperture pulp, after the slurries initial set, utilize sleeve valve pipe 3 to implement secondary grouting, secondary high-pressure slip-casting and undisturbed soil condition, the stake hole depth, position and grouting sequence etc. are relevant, and according to the present embodiment field condition, design secondary mesohigh grouting pressure is 1~3MPa, in the secondary grouting process, the valve pipe that is set to tuck inside the sleeve is only starched piston 6 in diverse location, penetrates slurry hole 7 pulps from sleeve valve pipe, because slurries pressure backs down rubber case 9, finally implement secondary high-pressure slip-casting, form injecting cement paste 5 at each different parts of pile body.In the secondary high-pressure slip-casting process, flow rate of grouting is controlled at 30~60L/min.

Claims (2)

1. a pressure casting non-sand concrete pile is characterized in that the pressure casting non-sand concrete pile comprises boring (1), Grouting Pipe (2), sleeve valve pipe (3), graded gravel or rubble (4), injecting cement paste (5); Its half sleeve valve pipe (3) is only starched piston (6) by sleeve valve pipe, and sleeve valve pipe is penetrated slurry hole (7), sleeve valve pipe floral tube (8), and rubber case (9) is formed; At first utilize boring machine to form boring (1) in the implementation process to the pile body projected depth, insert Grouting Pipe (2) and sleeve valve pipe (3), Grouting Pipe (2) and sleeve valve pipe (3) length are with boring (1) degree of depth, insert graded gravel or rubble (4) then, utilize Grouting Pipe (2) to implement once grouting earlier, once grouting is as the criterion with boring (1) aperture pulp; After the slurries initial set, utilize sleeve valve pipe (3) to implement the slip casting of secondary mesohigh, secondary mesohigh grouting pressure is 1~5MPa, flow rate of grouting is 10~60L/min; In the secondary grouting process, sleeve valve pipe is set only starches piston (6), penetrate slurry hole (7) pulp,, finally implement the slip casting of secondary mesohigh, form injecting cement paste (5) at each different parts of pile body because slurries pressure backs down rubber case (9) from sleeve valve pipe in diverse location.
2. a kind of according to claim 1 pressure casting non-sand concrete pile is characterized in that secondary mesohigh grouting pressure is 3~4MPa, and flow rate of grouting is 10~30L/min.
CNA2008100976988A 2007-05-30 2008-05-23 Pressure casting non-sand concrete pile Pending CN101294385A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2008100976988A CN101294385A (en) 2007-05-30 2008-05-23 Pressure casting non-sand concrete pile

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN200710099800.3 2007-05-30
CN200710099800 2007-05-30
CNA2008100976988A CN101294385A (en) 2007-05-30 2008-05-23 Pressure casting non-sand concrete pile

Publications (1)

Publication Number Publication Date
CN101294385A true CN101294385A (en) 2008-10-29

Family

ID=40064896

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2008100976988A Pending CN101294385A (en) 2007-05-30 2008-05-23 Pressure casting non-sand concrete pile

Country Status (1)

Country Link
CN (1) CN101294385A (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102418337A (en) * 2011-10-17 2012-04-18 湖南宏禹水利水电岩土工程有限公司 New grouting method
CN102863542A (en) * 2012-09-20 2013-01-09 无锡市凯利药业有限公司 Improved process for producing CMC (Carboxyl Methyl Cellulose)
CN103410154A (en) * 2013-08-23 2013-11-27 河南省纳川基础工程有限公司 Constructing method for high-pressure grouting of revetment small piles
CN105544508A (en) * 2015-12-02 2016-05-04 广西大学 Cast-in-place pile applicable to karst region having communicating channels
CN108071173A (en) * 2017-12-24 2018-05-25 胡晓霞 A kind of construction method of mass concrete
CN109487777A (en) * 2018-11-12 2019-03-19 山西晋建加固特种建筑工程有限公司 A method of a reinforcing deep soft soil foundation of filling the span of a man's arms is formed using slip casing by pressure
CN110130427A (en) * 2019-06-13 2019-08-16 国网江苏省电力有限公司连云港供电分公司 The reinforcement means and organizational pile foundation of precast hollow tubular pole
CN111441358A (en) * 2020-03-05 2020-07-24 南方电网科学研究院有限责任公司 Deep well pressure grouting process
CN112227356A (en) * 2019-07-15 2021-01-15 河北建设勘察研究院有限公司 Gravel grouting steel pipe pile and preparation method thereof
CN113217026A (en) * 2021-05-21 2021-08-06 瑞腾基础工程技术(北京)股份有限公司 Construction method for secondary grouting of tunnel leading large pipe shed
CN114622565A (en) * 2022-03-22 2022-06-14 白银有色集团股份有限公司 Sedimentation grouting reinforcement process for raft equipment foundation

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102418337B (en) * 2011-10-17 2013-10-02 湖南宏禹水利水电岩土工程有限公司 New grouting method
CN102418337A (en) * 2011-10-17 2012-04-18 湖南宏禹水利水电岩土工程有限公司 New grouting method
CN102863542A (en) * 2012-09-20 2013-01-09 无锡市凯利药业有限公司 Improved process for producing CMC (Carboxyl Methyl Cellulose)
CN103410154A (en) * 2013-08-23 2013-11-27 河南省纳川基础工程有限公司 Constructing method for high-pressure grouting of revetment small piles
CN105544508A (en) * 2015-12-02 2016-05-04 广西大学 Cast-in-place pile applicable to karst region having communicating channels
CN108071173B (en) * 2017-12-24 2021-10-22 中国人民解放军陆军勤务学院 Construction method of mass concrete
CN108071173A (en) * 2017-12-24 2018-05-25 胡晓霞 A kind of construction method of mass concrete
CN109487777A (en) * 2018-11-12 2019-03-19 山西晋建加固特种建筑工程有限公司 A method of a reinforcing deep soft soil foundation of filling the span of a man's arms is formed using slip casing by pressure
CN110130427A (en) * 2019-06-13 2019-08-16 国网江苏省电力有限公司连云港供电分公司 The reinforcement means and organizational pile foundation of precast hollow tubular pole
CN112227356A (en) * 2019-07-15 2021-01-15 河北建设勘察研究院有限公司 Gravel grouting steel pipe pile and preparation method thereof
CN111441358A (en) * 2020-03-05 2020-07-24 南方电网科学研究院有限责任公司 Deep well pressure grouting process
CN113217026A (en) * 2021-05-21 2021-08-06 瑞腾基础工程技术(北京)股份有限公司 Construction method for secondary grouting of tunnel leading large pipe shed
CN114622565A (en) * 2022-03-22 2022-06-14 白银有色集团股份有限公司 Sedimentation grouting reinforcement process for raft equipment foundation

Similar Documents

Publication Publication Date Title
CN101294385A (en) Pressure casting non-sand concrete pile
CN110230309B (en) Karst area bridge karst cave pile foundation construction method
CN100591866C (en) Drifting sand layer and gravel stratum water-moving double-liquid high pressure slip-casting water-blocking construction method
CN103233454B (en) Processing method of soaking, vacuum preloading and slurry injecting for sand piles of collapsible loess foundation
CN101532290B (en) Granule grouting pile of ripple plastic sleeve with hole for strengthening soft soil foundation and strengthening method
US20140314497A1 (en) Polymer grouting method for constructing gravel pile
CN104131555B (en) A kind of outsourcing water penetration concrete reinforced pipe crushed stone grouting pile and construction method thereof
CN104499479B (en) It is a kind of to pass through the dug pile construction method that sand gravel backfills layer
CN104612134A (en) Cast-in place pile post-grouting construction method for pouring construction
CN104278608A (en) Novel highway embankment widened structure and construction method
CN101070702A (en) Single-hole composite anchoring pile
CN103603379A (en) Anti-floating system combining anti-floating cement soil pile and anti-floating anchor rod and construction process of anti-floating system
CN111074883A (en) Post-grouting permeable concrete pipe pile and construction method thereof
CN100460604C (en) Crack-seam-free seepage-proof stable sweeled ground excavation dyke slope construction method
CN102606176A (en) Collapsible loess tunnel construction method
CN102877470B (en) Combined soil nailing construction method for supporting
CN102966072A (en) Construction method for treating widened and heightened engineering joint surfaces of dikes on soft clay foundation
CN104746505A (en) Method for treating miscellaneous fill foundation combing dynamic consolidation and compaction grouting
CN114109394A (en) Method for determining pile length of tunnel shallow-buried weak surrounding rock high-pressure jet grouting pile method ground surface reinforcement
KR101057487B1 (en) Grouting Method Using Enlarged Concrete Consolidation Grouting Apparatus
CN105625302B (en) A kind of variable cross-section strength core enhancing active material composite pile structure and construction method
CN203613568U (en) Anti-floating cement soil pile and anti-floating anchor rod combined anti-floating system
CN211851857U (en) Advanced support pipe shed structure under silty-fine sand geological condition
CN108277800A (en) A kind of consolidation layer of sand concrete reinforced pipe section broken stone pile and its construction method
CN100355991C (en) Method for constructing composite foundation of piles and ground interactive slurry bonded dispersed body material

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20081029