CN101545255A CN200910068623A CN200910068623A CN101545255A CN 101545255 A CN101545255 A CN 101545255A CN 200910068623 A CN200910068623 A CN 200910068623A CN 200910068623 A CN200910068623 A CN 200910068623A CN 101545255 A CN101545255 A CN 101545255A
Authority
CN
China
Prior art keywords
grouting
pile
pile tube
phc pile
phc
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN200910068623A
Other languages
Chinese (zh)
Other versions
CN101545255B (en
Inventor
刘永超
崔凤祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Jiancheng Jiye Group Co., Ltd.
Original Assignee
FOUNDATION OF TIANJIN CITY ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FOUNDATION OF TIANJIN CITY ENGINEERING Co Ltd filed Critical FOUNDATION OF TIANJIN CITY ENGINEERING Co Ltd
Priority to CN2009100686231A priority Critical patent/CN101545255B/en
Publication of CN101545255A publication Critical patent/CN101545255A/en
Application granted granted Critical
Publication of CN101545255B publication Critical patent/CN101545255B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention provides a method for manufacturing a PHC tubular pile in a soft soil region by chambering and grouting. The method comprises the following steps that: the pile end at the base of the PHC tubular pile sunken in construction is provided with an enlarged head plate; the enlarged head plate is subjected to chambering to form a square, circular, triangular or elliptical gap in the construction process; in the pile sinking process, grout, cement mortar or residual grout scrap is filled in the gap; the grouting materials achieve the function of protecting the wall in the pile sinking process; and after being solidified, the grouting materials can increase the resistance of the pile end and the frictional resistance of the pile side and improve the interaction between the pile and soil. The method has the effect of providing the simple method for improving the compression resistance, pulling resistance and horizontal force resistance of the PHC tubular pile in the soft soil region, fully exerts the strength of a tubular pile body, can reduce the friction of the soil on the pile body in the pile sinking process, protects an anticorrosive dope, has the action of seepage protection on cracks of the pile body, improves the impermeable effect; and the strength of the grouting materials after being solidified reaches between 3 and 15 MPa. With the method, the bearing capacity of the PHC tubular pile can be improved to 150 to 300 percent; the comprehensive construction cost can be saved by 20 to 60 percent; and the social economic benefit is improved.

Description

Make the method for PHC tubular pile in soft soil region through chambering and grouting
Technical field
The present invention relates to the technical field on the work basis in the civil works, particularly a kind of mode by reaming forms hole at the high-strength Prestressed Pipe Pile periphery, adopts along with pile tube sinks to adopting surplus slurry, cement paste, cement mortar grouting and the method for the making PHC tubular pile in soft soil region through chambering and grouting of the high-bearing capacity, high uplift resistance, high horizontal force resistant and the good seepage-proof property that form.
Background technology
Along with The development in society and economy, pre-tensioning system high-strength prestressed concrete pipe pile (being called for short the PHC pile tube) is a kind of stake type commonly used, as shown in Figure 1.The annual production in the whole nation in 2008 surpasses 300,000,000 meters, has been widely used in all kinds of buildings.Advantage such as that the PHC pile tube has is high-strength, economy, duration are fast, its pile strength can reach 80MPa, far above other foundation piles.The bearing capacity of stake is got the low value of following two factors: the one, and pile strength, the 2nd, but the frictional resistance of stake and soil, the PHC pile strength can reach 80MPa, far above the frictional resistance of stake with soil, so pile strength fails effectively to bring into play.To this problem, adopt kinds of processes both at home and abroad, in the hope of improving its bearing capacity, the employing high-pressure rotary jet grouting pile lock pin that has, the deep-mixed pile lock pin that has, the pile sinking grouting behind shaft or drift lining that has and first reaming be technology such as pile sinking and then slip casting again.Though like that having certain effect often needs plurality of devices to form a complete set of, working procedure is complicated and the construction effect is low, is difficult to obtain the good social economic benefit.So, how to adopt better simply construction technology to improve the mechanical property of PHC pile tube in soft clay area, become a stubborn problem.
Summary of the invention
For solving the problem that exists in the above-mentioned technology, the invention provides a kind of method of making PHC tubular pile in soft soil region through chambering and grouting, adopt the mode of grouting to improve the bearing capacity of PHC pile tube by structure more easily, be beneficial to reach the purpose that improves effect, saves investment.
For achieving the above object, the technical solution used in the present invention provides a kind of method of making PHC tubular pile in soft soil region through chambering and grouting, and this method includes following steps:
Bottom stake end at construction sinking PHC pile tube is provided with the enlarged footing plate, and the area of enlarged footing plate is greater than the sectional area of PHC pile tube, and employing is connected in the bottom stake end of HC pile tube greater than the steel plate of the sectional area of PHC pile tube;
Form the space by the enlarged footing plate in the middle of all soil of stake and PHC pile tube in construction sinking PHC pile tube process, by the Grouting Pipe of grouting grouting equipment grouting agent is injected the space then, Grouting Pipe is buried following 2 meters;
In construction sinking PHC pile tube process, reserve and be connected with grout pipe with grout pipe, grout pipe is in the outside of PHC pile tube, and sink synchronously with the PHC pile tube, after treating that grouting agent final set has preliminary intensity, then utilize the grouting grouting equipment once more by reserving the grout pipe secondary grouting, the grout hardens layer that forms with the compactness of strengthening grouting agent.
Effect of the present invention is to provide a kind of resistance to compression, resistance to plucking of better simply raising PHC pile tube, the method for horizontal force resistant in soft clay area; give full play to tubular pile body intensity; and can reduce native friction in the pile driving process to pile body; the anticorrosive paint of protection pile body; the pile body fine fisssure is sewed with the seepage flow protective effect, improves impervious effect.The bearing capacity of PHC pile tube can bring up to 150% ~ 300%, and comprehensive cost can save 20 ~ 60%.Obviously improved the bearing capacity of PHC pile tube, given full play to the high-strength performance of the pile shaft material of PHC pile tube, reduced investment outlay and improve economic results in society.
Description of drawings
Fig. 1 is conventional PHC pile tube schematic diagram;
Fig. 2 is a reaming schematic diagram of the present invention;
Fig. 3 is a grouting schematic diagram of the present invention;
Fig. 4 is four folding segment structure schematic diagrames of grout pipe of the present invention;
Fig. 5 is the connection diagram of end plate of the present invention and welding steel;
Fig. 6 is a secondary grouting schematic diagram of the present invention;
Fig. 7 is the structure chart of square enlarged footing of the present invention;
Fig. 8 is the structure chart of triangle enlarged footing of the present invention;
Fig. 9 is the structure chart of circular enlarged footing of the present invention;
Figure 10 is the structure chart of oval enlarged footing of the present invention.
Among the figure:
1, PHC pile tube 2, grout hardens layer 3, enlarged footing plate
4, all soil 5 of stake, space 6, Grouting Pipe
7, grouting agent 8, grout pipe 11, prestressed reinforcement
12, end plate 14, pile end grouting hole 15, stake side injected hole
16, grouting grouting equipment
The specific embodiment
Reaching embodiment in conjunction with the accompanying drawings is illustrated the method for making PHC tubular pile in soft soil region through chambering and grouting of the present invention.
Stake end at construction sinking PHC pile tube 1 adopts enlarged footing plate 3, and the area of enlarged footing plate 3 is greater than the sectional area of PHC pile tube, adopts the bottom stake end that is connected in HC pile tube 1 greater than the steel plate of the sectional area of PHC pile tube, as shown in Figure 2.
The shape of enlarged footing plate 3 according to the difference of formation properties, can have multiple shapes such as square, circular, triangle or ellipse, and the area of enlarged footing plate 3 can be 1.5-3 times of PHC pile tube 1 cross-sectional area.Described enlarged footing plate 3 can adopt the area that strengthens end plate 12 or directly will be greater than two kinds of forms of steel plate welding of PHC pile tube 1 cross-sectional area, and the enlarged footing plate 3 of two kinds of forms is connected with prestressed reinforcement 11 or end plate 12 in the PHC pile tube 1 respectively; When described increasing end plate is made at PHC pile tube 1, substitute the end plate 12 of PHC pile tube 1 one ends, be connected with the end plate preformed hole that strengthens end plate by the prestressed reinforcement in the PHC pile tube 1 11, as shown in Figure 5.Described welding steel is when PHC pile tube 1 pile sinking, and the welding steel by end plate in the PHC pile tube 1 12 and enlarged footing plate 3 is welded to connect.
In construction sinking PHC pile tube 1 process, in the middle of stake week native 4 and PHC pile tube 1, form space 5, by the Grouting Pipe 6 that is communicated with grouting grouting equipment 16 grouting agent 7 is injected space 5, as shown in Figure 3 by enlarged footing plate 3.Grouting Pipe 6 is buried following 2 meters and is connected with grout pipe 8, and Grouting Pipe 6 materials can adopt polyethylene pipe or galvanized pipe, and this Grouting Pipe 6 can reuse, and grouting pressure is not limit, as long as guarantee that injecting paste material can normally flow out.Grouting agent 7 can be cement paste, cement mortar or surplus slurry waste material, and cement adopts the normal silicate or the portland slag cement of 32.5 or 42.5 strength grades all can.
Reserving grout pipe 8 in construction sinking PHC pile tube 1 process is communicated with Grouting Pipe 6, the material of grout pipe 8 can adopt two kinds of polyethylene pipe or galvanized pipes, grout pipe 8 is located at the outside of PHC pile tube 1, and sink synchronously with PHC pile tube 1, along the stake limit per 4 meters fixing with steel wire and stake, note colligation again after need wait weld bond to cool off in PHC pile tube welding pile extension process as adopting polyethylene pipe, with non-ironing broken Grouting Pipe, and the bottom grouting port taked safeguard measure, avoid being full of in the filling process mud; Grout pipe 8 becomes four bendings at foot, reserves four grouting ports 14, as shown in Figure 4.Along in the length of PHC pile tube 1, reserve a stake side injected hole 15 every 1 meter below 6 meters at height of pile top; After treating that grouting agent 7 final set have preliminary intensity, once more with grouting agent 7 secondary groutings, as shown in Figure 6.Grouting pressure is 1-3MPa, with the compactness of strengthening grouting agent 7 and the influence that reduces the sclerosis drying shrinkage, solidifies the back and forms grout hardens layer 2; Secondary grouting after finishing by grouting in the pile driving process of PHC pile tube 1 and pile sinking, grout hardens layer 2 solidify back intensity can reach 3-15MPa.
That the shown PHC of the being pile tube 1 bottom enlarged footing plate 3 of Fig. 7-10 is respectively is square, triangle, circle and elliptical shape, the phantom drawing of sinking PHC pile tube 1 construction.

Claims (4)

1, a kind of method of making PHC tubular pile in soft soil region through chambering and grouting, this method includes following steps:
Bottom stake end at construction sinking PHC pile tube (1) is provided with enlarged footing plate (3), and the area of enlarged footing plate (3) is greater than the sectional area of PHC pile tube, and employing is connected in the bottom stake end of HC pile tube (1) greater than the steel plate of the sectional area of PHC pile tube;
In construction sinking PHC pile tube (1) process, in the middle of stake week soil (4) and PHC pile tube (1), form space (5) by enlarged footing plate (3), by the Grouting Pipe (6) of grouting grouting equipment (16) grouting agent (7) is injected space (5) then, Grouting Pipe (6) the following 2 meters grouting of burying;
In construction sinking PHC pile tube (1) process, reserve and be connected with grout pipe (8) with grout pipe (6), grout pipe (8) is in the outside of PHC pile tube (1), and sink synchronously with PHC pile tube (1), after treating that grouting agent (7) final set has preliminary intensity, then utilize grouting grouting equipment (16) once more by reserving grout pipe (8) secondary grouting, the grout hardens layer (2) that forms with the compactness of strengthening grouting agent (7).
2, method according to claim 1 is characterized in that: the area of described enlarged footing plate (3) is 1.5-3 times of PHC pile tube (1) cross-sectional area.
3, method according to claim 1 is characterized in that: described grouting grouting equipment (16) grouting pressure is 1-3MPa.
4, method according to claim 1 is characterized in that: described grouting agent (7) is cement paste, cement mortar or surplus slurry waste material, and the intensity after grouting agent solidifies reaches 3 one 15MPa.
CN2009100686231A 2009-04-27 2009-04-27 Method for manufacturing a PHC tubular pile in soft soil region through chambering and grouting Active CN101545255B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009100686231A CN101545255B (en) 2009-04-27 2009-04-27 Method for manufacturing a PHC tubular pile in soft soil region through chambering and grouting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009100686231A CN101545255B (en) 2009-04-27 2009-04-27 Method for manufacturing a PHC tubular pile in soft soil region through chambering and grouting

Publications (2)

Publication Number Publication Date
CN101545255A true CN101545255A (en) 2009-09-30
CN101545255B CN101545255B (en) 2010-08-25

Family

ID=41192613

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009100686231A Active CN101545255B (en) 2009-04-27 2009-04-27 Method for manufacturing a PHC tubular pile in soft soil region through chambering and grouting

Country Status (1)

Country Link
CN (1) CN101545255B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102505684A (en) * 2011-11-02 2012-06-20 河海大学 Hollow stiffness-core slurry-solidified discrete material pile and construction method thereof
CN107119683A (en) * 2016-02-24 2017-09-01 上海宝冶集团有限公司 A kind of method of reduction PHC pile tube penetrating resistances
CN108149676A (en) * 2017-12-28 2018-06-12 浙江大学 Band expands shoe stake side two-step-filling construction of prefabricated piles structure and its construction method
CN114482057A (en) * 2021-12-27 2022-05-13 佛山科学技术学院 Control device and method for pile side grouting reinforcement of pipe pile foundation

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102505684A (en) * 2011-11-02 2012-06-20 河海大学 Hollow stiffness-core slurry-solidified discrete material pile and construction method thereof
CN102505684B (en) * 2011-11-02 2014-09-10 河海大学 Hollow stiffness-core slurry-solidified discrete material pile and construction method thereof
CN107119683A (en) * 2016-02-24 2017-09-01 上海宝冶集团有限公司 A kind of method of reduction PHC pile tube penetrating resistances
CN108149676A (en) * 2017-12-28 2018-06-12 浙江大学 Band expands shoe stake side two-step-filling construction of prefabricated piles structure and its construction method
CN114482057A (en) * 2021-12-27 2022-05-13 佛山科学技术学院 Control device and method for pile side grouting reinforcement of pipe pile foundation

Also Published As

Publication number Publication date
CN101545255B (en) 2010-08-25

Similar Documents

Publication Publication Date Title
CN102691365B (en) Connecting structure for assembly type concrete shear wall edge member
CN202945622U (en) Composite repaired structure of reinforced concrete base plate cracks in basement
CN102787595B (en) Double-acting self-stressing combined uplift pile and pile forming method
US20220098819A1 (en) Method for strengthening and lifting high-rise building having raft foundation
CN105350531A (en) Pipe pile-anchor rod composite foundation capable of bearing pulling and pressing bidirectional loads and construction technology
CN103603379A (en) Anti-floating system combining anti-floating cement soil pile and anti-floating anchor rod and construction process of anti-floating system
CN101545255B (en) Method for manufacturing a PHC tubular pile in soft soil region through chambering and grouting
CN100535262C (en) Method for reinforcing and increasing foundation pit passive earth pressure
CN103410144B (en) Prestressed reinforcement piles set into rock and construction method
CN208763204U (en) A kind of vertical connecting structure of low layer assembled architecture prefabricated panel
CN214695636U (en) Novel foundation pit inclined pile supporting structure
CN207659986U (en) A kind of building or structures foundation stabilization underpin pier
CN203613568U (en) Anti-floating cement soil pile and anti-floating anchor rod combined anti-floating system
CN201395791Y (en) PHC tubular pile for broaching and grouting in soft soil region
CN202969370U (en) Novel steel pipe pile
CN210263075U (en) Arrange bars formula tubular pile post back slip casting internal anchor outer stagnant water support system
CN107034894A (en) Post-tensioned prestressed tension beam recoverable pattern foundation pit supporting structure prefabricated pile and preparation method thereof and construction method
CN108643215B (en) Construction method of anchor pier type foundation after rotary spraying and pressing into variable cross section
CN201474703U (en) Bearing structure of consolidated ring of hydraulic tunnel
CN214530638U (en) Multi-shaft stirring stiffness composite pile
CN201635072U (en) Centrally grouted static-pressured anchor pile former
CN108266207A (en) A kind of push pipe export & import water-stopping method and device suitable for deep water-rich sand layer area
CN106223344A (en) A kind of ground line piled anchor framework foundation pit supporting method
CN112411590A (en) Underground diaphragm wall structure and construction method
CN205999879U (en) Borehole thin-walled rubble fills out core slip casting pile composite foundation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: TIANJIN JIANCHENG JIYE GROUP CO., LTD.

Free format text: FORMER OWNER: FOUNDATION OF TIANJIN CITY ENGINEERING CO., LTD.

Effective date: 20110623

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20110623

Address after: 300301 Tianjin city Dongli District Junliangcheng North Road No. 14501

Patentee after: Tianjin Jiancheng Jiye Group Co., Ltd.

Address before: 300301 Tianjin city Dongli District Junliangcheng North Road No. 14501

Patentee before: Foundation of Tianjin City Engineering Co., Ltd.