CN205999879U - Borehole thin-walled rubble fills out core slip casting pile composite foundation - Google Patents
Borehole thin-walled rubble fills out core slip casting pile composite foundation Download PDFInfo
- Publication number
- CN205999879U CN205999879U CN201620972623.XU CN201620972623U CN205999879U CN 205999879 U CN205999879 U CN 205999879U CN 201620972623 U CN201620972623 U CN 201620972623U CN 205999879 U CN205999879 U CN 205999879U
- Authority
- CN
- China
- Prior art keywords
- armored concrete
- slip casting
- rubble
- borehole
- thin
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model discloses borehole thin-walled rubble fills out core slip casting pile composite foundation, it includes stake holes(1), Grouting Pipe(2), armored concrete thin wall cylinder(3), armored concrete back cover(4)With broken stone cushion layer(5), stake holes(1)Vertically arranged and stake holes(1)It is arranged in ground, stake holes(1)Bottom be provided with armored concrete back cover(4), stake holes(1)Interior and be sequentially arranged multistage armored concrete thin wall cylinder from top to bottom(3), armored concrete thin wall cylinder(3)Inside fill rubble(7), described broken stone cushion layer(5)It is arranged at armored concrete thin wall cylinder(3)Top.The beneficial effects of the utility model are:There is provided that work efficiency, construction noise are little, bending rigidity and anti-pressure ability are high, save rolled steel dosage 40%, save concrete 60% as structural elements by the use of hollowing out retaining wall.
Description
Technical field
This utility model is related to the technical field of composite foundation, and particularly borehole thin-walled rubble is filled out core grouting pile and is combined ground
Base.
Background technology
Caisson in current engineering is because of easy construction, construction is very fast, do not need heavy mechanical equipment, has strong adaptability
The advantages of, wider in the aspect range of application such as highway and civil buildings.Generally caisson is armored concrete or plain concrete is real
Heart stake, on the one hand leads to stake relatively costly because it is relatively large in diameter, and another aspect concrete coagulates consumption greatly and perfusion and solidification need
Longer time to be consumed, is unfavorable for shortening construction period.Therefore, how to reduce while shortening construction period and be constructed into
This, be the problem that those skilled in the art need to solve.
Utility model content
The purpose of this utility model is to overcome the shortcoming of existing borehole pouring concrete pile technology, provides a kind of reduction to apply
Work cost, improve that construction efficiency, construction noise are little, bending rigidity and anti-pressure ability are high, save rolled steel dosage 40%, save coagulation
The borehole thin-walled rubble of soil 60% fills out core slip casting pile composite foundation.
The purpose of this utility model is achieved through the following technical solutions:Borehole thin-walled rubble is filled out core grouting pile and is combined ground
Base, it includes stake holes, Grouting Pipe, armored concrete thin wall cylinder, armored concrete back cover and broken stone cushion layer, and stake holes is vertically arranged
And stake holes is arranged in ground, the bottom of stake holes is provided with armored concrete back cover, has been sequentially arranged in stake holes and from top to bottom
Multistage armored concrete thin wall cylinder, is provided with the Grouting Pipe of vertical setting in stake holes, Grouting Pipe is vertically arranged, the tube wall of Grouting Pipe
Go up and the length direction along Grouting Pipe is provided with multiple injected holes, filled rubble in armored concrete thin wall cylinder, described is broken
Stone bed pad layer is arranged at the top of armored concrete thin wall cylinder.
Described every adjacent segments armored concrete thin wall cylinder is connected with each other.
Described armored concrete back cover is connected with each other with bottom armored concrete thin wall cylinder.
Described Grouting Pipe is no less than two;
Described rubble fills out core layering vibration compacting.
Described injected hole is uniformly distributed in Grouting Pipe.
Described broken stone cushion thickness degree is 15cm ~ 30cm.
This utility model has advantages below:
1)Form the multistage armored concrete thin wall cylinder being sequentially connected with using borehole reinforced concrete core-tube it is ensured that bending resistance
Rigidity and anti-pressure ability and the restriction ability that rubble is filled out with core.
2)Fill rubble slip casting using borehole reinforced concrete core-tube composition is hollow, form the coagulation with some strength
Native pile body, increases bearing area.
3)Form large end face using borehole and amass stake bottom, and use armored concrete back cover, give full play to the pressure-bearing energy of foundation soil
Power.
4)Make full use of borehole retaining wall and form armored concrete thin wall cylinder, without using large type drill construction, reduce tradition
Bored concrete pile operation and time, technique is simpler, improves efficiency.
5)The armored concrete thin-walled cylinder pile being formed using borehole reinforced concrete core-tube, saves steel compared with total cross-section bored concrete pile
Timber-used amount 40%, saves concrete 60%.
6)Construction noise is little, and environmental conservation controllability is high.
Brief description
Fig. 1 is structural representation of the present utility model
Fig. 2 is this utility model section of structure
Fig. 3 is construction process figure of the present utility model;
In figure, 1- stake holes, 2- Grouting Pipe, 3- armored concrete thin wall cylinder, 4- armored concrete back cover, 5- broken stone cushion
Layer, 6- injected hole, 7- rubble.
Specific embodiment
Below in conjunction with the accompanying drawings this utility model is further described, protection domain of the present utility model be not limited to
Lower described:
As shown in figure 1, borehole thin-walled rubble fills out core slip casting pile composite foundation, it include stake holes 1, Grouting Pipe 2, reinforcing bar mix
Solidifying soil thin wall cylinder 3, armored concrete back cover 4 and broken stone cushion layer 5, stake holes 1 is vertically arranged and stake holes 1 is arranged in ground, stake
The bottom in hole 1 is provided with armored concrete back cover 4, and stake holes 1 is interior and has been sequentially arranged multistage armored concrete thin-walled from top to bottom
Cylinder 3, is provided with the Grouting Pipe 2 of vertical setting, Grouting Pipe 2 is vertically arranged, on the tube wall of Grouting Pipe 2 and along Grouting Pipe 2 in stake holes
Length direction be provided with multiple injected holes 6, filled rubble 7 in armored concrete thin wall cylinder 3, described broken stone cushion layer 5
It is arranged at the top of armored concrete thin wall cylinder 3.After to casting cement serosity in Grouting Pipe 2, make to fill out the mixing of core rubble cementing
Form concrete, formed together with armored concrete thin wall cylinder and there is the large end face rubble of high load performance fill out core grouting pile, paving
If stake top broken stone cushion layer, complete the construction that rubble fills out core slip casting pile composite foundation.
Described every adjacent segments armored concrete thin wall cylinder 3 is connected with each other it is ensured that armored concrete thin wall cylinder is overall
Bending rigidity and anti-pressure ability;Described armored concrete back cover 4 and armored concrete thin wall cylinder 3 are connected with each other;Described note
Slurry pipe 2 is no less than two;Described rubble 7 fills out core layering vibration compacting;Described injected hole 6 is uniformly distributed in Grouting Pipe 2;
Described broken stone cushion layer 5 thickness is 15cm ~ 30cm.
As shown in Fig. 2 the construction procedure that borehole thin-walled rubble fills out core slip casting pile composite foundation is:
S1, borehole equipment are in place;
S2, press the true fixed pile of design requirement, after positioning utilize borehole equipment construction stake holes 1;
S3, form armored concrete thin wall cylinder 3 in stake holes 1 section by section;
S4, with armored concrete close retaining wall cylinder bottom 4;
S5, in armored concrete thin wall cylinder 3 in the hole built-in slip casting pipe 2 and fixing;
After S6, Grouting Pipe 2 installation, fill rubble closely knit to armored concrete thin wall cylinder 3 in the hole;
After S7, step S6 terminate, the slip casting into Grouting Pipe 2, serosity enters in armored concrete thin wall cylinder 4 through injected hole 6
Core rubble 7 of filling out mix cementing and form concrete, after solidification, lay stake top broken stone cushion layer 5, that is, achieve borehole thin-walled broken
Stone fills out the construction of core slip casting pile composite foundation.
S8, late maintaining and foundation construction.
The above is only preferred implementation of the present utility model it should be understood that this utility model is not limited to herein
Disclosed form, is not to be taken as the exclusion to other embodiment, and can be used for various other combinations, modification and environment, and
Can be modified by the technology or knowledge of above-mentioned teaching or association area in contemplated scope described herein.And this area
Change that personnel are carried out and change, then all should be in rights appended by this utility model without departing from spirit and scope of the present utility model
In the protection domain requiring.
Claims (7)
1. borehole thin-walled rubble fill out core slip casting pile composite foundation it is characterised in that:It includes stake holes(1), Grouting Pipe(2), reinforcing bar
Concrete thin-wall cylinder(3), armored concrete back cover(4)With broken stone cushion layer(5), stake holes(1)Vertically arranged and stake holes(1)Setting
In ground, stake holes(1)Bottom be provided with armored concrete back cover(4), stake holes(1)Interior and be sequentially arranged many from top to bottom
Level armored concrete thin wall cylinder(3), in stake holes, it is provided with the Grouting Pipe of vertical setting(2), Grouting Pipe(2)Vertically arranged, slip casting
Pipe(2)Tube wall on and along Grouting Pipe(2)Length direction be provided with multiple injected holes(6), armored concrete thin wall cylinder(3)Interior
Fill rubble(7), described broken stone cushion layer(5)It is arranged at armored concrete thin wall cylinder(3)Top.
2. borehole thin-walled rubble according to claim 1 fill out core slip casting pile composite foundation it is characterised in that:Described every phase
Adjacent section armored concrete thin wall cylinder(3)It is connected with each other.
3. borehole thin-walled rubble according to claim 1 fill out core slip casting pile composite foundation it is characterised in that:Described reinforcing bar
Concrete sealing bottom(4)With bottom armored concrete thin wall cylinder(3)It is connected with each other.
4. borehole thin-walled rubble according to claim 1 fill out core slip casting pile composite foundation it is characterised in that:Described slip casting
Pipe(2)No less than two.
5. borehole thin-walled rubble according to claim 1 fill out core slip casting pile composite foundation it is characterised in that:Described rubble
(7)Fill out core layering vibration compacting.
6. borehole thin-walled rubble according to claim 1 fill out core slip casting pile composite foundation it is characterised in that:Described slip casting
Hole(6)It is uniformly distributed in Grouting Pipe(2)On.
7. borehole thin-walled rubble according to claim 1 fill out core slip casting pile composite foundation it is characterised in that:Described rubble
Mattress layer(5)Thickness is 15cm ~ 30cm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620972623.XU CN205999879U (en) | 2016-08-30 | 2016-08-30 | Borehole thin-walled rubble fills out core slip casting pile composite foundation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620972623.XU CN205999879U (en) | 2016-08-30 | 2016-08-30 | Borehole thin-walled rubble fills out core slip casting pile composite foundation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205999879U true CN205999879U (en) | 2017-03-08 |
Family
ID=58196169
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620972623.XU Active CN205999879U (en) | 2016-08-30 | 2016-08-30 | Borehole thin-walled rubble fills out core slip casting pile composite foundation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205999879U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108589757A (en) * | 2018-06-29 | 2018-09-28 | 湖南省第六工程有限公司 | Anti-settling foundation structure |
-
2016
- 2016-08-30 CN CN201620972623.XU patent/CN205999879U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108589757A (en) * | 2018-06-29 | 2018-09-28 | 湖南省第六工程有限公司 | Anti-settling foundation structure |
CN108589757B (en) * | 2018-06-29 | 2023-11-03 | 湖南省第六工程有限公司 | Anti-sedimentation foundation structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206941608U (en) | A kind of diaphram wall foundation pit supporting construction | |
CN108661069A (en) | Close on the wall piled anchor composite structure and method of old Retaining Wall Reinforcement under the load of river road surface | |
CN108560542A (en) | A kind of waste tire cladding builds the two-directed reinforcement and its construction method of slag | |
JP2015183364A (en) | Method for preventing soil structure from sliding at slope surface layer with geocell fixing operation auxiliary means | |
CN107503362A (en) | A kind of compound antiskid piling wall retaining structure and construction method suitable for reservoir stability | |
CN207211165U (en) | A kind of compound antiskid piling wall retaining structure suitable for reservoir stability | |
CN203361150U (en) | Composite anti-floating anchor pile | |
CN205999879U (en) | Borehole thin-walled rubble fills out core slip casting pile composite foundation | |
CN102626946A (en) | Manufacture method for concrete irregular fender post | |
WO2017133373A1 (en) | Small-diameter pile cluster used for pile foundation, and method for construction thereof | |
CN205382942U (en) | Multilayer underground space curtain posture subsurface excavated construction's supporting construction under existing facility | |
CN205024710U (en) | Adopt raft foundation structure of anti prestressed anchorage of floating cable | |
CN202672161U (en) | Cement-soil mixing drum sheet-pile united slope structure with soil nails | |
CN207092118U (en) | A kind of top carries the caisson composite foundation of oblique anchor pole | |
CN206359882U (en) | A kind of assembled solid steel tube constrains reinforced column squat pier | |
CN203256771U (en) | Semi-gravity type column and board combined retaining wall structure | |
CN205012333U (en) | Recoverable FRP stock with enlarged footing | |
CN205999890U (en) | Borehole thin-walled rubble fills out core grouting pile | |
CN203701128U (en) | Micro pile-reinforced bridge foundation and bridge | |
CN202577343U (en) | External reinforcement retaining supporting structure | |
CN206495202U (en) | A kind of top expansion type cement-soil composite pile | |
CN102433882A (en) | Construction method for forming foundation pit support through combining concrete pile wall and jet grouting anchor piles and anchor bar structural piece | |
CN207362837U (en) | A kind of concrete filled steel tube carrier pile | |
CN204418208U (en) | Anchor rod foundation | |
CN105421446A (en) | Mixed soil extruded and cured precast pile for soft foundation treatment as well as construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |