CN205999890U - Borehole thin-walled rubble fills out core grouting pile - Google Patents

Borehole thin-walled rubble fills out core grouting pile Download PDF

Info

Publication number
CN205999890U
CN205999890U CN201620972661.5U CN201620972661U CN205999890U CN 205999890 U CN205999890 U CN 205999890U CN 201620972661 U CN201620972661 U CN 201620972661U CN 205999890 U CN205999890 U CN 205999890U
Authority
CN
China
Prior art keywords
thin
rubble
armored concrete
wall cylinder
borehole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620972661.5U
Other languages
Chinese (zh)
Inventor
钟静
汪馨怡
刘薇
汪广江
冉丽琳
陈展
罗丹
秦燕
潘昱行
陈凌立
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Southwest Architectural Design and Research Institute Co Ltd
Original Assignee
China Southwest Architectural Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Southwest Architectural Design and Research Institute Co Ltd filed Critical China Southwest Architectural Design and Research Institute Co Ltd
Priority to CN201620972661.5U priority Critical patent/CN205999890U/en
Application granted granted Critical
Publication of CN205999890U publication Critical patent/CN205999890U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses borehole thin-walled rubble fills out core grouting pile, it includes stake holes(1), Grouting Pipe(2), armored concrete thin wall cylinder(3)With armored concrete back cover(4), stake holes(1)Vertically arranged, stake holes(1)Bottom be provided with armored concrete back cover(4), stake holes(1)Interior and be sequentially arranged multistage armored concrete thin wall cylinder from top to bottom(3), Grouting Pipe(2)It is arranged at armored concrete thin wall cylinder(3)Interior, Grouting Pipe(2)Above and along Grouting Pipe(2)Length direction be provided with multiple injected holes(6), armored concrete thin wall cylinder(3)Inside fill core rubble(5).The beneficial effects of the utility model are:Improve that pile work efficiency, construction noise are little, bending rigidity and anti-pressure ability are high, save rolled steel dosage 40%, save concrete 60%.

Description

Borehole thin-walled rubble fills out core grouting pile
Technical field
This utility model is related to the technical field of architectural engineering foundation pile construction, and particularly borehole thin-walled rubble fills out core slip casting Stake.
Background technology
Caisson in current engineering is because of easy construction, construction is very fast, do not need heavy mechanical equipment, has strong adaptability The advantages of, wider in the aspect range of application such as highway and civil buildings.Generally digging hole filling pile is armored concrete or plain coagulation Native solid pile, on the one hand leads to stake relatively costly because pile body diameter is larger, and the big perfusion of another aspect amount of concrete and solidification need Longer time to be consumed, is unfavorable for shortening construction period.Therefore, how to reduce while shortening construction period and be constructed into This, be the problem that those skilled in the art need to solve.
Utility model content
The purpose of this utility model is to overcome the shortcoming of existing piling technique, provides a kind of reduction construction cost, shortening The borehole that Finish time, construction noise are little, bending rigidity and anti-pressure ability are high, save rolled steel dosage 40%, save concrete 60% Thin-walled rubble fills out core grouting pile.
The purpose of this utility model is achieved through the following technical solutions:Borehole thin-walled rubble fills out core grouting pile, and it includes Stake holes, Grouting Pipe, armored concrete thin wall cylinder and armored concrete back cover, stake holes is vertically arranged, and the bottom of stake holes is provided with steel Reinforced concrete back cover, stake holes is interior and has been sequentially arranged multistage armored concrete thin wall cylinder from top to bottom, and Grouting Pipe is arranged at reinforcing bar In concrete thin-wall cylinder, in Grouting Pipe and the length direction along Grouting Pipe is provided with multiple injected holes, armored concrete thin wall cylinder Inside fill core rubble.
Described every adjacent level armored concrete thin wall cylinder is connected with each other.
Described armored concrete back cover is connected with each other with bottom armored concrete thin wall cylinder.
Described Grouting Pipe is no less than two.
Described fills out core rubble layering vibration compacting.
Described filling out is filled with cement mortar between core rubble.
This utility model has advantages below:
1)Form the multistage armored concrete thin wall cylinder being sequentially connected with using borehole reinforced concrete core-tube it is ensured that bending resistance Rigidity and anti-pressure ability and to the sidewise restraint filling out core rubble.
2)Hollow using borehole armored concrete thin wall cylinder composition fills rubble slip casting, is formed and has some strength Concrete pile body, increases bearing area.
3)Amass stake bottom using the large end face that borehole is formed, and use armored concrete back cover, give full play to the pressure-bearing of foundation soil Ability.
4)Make full use of borehole reinforced concrete core-tube and form thin-walled stake cylinder, without using large type drill construction, reduce and pass System bored concrete pile operation and time, technique is simpler, improves efficiency.
5)The cylinder stake being formed using borehole reinforced concrete core-tube, saves rolled steel dosage 40% compared with total cross-section bored concrete pile, saves Concrete 60%.
6)Pile-forming speed is fast, construction noise is little, and environmental conservation controllability is high.
Brief description
Fig. 1 is structural representation of the present utility model;
Fig. 2 is Fig. 1 top view;
Fig. 3 is construction process figure of the present utility model;
In figure, 1- stake holes, 2- Grouting Pipe, 3- armored concrete thin wall cylinder, 4- armored concrete back cover, 5- rubble, 6- notes Slurry hole.
Specific embodiment
Below in conjunction with the accompanying drawings this utility model is further described, protection domain of the present utility model be not limited to Lower described:
As shown in Figure 1 and 2, borehole thin-walled rubble fills out core grouting pile, and it is thin that it includes stake holes 1, Grouting Pipe 2, armored concrete Wall cylinder 3 and armored concrete back cover 4, stake holes 1 is vertically arranged, and the bottom of stake holes 1 is provided with armored concrete back cover 4, in stake holes 1 And it has been sequentially arranged multistage armored concrete thin wall cylinder 3 from top to bottom, Grouting Pipe 2 is arranged in armored concrete thin wall cylinder 3, note Starch on pipe 2 and the length direction along Grouting Pipe 2 is provided with multiple injected holes 6, filled core in armored concrete thin wall cylinder 3 broken Stone 5, after to casting cement serosity in Grouting Pipe 2, mixes cementing formation concrete, with armored concrete thin wall cylinder 3 with rubble Formed together and there is the large end face rubble of high load performance fill out core grouting pile.
As shown in figure 1, described every adjacent level armored concrete thin wall cylinder 3 is connected with each other it is ensured that armored concrete is thin The overall bending rigidity of wall retaining wall cylinder and anti-pressure ability;Described armored concrete back cover 4 is mutual with armored concrete thin wall cylinder 3 Connect;Described Grouting Pipe 2 is no less than two, adopts three Grouting Pipe 2 in the present embodiment;Described core rubble 5 layering of filling out is shaken Puddling is real;Described filling out is filled with cement mortar between core rubble 5.
As shown in figure 3, the construction procedure that borehole thin-walled rubble fills out core grouting pile is:
S1, borehole equipment are in place;
S2, press the true fixed pile of design requirement, after positioning utilize borehole equipment construction stake holes 1;
S3, form armored concrete thin wall cylinder 3 in stake holes 1 section by section;
S4, with armored concrete close retaining wall cylinder bottom 4;
S5, built-in slip casting pipe 2 fixation in armored concrete thin wall cylinder 3;
After S6, Grouting Pipe 2 installation, fill rubble closely knit into armored concrete thin wall cylinder 3;
After S7, step S6 terminate, the slip casting into Grouting Pipe 2, serosity enters in armored concrete thin wall cylinder 3 through injected hole 6 Rubble 5 and mix cementing formation concrete, achieve the construction that borehole thin-walled rubble fills out core grouting pile after solidification.
S8, late maintaining and foundation construction.
The above is only preferred implementation of the present utility model it should be understood that this utility model is not limited to herein Disclosed form, is not to be taken as the exclusion to other embodiment, and can be used for various other combinations, modification and environment, and Can be modified by the technology or knowledge of above-mentioned teaching or association area in contemplated scope described herein.And this area Change that personnel are carried out and change, then all should be in rights appended by this utility model without departing from spirit and scope of the present utility model In the protection domain requiring.

Claims (6)

1. borehole thin-walled rubble fill out core grouting pile it is characterised in that:It includes stake holes(1), Grouting Pipe(2), armored concrete thin Wall cylinder(3)With armored concrete back cover(4), stake holes(1)Vertically arranged, stake holes(1)Bottom be provided with armored concrete back cover (4), stake holes(1)Interior and be sequentially arranged multistage armored concrete thin wall cylinder from top to bottom(3), Grouting Pipe(2)It is arranged at reinforcing bar Concrete thin-wall cylinder(3)Interior, Grouting Pipe(2)Above and along Grouting Pipe(2)Length direction be provided with multiple injected holes(6), reinforcing bar Concrete thin-wall cylinder(3)Inside fill core rubble(5).
2. borehole thin-walled rubble according to claim 1 fill out core grouting pile it is characterised in that:Described every adjacent level reinforcing bar Concrete thin-wall cylinder(3)It is connected with each other.
3. borehole thin-walled rubble according to claim 1 fill out core grouting pile it is characterised in that:Described reinforced concrete grave Bottom(4)With bottom armored concrete thin wall cylinder(3)It is connected with each other.
4. borehole thin-walled rubble according to claim 1 fill out core grouting pile it is characterised in that:Described Grouting Pipe(2)No Less than two.
5. borehole thin-walled rubble according to claim 1 fill out core grouting pile it is characterised in that:Described fills out core rubble(5) Layering vibration compacting.
6. borehole thin-walled rubble according to claim 1 fill out core grouting pile it is characterised in that:Described fills out core rubble(5) Between be filled with cement mortar.
CN201620972661.5U 2016-08-30 2016-08-30 Borehole thin-walled rubble fills out core grouting pile Active CN205999890U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620972661.5U CN205999890U (en) 2016-08-30 2016-08-30 Borehole thin-walled rubble fills out core grouting pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620972661.5U CN205999890U (en) 2016-08-30 2016-08-30 Borehole thin-walled rubble fills out core grouting pile

Publications (1)

Publication Number Publication Date
CN205999890U true CN205999890U (en) 2017-03-08

Family

ID=58195282

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620972661.5U Active CN205999890U (en) 2016-08-30 2016-08-30 Borehole thin-walled rubble fills out core grouting pile

Country Status (1)

Country Link
CN (1) CN205999890U (en)

Similar Documents

Publication Publication Date Title
CN101775814B (en) Anti-slip cement soil pile soil blocking structure and construction method thereof
CN104988907A (en) Construction method of concrete pile
CN206941608U (en) A kind of diaphram wall foundation pit supporting construction
CN102900079A (en) High-frequency hydraulic vibratory construction method for cement-soil core-inserted combined pile
CN201857606U (en) Novel combined uplift pile
CN103603379A (en) Anti-floating system combining anti-floating cement soil pile and anti-floating anchor rod and construction process of anti-floating system
CN104563147A (en) Composite structure pile foundation applied to karst area and construction method of composite structure pile foundation
CN105297710A (en) High-pressure-jetting cement soil twist drill and reamed reinforced concrete grouting combined pile and manufacturing method
CN102626946A (en) Manufacture method for concrete irregular fender post
CN104074197A (en) Large-diameter thin-walled tubular pile composite anchor rod type foundation pit support structure and construction method thereof
CN201649076U (en) Inversed Y-type single-row unidirectional rotary spraying, mixing and reinforcing combined tangent pile
CN207484290U (en) The hollow clump of piles anchorage of super-large diameter
CN203613568U (en) Anti-floating cement soil pile and anti-floating anchor rod combined anti-floating system
CN203866852U (en) Anti-floating pile structure composited by deep spiral-spraying cement soil plate and anchor rod
CN203361150U (en) Composite anti-floating anchor pile
WO2017133373A1 (en) Small-diameter pile cluster used for pile foundation, and method for construction thereof
CN210263075U (en) Arrange bars formula tubular pile post back slip casting internal anchor outer stagnant water support system
CN205576957U (en) Stake end pilework
CN201649102U (en) U-shaped double-row unidirectional rotary jet reinforced combination stirring soldier pile
CN205999890U (en) Borehole thin-walled rubble fills out core grouting pile
CN205999879U (en) Borehole thin-walled rubble fills out core slip casting pile composite foundation
CN203594023U (en) Enhanced type long auger drilling pressure-grouting concrete pile
CN110258526A (en) The method of prefabricated diaphram wall and construct outer wall of basement and floor
CN202672161U (en) Cement-soil mixing drum sheet-pile united slope structure with soil nails
CN110067245A (en) It is a kind of can expanding reinforcing spiral self-drilling type piling bar and its method of construction