CN201092515Y - 新型高效集装箱装卸桥 - Google Patents

新型高效集装箱装卸桥 Download PDF

Info

Publication number
CN201092515Y
CN201092515Y CNU2007200832874U CN200720083287U CN201092515Y CN 201092515 Y CN201092515 Y CN 201092515Y CN U2007200832874 U CNU2007200832874 U CN U2007200832874U CN 200720083287 U CN200720083287 U CN 200720083287U CN 201092515 Y CN201092515 Y CN 201092515Y
Authority
CN
China
Prior art keywords
loading bridge
hoisting
trolley
crane
track
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007200832874U
Other languages
English (en)
Inventor
董明望
张明江
杜明
黄力军
李勋
谭道雄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN PORT (GROUP) CO Ltd
Wuhan University of Technology WUT
Original Assignee
TIANJIN PORT (GROUP) CO Ltd
Wuhan University of Technology WUT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN PORT (GROUP) CO Ltd, Wuhan University of Technology WUT filed Critical TIANJIN PORT (GROUP) CO Ltd
Priority to CNU2007200832874U priority Critical patent/CN201092515Y/zh
Application granted granted Critical
Publication of CN201092515Y publication Critical patent/CN201092515Y/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

一种新型高效集装箱装卸桥,包括一个常规集装箱装卸桥、常规装卸桥上再配置一个起重小车(后起重小车)和一个转运小车。装卸桥的横梁分为上下两层,都分别设置轨道。两个起重小车都安装在横梁上层轨道上,常规集装箱装卸桥自带起重小车(前起重小车)位于装卸桥横梁前端,后起重小车位于横梁后端;转运小车设置在装卸桥横梁的下层轨道上,位于两个起重小车之间。两个起重小车都只负责垂直方向起吊集装箱,集装箱在两个起重小车之间的水平运输由转运小车完成。在保证作业效率不低于现有双小车或双40尺集装箱起重机作业效率的同时,不会大幅增加轮压,不用改变现有码头承载能力状况,车辆组织方便。适用于集装箱码头集装箱的装卸作业。

Description

新型高效集装箱装卸桥
技术领域
本实用新型涉及一种装卸及搬运集装箱的装卸设备,特别涉及到一种新型高效集装箱装卸桥。
背景技术
世界集装箱运输的旺盛需求和集装箱船舶的大型化,对集装箱装卸技术和装备提出了更新更高的要求。
现有装卸效率较高的集装箱装卸桥有中国专利03117019.6中的双小车集装箱起重机和专利03141943.7中的可吊双40英尺箱的集装箱起重机。
专利03117019.6中的双小车集装箱起重机,它有两部起重小车,以及安置在起重机上位于大梁上的上部轨道和位于门框连续梁上的下部轨道,上下轨道分开独立设置;所述两部起重小车为在上部轨道上运行的前小车和在下部轨道上运行的后小车;所述起重机的海侧下横梁靠陆侧一边设置有集装箱中转平台,以安放来自前小车和后小车起吊运送来的集装箱。由于采用的是焊接一体的结构形式,自重太大,腿压大大增加,对码头前沿的承载能力要求高,造价昂贵。
专利03141943.7中的可吊双40英尺箱的集装箱起重机包括二套独立的吊具主起升机构和钢丝绳缠绕系统,以及二个吊具连同驱动油缸,在吊具上架配置有滑轮,在小车上配置二套起升滑轮组。第一吊具主起升机构和第二吊具主起升机构分别装有卷筒、吊具起升机构电机、制动器和吊具起升减速器,二套吊具主起升机构同步运行,第一吊具与第二吊具通过连接油缸实现二个吊具的收拢与分离。该发明采用二个独立吊具,用油缸实现二个吊具的分离、高低差、平移、夹角和脱离的功能,可吊起二个40英尺集装箱,也可使油缸脱开,实现二个吊具的独立操作。由于一次起重二个40英尺集装箱,吊具下重量增大,对码头前沿地面承载要求较高,而且起重机轨距内车道安排麻烦,交通组织复杂。
发明内容
本实用新型的目的是提供一种能解决现有常规集装箱装卸桥装卸效率低、双小车或双40尺集装箱装卸桥对码头要求高问题的新型高效集装箱装卸桥,它不改变现有的码头承载能力状况,码头基础设施不需进行改造就可以直接使用,大大的降低了码头的建设投资。
本实用新型的目的是这样实现的:
包括一个常规集装箱装卸桥、常规装卸桥上再配置一个起重小车(后起重小车)和一个转运小车。装卸桥的横梁分为上下两层,都分别设置轨道。两个起重小车都安装在横梁上层轨道上,常规集装箱装卸桥自带起重小车(前起重小车)位于装卸桥横梁前端,后起重小车位于横梁后端;转运小车悬挂在装卸桥横梁的下层轨道上,位于两个起重小车之间。两个起重小车都只负责垂直方向起吊集装箱,集装箱在两个起重小车之间的水平运输由转运小车完成。
转运小车既可以悬挂在下层轨道上,也可以放置在下层轨道上面行驶。
工作时(以卸船为例,装船为逆过程),常规装卸桥1上的前起重小车2从船上取箱,水平移动一个箱位后,将集装箱放到悬挂在下层轨道4上的转运小车6上,然后取下一个集装箱,这时转运小车6将集装箱运送到横梁后端的后起重小车3下方,后起重小车3将集装箱吊起,转运小车6返回前起重小车2处,等待运送下一个集装箱,同时,后起重小车3将集装箱放到位于装卸桥下方的集卡7或集卡8上,完成一次卸箱操作。
与现有集装箱起重机相比,本实用新型在装卸集装箱时,将常规集装箱起重机由一个起重小车完成集装箱装卸操作的过程分为3个环节,两个起重小车和一个转运小车各负其责,有效地提高了集装箱装卸效率。
本实用新型在保证作业生产率不低于现有双小车或双40尺集装箱起重机作业效率的同时,不会增加轮压,不用改变现有码头承载能力状况;此外,岸桥两条轨道内的集卡数量无须增加,车辆交通组织方便。
附图说明
附图是本实用新型的结构示意图。
图中:1.常规集装箱装卸桥,2.前起重小车,3.后起重小车,4.下层轨道,
5.上层轨道,6.转运小车,7.集卡,8.集卡
具体实施方式
参看附图,本实用新型配置有一个常规集装箱装卸桥1,自带有一个前起重小车2,另外再配置一个后起重小车3和转运小车6。常规装卸桥横梁上设置上层轨道5和下层轨道4,前起重小车2和后起重小车3都安装在横梁上层轨道5上,分别位于横梁的前端和后端。转运小车6悬挂在横梁下层轨道4上,位于前起重小车2和后起重小车3之间。

Claims (3)

1.一种新型高效集装箱装卸桥,包括一个常规集装箱装卸桥(1),常规集装箱装卸桥(1)的横梁分别设置上层轨道(5)和下层轨道(4),前起重小车(2)位于常规集装箱装卸桥(1)横梁前端,其特征在于:在常规集装箱装卸桥(1)横梁上层轨道(5)上再配置一个后起重小车(3)和一个转运小车(6);后起重小车(3)位于横梁后端,转运小车(6)设置在常规集装箱装卸桥(1)横梁的下层轨道(4)上,位于前起重小车(2)和后起重小车(3)之间。
2.根据权利要求1所述的新型高效集装箱装卸桥,其特征在于:转运小车(6)悬挂在下层轨道(4)上。
3.根据权利要求1所述的新型高效集装箱装卸桥,其特征在于:转运小车(6)放置在下层轨道上面(4)行驶。
CNU2007200832874U 2007-01-23 2007-01-23 新型高效集装箱装卸桥 Expired - Fee Related CN201092515Y (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007200832874U CN201092515Y (zh) 2007-01-23 2007-01-23 新型高效集装箱装卸桥

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007200832874U CN201092515Y (zh) 2007-01-23 2007-01-23 新型高效集装箱装卸桥

Publications (1)

Publication Number Publication Date
CN201092515Y true CN201092515Y (zh) 2008-07-30

Family

ID=39900479

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007200832874U Expired - Fee Related CN201092515Y (zh) 2007-01-23 2007-01-23 新型高效集装箱装卸桥

Country Status (1)

Country Link
CN (1) CN201092515Y (zh)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102139831A (zh) * 2011-01-25 2011-08-03 三一集团有限公司 集装箱起重机及其装箱和卸箱方法
CN103395634A (zh) * 2013-08-06 2013-11-20 天津港(集团)有限公司 集装箱岸边装卸系统及其装卸方法
CN103407900A (zh) * 2013-07-30 2013-11-27 华电重工股份有限公司 一种港口集装箱高效装卸系统及工艺
CN103523681A (zh) * 2013-10-29 2014-01-22 上海公茂起重设备有限公司 双樑移动式集装箱装卸桥
CN103803433A (zh) * 2012-11-06 2014-05-21 青岛理工大学琴岛学院 搬运设备
CN103818832A (zh) * 2014-02-11 2014-05-28 华电重工股份有限公司 一种具有升降式桁架大梁和三小车的岸桥
CN104261144A (zh) * 2014-10-11 2015-01-07 华电重工股份有限公司 一种穿越式双小车岸桥装卸系统及方法
CN105480868A (zh) * 2015-12-25 2016-04-13 三一海洋重工有限公司 集装箱起重机
CN105819342A (zh) * 2016-05-06 2016-08-03 三海洋重工有限公司 用于集装箱装卸的岸桥

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102139831A (zh) * 2011-01-25 2011-08-03 三一集团有限公司 集装箱起重机及其装箱和卸箱方法
CN103803433A (zh) * 2012-11-06 2014-05-21 青岛理工大学琴岛学院 搬运设备
CN103407900A (zh) * 2013-07-30 2013-11-27 华电重工股份有限公司 一种港口集装箱高效装卸系统及工艺
CN103395634A (zh) * 2013-08-06 2013-11-20 天津港(集团)有限公司 集装箱岸边装卸系统及其装卸方法
CN103395634B (zh) * 2013-08-06 2016-01-20 天津港(集团)有限公司 集装箱岸边装卸系统及其装卸方法
CN103523681A (zh) * 2013-10-29 2014-01-22 上海公茂起重设备有限公司 双樑移动式集装箱装卸桥
CN103523681B (zh) * 2013-10-29 2015-09-30 上海公茂起重设备有限公司 双樑移动式集装箱装卸桥
CN103818832A (zh) * 2014-02-11 2014-05-28 华电重工股份有限公司 一种具有升降式桁架大梁和三小车的岸桥
CN104261144A (zh) * 2014-10-11 2015-01-07 华电重工股份有限公司 一种穿越式双小车岸桥装卸系统及方法
CN105480868A (zh) * 2015-12-25 2016-04-13 三一海洋重工有限公司 集装箱起重机
CN105819342A (zh) * 2016-05-06 2016-08-03 三海洋重工有限公司 用于集装箱装卸的岸桥

Similar Documents

Publication Publication Date Title
CN201092515Y (zh) 新型高效集装箱装卸桥
US7731041B2 (en) Gantry stacker with two side-by-side spreaders
CN100460305C (zh) 轨道式双小车龙门型集装箱起重机
CN201932840U (zh) 半牵引小车式轻型门式起重机
CN102616666A (zh) 半牵引小车式轻型门式起重机
CN106627603B (zh) 一种多式联运互通控制系统
CN106828250B (zh) 多功能自装卸装备
CN103072902B (zh) 双大梁岸边集装箱起重机
WO2014169732A1 (zh) 集装箱码头用穿梭搬运车系统及其运送集装箱的方法
CN105174072A (zh) 解决自动化集装箱码头agv与岸桥互等的装卸方法及岸桥
CN105000480A (zh) 一种双主小车的集装箱起重机
CN204778506U (zh) 一种双主小车的集装箱起重机
CN103318771A (zh) 具有三套小车的岸边起重机
CN103407900B (zh) 一种港口集装箱高效装卸系统及工艺
CN102849470B (zh) 一种钢箱梁节的装船方法
CN203359826U (zh) 具有三套小车的岸边起重机
CN203624883U (zh) 一种箱式随车起重机
CN100341771C (zh) 可吊双40英尺箱的双小车集装箱起重机
CN105417394A (zh) 岸边集装箱起重机
CN103466459B (zh) 跨海集装箱装卸工艺及带有跨海栈桥的集装箱装卸系统
CN102030289A (zh) 袋装货物推拉器
CN201850117U (zh) 袋装货物推拉器
CN107724194A (zh) 用于对物流运输车导向的导向轨及其配套装置
CN203529773U (zh) 一种港口集装箱高效装卸系统
CN203568713U (zh) 可升降大梁三小车岸桥

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080730

Termination date: 20160123

EXPY Termination of patent right or utility model